INSTALLATION INSTRUCTIONS

Similar documents
AHWG Remote Mount Hot Water Generator Module for TTP Series Outdoor Split Unit

AHWG Remote Mount Hot Water Generator Module

Earth Loop Fluid Temperatures F Ground Water Fluid Temperatures 45-75

Earth Loop Fluid Temperatures F Ground Water Fluid Temperatures 45-75

EARTHLINKED GEOTHERMAL RENEWABLE ENERGY SYSTEMS MAINTENANCE GUIDE

CAH SERIES INSTALLATION & MAINTENANCE MODELS CAH CAH

INSTALLATION INSTRUCTIONS GPM SERIES LOOP PUMP MODULES

GEOTEC GV Series High Efficiency Geothermal/Water Source Packaged Step-Capacity Heat Pump R-410A

INSTALLATION INSTRUCTIONS

4201 Lien Rd Madison, WI Owner s Manual Therma-Stor III Heat Recovery System. Installation, Operation & Service Instructions

EarthLinked Model DSH-1872 Desuperheater Kit

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL ECO 18 ECO 24 ECO 27 IMPORTANT SAFETY INFORMATION

PCAH SERIES AIR HANDLER

> HGA AIR - WATER HEAT PUMPS FOR OUTDOOR INSTALLATION. Available range. Unit description. Options. Accessories

Installation and Service Manual. In-Floor Warming Module external desuperheater for 3rd party air source heat pumps

PATENT PENDING WATER SOURCE HEAT PUMPS INSTALLATION INSTRUCTIONS. Earth Loop Fluid Temperatures Ground Water Temperatures MODELS:

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL AUTOBOOSTER IMPORTANT SAFETY INFORMATION

Partner. Peerless. Indirect-Fired. Water Heater. Installation, Operation & Maintenance Manual

Heat Recovery Module Installation Manual for

PRE INSTALLATION PROCEDURES

INSTALLATION INSTRUCTIONS TEC40 ELECTRONIC CONTROLLER

SERVICING PROCEDURE R-410A LEAK TEST EVACUATION CHARGING. Bard Manufacturing Company, Inc. Bryan, Ohio Manual Page 1 of 11

1. Included Accessories. Installation Manual. System Controller SC-201-6M-EXT(-OD, -DVC) Requests to Installers

TWINTEMP JR. HYDRONIC SYSTEM 2/2013

INSTALLATION INSTRUCTIONS FOR 6797A737 HEAT PUMP FLUSH MOUNT CEILING PLENUM

INSTALLATION INSTRUCTIONS FOR 7370A736 FLUSH MOUNT CEILING PLENUM

INSTALLATION MANUAL GEO-BOOST GROUND LOOP HEAT EXCHANGER

INSTALLATION INSTRUCTIONS MASTER CONTROLLERS MC91AE MC92AE MC93AE MC94AE MC94AEH MC96AEH MC97AE-1

INSTALLATION INSTRUCTIONS WALL MOUNTED PACKAGE AIR CONDITIONERS WA121

SERVICE MANUAL VC3ED FULL SIZE ELECTRIC CONVECTION OVEN - NOTICE -

6 Zone 120/60/1vac 3A 24 VAC class 2 2 x 40 VA 2 x 5 amp fuses 1/6 hp, 120 VAC

Niles Steel Tank Hot Water Generator Installation and Operation Manual

INSTALLATION INSTRUCTIONS ENERGY RECOVERY VENTILATOR WITH EXHAUST

Q - Series Boiler. Troubleshooting Manual

Armstrong Flo-H2O Water to Water Instantaneous Heater Installation and Maintenance & Operation

Heat Pump Water Heater. Table of Contents

INSTALLATION INSTRUCTIONS MASTER CONTROLLERS MC91AE MC92AE MC93AE MC94AE MC94AEH MC96AEH

Owner s Manual Therma-Stor II Heat Recovery System

INSTALLATION MANUAL GEO-BOOST GROUND LOOP HEAT EXCHANGER

Water Heaters. Solar Applications

GUIDE SPECIFICATIONS AQUARIUS ii

Installation, Operating, and Maintenance Manual

Service Manual. Models 17700/17701/17703 Recovery/Recycling/Recharging Unit For R-12 Only

