Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio un=l the Webcast begins

Similar documents
Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio until the Webcast begins

Automatic Fire Alarm Association Webinar On Inspection, Testing, And Maintenance Of Fire Alarm Systems

NFPA Siemens Industry, Inc. All rights reserved. usa.siemens.com/infrastructure-cities

WHEA FSE inspections.

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

NFPA 72 Code Changes vs 2013

DERRY FIRE DEPARTMENT LISTED AGENT CERTIFICATION PROGRAM

Are You Prepared? The impending impact of Code on Servicing Security Systems

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Fire Alarm System Fundamentals

Southaven Fire Department Fire Marshal s Office 8710 Northwest Drive Southaven, Mississippi Phone: Fax:

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Fire Alarm and Life Safety System Inspection Certificate

Florida Building Code 2010

Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio until the Webcast begins

The 2013 National Fire Alarm and Signaling Code

Medical Gas Inspections and Maintenance Programs. HESNI Annual Conference NIU Conference Center May 10-11, 2018 Presented by Mathis Carlson

Applying Performance-based Fire Alarm System Design Part 4

Changes in NFPA

SECTION FIRE ALARM SYSTEMS

1.3 REFERENCE STANDARDS

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Type of Fire Alarm Control Panel: System is: Existing OR New If new, provide Electrical Permit Number:

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Developing a Healthcare Facility Fire Door Inspection Program

Unified Fire Authority - Fire Prevention Bureau

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

PROTECTED PROPERTY. City: State: Zip Code: ALARM SERVICE COMPANY. City: State: Zip Code: COMMENTS AND CLARIFICATIONS ALARM SYSTEM DESCRIPTION

Danilo B. Concepcion, CBNT, CCHT-A Operations Manager St. Joseph Hospital Renal Services

MNEC NFPA 72 WHITE PAPER

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

Control Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016

SECTION SECURITY TESTING AND COMMISSIONING

2019 COURSE CATALOG (rev )

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

Proposed Changes to NFPA

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

MANUAL OF DESIGN CRITERIA AND SPECIFICATIONS FOR FIRE DETECTION AND ALARM SYSTEMS PUBLIC SCHOOLS IN NEW MEXICO

THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS.

NZQA registered unit standard version 4 Page 1 of 5

Bold items are particular to the City of Euless

FIRE & LIFE SAFTEY STANDARD

Fire Signal Receiving Centres vs. Proprietary Fire Signal Receiving Centres CAN/ULC-S561 ALAN CAVERS ULC

Other EC and LS documents may be requested by surveyors, as needed, throughout the survey.

Full Service Central Station Fire Alarm Listing Evaluation

CONTENTS AUTOMATIC TRANSFER SWITCHES

NFPA Changes

SAFETY CODES COUNCIL ORDER. BEFORE THE FIRE TECHNICAL COUNCIL On June 21, 2012

Surviving Survivability A User s Guide to Survivable Fire Alarm Circuits Larry D. Rietz, SET 23 May 2018

Please think twice about printing this matrix. You can it, along with your ballot to or

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

Idaho Surveying & Rating Bureau, Inc South Cobalt Point Way Tel: (208) Meridian, Idaho FAX: (208)

CAN/ULC-S561. To comply, or not to comply. actually it s not even a question! Underwriters Laboratories of Canada. By Alan Cavers & Brian McBain

Michigan State University Construction Standards FIRE DETECTION AND ALARM PAGE

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

Advanced Fire Alarm Systems Training Program Outline (5 Day)

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

MAINTENANCE OF FIRE PROTECTION DEVICES WITHIN RESIDENTIAL SUITES OF MULTI-FAMILY BUILDINGS

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.

2016 Joint Commission Update

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

Audio Verified Alarms Best Practices

EC 5.10 FIRE PREVENTION MANAGEMENT

Chubb Monitoring Solutions

LIFE SAFETY & FIRE PREVENTION MANAGEMENT PLAN

4/18/2017. *2012 edition of NFPA 99 has gone through a major overhaul. *This document is now a Code.

