STEAM DISTRIBUTORS ASD / BSD / CSD. Installation Manual C

Similar documents
Steam Distribution. Installation Manual. Includes installation instructions for steam distributions ASD/BSD/CSD/RSD/SSD.

READ AND SAVE THESE INSTRUCTIONS

NHRS Series RESISTIVE ELEMENT STEAM HUMIDIFIER. Engineering Manual. Manual No. H

READ AND SAVE THESE INSTRUCTIONS

Help. Help Software Tutorial. Building a Load Sizing Project with an NH-EL Humidifier and CSD Distributor.

Installation, Operation, Maintenance, Spare Parts, and Exploded Views Guide

SETC Outdoor. Supplemental Installation and Spare Parts Manual

Help. Help Software Tutorial. Building a Load Sizing Project with an SETC Humidifier and a mini SAM-e Distributor

Pressure Steam Humidifiers. Designed to deliver reliable humidity from facility steam boilers. Live Steam

Installation, Operation, Maintenance and Troubleshooting Guide

Pressure Steam Humidifiers LS SERIES. humidity.com

SAM-e - Short Absorption Manifold Submittal Drawings

READ AND SAVE THESE INSTRUCTIONS

Installation and Operation Guide

NH Series. Installation and Operation Manual

Installation, Operation, Maintenance, Spare Parts, and Exploded Views Guide

NH Series. Electric Steam Humidifiers. Designed for installation flexibility while maintaining precise humidification control

INSTY-PAC EXTERNAL MOUNT MULTIPLE TUBE ASSEMBLY

Atomizing Nozzle Humidifiers. Designed for Air Handling Systems, and Manufacturers, Processors and Distributors of Humidity Sensitive Products.

Quick Start Installation Guide

SE Series. Installation and Operation Manual

Armstrong ExpressPack Multi-Tube Steam Dispersion Panel Assembly and Installation Instructions

MES2. Installation and Operation Manual

NH Series. Installation and Operation Manual

NH Series Electric Steam Humidifiers

Drain Cooler Water tempering device

CUFFED FAST-PAC EXTERNAL MOUNT MULTIPLE TUBE ASSEMBLY

IMPORTANT! Read and save these instructions. This manual to be left with the equipment.

SE Series. Installation and Operation Manual

MANUAL 8/12/05. Model BKP TM 100 INSTALLATION, OPERATION & MAINTENANCE. Commercial High Efficiency Heat Pipe Dehumidifier

WMWLB / WMWFM / WTWLB / WTWFM Series Hydronic Heating Unit

THE BOARD 100IB / 200IB HOME IRONING BOARD INSTRUCTION MANUAL

RH2+ Installation and Operation Manual

INSTALLATION MANUAL. Gas-fired Steam Humidifier Nortec GS. IMPORTANT! Read and save these instructions. This manual to be left with the equipment.

Compressed Air Dryer

Design Criteria. Installation

Model CV-1FR Riser Check Valves 2 to 12 Inch (DN50 to DN300) General Description. Installation. Technical Data. Page 1 of 6 OCTOBER 2010 TFP950

MH Series EVAPORATIVE HUMIDIFIER/COOLER. Installation Manual A

Condair SETC. Steam Exchange Humidifier

CONTACTING CONDUCTIVITY BOILER SENSORS Instruction Manual

GS Series. Gas Steam Humidifiers. Designed for air handling systems and for areas requiring individual humidification control

Model A Pipe Line Strainer 3, 4, 6, 8 & 10 Inch (DN80, DN100, DN150, DN200 & DN250) 175 psi (12,1 bar) General Description.

GS Series. Installation and Operation Manual

Installation, Operation, Maintenance and Troubleshooting Guide

Steam Humidifier Fan Pack Installation & Maintenance Instructions

Insty-Pac Steam Humidifiers

Series ELO-231 Upright and Pendent Sprinklers. Standard Response, Standard Coverage, General Description

SACKSAFOAM QUICK FILL OPERATIONS MANUAL 2019A

INDOOR, SUSPENDED, STEAM OR HOT WATER HYDRONIC UNIT HEATER FOR VERTICAL OR HORIZONTAL CONFIGURATION

1.3 REFERENCES A. ANSI/NFPA 70 - National Electrical Code. B. ARI Commercial and Industrial Humidifiers.

Installation, User & Maintenance Guide

GETZ MANUFACTURING PART # CYLINDER DRYER

Series EC-11 and EC-14 Sprinklers, 11.2 K and 14.0 K Upright, and Pendent Extended Coverage Light and Ordinary Hazard General Description

