Lab 1b Cooling Tower Performance and Sensors for Thermal-Fluid Systems

Similar documents
Bench Top Cooling Tower H893

Exercise 2-4. Heat Exchangers (Optional Exercise) EXERCISE OBJECTIVE DISCUSSION OUTLINE. Description of a brazed plate heat exchanger DISCUSSION

3.4 Humidity. Types of instruments

A660 Air Conditioning Laboratory Unit

AND AIR-CONDITIONING. Dr Ali Jawarneh Department of Mechanical Engineering Hashemite University

ME 410 MECHANICAL ENGINEERING SYSTEMS LABORATORY MASS & ENERGY BALANCES IN PSYCHROMETRIC PROCESSES EXPERIMENT 3

LEAKAGE MONITORING OF SEAL PLUG FOR INDIAN PRESSURIZED HEAVY WATER REACTOR BY PSYCHOMETRICS ANALYSIS METHOD

For an ideal gas mixture, Dalton s law states that the sum of the partial pressures of the individual components is equal to the total pressure.

Technical college/ Baghdad 4th Year Week No. :- 11. The objectives of this lesson are to: Introduction:

Psychrometrics. Outline. Psychrometrics. What is psychrometrics? Psychrometrics in daily life and food industry Psychrometric chart

TMCI Padovan Evaporators

THERMODYNAMICS STEAM P7690 AND STEAM BENCHES CUSSONS TECHNOLOGY LABORATORY RECOMMENDATION

Air & Water Heat Pump R832

How about Savings in Time, Money, Energy and Longer Life?

Evaporation studied on a duplicated vessel, pilot scale evaporator equipped with a heat pump

CHAPTER 2 EXPERIMENTAL APPARATUS AND PROCEDURES

Chapter 14, Problem 27.

Instruction Manual DIGITAL MANIFOLD FOR HVAC/R SYSTEMS

READ AND SAVE THESE INSTRUCTIONS OWNER S MANUAL FOR BYPASS AND FAN POWERED HUMIDIFIERS. Small or Large Bypass 12 Water Saver Bypass 13 Fan Powered 14

Mechanical Heat Pump R515

ME 410 MECHA ICAL E GI EERI G SYSTEMS LABORATORY

Overall Heat Transfer Coefficient for Double-Pipe Heat Exchanger

Alfa Laval Wet Surface Air Coolers (WSAC ) FAQs

In order to be useful, many substances must be available in pure form.

Introduction Portable Meters Transmitter Probes RELATIVE HUMIDITY

Appendix A. Glossary of Common Terms

HVAC (Heating, Ventilating, and Air Conditioning)

Scientific Principals and Analytical Model. Charcoal Cooler. Lisa Crofoot MECH 425, Queens University

Performance Rating of Commercial and Industrial Humidifiers

SBS5311 HVACR II Experiment 2: Analysis of the Combined Rankine and Vapour Compression Cycle

Quality Assurance/ Quality Control. Topic 4 - Audio 46. Key Points

Performance of R-22, R-407C and R-410A at Constant Cooling Capacity in a 10

Eastern Mediterranean University Department of Mechanical Engineering Laboratory Handout

LAB EQUIPMENT DETAILS

Development of a Psychrometric Test Chamber. Michael J. Swedish. Associate Professor Mechanical Engineering Department Milwaukee School of Engineering

Available online Journal of Scientific and Engineering Research, 2017, 4(10): Research Article

Refrigeration Cycle Demonstration Unit R634

Heat Exchanger. The purpose may be either to remove heat from a fluid or to add heat to a fluid.

cussons Refrigeration Assembly Range TECHNOLOGY REFRIGERATION AND AIR CONDITIONING CUSSONS TECHNOLOGY LABORATORY RECOMMENDATION

Refrigeration Cycle Demonstration Unit R633

MECHANICAL ENGINEERING ME.2017 FUNDAMENTAL OF REFRIGERATION AND AIR CONDITIONING. Sample Questions and Answers

Drop-in Testing of Next-Generation R134a Alternates in a Commercial Bottle Cooler/Freezer

2. HEAT EXCHANGERS MESA

What is Cooling S.Sen

Use this Construction/HVAC Glossary to answer the questions below.

