Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

Similar documents
Cotton Belt Regional Rail Corridor Project

Cotton Belt Corridor. Area Focus Group (AFG) Richardson/Plano August 24, John Hoppie, Capital Planning

REQUEST FOR SHPO CONSULTATION: Projects Subject to Section 106 of the National Historic Preservation Act and/or the Antiquities Code of Texas

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

Cotton Belt Corridor Regional Rail

Honorable Members of the Public Safety and Criminal Justice Committee Fire Watch Procedures

Appendix B. Technical Memoranda and Reports

Memorandum CITY OF DALLAS

Cotton Belt Corridor Regional Rail

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Cotton Belt Corridor Regional Rail; Land Use Existing Conditions Technical Memorandum. John Hoppie, Project Manager, DART Capital Planning

Cotton Belt Corridor Regional Rail

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

Memorandum CITY OF DALLAS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

U T D N o r t h C a m p u s T O D and D o w n t o w n D e n t o n T O D

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

Emergency Management. questions. need

Appendix B. Technical Memoranda and Reports

East Corridor Final Environmental Impact Statement

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Memorandum CITY OF DALLAS

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013

Chesterfield County Project Update

WEST OAK CLIFF RED LINE EXTENSION

IH35 Corridor Plan Amendment to the Comprehensive Plan

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

Q:%4~ Memorandum CITY OF DALLAS

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

BeltLine Corridor Environmental Study

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

Belt Line Corridor Vision

METRO Gold Line BRT CMC Meeting

Good Neighbor Plan Dallas Love Field Airport Transportation and Environment Committee

IH35 Corridor Plan Amendment to the Comprehensive Plan

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

APPENDIX F DRAFT SECTION 4(f) EVALUATION

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Southern Gateway Project and Public Green

Regional Mobility & the US 380 Bypass Concept. Informational Meeting February 9, 2017

City Council Special Meeting AGENDA ITEM NO. C.

Appendix D Community Impact Assessment

Northwest Corridor LRT Line to Irving/DFW. Mandalay Place HOA February 7, 2005

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

Dallas CBD Second Light Rail Alignment (D2)

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Inglewood Transit Connector Environmental Impact Report Scoping Meeting July 26, 2018

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

METRO Gold Line BRT CBAC Meeting. August 23, 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

Staff Report CONDITIONAL USE

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

Mississippi Skyway Preliminary Engineering Report

Right-of-Way Acquisitions and Relocations Technical Memorandum

Northern Branch Corridor SDEIS March Table of Contents

Corridor Management Committee. September 29, 2017

Implementation Guide Comprehensive Plan City of Allen

Central Corridor Light Rail Transit. Environmental Assessment Three Infill Stations. Western, Victoria, and Hamline

Chapter 2: Preliminary Analysis

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Transportation Committee

3.5 VISUAL AND AESTHETIC QUALITIES

Physical Map Revision Flood Insurance Study

Asheville Design Center March 2010

CITY OF LARKSPUR Staff Report. August 21, 2013 Council Meeting UPDATE ON TRANSPORTATION AUTHORITY OF MARIN (TAM) GREENBRAE CORRIDOR WORKING GROUP

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

BeltLine Corridor Environmental Study

I. INTRODUCTION. Project Background and Study Area

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

Local Growth Planning in North Central Green Line Communities

D2 Subway Project Development. Public Meeting September 12, 2018

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

Kanata Light Rail Transit Planning and Environmental Assessment Study

CITY COUNCIL AGENDA REPORT

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

4.500 Preston Road Overlay District

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

Elgin O Hare Western Access Project Local Advisory Committee. February 10, 2014

Executive Summary. NY 7 / NY 2 Corridor

The Trinity River Corridor Project Update

Bassett Creek Valley Working Group. October 4, 2017

Silver Line Gateway. Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston. Public Informational Meeting Chelsea, MA

D2 Subway Project Development. Interagency Meeting July 27, 2018

PLNPCM Carl s Jr. Commercial Parking Lot at Redwood Road and 1700 South

Dallas CBD Second Light Rail Alignment (D2)

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

S C O P E O F W O R K A P R I L

Clay Street Bridge Replacement Project

AMENDMENT NUMBER 2 TO AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN URS CORPORATION GREAT LAKES AND THE CITY OF ANN ARBOR

Sustainable Development Call for Projects Western Infrastructure Project Submissions

