Construction Fabrication Service

Similar documents
HVAC 101. H V A C S y s t e m s

Session: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO

Closing the Loop What s best for your system?

Variable Refrigeration Flow Systems Overview 10/11/2016

Daikin Blueprint: Delivering Hot Water with a Chiller

GARCIA GALUSKA DESOUSA Consulting Engineers

Instructors: Contact information. Don Reynolds Doug McGee Factory Tech Support

CONTROLLED CHILLED BEAM PUMP MODULE

Variable Refrigerant Flow (VRF) Systems

Product Line Introduction. Karl Zhang Technical support engineer

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC

Geothermal HVAC. Modern. Engineering and Control Applications. Greg Cunniff. Jay Egg. Carl D. Orio. Mc Graw Hill Education

EarthWise System Seminar

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,

Small Commercial Business Energy Audits. Recognizing and addressing the special requirements of the small business market segment.

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

CALIFORNIA MECHANICAL CODE OVERVIEW OF 2016 UPDATES CHANGES AND RAMIFICATIONS

Gas Heat Pump (GHP) Presented for Panasonic Heating & Cooling Systems by Lee Howes Consultant Sales Engineer

Efficiency Vermont The American Institute of Architects Continuing Education Systems (AIA/CES) AIA/CES AIA/CES

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

Air Conditioning Options Winnetka Public School District 36 Winnetka, Illinois November 4, 2016

Eclipse Technical Training CME686 CME810 CP686 CP886 CP1086

Geothermal Heating and Cooling Using Ground Source Heat Pumps. Prepared by: Steven Forrester, P.E. Principal

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

Some of these procedures need to be performed to conform to requirements of the Clean Air Act.

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE

The Ed Roberts Campus Berkeley, CA

Smardt vs. McQuay Comparison of Standard Options and Other Benefits < 400 tons

Chiller Plant Design. Julian R. de Bullet President debullet Consulting

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

2009 IECC Commercial Mechanical Requirements

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems

Installation Manual for ETI AVS Series and NON-ETI Air Handlers with SC or SD Compressor Units and R-410A Refrigerant

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

LG VRF Systems. Air Conditioning Technologies

Low Charge ADX Ammonia. Presented by: Bruce Nelson, President, Colmac Coil Manufacturing Rick Watters, Vice President, AMS Mechanical Systems

Case 13 Food Storage & Processing Center

Available online at ScienceDirect. Physics Procedia 67 (2015 )

Presented By: John Dolan, P.E.

1 - This title will copy onto other forms Date

CB/CF. Series CONDENSERS AND CONDENSING UNITS. Features:

ISSN: ISO 9001:2008 Certified International Journal of Engineering and Innovative Technology (IJEIT) Volume 7, Issue 11, May 2018

ASHRAE Headquarters Building: GSHP vs. VRF systems

CB18/CBS18 Bulletin # September 1994 Supersedes August 1986

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

OPER LV Wheeler Way

RECORD SUBMITTAL COVER SHEET

SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. HEAD OFFICE-GROUND FLOOR RAHEJA CHAMBERS, FREE PRESS JOURNAL MARG, NARIMAN POINT, MUMBAI-21

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION

OPERATING INSTRUCTIONS

NET ENERGY WATER LOOPS A clear path to net zero energy buildings

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler

Powers Controls Low Temperature Detection Thermostat

CHAPTER 4. HVAC DELIVERY SYSTEMS

Building America AC Installation Using CheckMe!

ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY

Challenges and Methods of Estimating a Conceptual HVAC Design

Powers Controls ET 134 Low Temperature Detection Thermostat

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

Update Dedicated Heat Recovery Chiller Technology. Don Frye. Gulf South

CHAMPION SPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION FEATURES L2EU NOMINAL TONS

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Service Step by Step Trouble-Shooting Check-List

Selection of air conditioning systems

CONTENTS. B. System Design and Performance Requirements

VARIABLE REFRIGERANT FLOW (VRF) FULL LINE CATALOG

University of Iowa Indoor Practice Facility Outside-the-box HVAC OUTLINE AND LEARNING OBJECTIVES:

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL With Master Rack Compressor Sequencer

ENGINEERING. Edition No. 13 October 2002

Implications of GHP Fan Control Strategies on Humidity Control in Commercial Applications

Product Data. GEMINI SELECT 09DPS ,09DPM Air-Cooled Condensers with PURON Refrigerant (R-410A) 50/60 Hz

SPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION FEATURES L4EU NOMINAL TONS

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK

Summary Comparison of Simulation Program Features

Adsorption Chillers Energysmart Green Cooling

Installation Manual for. Series HWM and Non-ETI HYDRONIC WATER MODULE with SC and SD COMPRESSOR UNITS and R-410 REFRIGERANT

FACT SHEET 9 Large Air-Conditioning (air-to-air)

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Variable Refrigerant Flow

Technical Assignment 3 11/15/04. Executive Summary

Nominal Capacity 024 = 7 kw (2 tons) 036 = 10.5 kw (3 tons) 048 = 14 kw (4 tons) 060 = 17.5 kw (5 tons)

TECHNICAL GUIDE. Description SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS YD360, 480 & THRU 50 NOMINAL TONS YTG-B-0811

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

Worksheet for Small Commercial Air System Design

HVAC Mandatory Provisions Part II, Page 1

ADVANCED TRAINING INSTITUTE, HYDERABAD PR04/F01

FirstEnergy Program Overview

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

Technical Assignment 3

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

Transcription:

Construction Fabrication Service

VRF vs Heat Pump Chicago VRF Design & Installation Considerations

Presentation Overview o Premier Mechanical Background o VRF Project Resume o 2211 N Milwaukee Case Study o Design Considerations for VRF o Installation Considerations for VRF

Company History o Founded in 1994 o MEP BIM 400 & 500 Levels o Drawing in 3D Since 1998 o 2 In-House PE s o Markets o High Rise, Tenant Buildout, Health Care, Laboratory, Design Build, Education, Industrial VRF Condensers Boiler & Chillers Serving Chilled Beams

VRF Resume o First VRF Job 2008 o Certified Installers Of: o 5 VRF Manufacturers o Over 1000 Tons of VRF o Over 700 VRF Evaporators

VRF Projects Project Market VRF Type Illinois Valley Community College Institutional Geothermal Water Source Heat Pump VRF System Autumn Green Animal Hospital Commercial Design Build - Geothermal Water Source Heat Pump VRF VA Hospital North Chicago Bldg 4 Hospital Air Cooled VRF O Plaine Middle School - Gurnee IL School Air Cooled VRF RML Hospital Hospital Air Cooled VRF Thornton Fractional North High School School Air Cooled VRF Thornton Technical Academy School Air Cooled VRF Deerfield Public Library Institutional Air Cooled VRF 2211 North Milwaukee Residential Air Cooled VRF

2211 North Milwaukee Ave Case Study Air Cooled VRF Heat Pump Vs. Water Cooled Heat Pump

2211 North Milwaukee Ave Case Study Air Cooled VRF Heat Pump Vs. Water Cooled Heat Pump Building Summary VRF Design Summary 6 Story Apartment Building 2 MAU Gas Fired, 10,000CFM Each 1st Floor Parking & Commercial 2nd - 6th Apartments 16 VRF Condensing Units 160 Vertical VRF Evaporators 144,000 Sq Ft 16 Horizontal Ducted VRF Evaporators in Common Areas on 1st Floor 120 Apartments 17 Zones

2211 North Milwaukee - Upfront Cost Analysis Cost Breakdown Air Cooled VRF Vertical Stacked HPs Equipment $543,000.00 $615,000.00 Ventilation $400,000.00 $400,000.00 Temperature Controls $103,000.00 $65,000.00 Piping Material $88,000.00 $175,000.00 Piping Labor $383,000.00 $407,000.00 Cost/SqFt $13.95/SqFt $14.96/SqFt Total Cost $2,010,000.00 $2,155,000.00

2211 North Milwaukee Ave - Electrical Amp Comparison Floor Air Cooled VRF HP Water Cooled HP 2nd Floor 52.1 303 3rd Floor 52.1 303 4th Floor 52.1 303 5th Floor 52.1 303 6th Floor 52.1 303 Mechanical Equipment 826.5 200 Total Amps 1087 1715 36.6% Decrease in AMP Requirements

VRF Design Considerations from a Contractors Prospective Heat Pump or Heat Recovery Low Ambient High Rise Temperature Controls Intelligent Zoning Code Issues VRF Wall Mounted Evaporator

VRF Heat Pump VS Heat Recovery VRF Heat Pump Lower First Cost Single Mode Operation VRF Heat Recovery Higher First Cost Simultaneous Heat & Cool

Low Ambient Heating Capacity on VRF MAU (Discharge Air Reset) Supplemental Heat Water Cooled/Geothermal VRF Sizing of VRF Condensing Unit Condensing Unit Location VRF Air Cooled Ducted Condensing Unit Maintenance Access Use of Existing Gas Unit Heaters

High Rise Considerations Building Height Manufacturer Line Length Refrigerant Codes Air Cooled 10 Story Range Mech. Equipment Space

Temperature Controls & Intelligent Zoning

VRF Code Issues City of Chicago Code - No Flared or Mechanical Connections City of Chicago Code - Firemen's Dump Valve Circuits Exceeding 100# City of Chicago Code - Relief Valves Required Greater than 30# ASHRAE 15 - Maximum Refrigerant 26lbs/1000ft3 (R410a)

VRF Installation Considerations Certified Installers Hard Pipe vs Line Set Manufacturer Practices Flaring VRF Component Protection 2211 N Milwaukee - BIM Model

Manufacturer Certified Installers VRF is Not a Residential Split System Certification Installation Commissioning Service Manufacturers Participation Before Install, During Install, Startup Examples of Poor Installations

Hard Pipe vs Line Set Line Set Considerations: Kinking of Smaller Diameter Less Joints More Hangers Hard Pipe Considerations: Increased Insulation Cost Cleaner Install Insulation Considerations: EPDM Insulation Required VRF Operating Temps Vapor Barriers Pipe Hangers

Varying Manufacturer Requirements Commissioning Pressure Testing Pressure & Duration Evacuation Double or Triple Pull-Down Micron Level & Duration Control Wiring Shielded vs Non-Shielded Cable Service/Isolation Valve Refrigerant Tees Manufacturer or Field Provided Inlet/Outlet Distance Restrictions Line Lengths 2 & 3 Pipe Layout Others?

Flaring R410a vs R22 Flare Chicago Code

VRF Component Protection Nitrogen Purge Heat Protection

Summary Evaluate Building Heights 10 to 12 Stories Mechanical Space Locations Design Considerations Condenser Location Intelligent Zoning Installation Considerations Certified Installers Manufacturer Variations

Questions? Contact: Andy Hubner 630-640-5377 andy.hubner@premier-mechanical-inc.com