Wet Bulb Thermo-Hygrometer Datalogger

TECHNICAL SPECIFICATIONS - CW-80T-TWIN USA & MEXICO

P.A. Hilton Ltd. Figure 2: HC655A Optional Computer Linking Upgrade

Model 5190-F Temperature/Humidity Probe

Summary of Comments (Washington Revisions November 7, 2000) Update November 27, 2000

CHAPTER 5 CONDENSER AND EVAPORATIVE COOLING TOWER

Model 5190-E Temperature/Humidity Probe

PREDICTION OF THE PRESSURE DROP OF CO 2 IN AN EVAPORATOR USED FOR AIR COOLING ABSTRACT 1. INTRODUCTION 2. EXPERIMENTAL SET-UP AND PROCEDURE

Activity Watering and Plant Growth

What is a Closed circuit Cooling Tower (CCT)?

Gas Plant Training Module 4 TEG Dehydration Systems

MECHANICAL ENGINEERING THERMAL AND FLUID SYSTEMS STUDY PROBLEMS

Effects of Flash and Vapor Injection on the Air-to- Air Heat Pump System

Hunting Phenomena Of Automotive Air Conditioning Systems With Variable Displacement Compressor

Shell-and-Tube Heat Exchanger (Four Passes) - Optional

Design and Research of the Digital VRV Multi- Connected Units With Three Pipes Type Heat Recovery System

Davis Soil Moisture and Temperature Station Protocol

Hot Water Making Potential Using of a Conventional Air- Conditioner as an Air-Water Heat Pump

HERMS (Heat Exchanger Recirculating Mash System) Controller

TECHNICAL SPECIFICATIONS - CW-80T AUSTRALIAN, EUROPEAN, SOUTH AFRICAN & UK

Celebrating over 30 years of excellence in manufacturing ultrasonic cleaning equipment, electropolishing equipment and associated chemistries

Institute of Aeronautical Engineering (Autonomous) Dundigal, Hyderabad B.Tech (III II SEM) MECHANICAL ENGINEERING

ZERO AIR GENERATOR MODEL 7000 INSTRUCTION MANUAL

MODULE 6 HUMIDIFICATION AND AIR CONDITIONING

User Manual. For use with model CS-10A/CS-11A solar ventilation system controllers

Experimental Study on Match for Indoor and Outdoor Heat Exchanger of Residential Airconditioner

Chapter 14 GAS VAPOR MIXTURES AND AIR-CONDITIONING

ME Mechanical Engineering Systems Laboratory. Experiment 3 - Mass and Energy Balances in Psychrometric Processes

All rights reserved, Armando B. Corripio, PhD, PE, Solid Dryer Design Introduction Continuous Dryer Design...

Aprilaire Dehumidifier Troubleshooting Manual Models 1830, 1850, 1870

Air Conditioning Clinic. Absorption Water Chillers One of the Equipment Series TRG-TRC011-EN

Advance Optima Module Magnos 17

THERMAPHASE INSTALLATION AND OPERATING INSTRUCTIONS

TECHNICAL SPECIFICATIONS - CW-80T-TWIN AUSTRALIAN, EUROPEAN, SOUTH AFRICAN & UK

Vapour Jet Refrigerator / Heat Pump R853

Understanding Process Vacuum for Process Improvement

EXPERIMENTAL STUDY OF CENTRIFUGAL HUMIDIFIER FITTED IN AN INDUSTRIAL SHED LOCATED IN TROPICAL CLIMATES

Superheat charging curves for technicians

EST User Manual. (Please read this manual carefully before using)

Chapter 8 Balances on Nonreactive Processes PSYCHROMETRIC CHART

SIR C.R.REDDY COLLEGE OF ENGINEERING, ELURU DEPARTMENT OF MECHANICAL ENGINEERING ETD-II. Model Short Answer Questions And Answers

INSTRUCTION MANUAL 4-WAY BALL VALVE Digital Manifold

THE PSYCHROMETRIC CALCULATOR By: Stanley F. Gallos, The Bastian-Blessing Company INTRODUCTION PROPERTIES OF THE RSES CALCULATOR