North Somerset Council Local Development Framework

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Transcription:

Memorandum DATE March 23, 2018 CITY OF DALLAS TO Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee SUBJECT Cotton Belt Regional Rail Corridor Project On Monday, March 26, 2018, you will be briefed on the Cotton Belt Regional Rail Corridor Project. The briefing materials are attached for your review. Please feel free to contact me if you have any questions or concerns. Majed A. Al-Ghafry Assistant City Manager [Attachment] c: Honorable Mayor and Members of the City Council T.C. Broadnax, City Manager Larry Casto, City Attorney Craig D. Kinton, City Auditor Bilierae Johnson, City Secretary (Interim) Daniel F. Solis, Administrative Judge Kimberly Bizor Tolbert, Chief of Staff to the City Manager Jo M. (Jody) Puckett, Assistant City Manager (Interim) Jon Fortune, Assistant City Manager Joey Zapata, Assistant City Manager M. Elizabeth Reich, Chief Financial Officer Nadia Chandler Hardy, Chief of Community Services Raquel Favela, Chief of Economic Development & Neighborhood Services Theresa O Donnell, Chief of Resilience Directors and Assistant Directors Our Product is Service Empathy Ethics Excellence Equity

Cotton Belt Regional Rail Corridor Project Dallas Council Committee on Mobility Solutions, Infrastructure and Sustainability March 26, 2018 Stephen Salin, AICP Vice President, Capital Planning

Presentation Outline Project Overview Draft Resolution and Recent Public Meetings Alignment Stations Grade Separations Upcoming Public Involvement Opportunities 1

Project Summary - Dallas Service to DFW Cypress Waters Alignment and Station Include Knoll Trail Station Eliminate Preston Road Station Include Coit Road Station Coit Road Grade Separation (Road up and Rail Down) Rail Freight Service eliminated in North Dallas Mitigation of Noise, Vibration Opportunity for application of Betterments Enhanced Landscaping Trail within the Cotton Belt Corridor 2

City Resolutions - Status Addison pending (many previously adopted) Carrollton pending (anticipated in April) Dallas pending (anticipated March 26/28) Plano passed February 26, 2018 (support) Richardson passed January 22, 2018 (support) Coppell passed June 13, 2017 (support) Grapevine pending (anticipated in April) 3

Downtown Carrollton Reconfiguration CityLine Alignment DFW Airport Terminal B Connection Cypress Waters Alignment Proposed Cotton Belt Alignment DFW Airport to Shiloh Road 4

DFW Airport Terminal B Connection Alignment exits railroad corridor to connect to TEXRail alignment and serve DFW Airport Terminal B 5

6

DFW North Station 7

Freight Tracks Passenger Tracks Cypress Waters Alignment 8

Cypress Waters Station 9

Knoll Trail Station 10

Preston Road Station 11

Coit Road Station 12

Sanders Loop Future DFW Road (Road Over) S. Belt Line Road Future Dallas Road (Road Over) Cotton Belt Proposed Grade Separations 13

Coit Road (Road Over) Midway Road Cotton Belt Proposed Grade Separations

Upcoming Opportunities for Public Involvement Always Available DART web site: www.dart.org/cottonbelt Email: cottonbelt@dart.org Letters Board Meetings Project Public Meetings and Hearings March 15, 2018 @ Noon: Facebook Live (DART s Facebook page) March 27, 2018: Service Plan Amendment Public Hearing April/May 2018: DEIS Public Hearing 15

16

Supplemental Information

DFW Airport Terminal B Connection Alignment exits railroad corridor to connect to TEXRail alignment and serve DFW Airport Terminal B 18

Freight Tracks Passenger Tracks Cypress Waters Alignment 19

Downtown Carrollton Reconfiguration Madill Sub grade separation Relocate Mercer Yard Cotton Belt bridge over BNSF Future Irving/Frisco Platform

Freight Tracks Passenger Tracks CityLine Alignment 21

Alignment Schematic DFW Airport 22

Alignment Schematic Cypress Waters 23

Alignment Schematic Carrollton 24

Alignment Schematic Addison/Dallas 25

Alignment Schematic Richardson 26

Alignment Schematic Plano 27

Stations

Station Guidance Station Name Location Input To Date* DFW DFWIA B Terminal Station DFW include in project 1 North DFW Station DFW include in project 2 Cypress Waters Station Dallas include in project 3 Downtown Carrollton Station Carrollton include in project 4 Addison Station Addison include in project 5 Knoll Trail Station Dallas include in project 6 Preston Rd Station Dallas candidate for elimination 7 Coit Rd. Station Dallas include in project 8 UT-Dallas Station Richardson include in project 9 CityLine/Bush Station Richardson include in project 10 12th Street Station (Light Rail and Cotton Belt) Plano include in project 11 Shiloh Station Plano include in project *Input received during Public and Board Meetings 29