INSTALLATION INSTRUCTIONS FOR 8330*633* COOL ONLY A/C 8330*635* HEAT READY A/C 8530*63** HEAT PUMP CHILLGRILLE FLUSH MOUNT CEILING ASSEMBLY

SM Field Installed Electric Heat Kit

PRE INSTALLATION PROCEDURES

ARTESIAN 220 & 340 Instantaneous Indirect Water Heater By Dunkirk Boilers INSTALLATION AND OPERATING INSTRUCTIONS ENGINEERING MANUAL

TRI-PLATE B INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS PART NO EFFECTIVE MARCH 1, 1983 REPRINT APRIL 16, 1999

CodeNotes. Solar Water Heating Systems Based on the 2015 International Solar Energy Provisions. Introduction. Solar Water Heating System Designs

MANUAL RESET ALARM RELEASE

SECTION 7 AIR CONDITIONING (COOLING) UNIT 39 CONTROLS

SECTION 7 AIR CONDITIONING (COOLING) UNIT 39 CONTROLS UNIT OBJECTIVES UNIT OBJECTIVES. After studying this unit, the reader should be able to

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL FOR THE HUBBELL MODEL TX / HX TANKLESS WATER HEATER

INSTALLATION INSTRUCTIONS WINTER/SUMMER KIT

GUIDE SPECIFICATIONS AQUARIUS ii

INSTALLATION INSTRUCTIONS FOR 7330C740 FLUSH MOUNT CEILING ASSEMBLY

Installation & Operation Manual Models: TSU

SYSTEM DESIGN REQUIREMENTS

NO. 15FD-742 ISSUED: AUG. 10, 2007 REVISED: SEP. 30, 2013 HOSHIZAKI SELF-CONTAINED CRESCENT CUBER KM-30A KM-35A KM-50A KM-75A MODEL SERVICE MANUAL

SECTION 8 AIR SOURCE HEAT PUMPS UNIT 43 AIR SOURCE HEAT PUMPS

GEOTHERMAL HYDRONIC CONTROL MODULE By TERRA-THERM, INC.

INSTALLATION INSTRUCTIONS FOR 8330*63**, 8530*63** CHILLGRILLE FLUSH MOUNT CEILING ASSEMBLY

INSTALLATION INSTRUCTIONS

GTIP60 ISO GT Series, Inch Pounds - 60 Hz GT (iso) Spec Guide Drawings Spec Sheets Low Temp Heating P/T Charts

KITS COMMON TO HEATING AND COOLING EQUIPMENT 504,652M 03/04. Supersedes 503,249M

Installation Instructions

Ocean Breeze Split System. General Installation Manual. Ocean Breeze 2951 SE Dominica Terrace Stuart, Florida Tel:

Unit 3 Machine Composition

Heat Transfer Products, Inc. 120 Braley Road East Freetown, MA The first totally integrated multiple boiler management control.

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL FOR THE HUBBELL MODEL JTX TANKLESS BOOSTER HEATER ELECTRIC HEATER COMPANY

Installation and Operation Guide

INDIRECT FIRED WATER HEATERS

347002K/177002K/34900

ECO1ZN3P, ECO2ZN4P ECO

water source / fan coils

AMERICAN EQUIPMENT SYSTEMS A Division Of Trevor-Martin Corporation th Terrace North Clearwater, Florida 33762

ECAH SERIES ECM AIR HANDLER

CWS AIR-CONDITIONERS

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

Surna 25-Ton Chiller Operating & Maintenance Manual

EarthLinked STORAGE WATER HEATER / HYDRONIC BUFFER TANK MODELS GSTE-60, GSTE-80 & GSTE-119

Method to test HVAC equipment at part load conditions

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

Installation Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL FOR THE HUBBELL MODEL JTX / JHX TANKLESS BOOSTER HEATER

RECOMMENDED PROCEDURES FOR THIRD-PARTY PREVENTATIVE MAINTENANCE PROVIDERS

be liable for any other loss or damage, whether direct, indirect, incidental or consequential.