WESTIN HOTEL. Smoke Control System. Testing Procedures Manual. October 10, Copyright Impact Engineering, Inc All Rights Reserved

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Florida Senate SB 982 By Senator Bennett

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

AIRPORT OFFICE BUILDING. Smoke Control System. Testing Procedures Manual. September 10, 2016

Date Issued: December 14, 2017 Revision: 2.1

Annual Fire Systems and Backflow Preventers Testing

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety

STANDARDS UPDATE NOTICE (SUN) ISSUED: February 5, 2018

Hinesville First United Methodist Church SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE

2. HVAC and smoke control systems; fire, smoke, and combination fire/smoke dampers. 5. Central control and monitoring system.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

10/25/2018. Facilitators. Emergency Preparedness &Life Safety Code for Administrators. Participant Guide

Life Safety Code Comparison

Life Safety Code Potpourri

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Addressing Sound Masking Requirements in the National Fire Alarm and Signaling Code and UL Standards

Audio Verification and Notification Procedures

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD

Transcription:

Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio un=l the Webcast begins

Today's Moderator Cathy Jakicic Editor

Today's Presenter Esteban Cota Na#onal Business Manager for Fire Safety and Security Services, Siemens Industry, Inc. Esteban Cota is a Na#onal Business Manager for Fire Safety and Security Services with Siemens Industry, Inc. With more than 20 years of experience working in the healthcare industry, Cota has worked in roles from the field technical level and project engineering to program management, and service and sales opera#ons. His experience spans hands- on tes#ng and installing systems to selling systems, along with engineering to business development roles crea#ng programs targeted at the healthcare industry. He is a member of the NFPA 72 Chapter 14 Test and Inspec#on Technical CommiQee, as well as a member of the American Society for Healthcare Engineering (ASHE), the Interna#onal Associa#on for Healthcare Security & Safety (IAHSS), the Na#onal Fire Protec#on Associa#on (NFPA), and the Texas Associa#on of Healthcare Facili#es Management (TAHFM).

Disclosure: Today s presenter is currently employed by Siemens, which manufactures the technology referenced in this presenta=on.

To ask Ques=ons: Please use the ques=on and answer panel on the right- hand side of the screen, and send to all panelists.

Polling Ques=ons Today s event will include a series of mul=ple- choice polling ques=ons. Your par=cipa=on is appreciated.

Presenta=on Handouts All par=cipants will receive an e- mail by the end of the day with a link to download a PDF copy of today s presenta=on slides.

CEU Informa=on Trade Press Media Group has been accredited as an authorized Provider by the Interna=onal Associa=on for Con=nuing Educa=on and Training (IACET), 1760 Old Meadow Road, Suite 500, McLean VA 22102; (703) 506-3275 To successfully earn 0.1 CEUs, you must a`end the en=re webcast and earn a 70% or higher on the assessment.

Unlocking the Code The key to meeting The Joint Commission requirements is in properly interpreting and understanding NFPA codes www.usa.siemens.com/buildingtechnologies

Agenda q Overview / Objectives q Background q Understanding the Standard Requirements EP1 EP3 EP4 EP5 q Fire Safety Service Agreements q After Testing is Complete q Conclusion Page 13

Overview q The healthcare industry has been experiencing an unprecedented amount of attention from The Joint Commission (TJC) concerning fire and life safety issues. q It is critical for hospital facility directors to be familiar with the code requirements themselves and knowledgeable about their interpretation. q Hospitals face potential cost due to inappropriate code interpretation. Page 14

Objectives q Review some of the most challenging requirements outlined in EC.02.03.05. q Review corresponding NFPA codes and standards. q Discuss best practices for demonstrating compliance with the code. Page 15

Background q EC.02.03.05 addresses requirements for maintenance, testing, and inspection of fire safety equipment and building features. q Standard EC.02.03.05 repeatedly makes The Joint Commission s top ten list of most frequently-cited standards. q 6 th most frequently-cited standard in hospital surveys in 2013. q 44% of hospitals non-compliant in 2013 (up from 2012). Page 16