2040 Ridership Scenarios STATION NAME Full Build Regional Model Full Build All Stations Without % Change Full Preston Station Build Without North Dallas Stations % Change Full Build DFWIA AB Terminal Station 3,950 1,170 1,170 0% 1,160-1% North DFW Station 900 1,320 1,330 1% 1,310-1% Cypress Waters Station 600 910 900-1% 890-2% Downtown Carrollton 4,000 1,970 1,930-2% 1,850-6% Station Addison Station 2,800 1,690 1,750 4% 1,940 15% Knoll Trail Station 750 530 530 0% -- -- Preston Rd Station 800 400 -- -- -- -- Coit Rd. Station 1150 760 770 1% -- -- UT-Dallas Station 1000 850 940 11% 1,200 41% CityLine/Bush Station 3750 1,380 1,370-1% 1,240-10% 12th Street Station 600 370 330-11% 340-8% Shiloh Station 800 660 700 6% 690 5% Corridor Ridership 21,100 12,010 11,720-2% 10,620-12% 30

31

DFW North Station 32

Cypress Waters Station 33

Downtown Carrollton Station 34

Addison Station 35

Knoll Trail Station 36

Preston Road Station 37

Coit Road Station 38

UT Dallas Station 39

CityLine/Bush Station 40

12 th Street Station 41

Shiloh Road Station 42

NEPA Review Environmental Impacts and Mitigation

Environmental Review Notice of Intent (NOI) Published- July 8, 2010 Scoping Meeting - July 29, 2010 Administrative Draft now under review DEIS anticipated March/April 2018 DEIS Hearing anticipated April/May 2018 FEIS anticipated June 2018 RODs anticipated July 2018 44

Impact and Mitigation Guidance Summary Impact Mitigation Input to Date* Noise Quiet Zones include in project Noise Sound Barriers include in project Noise Bell Mitigation include in project Vibration Tire Derived Aggregate (TDA) Material include in project Traffic Visual Visual Grade Separation Intersection and Signal improvements Landscaping Wheeler Bridge (Midway Road) Complementary Design include in project Coordinate with communities/cities include in project Historic Bridge Relocation/Adaptive Reuse include in project Parkland - Section 4(f) Trail Replacement include in project *Input received during Public and Board Meetings as of 3/8/18 45

Noise Impacts and Mitigation

Residential Noise Impact Summary Residential Noise Impact Without Quiet Zones Quiet Zones without Additional Mitigation Quiet Zones with Additional Mitigation City Moderate Severe Moderate Severe Moderate Severe Coppell 303 425 0 0 0 0 Carrollton 328 547 31 0 *2 0 Addison 414 297 16 0 0 0 Dallas 968 1,502 188 0 0 0 Richardson 0 0 0 0 0 0 Plano 316 319 0 0 0 0 Total 2329 3090 235 0 *2 0 * Additional mitigation to be considered 47

Example of Quiet Zone Quad Gates Quiet Zone = No Train Horn 48

Proposed Noise Mitigation Mitigation Corridor Coppell Carrollton Addison Dallas Richardson Plano Quiet Zones 36 7 9 4 7 5 4 Crossing Bell 8-1 1 6 - - Noise Barriers 19-2 - 17 - - Noise Barrier Length (feet) 20,300-2,600-17,700 - - Example 49

Noise Barrier Locations Carrollton 50

Noise Barrier Locations North Dallas 51

Vibration Impacts and Mitigation

Vibration Impact Location Map Dallas and Carrollton Vibration Legend Vibration Impact 53

Proposed Vibration Mitigation Track treated with Tire Derived Aggregate (TDA) 54

Traffic Analysis and Mitigation

Crossing Configuration Summary 71 Roadway Crossings (1-71) 45 At-Grade 14 Existing Grade Separations 8 Proposed New Grade Separations 2 Future Grade Separations 1 Closure or remain grade separated 1 Closure 8 Non-Roadway Crossings (A-H) 1 At-Grade 6 Existing Grade Separations 1 Proposed Grade Separations 56