INSTALLATION INSTRUCTIONS

Parts Manual. Counter Type Electric Convection Steamer. Series: SteamCraft Models 21CET East 179 th Street Cleveland, Ohio 44110

MAC N-407 Air-Cooled Chiller

INSTALLATION MANUAL. Domestic hot water tank for air to water heat pump system EKHTS200A EKHTS260A EKHTSP200AA EKHTSP260AA

3 TON Heating Performance Data TON Cooling Performance Data TON Heating Performance Data TON Cooling Performance Data...

INSTALLATION INSTRUCTIONS FOR MODELS 16NG50-6/16LP50-6, 16NG60-6/16LP60-6, 20NG50-6/20LP50-6, 20NG60-6/20LP60-6, 26NG50-6/26LP50-6, 26NG60-6/26LP60-6

Indesit Company. Multiplo 2008 Jaeger Platform. Fabriano, May 2008

Installation, operating and servicing instructions

Packaged Instantaneous Domestic Hot Water Generator Energy Source: Boiler Water

Use & Care Manual. Electric Tankless Water Heaters. With Installation Instructions for the Installer AP15447 (10/10)

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

CWA2 Chilled Water Fan Coil With or Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000-60,000 BTUH

Transcription:

INSTALLATION INSTRUCTIONS GVDM-26 DOMESTIC HOT WATER DESUPERHEATER PUMP MODULE KIT BMC, Inc. Bryan, Ohio 43506 Manual: 2100-546C Supersedes: 2100-546B Date: 4-18-16 Page 1 of 11

CONTENTS General... 3 Description... 3 Location... 3 Electrical Connection... 3 Soldering Tubing... 3 Installation Procedure General... 3 Operation of the Heat Recovery Unit... 4 Start Up and Check Out... 4 Maintenance... 4 Control Board Sequence of Operation... 10 WIRING DIAGRAM...5 FIGURES Figure 1 Mounting Directly onto Unit... 6 Figure 2 Air Purge Port... 7 Figure 3 Remote Mounting & Piping... 8 Figure 4 Single Tank System... 9 Figure 5 Thermistor... 10 Figure 6 Replacement Parts... 11 Page 2 of 11

GENERAL The pump module kit should only be installed by trained technicians. These instructions serve as a guide to the technician installing the pump module kit. They are not intended as a step-by-step procedure with which the mechanically inclined owner can install the unit. DESCRIPTION The system is designed to heat domestic water using heat recovered from a water source unit s hot discharge gas. LOCATION There are two options for the mounting location of the GVDM-26 Domestic Hot Water Desuperheater Module. First, there are pre-punched mounting holes for it on the side of the geothermal heat pump beneath the filter rack. Factory supplied in the kit are interconnect tubes that connect the pump module to the water source unit (see Figure 1 on page 6). The second is to locate the GVDM-26 on a wall adjacent to the geothermal unit or storage tank/water heater (see Figures 3 and 4 on pages 8 and 9.) Because of potential damage from freezing or condensation, the unit must be located in a conditioned space; therefore, the GVDM-26 must be installed indoors. Locate the storage tank as close to the geothermal heat pump and pump module as the installation permits. Keep in mind that water lines should be a maximum of 25" long measured one way. Also, the vertical lift should not exceed 20". This is to keep pressure and heat losses to a minimum. ELECTRICAL CONNECTION Line Voltage Connections The GVDM-26 is equipped with a standard 115V 3-prong plug. The unit is rated at.9 amps and can normally be plugged into any convenient electrical outlet. NOTE: Make sure outlet is grounded, and that the circuit will handle the added load. If this is a concern, run a separate grounded circuit to the main panel. Low Voltage Connections Protruding from the bottom of the GVDM-26 are three wires (yellow, red and black) that need tied into the 24 volt terminal strip of the GV**S1 so the wall thermostat initiates the desuperheater pump module. Yellow Needs to be connected to Y1 of the low voltage terminal strip. Red Black Needs to be connected to R of the low voltage terminal strip. Needs to be connected to C of the low voltage terminal strip. SOLDERING TUBING NOTE: The inlet (black wire) and outlet (red wire) thermistors should be removed from the tubes prior to soldering/brazing operation so they are not damaged. They are clipped onto the DSH COIL INLET and from DSH OUTLET tubes of the GVDM-26 Module. Once soldering operations are complete and the tubes have cooled, reattach the sensors and wrap with provided insulation. INSTALLATION PROCEDURE GENERAL Before beginning the installation, turn off all power supplies to the water heater and unit and shut off the main water supply line. Two Tank Installation In order to realize the maximum energy savings from the heat recovery system, it is recommended that a second water storage tank be installed in addition to the main hot water heater. Fossil fuel fired water heaters must be a two-tank installation. Tanks specifically intended for hot water storage are available from water heater manufacturers (solar hot water storage tanks). A well insulated electric water heater without the electric heating elements will also make a suitable storage tank. The size of storage tank should be as large as space and economy permit but in no event should it be less than 1/2 of the daily water requirements for the occupants. As a guide in estimating the daily family water requirements, the Department of Energy recommends a figure of 16.07 gallons of hot water per day per individual. For example, a family of four would require 64.3 gallons per day (4 x 16.07). One Tank Installation The single hot water tank may be a new hot water heater (sized to 100% of daily water requirements) or the existing water heater in the case of a retrofit installation. The existing water heater should be drained and flushed to remove all loose sediment. This sediment could damage the circulating pump. The bottom heating element should be disconnected. NOTE: Make sure water heater thermostats are set below 125 on one tank unit. Page 3 of 11