Background q NFPA 72, National Fire Alarm Code, in it s entirety, is a mandatory requirement as referenced in Chapter 2 of NFPA 101 Life Safety Code, 2000 Edition. 2.1 The following documents or portions thereof are referenced within this Code as mandatory requirements and shall be considered part of the requirements of this Code. The numbers in parentheses represent the paragraph numbers from chapters of this Code that reference the given publication in a mandatory way. NFPA 72, National Fire Alarm Code, 1999 edition. [7.2.1.8.2(3), 7.2.1.9.2(4), 8.2.4.4.3, 8.3.5.2, 8.3.5.2 Exc. No. 2,8.3.5.3, 9.6.1.4, 9.6.1.7, 9.6.2.8, 9.6.2.9, 9.6.2.10.1, 9.6.2.10.2, 9.6.3.4, 9.6.3.5, 9.6.3.6, 9.6.3.7 Exc. No. 2, 9.6.3.10, 9.6.4,9.6.5.4, 9.7.2.1, 11.8.3.2, 14.3.4.2.3(1), 15.3.4.2.3(1), 22.3.4.1.2, 22.3.7.9, 23.3.4.1.2, 23.3.7.9, 32.3.3.4.8] Page 17 9.6.1.7* To ensure operational integrity, the fire alarm system shall have an approved maintenance and testing program complying with the applicable requirements of NFPA 70, National Electrical Code, and NFPA 72, National Fire Alarm Code.

Background q Most challenges related to staying in compliance can be mitigated through: 1. Better understanding of standard requirements (knowing the code). 2. Entering into fair and equitable service agreements with industry vendors. 3. Ability to demonstrate an understanding of the vendor s testing and inspection documentation. Page 18

1 Understanding Standard Requirements A Closer Look at Standard EC.02.03.05 q EC.02.03.05 consists of Elements of Performance tasks, or Eps. q EPs cover the maintenance, testing, and inspection of fire safety systems. q A thorough understanding of NFPA code requirements is key to understanding TJC requirements and ensure full compliance. CFR Title 42 482.41 CoP NFPA 101 Chapter 2 & 9 NFPA 72 TJC Life Safety Chapter LS.01.01.01 NFPA 101 LS.02.01.34 NFPA 101 Environment of Care Chapter EC EC.02.03.05 NFPA 72 Testing Inspection Maintenance EC.02.05.05 Utility Systems Page 19

1 Understanding Standard Requirements Standard EC.02.03.05 EP1 q EC.02.03.05-EP1: At least quarterly, the hospital tests supervisory signal devices (except valve tamper switches). The completion date of the tests is documented. q Areas for Discussion: Definition of Supervisory Signal Devices Types of Supervisory Signal Devices Duct smoke detectors programmed to initiate as supervisory signal Page 20

1 Standard EC.02.03.05 EP1 Definition of Supervisory Signal Devices q A Supervisory Signal Device: q Is an initiating device, such as a valve supervisory switch, water level indicator, or low air pressure switch on a dry-pipe sprinkler system in which the change of state signals an off-normal condition and its restoration to normal of a fire protection or life safety system; or a need for action in connection with guard tours, fire suppression systems or equipment, or maintenance features of related systems. q Shall be tested on a quarterly basis, except for control valve switches. Page 21

1 Standard EC.02.03.05 EP1 Types of Supervisory Signal Devices q There are five types of initiating supervisory signals: Page 22 Control valve switch High- or low-air pressure switch Room temperature switch Water level switch Water temperature switch q This list of supervisory signals is not comprehensive - does not preclude the hospital from testing any other Supervisory Signals.