Quick-Start Operating Guide Document No Acrylic Vacuum Chambers Copyright 2010 Terra Universal Inc. All rights reserved. Revised October 2010

Getting Rid of Scale. Nortec RS Series Steam humidifier with patented scale management. Humidification and Evaporative Cooling

BX Series. Installation, Operation, Maintenance Instructions & Spare Parts

Model/Sprinkler Identification Number JULY, 2011 WARNINGS

INSTY-PAC EXTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY

Series ELO-231B 11.2 K-factor Upright and Pendent Sprinklers. Standard Response, Standard Coverage, General Description

INSTY-PAC INTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY

MODEL CDB8 INSTALLATION INSTRUCTIONS

QAS SERIES PLUG-IN CONTROLLERS c/w SOLID STATE SENSOR

Blade Series Heat Exchanger Operation and Installation

QAS-101 SERIES SINGLE CHANNEL CONTROLLERS

TrueClean ToteCleaner

TITAN FLOW CONTROL, INC.

DESIGNED BY FIRE FIGHTERS FOR FIRE FIGHTERS.

Model/Sprinkler Identification Numbers

Product Handbook 2008

MN908 No. 282C Replaces 282B LB7013

1/24/01 SYLVANIA Process Heat FOR SAFETY AND LONG HEATER LIFE, CAREFULLY READ THIS MANUAL BEFORE USE.

Installation and Operating Guide Document No Vacuum Chambers Copyright 2017 Terra Universal Inc. All rights reserved.

SKR series Steam Humidifier Kit N (Patent Pending)

IAQ Series. Bosch IAQ Photo Catalytic Oxidizer (PCO) Residential Application. Installation Manual and Owner s Guide

Series TY-B & TY-FRB, 10 mm Orifice, ISO 7/1-R3/8 Upright, Pendent, and Recessed Pendent Sprinklers Standard and Quick Response General Description

Series TY-B 2.8, 5.6, and 8.0 K-factor Upright, Pendent, and Recessed Pendent Sprinklers Standard Response, Standard Coverage General Description

92831 TEL: (714) FAX:

Cool, Clean and Comfortable Nortec HP-Series. Adiabatic In-Duct High Pressure Humidification System... Simply Awesome

_C_EN_1612 INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Blower Pack Condair BP. Humidification and Evaporative Cooling

AG Series Electric Heaters

MS-600 DESICCANT DEHUMIDIFIER

Getz Equipment Innovators 450 lb Dual Portable Dry Chemical Fill System

installation, operation & Maintenance manual Floor-mounted Induction units

Warmer Cabinet Instruction Manual Model # 5581, 5581EX. Part No

Users Manual. LAURUS Systems, Inc. - Ph: Fax:

INSTALLATION AND OPERATING INSTRUCTIONS FOR THE VEHICLE-MOUNTED RADIATION DETECTION SYSTEM

ES Series Electric Humidifier

Technical Data. Installation

Installation Instructions

GTS. User Manual. Gas-to-Steam Humidifier. Affix product label here.

The Series LFII (TY3596) Residential

Alnor AirGard 410HE Air Flow Monitor for Hazardous Environment Fume Hoods

5.6K Horizontal Sidewall Standard and Quick Response, Extended Coverage General Description. Model/Sprinkler Identification Numbers (SINs)

HOT DOG STEAMER Instruction Manual Models: 8007 & 8012

HYDRONIC HEATING CATALOG

Installation and Testing of Inverted Bucket Steam Traps Manual

Clean Steam Generators

TrueClean ToteCleaner

Desiccant Tank Retrofit Kit for CD100/CS101 dehumidifying dryers

ILLUSION 11.2 K-factor Extra Large Orifice Concealed Pendent Sprinklers Quick Response, Standard Coverage General Description

Transcription:

STEAM DISTRIBUTORS ASD / BSD / CSD Installation Manual 1506117-C

PROPRIETARY NOTICE This document and the information disclosed herein are proprietary data of WALTER MEIER LTD. Neither this document nor the information contained herein shall be reproduced used, or disclosed to others without the written authorization of WALTER MEIER LTD., except to the extent required for installation or maintenance of recipient s equipment. All references to the NORTEC name should be taken as referring to WALTER MEIER LTD. LIABILITY NOTICE NORTEC does not accept any liability for installations of humidity equipment installed by unqualified personnel or the use of parts/components/equipment that are not authorized or approved by NORTEC. COPYRIGHT NOTICE Copyright 2008, WALTER MEIER LTD. All rights reserved.