Thermodynamics II Chapter 6 Mixtures & Psychrometry

Combination unit to support instruction in Thermodunamics, Fluid Mechanics, and Heat Transfer

Heat Recovery Units. Heat Recovery 1

PumpLab TM Operator s Manual

Air Conditioning Clinic

R07. Answer any FIVE Questions All Questions carry equal marks *****

IGCSE PHYSICS GRADE 11 TERM 1 ASSESSMENT BOOKLET

Enhancement of Round Tube and Flat Tube- Louver Fin Heat Exchanger Performance Using Deluge Water Cooling

College of Technological Studies Department of Power & Refrigeration Technology. Course Contents

4th International Conference on Sensors, Measurement and Intelligent Materials (ICSMIM 2015)

Performance Investigation of Refrigerant Vapor- Injection Technique for Residential Heat Pump Systems

Process Simulation and Optimization of Cryogenic Operations Using Multi-Stream Brazed Aluminum Exchangers

Transcription:

Lab 1b Cooling Tower Performance and Sensors for Thermal-Fluid Systems OBJECTIVES Warning: though the experiment has educational objectives (to learn about boiling heat transfer, etc.), these should not be included in your report. - To become familiar with the P.A. Hilton H891 Bench Top Cooling Tower and its operating principles. - Check the accuracy of the temperature sensors (thermocouples) in the cooling tower. - To measure wet and dry bulb temperatures, apply psychrometric principles to determine relative humidity, and measure humidity. EQUIPMENT Name Model S/N Bench Top Cooling Tower P.A. Hilton H891 Data acquisition system Thermistor temperature standard Constant temperature thermo-cell Power supply Handheld temperature-relative humidity probe Sling psychrometer The Bench Top Water Cooling Tower has been designed to give students an appreciation of the construction, design and operational characteristics of a modern evaporative cooling system. The unit is also an excellent example of an 'open system' through which two streams of fluid flow (water and air) and in which there is a mass transfer from one stream to the other. Convincing energy and mass balances are obtained and students can quickly investigate the effects of air flow rate, water flow rate, water temperature and cooling loads on the performance of a cooling tower. You will measure the performance of the cooling tower, and determine the errors of your sensors and uncertainties of your measurements

Cooling Tower Schematic PRE-LAB QUESTIONS Figure 1: Bench Top Water Cooling Tower 1- What is difference between dry bulb temperature and wet bulb temperature? 2- What is the Cooling Rate? 3- Describe with examples the difference between Open System and Closed System? 4- What is Psychrometric chart? 5- What is the effect of cooling loads on the performance of a cooling tower? COOLING TOWER TERMS Cooling range: The difference between the water temperature at entry to and exit from the tower. Cooling rate: The rate at which heat is removed from the water. This may be expressed in KW, Btu/h or Kcal/h. Make-up: the quantity of fresh water which must be supplied to the water circuit to make good the losses due to evaporation and other causes.

Drift or Cary out: Droplets of water which are entrained by the air stream leaving the tower. Packing or Fill: The material over which the water flows as it falls through the tower, so that a large surface area is presented to the air stream. Approach to wet bulb: The difference between the temperature of the water leaving the tower and the bulb temperature of the air entering. Drain down: Water deliberately removed from the water system to prevent the excessive concentration of dissolved solids (due to evaporation) and sludge (due to impurities from the atmosphere). PRECAUTIONS AND WARNINGS 1- Whenever possible, distilled or demineralized water should be used for filling and topping up of this unit. (This is to eliminate problems with scale and unsightly stains resulting from water impurities.) 2- The water and air stream temperature must not be allowed to exceed 50 C. 3- The make-up tank must always be refilled before the depth of water falls below 50 mm. 4- The make-up tank should be allowed to fall to about 50 mm whenever the unit is inoperative for more than two hours. (This is to ensure that any leakage past the float valve does not result in an overflow from the load tank.) 5- The system should be completely drained and refilled with fresh water after approximately 20 hours operation or when the unit is to be inoperative for several days. 6- The pump must not be switched on unless the system is filled with water. 7- The two wet bulb reservoirs must be filled with distilled water. 8- If the water level in the load tank falls below the arrowed position, switch off heaters and investigate the cause. BASIC UNIT Water Circuit Warm water is pumped from the load tank through the control valve and water flow meter to the column cap where its temperature is measured. The water is uniformly distributed over the top packing deck and, as it spreads over the plates, a large thin film of water is exposed to the air stream. During its downward passage through the packing, the water is closed, largely by the evaporation of a small portion of the total flow. The cooled water falls from the lowest packing deck into the basin, from where it flows past a thermocouple and into the load tank where it is re-heated for re-circulation.