Roadway (Arterials Only) Mitigation Grade Separations and Signal/Design Improvements Roadway At-Grade Crossing City Insert (Crossing map Number) with location key LOS Impacts? Queuing Impacts? Recommended Traffic Mitigation Grade Separation (5 New) Treatment South Belt Line Road (16) Includes Sanders Loop (17) Coppell / Dallas Yes Yes Track over the Road Midway Road (37) Addison No Yes Track over the Road Coit Road (53) Dallas No Yes Roadway over the Track Custer Parkway (58) Richardson Yes Yes Track over the Road Plano Parkway (66) Plano Yes Yes Track over the Road Intersection Improvements (6) Treatment MacArthur Boulevard (21) Coppell Yes No Signal/Design Improvements Luna Road (26) Carrollton Yes Yes Signal/Design Improvements (Grade Separation not feasible) North Marsh Lane (35) Carrollton / Addison Yes Yes Signal/Design Improvements Addison Road (38) Addison Yes Yes Signal/Design Improvements (Grade Separation not feasible) Hillcrest Road (49) Dallas No No Signal/Design Improvements Alma Road (59) Richardson Yes Yes Signal/Design Improvements (Grade Separation not feasible) Note: All at-grade roadway crossings will be gated; residential areas will include quiet zones 57

Sanders Loop Future DFW Road (Road Over) S. Belt Line Road Future Dallas Road (Road Over) Cotton Belt Proposed Grade Separations 58

BNSF/ Madill Sub (Cotton Belt over BNSF) Cotton Belt Proposed Grade Separations 59

Coit Road (Road Over) Midway Road Cotton Belt Proposed Grade Separations

Custer Parkway Plano Parkway US 75 Red Moon Way Cotton Belt Proposed Grade Separations 61

Cotton Belt Proposed Roadway Crossing Configuration ID Location Name Type Configuration 1 DFW Crossunder # 2 Street At-Grade 2 DFW International Service Road Street Existing Grade Separation (Rail Under) 3 DFW North Employee Road Street At-Grade 4 DFW North Airfield Drive Street Existing Grade Separation (Rail Under) 5 DFW SH 121/SH 114 Freeway Existing Grade Separation (Rail Under) 6 DFW Dallas Road Street Future Grade Separation (Rail Under) 7 DFW Chesapeake Access Road Access At-Grade 8 DFW New DFW Road Street Future Grade Separation (Rail Under) 9 DFW DFW Fire Station 6 Road Driveway New At-Grade 10 DFW SH 121 Freeway Existing Grade Separation (Rail Under) 11 DFW IH 635, Freeway Existing Grade Separation (Rail Under) 12 Coppell Royal Lane Street At-Grade 13 Coppell Freeport Parkway Street At-Grade 14 Coppell Coppell Road Street At-Grade 15 Coppell Southwestern Boulevard Street At-Grade 16 Coppell South Belt Line Road Street Proposed Grade Separation 17 Coppell Sanders Loop Street Proposed Grade Separation 18 Dallas East Belt Line Road Street At-Grade 19 Coppell Moore Road Street At-Grade 20 Coppell Mockingbird Lane Street At-Grade 21 Coppell MacArthur Boulevard Street At-Grade 22 Coppell Fairway Drive Street At-Grade 23 Coppell Private /Ledbetter Road Driveway At-Grade 24 Carrollton Private (Gun Range Road) Driveway Existing Grade Separation (Rail Over) 62