Content 2 1 Installation 1 Receiving & Unpacking 1 Pre-Installation Check 1 Steam Line Installation 2 Condensate Return Guidelines for Main Steam Lines 3 Distributor Mounting 8 Spare Parts

1. INSTALLATION A. RECEIVING AND UNPACKING EQUIPMENT 1. Check packing slip to ensure ALL material has been delivered. 2. All material shortages are to be reported to Walter Meier (NORTEC) within 48 hours from receipt of goods. Walter Meier (NORTEC) assumes no responsibility for any material shortages beyond this period. 3. Inspect shipping boxes for damage and note on shipping waybill accordingly. 4. After unpacking, inspect equipment for damage and if damage is found, notify the shipper promptly. 5. All NORTEC products are shipped on an F.O.B. factory basis. Any and all damage, breakage or loss claims are to be made directly to the shipping company. 6. Each distributor is provided with: installation manual, one hose cuff, and two hose clamps. B. PRE-INSTALLATION CHECK 1. Ensure the total capacity of the humidifier is not higher than the allowable maximum steam capacity of the distributors used. ASD 10: 22 lbs/hr (8 kg/hr) ASD: 25 lbs/hr (9 kg/hr) BSD: 35 lbs/hr (13 kg/hr) CSD: 115 lbs/hr (45 kg/hr) C. STEAM LINE INSTALLATION 1. NORTEC steam hose should only be used on short steam runs below 10 feet. 2. Ensure that no condensate produced in the steam line will remain trapped. Steam naturally flows upward and condensate naturally flows downward. 3. See material recommended for use in the chart below. To eliminate the metal corrosion, NORTEC does not recommend the use of steel piping. 4. Consult the following pages for step by step distributor installation starting with Figure 1. 5. Consult the charts below for steam and condensate sizing guidelines when using steam distributors. Page 1

Table 1. Steam Line Material Steam Hose Copper Tube Stainless Steel Tube Short run < 10 feet (3 m) Long run > 10 feet (3m) DI / RO water Table 2. Recommended Material and Size for Steam Run Load Steam Run lb/hr kg/hr ft m Steam Line Material Steam Line Description 0-30 0-13 0-10 0-3 Copper tube ¾ MED-L Tubing (7/8 O.D.) 0-30 0-13 10+ 3+ Copper tube 1 MED-L Tubing (1 1/8 O.D.) 0-30 0-13 0-10 0-3 Stainless Steel Tube 7/8 tube x 0.049 thick 0-30 0-13 10+ 3+ Stainless Steel Tube 1 1/8 tube x 0.49 thick 30-100 13-45 0-20 0-6 Copper tube 1 ½ MED-L Tubing (1 5/8 O.D.) 30-100 13-45 20+ 6+ Copper tube 2 MED-L Tubing (2 1/8 O.D.) 30-100 13-45 0-20 0-6 Stainless Steel Tube 1 3/4 tube x 0.065 thick 30-100 13-45 20+ 6+ Stainless Steel Tube 2 tube x 0.065 thick Please note that options shown in a bold-italic font requires that reducers be used at both ends. These extra large sizes are to allow for better condensation removal in long steam runs. These sizes will not permit you to use hose coupling to connect your self to either humidifier or distributors. Table 3. Recommended Condensate Line at Distributor(s) Dispersion Method Condensate Hose Copper Tube Stainless Steel Tube 1 x Steam Distributor 3/8 Nortec 1328840 1/4 MED-L Tubing (3/8 O.D.) 3/8 tube 0.049 thick 3 x Steam Distributor 3/8 Nortec 1328840 1/2 MED-L Tubing (7/8 O.D.) 5/8 tube 0.049 thick *When using more than one distributor, the condensate line should be trapped before joined together. Page 2

D. CONDENSATE RETURN GUILDEINES FOR MAIN STEAM LINES 1. Use vertical condensate leg of distributor only. Do not over-tighten clamp. 2. Condensate traps on steam mains must be located at all low points in the system, at each elevation change and or directional change. 3. Horizontal runs of steam must rise 2 per foot (10º) when flow is going upwards away from condensate trap, and fall ½ per foot (2º) when flow is going downwards towards a condensate trap. 4. In a horizontal run of the steam main, condensate traps must be located at regular intervals of 20 feet. 5. The condensate trap itself is a section of piping connected to the bottom of the main. A full size tee must be used to create a condensate trap to allow the condensate to fall away from the steam flow. 6. Vertical drop of the condensate trap should be 1.5 times the diameter of the steam main but no less than 12. 7. A P-trap should be installed at the bottom of the condensate trap. The center to center trap height should be 2 greater than duct static pressure. 8. All distributors must be individually trapped. Figure 1. Drain Tee Page 3