Due to the evaporation, the level of the water in the load tank slowly falls. This causes the float operated needle valve to open and transfer water from the make-up tank is equal to the rate of evaporation, plus any small airborne droplets in the air discharge. Air Circuit Air from the atmosphere, pre-heated by external means if desired, enters the fan at a rate, which is controlled by the intake damper setting. The fan discharges into the distribution chamber and the air passet wet OPERATING PRINCIPLE Familiarize yourself with the Bench Top Cooling Tower System, noting the locations of the 6 temperature readings to be taken when using the system: 1. The hot water enters the top of the tower (note T 5 in system diagram on front of unit) and is fed into troughs, from which it flows via notches onto the packing material in the tower (packings). The troughs at the top of the tower are designed to distribute the water uniformly over the packing with minimum splashing. There are several packings that can be used in the tower; you will probably be using the flat, slat-like material. The packings have an easily wetted surface and the water spreads over this to expose a large surface to the air stream. 2. The cooled water falls from the lowest packing into the collection basin, and exits the cooling tower (note T 6 in system diagram). Next, the water is pumped to heaters. The two amber switches on the front of the unit operate the heaters, and note that this allows for three combinations of heating load. In cooling tower applications the heating load results from a process requiring cooling, such as the condenser coils of an air conditioner. For the Bench Top Cooling Tower, this is a simulated load, and comes in the form of the load tank. 3. Due to evaporation from the water, an accumulator or make-up tank must maintain the quantity of water in the cooling system. The volume of water added to the system can be measured by the lost of water in the make-up tank. 4. Droplets of water (resulting from splashing, etc) may become entrained in the air stream and then lost from the system. This loss does not contribute to the cooling, but must replenish by the accumulator or make-up tank. To minimize this loss, a droplet arrester, or eliminator is fitted at the tower outlet. This component causes droplets to coalesce, forming drops which are too large to be entrained and these will fall back into the packings.

5. Water flow is controlled by the control valve on the float-type flow meter (rotameter) at the far right of the untit. Note that a turbine flow meter has been installed (retrofitted) to the unit to measure the flow rate using the data acquisition system. Air System 1. Using a small centrifugal fan with damper to control flow rate, air is driven up through the wet packings. Air enters the bottom of the tower and flows past a dry bulb temperature sensor (T 1 ) and a wet-bulb temperature sensor (T 2 ). At the exit of the cooling (at the top) the exit air dry bulb temperature (T 3 ) and wet-bulb temperature (T 4 ) are measured. Note that the wicks on the wet bulb sensor are immersed in reservoirs of water that may require filling. It should be observed that the change of dry bulb temperature is smaller than the change of wet bulb temperatures. This indicates that the air leaving is almost saturated, ie, Relative Humidity approaches 100%. This increase in the moisture content of the air is due to the conversion of water into steam and the latent heat for this will account for most of the cooling effect. 2. If the cooling load was switched off and the unit allowed to stabilize, it should be found that the water will leave the basin close to the wet bulb temperature of the air entering. According to the local atmospheric conditions, this can be several degrees below the incoming air (dry bulb) temperature. 3. Without a simulated load, the cooling tower would be able to cool the water to a temperature that approaches the wet bulb temperature. This is an ideal parameter of this system.