Water Piping All water piping must adhere to all state and local codes. Refer to piping diagrams for recommended one and two tank installations. Piping connections are 1/2" nominal copper plumbing. A cleanable Y type strainer should also be included to collect any sediment. WARNING Never alter or plug factory-installed pressure relief valve on water heater or auxiliary tank. OPERATION OF THE HEAT RECOVERY UNIT The pump module is a very simple device containing basic controls and a circulating pump. Heat is transferred from the hot refrigerant (discharge gas) to the cool water. The operation of the desuperheater pump module is controlled first by the operation of the geothermal heat pump and secondly by internal controls within the pump module. A low voltage signal from thermostat Y is connected to the internal control board of the GVDM-26 and acts as the primary on/off switch for the circulating pump. Also connected to this board is a temperature overlimit device which shuts down the GVDM-26 once inlet water has exceeded 125 so the water cannot create a scald condition. There are also two thermistor sensors connected to the control board. These thermistors are measuring and controlling to ensure there is a positive heat differential across the water being circulated. When operating in part load condition, there are certain conditions (ground loop temperatures versus hot water temperatures) that potential exists where heat could transfer from the hot water into the refrigeration system instead of the refrigeration system into the hot water. Through the control board logic, these thermistors ensure there is at least 2 positive differential between entering/leaving water temperatures and will shut down the pump accordingly. START UP AND CHECK OUT Be sure all shut off valves are open and all power supplies are on. Open a hot water faucet to permit any air to bleed from the plumbing. NOTE: The inherent design of this pump for maximum efficiency means this pump is not self-priming. It is imperative to check that the air has been adequately bled from the system. There is a bleed port built into the pump module that can be utilized after the system water has been fully restored. See Figure 2 o page 7 for this bleed port location. Turn ON the air conditioning system and verify the circulating pump will operate. Feel the Water to Unit and Water from Water Heater tubes for noticeable difference in temperature. Turn OFF the system and verify that the circulating pump stops. NOTE: When checking the refrigerant operating pressures of the ground source heat pump. The GVDM-26 must be turned off. With the GVDM-26 operating a wide variance in pressures can result, giving the service technician the indication there is a charge problem when the unit is operating correctly. MAINTENANCE Cleaning the Heat Exchanger If scaling of the coil is strongly suspected, the coil can be cleaned with a solution of phosphoric acid (food grade acid). Follow the manufacturer s directions for the proper mixing and use of cleaning agent. Page 4 of 11

WIRING DIAGRAM GV**S1 LOW VOLTAGE TERMINAL STRIP Y1 R C 24 VAC YELLOW RED BLACK BLACK WHITE R C 24VAC L N POWER PUMP OUTLET 3 AMP FUSE CONTROL LOGIC NO NC C Y TSTAT WATER SENSORS OUTLET INLET DESUPERHEATER PUMP CONTROL BLACK BLACK RED RED THERMISTOR THERMISTOR LINE VOLTAGE OVER TEMP. LIMIT N L PUMP MOTOR GREEN WHITE BLACK RED RED FACTORY WIRING FIELD WIRING WALL PLUG BI-METAL TEMPERATURE LIMIT 4053-113 C Page 5 of 11

FIGURE 1 Mounting Directly Onto Unit FILTER ASSEMBLY DESUPERHEATER PUMP MODULE ATTACH TO UNIT USING PROVIDED SCREWS INLET AND OUTLET TUBES SUPPLIED WITH PUMP MODULE MIS-2647 A Page 6 of 11