Figure 2. Distributor Mounting Page 4

B Always align distributor holes so that steam is discharged upwards to ensure condensate will remain in the distributor. 1 1x 2 + 45º - 45º 3 GO TO C2 Figure 3. Vertical Airflow Page 5

61 mm C1 Always align distributor holes so that steam is discharged upwards to ensure condensate will remain in the distributor. 41-... 81-... 61-... Template provided by Nortec in box. 81-... 61-... / 41-... 43 mm 3.6 mm ASD BSD CSD XMin. HMin. 3 (76mm) 8 (203mm) 4 (102mm) 10 (254 mm) 5 (127mm) 14 (356mm) 81-... 61-... / 41-... ASD BSD CSD ø 1.7" (43 mm) ø 1.7" (43 mm) ø 2.4" (61 mm) H 3.6 mm X 2/3H H 1/3H 2/5H 2/5H H 1/5H 5 min. A A B A B ASD: 5 3 BSD: 6 4 CSD: 9 5 GO TO D Figure 4. Horizontal Airflow Page 6

C2 Always align distributor holes so that steam is discharged upwards to ensure condensate will remain in the distributor. 1/3W W 2/3W H 1/3W 1/3W 1/3W Min. W = 8 (203 mm) GO TO D Figure 5. Vertical Airflow WARNING These installation guidelines apply for duct velocities under 2000 ft/min (610 m/min), please consult factory for higher velocities. Please make sure no obstacles (elbow, filter, or diffuser) are located after the distributor in the direction of the airflow closer than the absorption distance calculated for your application. Unless you know the exact absorption distance required for the steam absorption into the air stream, the distributor should be located at least 8-10 ft (2-3 m) away from any obstacle it may condense on (elbow, diffuser, filter, etc.). Page 7

Figure 6. Distributor Mounting Horizontal & Vertical Flow Figure 7. Distributor Mounting Page 8

Page 9 Figure 8. Spare Parts

Warranty Walter Meier Inc. and/or Walter Meier Ltd. (hereinafter collectively referred to as THE COMPANY), warrant for a period of two years after installation or 30 months from manufacturer s ship date, whichever date is earlier, that THE COMPANY s manufactured and assembled products, not otherwise expressly warranted (with the exception of the cylinder), are free from defects in material and workmanship. No warranty is made against corrosion, deterioration, or suitability of substituted materials used as a result of compliance with government regulations. THE COMPANY s obligations and liabilities under this warranty are limited to furnishing replacement parts to the customer, F.O.B. THE COMPANY s factory, providing the defective part(s) is returned freight prepaid by the customer. Parts used for repairs are warranted for the balance of the term of the warranty on the original humidifier or 90 days, whichever is longer. The warranties set forth herein are in lieu of all other warranties expressed or implied by law. No liability whatsoever shall be attached to THE COMPANY until said products have been paid for in full and then said liability shall be limited to the original purchase price for the product. Any further warranty must be in writing, signed by an officer of THE COMPANY. THE COMPANY s limited warranty on accessories, not of the companies manufacture, such as controls, humidistats, pumps, etc. is limited to the warranty of the original equipment manufacturer from date of original shipment of humidifier. THE COMPANY makes no warranty and assumes no liability unless the equipment is installed in strict accordance with a copy of the catalog and installation manual in effect at the date of purchase and by a contractor approved by THE COMPANY to install such equipment. THE COMPANY makes no warranty and assumes no liability whatsoever for consequential damage or damage resulting directly from misapplication, incorrect sizing or lack of proper maintenance of the equipment. THE COMPANY makes no warranty and assumes no liability whatsoever for damage resulting from freezing of the humidifier, supply lines, drain lines, or steam distribution systems. THE COMPANY makes no warranty and assumes no liability whatsoever for equipment that has failed due to ambient conditions when installed in locations having climates below 14 F (-10 C) during January or above 104 F (40 C) during July. (See Table 1: Weather Design Data above). THE COMPANY retains the right to change the design, specification and performance criteria of its products without notice or obligation.

U.S.A. Walter Meier (Climate USA) Inc. 826 Proctor Avenue Ogdensburg, NY 13669 CANADA Walter Meier (Climate Canada) Ltd. 2740 Fenton Road Ottawa, Ontario K1T 3T7 TEL: 1.866.NORTEC1 FAX: 613.822.7964 EMAIL: northamerica.climate@waltermeier.com WEBSITE: www.humidity.com www.norteconline.com www.nortecparts.com