Figure 2: Bench Top Cooling Tower diagram PROCEDURE (DAY 1) 1. Study the operating principle of a cooling tower before working with the bench top model. 2. Identify the adjustable parameters and data acquisition systems built into the system. What three variables can be changed? 3. Check wet bulb thermocouple reservoir wells for water (T 2 and T 4 ). Add if necessary. 4. Determine the accuracy of thermocouple T 1 relative to a standard: Removed T 1 from tower and inserted into the constant temperature calibrator

Insert thermistor (lab standard) into calibrator. Turn on the main power switch to the cooling tower, and the red LED readout for the thermocouple/temperature reading should become active. Adjust the thermocouple selector dial to read the output from T 1. At room temperature, and two temperature set-points (approximate 40 C and 50 C) take 10 measurements readings each from the thermistor (lab standard), cooling tower readout for channel 1 and DasyLAB software read out for T 1. Establish a spreadsheet for the 10 readings for all three sensors at each temperature, determine the average of each sensor reading and determine the accuracy of the cooling tower readout and the DASYLab readout relative to the thermistor standard. 5. Perform an accuracy check on the thermocouple in the tower using sensor T 1. Reinstall T 1 in the tower and turn the water flow rate adjustment knob (clockwise) to shut the water flow off. Switch on the main power so the pump will run, but no water will flow through the tower. Fully open the damper on the fan. Let the tower stabilize for 10 minutes. Operating the cooling tower with no water flow, only the fan with damper fully open, record the dry bulb thermocouple readings (T 1 and T 3 from the unit and DASYLab). Ideally, they should have the same readings; similarly the wet bulb thermocouples should the same values so record these as well. 6. Compare the mean values of T 1 and T 3 with the mean values of the T 2, T 4, T 5 and T 6. A difference in instrument readings, will this require a possible correction factor to bias the sensor readings? 7. Using the handheld temperature-relative humidity probe, carefully take readings at the inlet to the fan. Using the sling psychrometer (convert to degrees C if needed!), take wet and dry bulb measurements of the room. Record all data, and compare with the results of step 6 using a psychrometric chart given at the end of this handout. Put a copy of a chart in your log book indicating the three moist air states you have just determined (tower sensors at air inlet, handheld probe at air inlet, and room with sling psychrometer). 8. Connect the water system to allow for proper operation. Start the Bench Top Cooling Tower and observe the effects of orifice differential pressure, water flow rate and all the thermocouple readings. PROCEDURE (DAY 2) 1. Check wet bulb thermocouple reservoir wells for water (t 2 and t 4 ). Add if necessary. 2. The make-up tank should be at least half full before the starting the cooling tower. Use distilled water if fluid must be added to the system. Monitor and calculate the amount of water evaporated during all of the test operations of

the cooling tower. This can be done by measuring the cross-section of the make-up tower and finding the change in the water level. 3. Start the Bench Top Cooling Tower and allow to stabilize under the following suggested conditions: Air orifice differential pressure: 14 mm water Water flow rate: 30 gm/s Cooling load: 1.0 kw 4. Let the tower stabilize for 10 minutes. Go step 5 while waiting. 5. While you are waiting for the system to come to steady-state, there should be a power supply on the bench top, turned off with the black - lead unplugged. The power lead should read Pressure & Turbine Flow Meter Power 8.22 VDC. Make sure the red + side lead is plugged in, if it isn t. Turn the power supply on adjusting the voltage readout to as close to 8.22 V as you can. Observe the signal output leads (bundled with the power supply leads) from the pressure transducer and water turbine flow meter, and where they are connected to the data acquisition equipment. Be sure they are not touching each other or any other metal and that the connections appear sound. Now plug in the black - lead to the power supply. This should now provide power to the pressure transducer and turbine flow meter in the tower, and the power draw on the power supply should be about 0.01 A (10 ma). You can check the zero offset error on the transducer output by disconnecting the pressure tap tube connecting the high side pressure transducer port, which should be connected to the tap in the top/exit chamber of the cooling tower. Record this value from the DASYLab worksheet as you check it out in step 6. Then reconnect the pressure tap tubing. While continuing to wait for the system to come to steady-state proceed to step 6. 6. While you are waiting for the system to come to steady-state, familiarize yourself with the DASYLab worksheet created to acquire data from the cooling tower. In a past semester, two sensors were retrofitted to the tower by students as part of their final 58:080 project: a turbine flow meter (TFM) to measure water flow rate, and a piezo-resistive differential pressure transducer for measuring the mass of air flow through the tower. Observe that a counter is used on TFM to convert the wave pattern seen in the Y-t plot on the TFM output to a frequency. The frequency output has been calibrated as shown in Figure 2, and this calibration curve is applied in the DASYLab worksheet to output the water flow rate in gram/sec. The pressure transducer output has been calibrated as shown in Figure 3, and the calibration curve. The orifice at the top of the cooling tower (an example of an obstruction flow meter) has been calibrated by the manufacturer to measure mass flow rate of dry air as a function of differential pressure across the orifice and specific volume of the moist air mixture exiting the tower. This relationship is:

mass flow rateof dry air m 0.0137 air Porifice 1 where ΔP orifice is the orifice pressure difference in mm H 2 O, υ air is the specific volume of dry air (m 3 /kg), and ω out is the specific humidity of the air exiting the tower (kg/kg). 7. Record the six thermocouple values, and the inlet and exit air relative humidity and temperature using the handheld humidity probe. Note: each time you are told to record thermocouple values, record the digital readout from the unit, and the readout from the DASYLAB. Take thermocouple readings 3 times, in 2 minute intervals. 8. Before proceeding check the make up level of the water, and add water as needed to bring the level back to the level at the start of the cooling tower operation in step 2. Be sure to measure how much make up water you add. Increase the cooling load to 1.5kW. Let the tower stabilize for 10 minutes. Record the six thermocouple values, and the inlet and exit air relative humidity and temperature using the handheld humidity probe: 3 times, in 2 minute intervals. out 9. Before proceeding check the make up level of the water, and add water as needed to bring the level back to the level at the start of the cooling tower operation in step 2. Start the Bench Top Cooling Tower and allow to stabilize under the following suggested conditions: Air orifice differential: 6 mm water Water flow rate: 30 gm/s Cooling load: 1.0 kw 10. Let the tower stabilize for 10 minutes. Record the six thermocouple values, and the inlet and exit air relative humidity and temperature using the handheld humidity probe. Take thermocouple readings 3 times, in 2 minute intervals. 11. Before proceeding check the make up level of the water, and add water as needed to bring the level back to the level at the start of the cooling tower operation in step 2. Increase the cooling load to 1.5kW. Let the tower stabilize for 10 minutes. Record thermocouple values. Record the six thermocouple values, and the inlet and exit air relative humidity and temperature using the handheld humidity probe - 3 times, in 2 minute intervals.

ANALYSIS 1. Calculate average, precision and bias errors, and total error for the thermocouples. See the Appendix A Determining Bias and Precision Errors for a detailed procedure on these calculations. Essentially, the bias error is the difference between your standard and the mean of your measurements, and the precision error is the 95% confidence interval about your mean value. The total error is the root sum of the squares of both. 2. Using a psychrometric chart given at the end of this handout, determine the relative humidity in the room for each setting at which the unit was run using the wet and dry bulb inlet air temperatures (averaged). Compare with the handheld probe at each setting. Is the room becoming more humid as the testing progresses (systematic), or does it appear random? 3. Find the evaporation rate of the cooling tower at the different settings using your make up water measurements. Comment on the results, does the trend in the data make sense given the operating conditions used? 4. Calculate the effectiveness of the cooling tower by calculating the difference between the water exiting the cooling tower (T 6 ) and the wet bulb temperature of the air entering the cooling tower (T 2 ). This is known in cooling tower terminology as the approach temperature. Is it physically possible for the approach temperature (T6 T2) to be less than 0? 5. Compare and comment on the results between the cooling tower operating conditions. What test matrix of variables was used, which variables were held constant (or controlled) which did we vary? Remark on any other interesting tests that might be run, measurements which don t make sense, and any other engineering observations about the experiment.

Measured flow (g/s) APPENDIX.A FIGURES Figure 2 Calibration curve for the pressure transducer Mass Flow Calibration Curve 45 35 Flow (g/s) = 0.1463(TFM Output, Hz) + 0.0885 y = 0.1463x + 0.0885 R 2 = 0.9998 25 15 5 0 50 100 150 200 250 300 Flow meter output (Hz) Figure 3 Calibration curve for the turbine flow meter added to the Experimental Engineering Lab s Cooling Tower