1 Standard EC.02.03.05 EP1 Duct Smoke Detectors Initiating as Supervisory Signal q Duct smoke detectors can be programmed to initiate to the fire alarm panel as a Supervisory Signal quarterly test (per EP1) or annual test (per EP3). q NFPA 72, 2010 edition: duct detectors that are programmed as supervisory initiating devices are not supervisory devices but they initiate a supervisory signal at the FACU. q Duct detectors should be listed under EP3, not EP1, and tested on an annual basis. Page 23

1 Understanding Standard Requirements Standard EC.02.03.05 EP3 q EC.02.03.05-EP3: Every 12 months, the hospital tests duct detectors, electromechanical releasing devices, heat detectors, manual fire alarm boxes, and smoke detectors. The completion date of the tests is documented. q Areas for Discussion: Electromechanical releasing devices Classification and testing requirements for magnetic door holders Page 24

1 Standard EC.02.03.05 EP3 Electro-Mechanical Releasing Devices q NFPA 72 1999 edition: electro-mechanical releasing devices are classified as initiating devices similar to smoke detectors, heat detectors, and manual pull stations. q Electro-mechanical releasing devices shall be tested on an annual basis. q There are two types of electro-mechanical releasing devices: non-restorable link type and restorable link type. q Appendix A Explanatory Material: for the restorable link type, it is a fusible thermal link detector used to close fire dampers, and fire dampers are actuated by the presence of external heat. Page 25

1 Standard EC.02.03.05 EP3 Magnetic Door Holders q Magnetic door holders are often wrongly classified as electro-mechanical releasing devices. q TJC is looking for documentation as part of EP3 however, there is no specific EP for magnetic door holders. q Testing of magnetic door holders should fall under the classification of auxiliary functions or building safety features of the fire alarm system. q TJC considers magnetic door holders and security magnetic locked doors to be included as part of EP3.* Page 26 * Environment of Care News, December 2013, Volume 16, Issue 12

1 Understanding Standard Requirements Standard EC.02.03.05 EP4 q EC.02.03.05-EP4: Every 12 months, the hospital tests visual and audible fire alarms, including speakers. The completion date of the tests is documented. q Areas for Discussion: Definition Documentation of test results Labeling and inventories Finding the right time for testing activities Page 27

1 Standard EC.02.03.05 EP4 Definition q NFPA 72 classifies a visual and audible fire alarm, including a speaker, as a notification appliance. q NFPA definition of notification appliance: a fire alarm system component, such as a bell, horn, speaker, light, or text display that provides audible, tactile, or visible outputs, or any combination thereof. q Testing frequency of a notification appliance: Annually. Page 28

1 Standard EC.02.03.05 EP4 Documentation of Test Results q General statements, such as all notification appliances tested, are not sufficient. q Each device has to be listed separately, indicating whether it passed or failed the test. q Complete inventory of notification devices serves as baseline for testing. Page 29

1 Standard EC.02.03.05 EP4 Labeling and Inventories q Labeling each field notification device is a recommended best practice. q Faster and more accurate recording of test results q Closes the loop q Inventory requirement are not specifically stated in EC.02.03.05 but are expected by The Joint Commission. Page 30

1 Standard EC.02.03.05 EP4 Finding the Right Time for Testing Activities q Finding the right time to perform test and ensure duration of test complies with code requirements is challenging in a hospital environment. q Advanced planning, as well as a documented and well-coordinated effort by the hospital, its staff, and the vendor, is required. Page 31

1 Understanding Standard Requirements Standard EC.02.03.05 EP5 q EC.02.03.05, EP5: Every quarter, the hospital tests fire alarm equipment for notifying off-site fire responders. The completion date of the tests is documented. q Areas for Discussion: NFPA code requirements and test methods Page 32

1 Standard EC.02.03.05 EP5 NFPA Code Requirements and Test Methods q Required testing frequency: Quarterly q Properly testing off premise notification equipment NFPA 72 Table 7-2.2(9) Test Methods: Initiating device shall be actuated and receipt of alarm signal at the off-premises location shall be verified. A trouble condition shall be created and receipt of a trouble signal at the off-premises location shall be verified. A supervisory device shall be actuated and receipt of a supervisory signal at the off-premises location shall be verified. If a transmission carrier is capable of operation under a single or multiple fault condition, an initiating device shall be activated during such fault condition and receipt of a trouble signal at the off-premises location shall be verified, in addition to the alarm signal. Page 33