Cotton Belt Proposed Roadway Crossing Configuration ID Location Name Type Configuration 25 Carrollton PGBT Freeway Existing Grade Separation (Rail Under) 26 Carrollton Luna Road Street At-Grade 27 Carrollton Unnamed dirt road (Utility) Access Existing underpass to be relocated 28 Carrollton IH-35E Freeway Existing Grade Separation (Rail Under) 29 Carrollton North Broadway Street Street At-Grade 30 Carrollton North Denton Drive Street At-Grade 31 Carrollton Perry Road Street At-Grade 32 Carrollton North Josey Lane Street At-Grade 33 Carrollton Kelly Boulevard Street At-Grade 34 Carrollton Private Driveway (Golf Club) Driveway Closed 35 Addison North Marsh Lane Street At-Grade 36 Addison Surveyor Boulevard Street At-Grade 37 Addison Midway Road Street Proposed Grade Separation 38 Addison Addison Road Street At-Grade 39 Addison Quorum Drive Street At-Grade 40 Addison Spectrum Drive Street At-Grade 41 Addison DNT SB Frontage Road Street At-Grade 42 Dallas Dallas North Tollway Freeway Existing Grade Separation (Rail Over) 43 Dallas DNT NB Frontage Road Street At-Grade 44 Dallas Knoll Trail Drive Street At-Grade 45 Dallas Preston Road, Street Existing Grade Separation (Rail Under) 46 Dallas Davenport Road (South) Street At-Grade 47 Dallas Campbell Road Street At-Grade 48 Dallas Davenport Road Street At-Grade 63

Cotton Belt Proposed Roadway Crossing Configuration ID Location Name Type Configuration 49 Dallas Hillcrest Road Street At-Grade 50 Dallas McCallum Boulevard Street At-Grade 51 Dallas Meandering Way Street At-Grade 52 Dallas Dickerson Street Street At-Grade 53 Dallas Coit Road Street Proposed Grade Separation 54 Richardson Waterview Parkway Street At-Grade 55 Richardson Rutford Avenue Street New At-Grade 56 Richardson Synergy Park Boulevard Street Existing Grade Separation (Rail Over) 57 Richardson Renner Road Street Existing Grade Separation (Rail Over) 58 Richardson Custer Parkway Street Proposed Grade Separation 59 Richardson Alma Road Street At-Grade 60 Richardson US 75 Freeway Proposed Grade Separation 61 Richardson Red Moon Way Street Proposed Grade Separation 62 Richardson W. CityLine Drive Street At-Grade 63 Plano PGBT EB Frontage Road Street At-Grade 64 Plano PGBT Freeway Existing Grade Separation (Rail Under) 65 Plano PGBT WB Frontage Road Street At-Grade 66 Plano Plano Parkway Street Proposed Grade Separation 67 Plano K Avenue Street At-Grade 68 Plano Municipal Avenue Street At-Grade 69 Plano N Avenue Street At-Grade 70 Plano Jupiter Road Street At-Grade 71 Plano Shiloh Road Street At-Grade 64

Proposed Non-Roadway Crossing Configuration ID Location Name Type Configuration A DFW Skylink People Mover APM Existing Grade Separation (APM Over) B DFW Taxiway Z Taxiway Existing Grade Separation (Taxiway Over) C DFW Taxiway Y Taxiway Existing Grade Separation (Taxiway Over) D Carrolton UP Railroad Railroad At-Grade E Carrolton DART Green Line LRT Existing Grade Separation (LRT Over) F Carrolton BNSF/Madill Subdivision Railroad Proposed Grade Separation G Richardson KCS Railroad Railroad Existing Grade Separation (KCS Over) H Plano DART Red Line LRT Existing Grade Separation (LRT Over) 65

Visual Mitigation

Visual Mitigation Examples Typical landscaping at 120-150 foot intervals along residential areas for: Visual screening Soften views of sound walls, corridor fencing (where possible) Preservation of existing vegetation Station landscaping/appropriate lighting in residential areas Station materials/finishes to complement surrounding character Complementary structure design Public and agency coordination to define types of vegetation 67

Other Impacts and Mitigation

Other Impacts Identified in DEIS 1 2 Cottonwood Creek Floodplain Encroachment - DFW 4 Wheeler Signature Bridge - Addison 1 2 3 3 4 White Rock Creek Bridge Reuse - Dallas Spring Creek Trail Relocation - Richardson 69

Relocation of Mercer Yard Existing rail yard in downtown Carrollton to be relocated approximately two miles to the east 70

Proposed TRE Facility Expansion 71

Design Considerations

Presented August 2016 Public Meetings 73

Proposed Noise Wall Cross-Section One Noise Barrier Wall Two Noise Barrier Walls 74

Example Wall Treatment 7 ft Height 75

Example Wall Treatment 15 ft Height 76

Design Examples Fencing in Residential Areas Channelized Pedestrian Crossings (TCRP Report 69) Pedestrian Gates 77

Increased Aesthetics Example Hike/Bike Trail, Planting, Fencing, Wall (Residential Area) Los Angeles - Orange Line BRT (dedicated fixed guideway) 78