TC 155 TIMES. E-net doc. 2014/6266. November 2014 BRIEFING FOR BPF-PPG MEMBERS

Similar documents
TC 155 TIMES. E-net doc. 2015/6392. May 2015 BRIEFING FOR BPF PIPES GROUP MEMBERS

ISO INTERNATIONAL STANDARD. Plastics piping systems for hot and cold water installations Crosslinked polyethylene (PE-X) Part 1: General

BUSINESS PLAN CEN/TC 203 CAST IRON PIPES, FITTINGS AND THEIR JOINTS EXECUTIVE SUMMARY

This document is a preview generated by EVS

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

Contents. EN :2012 (E) Issue 5 ( ) Page

Contact: Title: Resolutions of ISO/TC th plenary meeting held on in Tokyo (Japan) Source: TC secretariat. Project(s): Status:

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 72 FIRE DETECTION AND FIRE ALARM SYSTEMS EXECUTIVE SUMMARY

CEN/TC 442 Decisions taken /16

Doc. Number: N Report of CEN/TC 267 Secretariat "Industrial piping and pipelines" for the 30 th Plenary Meeting 27 October 2016 (Paris)

Radiation. Pekka Vuorinen. Finnish Association of Construction Product Industries RTT

CEN/TC 207 N N Work programme May Document type: Other committee document. Date of document:

FINAL DRAFT FprEN

Mandate M/118 WASTE WATER ENGINEERING PRODUCTS

ISO INTERNATIONAL STANDARD. Rotary positive displacement pumps Technical requirements

EUROPEAN COMMITTEE FOR ELECTROTECHNICAL STANDARDIZATION (CENELEC) TECHNICAL COMMITTEE No. 62: ELECTRICALEQUIPMENT IN MEDICAL PRACTICE

This document is a preview generated by EVS

CEN/TC 442. Building Information Modelling REPORT TO ACE BRUSSELS ØIVIND ROOTH, CHAIR CEN/TC442

This document is a preview generated by EVS

This document is a preview generated by EVS

This document is a preview generated by EVS

BUSINESS PLAN CEN/TC 142 WOODWORKING MACHINES SAFETY EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 305 POTENTIALLY EXPLOSIVE ATMOSPHERES EXPLOSION PREVENTION AND PROTECTION EXECUTIVE SUMMARY

This document is a preview generated by EVS

The CPD - The View of the European Commission

BUSINESS PLAN CEN/TC 10 LIFTS, ESCALATORS AND MOVING WALKS EXECUTIVE SUMMARY

1. Terms defined in the Construction Products Regulation (CPR)

Status report to ISO/TC204 October 2012

BUSINESS PLAN CEN/TC 159 HEARING PROTECTORS EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 162 PROTECTIVE CLOTHING INCLUDING HAND AND ARM PROTECTION AND LIFEJACKETS EXECUTIVE SUMMARY

About European Standards

The national standards bodies of:

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

ISO INTERNATIONAL STANDARD. Rotary positive displacement pumps Technical requirements

BUSINESS PLAN. CEN/TC 137 Assessment of workplace exposure to chemical and biological agents EXECUTIVE SUMMARY

The Process of making European Standards. Frank Moore Chairman CEN TC/248 Textiles

BUSINESS PLAN CEN/TC 69 INDUSTRIAL VALVES EXECUTIVE SUMMARY

Technical Bulletin CE marking: from 1st July 2013

Confused by standards Standards for social alarms

CE Marking for Fire Resistant doors. The future EN Agustín Garzón Cabrerizo Technical Director Fire Resistance Lab.

Update on European Standardization Work

ISO/TS TECHNICAL SPECIFICATION

ISO INTERNATIONAL STANDARD

Sýnishorn General requirements for components used in drains and sewers

Draft minutes of the meeting of

CEN/TC 12. and ISO TC67 SC4 Plenary meeting in PAU (2004)

CEN System - Delegated Decisions Dispatch 22:2017

BUSINESS PLAN CEN/TC 149 POWER-OPERATED WAREHOUSE EQUIPMENT EXECUTIVE SUMMARY

BUSINESS PLAN CEN-CLC/TC 3 QUALITY MANAGEMENT AND CORRESPONDING GENERAL ASPECTS FOR MEDICAL DEVICES EXECUTIVE SUMMARY

SOUTH AFRICAN NATIONAL STANDARD

ILNAS-EN :2018

Revision process of EN 45545

BUSINESS PLAN CEN/TC 249 PLASTICS

BUSINESS PLAN CEN/TC 164 WATER SUPPLY EXECUTIVE SUMMARY

ETICS & HARMONIZATION The challenges

Standardization in the Construction Sector Sustainability assessment and Environmental Product Declarations