1 Standard EC.02.03.05 EP5 NFPA Code Requirements and Test Methods q Documenting the elapsed time to central station Table 7-2.2(16) applies for Digital Alarm Communication Transmitters (DACT): The maximum elapsed time from sensing a fire alarm at an initiating device or initiating device circuit until it is recorded or displayed at the proprietary supervising station shall not exceed 90 seconds and trouble signals shall be within 200 seconds. q Testing the phone lines 5-5.3.2.1.4: A DACT shall have the means to satisfactorily obtain a dial tone; dial the number(s) of the Digital Alarm Communication Receiver (DACR); and obtain verification that the DACR is able to receive signals, transmit the signal, and receive acknowledgment that the DACR has accepted that signal. In no event shall the time from going off-hook to on-hook exceed 90 seconds per attempt. Page 34

Polling Ques=ons Today s event will include a series of mul=ple- choice polling ques=ons. Please make your selec=on to the right of this screen.

2 Fire Safety Service Agreements NFPA Code Requirements and Responsibilities q NFPA 72 Scope is the MINIMUM. 7-1.1.1 Inspection, testing, and maintenance programs shall satisfy the requirements of this code, shall conform to the equipment manufacturer s recommendations, and shall verify correct operation of the fire alarm system. q Task may be performed by owner if they meet the requirements of the code (if qualified). q If tasks are to be performed by a vendor, a written service contract must be in place. 7-1.2.1 Inspection, testing, or maintenance shall be permitted to be done by a person or organization other than the owner if conducted under a written contract. Testing and maintenance of central station service systems shall be performed under the contractual arrangements specified in 5-2.2.2. Page 36

2 Fire Safety Service Agreements NFPA Code Requirements and Responsibilities q NFPA 72 states the owner is responsible for ensuring all testing, visual inspections, and maintenance. 7-1.2 The owner or the owner s designated representative shall be responsible for inspection, testing, and maintenance of the system and alterations or additions to this system. The delegation of responsibility shall be in writing, with a copy of such delegation provided to the authority having jurisdiction upon request. q Visual inspections and maintenance have different frequencies requirements than testing. 7-3.1* Visual Inspection. Visual inspection shall be performed in accordance with the schedules in Section 7-3 or more often if required by the authority having jurisdiction. The visual inspection shall be made to ensure that there are no changes that affect equipment performance. Page 37

2 Fire Safety Service Agreements NFPA Code Requirements and Responsibilities q Maintenance per Manufacturer s Instructions. q Frequency NOT defined in NFPA 72. 7-4 Maintenance. 7-4.1 Fire alarm system equipment shall be maintained in accordance with the manufacturer s instructions. The frequency of maintenance shall depend on the type of equipment and the local ambient conditions. 7-4.2 The frequency of cleaning shall depend on the type of equipment and the local ambient conditions. q CMS Waiver for alternate maintenance does not apply 482.41(c)(2). Hospitals are expected to maintain equipment inventories and documentation of their maintenance activities. Federal or State laws and regulations (including Life Safety Code requirements adopted as part of Federal regulations) may require that equipment maintenance activities (i.e., maintenance, inspection, and testing) be performed in accordance with the manufacturer s recommendations or may establish other maintenance requirements. In these instances, the hospital must be in compliance with the most stringent maintenance requirements mandated. Page 38

2 Fire Safety Service Agreements NFPA Code Requirements and Responsibilities q Service Personnel Qualifications Includes testing, visual inspections, maintenance, and repairs 7-1.2.2 Service personnel shall be qualified and experienced in the inspection, testing, and maintenance of fire alarm systems. Examples of qualified personnel shall be permitted to include, but shall not be limited to, individuals with the following qualifications: 1. Factory trained and certified 2. National Institute for Certification in Engineering Technologies fire alarm certified 3. International Municipal Signal Association fire alarm certified 4. Certified by a state or local authority 5. Trained and qualified personnel employed by an organization listed by a national testing laboratory for the servicing of fire alarm systems Page 39