FIGURE 2 Air Purge Port NOTE: TO AVOID DAMAGE BEFORE BRAZING MAKE SURE INLET AND OUTLET THERMISTORS ARE NOT CLIPPED TO TUBES. AFTER BRAZING IS COMPLETE, INSTALL THERMISTORS TO INLET AND OUTLET TUBES AS SHOWN AIR PURGE PORT NOTE: PUMP IS NOT SELF-PRIMING, IT I S RECOMMENDED TO MANUALLY BLEED-OFF AIR. INLET OUTLET RED WIRE OUTLET THERMISTOR BLACK WIRE FROM DSH COIL OUTLET INLET THERMISTOR AFTER BRAZING ATTACH OUTLET THERMISTOR TO INLET TUBE WITH CLIP AS SHOWN TO DSH COIL INLET AFTER BRAZING ATTACH INLET THERMISTOR TO OUTLET TUBE WITH CLIP AS SHOWN WRAP WITH PROVIDED INSULATION VERIFY THERMISTOR CONNECTION ON CIRCUIT BOARD (INLET) WRAP WITH PROVIDED INSULATION VERIFY THERMISTOR CONNECTION ON CIRCUIT BOARD (OUTLET) 7960-583 C Page 7 of 11

Page 8 of 11 FIGURE 3 Remote Mounting and Piping

FIGURE 4 Single Tank System Page 9 of 11

CONTROL BOARD SEQUENCE OF OPERATION The desuperheating control board will make a determination whether or not to energize the pump relay inclusive on the control board. A. It will constantly monitor inputs from two temperature sensors, inlet and outlet water sensors. B. It will constantly monitor the Y signal. C. Upon acknowledgment of Y signal, and following 2 minutes, the control board will energize the pump relay. D. After 1½ minutes, based on temperature difference between outlet and inlet sensors, and the presence of Y signal, the following will take place: 1. If temperature difference is greater than 3 F, the control will continue to energize pump relay. 2. If temperature difference is less than 3 F, the control will de-energize the pump relay. 3. The control will wait for 10 minutes before repeating Step 1 (above). E. The over temperature limit switch is placed in series with the line voltage. Therefore, continuity between L of line voltage and L of pump output is forced broken when the over temperature limit switch opens (see wiring diagram on page 5). F. The 3-amp fuse is put in series with the R connection to the board. Whenever the fuse is blown, the control will lose power and consequently, the relay will disengage. FIGURE 5 Thermistor Temperature (F) vs Resistance (R) of Temperature Sensor F R F R 53.0 19374 89.0 7507 52.0 18867 90.0 7334 53.0 18375 91.0 7165 54.0 17989 92.0 7000 55.0 17434 93.0 6840 56.0 16984 94.0 6683 57.0 16547 95.0 6531 58.0 16122 96.0 6383 59.0 15710 97.0 6239 60.0 15310 98.0 6098 61.0 14921 99.0 5961 62.0 14544 100.0 5827 63.0 14177 101.0 5697 64.0 13820 102.0 5570 65.0 13474 103.0 5446 66.0 13137 104.0 5326 67.0 12810 105.0 5208 68.0 12492 106.0 5094 69.0 12183 107.0 4982 70.0 11883 108.0 4873 71.0 11591 109.0 4767 72.0 11307 110.0 4663 73.0 11031 111.0 4562 74.0 10762 112.0 4464 75.0 10501 113.0 4367 76.0 10247 114.0 4274 77.0 10000 115.0 4182 78.0 9760 116.0 4093 79.0 9526 117.0 4006 80.0 9299 118.0 3921 81.0 9077 119.0 3838 82.0 8862 120.0 3757 83.0 8653 121.0 3678 84.0 8449 122.0 3601 85.0 8250 123.0 3526 86.0 8057 124.0 3452 87.0 7869 88.0 7686 Page 10 of 11

FIGURE 6 Replacement Parts 2 1 3 4 5 6 8 7 MIS-2669 B Drawing No. Part No. Description 1 S127-374-4 Base 2 8402-182 Water Temperature Limit 3 113-371 Control Board Bracket 4 8201-114 Desuperheater Control Board 5 8614-045 Fuse 3-Amp Violet 6 8408-043 Outlet Thermistor 7 8408-040 Inlet Thermistor 8 8300-010 Circulating Pump NS S133-200-4 Cover Page 11 of 11