Report on the activities of the ATEX consultant. Xavier Lefebvre. Contract : CENELEC/NA Consultant/2013-1

Relevance of standards for tractors and agricultural machinery. Antoon Vermeulen, CNH Belgium N.V. June pages

The development of seat fire testing for EN Richard Nowell

ISO 2411 INTERNATIONAL STANDARD. Rubber- or plastics-coated fabrics Determination of coating adhesion

On , CCMC received a proposal from DIN for the creation of a new Technical Committee in the area of Food Authenticity (see Annex 1).

CEN System - Delegated Decisions Dispatch 14:2017

SOUTH AFRICAN NATIONAL STANDARD

BUSINESS PLAN. CEN/TC 444 Test methods for environmental characterization of solid matrices

Guidance Note No 21/1. CE Marking Windows and doorsets to BS EN 16034

ISO 7458 INTERNATIONAL STANDARD. Glass containers Internal pressure resistance Test methods

Irish Standard I.S. EN :2009

New CEN Enquiry procedure - 3 Month enquiry with weighted vote and optional formal vote for CEN home-grown projects

Technical standards to support the evolution of technology enabled care services

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Adhesives for thermoplastic piping systems Part 1: Determination of film properties

STEEL TUBES AND FITTINGS FOR

CEN/TC 186 ISO/TC 244

ISO 1806 INTERNATIONAL STANDARD. Fishing nets Determination of mesh breaking force of netting

BUSINESS PLAN CEN/TC 208 ELASTOMERIC SEALS FOR JOINTS IN PIPEWORK AND PIPELINES EXECUTIVE SUMMARY

Standards and Standardisation. An Overview

ISO INTERNATIONAL STANDARD. Non-destructive testing Penetrant testing Part 2: Testing of penetrant materials

STANDARDISATION OF SRF (ISO/TC 300)

EN ISO 9001 ÖNORM. Quality management systems Requirements. Edition: EN ISO 9001: Cor.1: (consolidated version)

CEN System Delegated Decisions Dispatch 33:2016

EUROCODE 5 - A HALFTIME SUMMARY OF THE REVISION PROCESS

EN Electrical Equipment of non-electric appliances for household and similiar purposes Safety requirements

CEN/TC 442. Building Information Modelling SMART CE MARKING KICK-OF MEETING BRUSSELS ØIVIND ROOTH, CHAIR CEN/TC442

EN transition from BS 1387 Structural & Conveyance Business

BUSINESS PLAN CEN/TC 79 RESPIRATORY PROTECTIVE DEVICES EXECUTIVE SUMMARY

CEN strategies and plans for a global acceptance of the Eurocodes

BUSINESS PLAN CEN/TC 135 EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES EXECUTIVE SUMMARY

Record of Amendments. Version Date Amendment Section/page affected

ISO INTERNATIONAL STANDARD. Steel cord conveyor belts Part 4: Vulcanized belt joints

BUSINESS PLAN CEN/TC 121 WELDING AND ALLIED PROCESSES EXECUTIVE SUMMARY

Does your equipment meet your needs and the operational capacity stated by the manufacturer?

Sýnishorn Glass in building - Insulating glass units - Part 5: Evaluation of conformity

ILNAS-EN 61882:2016. Hazard and operability studies (HAZOP studies) - Application guide

National foreword. Text affected

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Adhesives for thermoplastic piping systems Part 2: Determination of shear strength

ILNAS-EN 50304:2001. Electric ovens for household use - Methods for measuring the energy consumption

ISO INTERNATIONAL STANDARD. Glass containers Vacuum lug finishes Part 1: General

EN ISO Welding coordination Tasks and responsibilities. Schweißaufsicht Aufgaben und Verantwortung (ISO 14731:2006)

Transcription:

E-net doc. 2014/6266 November 2014 TC 155 TIMES BRIEFING FOR BPF-PPG MEMBERS Draft harmonised standards for thermoplastics pipes: comments being reviewed by Task Groups. Future of CE marking for plastic pipes systems under discussion with Commission. IN THIS ISSUE Highlights & plenary 1 Pressure 2 Non-pressure 3-4 General 5 Liaison with others 5 CE marking 6 Default time for CEN enquiry reduced to 3 months. Enquiry and formal vote can be combined. Public comment stage on revisions to start shortly: EN 13476 Structured-wall piping (all parts) EN 12200-1 Rainwater piping systems EN 13598-2 Manhole and inspection chambers EN 15223 Design of buried pipes EN 1451-1 PP pipes, fittings and the system. EN 13844 and EN 13845 PVC-U sockets with seals The 46th meeting of TC 155 was held on the 19th and 20th November 2014 with the new chair Monica de la Cruz (Spain). The UK delegation comprised: Caroline Ayres (BPF), Julia Trew (BPF), and Steve Beech (Convenor TC 155 / WG12). The Plenary was divided into : General matters, Pressure, Nonpressure, liaison reports and matters relating to harmonisation. If you wish to view any documents relating to this meeting, contact Carol at secretary@plasticpipesgroup.com. Of key importance to the PPG members were: Review of comments on 4 umbrella hens. Discussions with DG Enterprise on CE marking under mandate M/131. Report that Mandate M/136 is on hold. Russia observer status to be declined and Japan observer status to be terminated. Request for permeability requirement for CE marking rejected. Working group reps who are inactive (by attendance or correspondence) are to be reviewed and possibly removed. 1

WG8 Systems for water supply and pressure drainage and sewerage: PVC-U (solid wall) Convenor: Urs Amacher (Switzerland) pren ISO 13844 (PVC-U socket joints with elastomeric seals: Test method for leak tightness under negative pressure). Being adapted for use with ISO 17885 (mechanical fittings). Final Vote closes 24/12/2014. pren ISO 13845 (PVC-U socket joints with elastomeric seals: Test method for leak tightness under internal pressure and angular deflection). Being adapted for use with ISO 17885 (mechanical fittings). Final Vote closes 24/12/2014. Request made to TC 155 for adoption of NWIP ISO 16422 (PVC-O pipes) as EN ISO. Proposal to be clarified and sent for committee vote. Responsibility within TC 155 to be agreed. Reference to existing products / standards in Europe need to be included. Next meeting - none planned. WG16 Systems for hot and cold water applications Under Vienna Agreement, work on this subject is undertaken by CEN TC 155/WG16. Convenor: Jerker Skarelius (Sweden) Draft revisions of Part 7 (assessment of conformity) for the individual material standards (PP, PE-X, PB, CPVC) prepared. TC 155 agreed to register these work items and send to vote. TC 155 agreed to initiate a work item for Part 7 for PE-RT and notify TC 138 / SC2. It is expected that Part 7 for multilayer pipes will be presented to the next TC 155 meeting. Revision of EN ISO 15876 Parts 2, 3 and 5 (PB pipes and fittings for hot water) draft in preparation. Revision of 15874 Parts 2, 3 and 5 (PP pipes and fittings for hot water) to increase the size range from 160mm to 400mm discussion ongoing on content. Next meeting 5th February 2015. WG12 Pressure systems of polyolefin material for gas supply, water supply and drainage and sewerage Convenor: Steve Beech (UK) pren 12106 (PE pipes - Test method for the resistance to internal pressure after application of squeeze-off). Enquiry closed, German and British comments to be addressed. TC 155 agreed that this standard will be developed now through ISO TC 138 / SC5 and this EN will not be required in time. Next meeting none planned. WG 23 Thermoplastics systems for industrial applications Convenor: Andreas Neubert (Switzerland) Under Vienna Agreement, work on this subject is undertaken by ISO/ TC 138/SC3. EN ISO 15494 (PB, PE, PE-X, PE-RT and PP pipes for industrial applications) approved for FDIS / FV vote, Dec 2014. Problems raised with annex ZA which is drafted under the Pressure Equipment Directive. EN ISO 15493 (ABS, PVC-U and PVC-C pipes for industrial applications). Request for amendment to be submitted. EN ISO 10931: 2005 / pra1 (PVDF pipes for industrial applications). Amendment in progress. Next meeting none planned. 2