2 Fire Safety Service Agreements Recommendations and Best Practices q Performing work on time and material basis may put hospital at risk. q Thoroughly read and understand your service agreement - address any questions or concerns with the vendor upfront. q Take ownership of the service agreement; provide oversight for the actual work performed by the vendor. Page 40

2 Fire Safety Service Agreements Recommendations and Best Practices Responsibility begins early in the process q During the completion of new system, the Record of Completion document requires for a written service agreement to be in place prior to the AHJ giving TCO of the building to the owner. Excerpt from NFPA 72 Record of Completion Form 1-6.2.1* A record of completion (Figure 1-6.2.1) shall be prepared for each system. Parts 1, 2, and 4-10 shall be completed after the system is installed and the installation wiring has been checked. Part 3 shall be completed after the operational acceptance tests have been completed. A preliminary copy of the record of completion shall be given to the system owner and, if requested, to other authorities having jurisdiction after completion of the installation wiring tests. A final copy shall be provided after completion of the operational acceptance tests. Page 41

3 After Testing is Complete Understanding Testing and Inspection Documentation q Review the documentation for accuracy and completeness. q Address any errors or omissions (verification or retest). q Ensure facility staff has a good under-standing of test performed and is familiar with documentation. q Use vendor s sample test reports to run a mock survey with hospital s facility staff. q Schedule regular quality review meetings with vendor to walk through paperwork. Page 42

Conclusion Sample Gap Analysis Report All Functional Testing Summary q Take a comprehensive approach - perform a gap analysis to identify strengths and potential weaknesses. Vendors 52% In House Combo 10% 5% Not Done 33% q Create a complete inventory of all fire safety equipment systems in the facility: 33 % of functional testing not being performed All Visual Inspections Summary q Understand how these systems interface with each other. Vendors 44% In House 13% Not Done 43% q Understand specific maintenance, inspection, and testing requirements for each system. 43 % of visual inspections not being performed All Maintenance Summary Vendors 70% Page 43 Not Done 30% 30 % of maintenance not being performed

Conclusion (cont d) q Perform a gap analysis of all your fire safety systems to determine which tasks a hospital s maintenance staff might perform in-house vs. outsource. q Does the staff have the proper technical knowledge and training as prescribed by each relevant NFPA standard? q If not, evaluate the on-going training cost to keep staff abreast of any changes to the systems and codes. q Find a vendor who will partner with your organization and understands the organization s goals and objectives related to maintaining compliance with The Joint Commission s accreditation standards. Page 44

Conclusion (cont d) q Topics to cover during the interviewing process with the vendor: q Ask about the vendor s knowledge of fire safety equipment. q Ask about the vendor s knowledge of The Joint Commission s standards. q Ask about vendor s knowledge on not just local requirements, but all state and federal requirements. q Evaluate the vendor s final deliverables the documentation. q Ask potential vendors how they plan to help manage the hospital s fire protection program and stay in regulatory compliance with The Joint Commission and any other AHJ. Page 45

Conclusion (cont d) q Organizing and maintaining the hospital s report documentation is essential. q How the reports are organized whether by buildings, systems, or each individual Element of Performance is critical. q During a survey, hospital facility directors and their staff should be able to provide and explain requested information with confidence and assurance. q A better understanding of NFPA codes and requirements enables hospital facility directors to more effectively evaluate and work with industry vendors, as well as ensure accurate, complete, and properlymaintained documentation. Page 46

Contact Siemens Esteban Cota National Business Development Mgr Siemens Industry, Inc. Building Technologies Division 1000 Deerfield Parkway Buffalo Grove, IL 60089 Phone: 512.217.6574 E-mail: esteban.cota@siemens.com siemens.com/answers Page 47