WG1 Installation outside building structures of flexible piping systems New convenor: Peter Verlaan (NL) CEN / TS 15223 (Validated design parameters design of buried thermoplastics piping systems). Major change to structure during revision, draft sent for TC 155 committee vote in Oct 2014. Comments to be addressed and document issued for public comment. WG1 asked TC 155 if they should deal with a guidance for installation of infiltration systems for storm water management (see notes under WG26) and whether there is a need for guidance for above ground installation of non-pressure drainage and sewerage (agreed that there is no evidence of need). Next meeting 21st Jan 2015. WG13 Systems with structured wall pipes for nonpressure drainage and sewerage PE, PP, PVC-U Convenor: Peter Verlaan (NL) EN 13476 (Structured-wall piping systems of PVC-U, PP and PE). Parts 1 (General requirements and performance characteristics), 2 (Type A) and 3 (Type B) revisions are ready for CEN enquiry and Formal Vote (early 2015). Main focus large diameter pipes, test regime and editorial changes. WG 13 asked TC 155 request an early revision of CEN/ TS 13476-4 (assessment of conformity), because of the introduction of very large diameters and new test methods in other parts. Request noted for future meeting. Next meeting April 2015 (date to be confirmed following CEN enquiry). WG6 PVC piping systems for non-pressure soil and waste and solid wall piping systems for underground drainage Convenor: Michel Divanach (F) EN 1329-1 (soil and waste, low and high temperature in buildings). Published Aug 2014, request for revision pending revision of EN 1453-1. PD CEN/TS 1329-2 (soil and waste, low and high temperature in buildings, assessment of conformity). Revision to start at next meeting. EN 1453-1 (soil and waste, low and high temperature in buildings, structured wall). Enquiry in progress until 25/2/2015. DD ENV 1453-2 (soil and waste, low and high temperature in buildings, structured wall, assessment of conformity). Revision to start at next meeting. EN 1055 / ISO 13257 (Resistance to elevated temperature cycling). Draft to improve test circulated to WG6. EN 1401-1 (underground drainage). TC 155 agreed to revise. Next meeting 21st / 22nd April 2015. WG 10 Systems of polyolefin material for soil and waste discharge and non-pressure drainage and sewerage Convenor: Jens Martin Storheil (Norway) EN 1852-1 (underground drainage, PP). TC 155 agreed to revise. CEN/TS 1852-2 (underground drainage, PP. Assessment of conformity). Revision to be sent for TC 155 agreement by correspondence. pren 1451-1 (soil and waste, low and high temperature in buildings, PP). To be issued for voting. Next meeting 23rd / 24th June 2014. 3

WG 15 Pipes and fittings for piping systems for rainwater discharge Convenor: Alastair Walmsley (UK) EN 12200-1 (Rainwater piping systems. PVC-U). Revision prepared by convenor and discussed by WG15, includes other polymers for the external layer of pipes and fittings. Issued for CEN enquiry between 13 Nov 2014 and 28 Feb 2015. Next meeting 14th April 2015. WG20 Ancillaries for soil and waste discharge and gravity buried drainage and sewerage systems Convenor: Alastair Walmsley (UK) EN 13598-2 (Specifications for manholes and inspection chambers in traffic areas and deep underground installations. PVC-U, PP and PE). Revised following comments during 5 year review. Ready for CEN enquiry between Dec 2014 and Mar 2015. Part 1 will also need to be revised to remove overlap. TC 155 were asked about the timescale for this activity and it was referred to WG20. Decision on harmonized standards under mandate M/118 pending TC 155 discussions on M/131. Next meeting 9th/10th June 2015 WG 26 Systems for storm water handling Convenor: Hielke Hoekstra (NL) WI 00155783 and WI 00155784 (see below for titles), will run out of time before completion, new work items approved by TC 155 to continue work. WI 00155784 (Test method for determination of short term compression strength of boxes). Document being checked ahead of 2nd committee ballot. WI 00155783 (Test method for determination of long term structural compression strength of boxes). Proposed test needs revision as the outcome of the test results will not give distinctive results. UK delegation working on revision to present to next meeting. WI 00155824 (Specification for boxes used for infiltration, attenuation and storage systems made of PVC-U and PP). In preparation, but disagreement of materials clauses. UK propose including in informative annex to guide suppliers and purchasers of materials. Preliminary work item registered by TC 155 for components for storm water handling to cover mechanical resistance of tanks. This addresses infiltration and infiltration tanks referred from TC 165 / WG50 (water reuse). New part for Attestation of Conformity will be started when product standard has gone to CEN enquiry. Next meeting 9th / 10th February 2015. 4

WG17 Rehabilitation of pipeline systems Convenor: Wim Elzink (NL). The scope of WG17 was recently aligned with ISO TC 138/SC8 (chaired by John Gumbel, UK) to include trenchless replacement and renovation, SC8 lead on standards development and includes both water and gas applications. Wim Elzink is liaison officer between TC 155 and ISO TC 138/SC8. Concern was raised at TC 155 over marginal difference between rehabilitation (pipe in pipe) and no-dig installation of new pipes (replacement by a new pipe) and where responsibilities lie. Next meeting - none planned. WG25 Recycling of PVC-U, PE and PP materials Convenor: Tinus De Lange (NL). Nothing to report. Next meeting - none planned. WG 27 Environmental aspects Convenor: Sándor Aranyi (Hungary). Drafts for Environmental Product Declarations - Product Category Rules for (i) buried pipes and (ii) pipes in buildings to be sent to TC 155 for committee ballot before CEN enquiry. AHG 45 Lifetime expectancy of non-pressure piping systems Convenor: Henk Meerman (NL) This AHG is working on a package of tests for determining the life expectancy of materials of nonpressure pipes to increase options for use of recycled materials. Two tests considered: Fatigue and Cracked Round Bar method based on ISO/DIS 18489. Comparative testing between two tests on PP and PVC, virgin and non-virgin is ongoing to establish method and equipment. Next meeting 2nd / 3rd December 2014. CEN TC 107 Prefabricated district heating piping systems Fpr CEN/TS 16591 crosslinkable PE-Xb in district heating pipes to be cancelled. CEN TC 127 Fire safety in buildings draft EN 1366 includes plastic pipes, to be issued for CEN enquiry. CEN TC 249/WG16 Thermoplastics welding new technical report being drafted for supervision of welders. CEN / CLC TC 213 Underground plastics conduits for protection of cables - new standard being drafted EN 50626 (part 1 for pulled cables, part 2 for other cable installation). TEPPFA project on lifetime of polyolefin non-pressure pipes conclusions presented to TC 155, slides will be circulated later. Needs to link with work of AHG 45. 5 CEN TC 164 Water Supply 4MS Portugal to join as 5th member. Substances already listed for food contact automatically to be accepted for water and not included in core 4MS list. Test for mutual recognition of Enhancement of Microbial Growth not agreed but until M/136 restarted for products there is no driver to sort this. National Regulations continue. CEN TC 165 Wastewater systems EN 124 (Gully, manhole tops) prepared for FV includes Part 6 for thermoplastics; EN 1610 (pipelaying) prepared for FV; EN 12889 (trenchless construction) withdrawn. EN 1433 (drainage channels) revision started but plastics not well represented. ISO TC 138 and its working groups see separate report e-doc 6248 for work in ISO.

CEN TC 155 PLENARY MEETINGS Spring 2015: Vienna, Austria Autumn 2015: Delft, Netherlands Spring 2016: Helsinki, Finland Mandate M/131 (harmonised standards on pipes, tanks and ancillaries not in contact with water intended for human consumption) Four application-based harmonised standards (hens) proceeding: pren 15012 Buried and above ground piping components for nonpressure soil and waste discharge within the building structure. pren 15013 Non-pressure drainage and sewerage piping components buried in ground. pren 15014 Buried and above ground piping components for water under pressure. pren 15015 Hot and cold water piping components. The draft hens were subject to a 5 month CEN enquiry following which the tasks groups have started to discuss comments. CEN TC 155 sought a meeting with the European Commission s DG Enterprise to confirm fundamentals of CE marking under the CPR, clarify essential requirements and to identify a way forward. This document is prepared as an overview of the workings of CEN TC 155 for BPF-PPG members only. Reference should always be made to the full documents and official minutes and resolutions of the meeting. All information is given in good faith but no responsibility can be accepted for errors and omissions. DG Enterprise has proposed that CE marking for this sector may be reviewed as products standards already exist to meet CPR objective to remove barriers to trade. Other mandates under Construction Products Regulations Mandate M/136 Harmonised standards for construction products in contact with water intended for human consumption work on products postponed (confirmed by DG Enterprise), response to mandate to be delayed. Mandate M/366 Dangerous substances nothing to report. Mandate M/118 Harmonised standards for waste water engineering products work on manholes and shafts pending clarification of direction of M/131. Prepared by: Julia Trew Standards Manager BPF Plastic Pipes Group Tel: 01793 326284 Mobile: 07885 561190 E-mail: julia.trew@plasticpipesgroup.com 6