City of Sun Prairie Wetland Buffer Reduction Request

Similar documents
SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

USA Addition of South & East Side Residential Parcels. USA Deletion of a Town of Christiana Parcel. Conversion from USA to Limited Service Area

Florence County Small Commercial Land Disturbance Permit Application

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Zoning Ordinance Chapter 10

Draft Rhode Island Stormwater Design and Installation Standards Manual

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Asbury Chapel Subdivision Sketch Plan

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Plan Review Checklist

The Engineer/Developer s Perspective on Storm Water Management

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

SITE PLAN REVIEW APPLICATION AND CHECKLIST

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL

Village of Glenview Plan Commission

Watertown City Council

Town of Essex Small Site Erosion Control Guide

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

Chapter 1: General Program Information

Major Subdivision Sketch Plan Checklist

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

Section 3 Non-Structural BMPs

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE


PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

Review Zone Application for D&R Canal Commission Decision

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Chapter 3 Site Planning and Low Impact Development

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

SENSITIVE LANDS OVERLAY

UNIVERSITY OF MICHIGAN:

THE CITY OF MOBILE, ALABAMA

Planning Districts INTRODUCTION

Drexel, Barrell & Co.

SECTION UNIFIED DEVELOPMENT ORDINANCE SECTION Part 1 Ordinance. ARTICLE 1 Zoning Districts

Leduc Industrial Outline Plan SE W4

Appendix I. Checklists

City of Waco Stormwater Management Regulations

Chapter 131 GENERAL REFERENCES

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

Drexel, Barrell & Co.

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Rule D Wetland and Creek Buffers

Urban Planning and Land Use

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

Vegetated Filter Strips and Buffers

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Coffee Creek Park Development Low Impact Development (LID)

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

O l so n M e morial Highway, S t e , G o l d e n V a l l e y, MN Delano Laketown Homes Concept Plan

SEMSWA s Role in the Land Development Process

East Panorama Ridge Concept Plan Amendment

Zoning Ordinance Article 3

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

Chapter 10 IMPLEMENTATION RECOMMENDATIONS

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

OP Council Resolution June 16, Planning and Development Services

Glenn Highway MP DSR. Landscape Narrative

ARTICLE VI: SITE PLAN REVIEW

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

LAND USE AMENDMENT CORNERSTONE (WARD 3) COUNTRY HILLS BOULEVARD AND STONEY TRAIL NE BYLAW 9D2017

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

EROSION PREVENTION BMP SUGGESTED USES MATRIX

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

June 27, Letter of Intent West Prairie Village Replat No.1

Deerfield Township Community Development Department

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

ITEM # _ 41 _ DATE: COUNCIL ACTION FORM MAJOR FINAL PLAT FOR MENARDS SUBDIVISION BACKGROUND:

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

ARTICLE VI AGRICULTURAL PROTECTION DISTRICT

ARTICLE V PLANNED UNIT DEVELOPMENT DISTRICT

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

Red Fox Commercial Outline Plan

Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses

Huntington Stormwater Utility

4. CONCEPT PLAN DEVELOPMENT

STREAM BUFFER PROTECTION AND MANAGEMENT

ARTICLE IX SPECIAL PERMIT USES

STATUS OF REVIEW: ENGINEER WILL COMPLY

Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017

Vegetated Filter Strips and Buffers

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

When planning stormwater management facilities, the following principles shall be applied where possible.

IV. Development in the Rural Overlay District

Highway Oriented Commercial Development Criteria

Transcription:

City of Sun Prairie Wetland Buffer Reduction Request Westside Development Area January 9, 2017 Prepared by: City of Sun Prairie 300 E. Main Street Sun Prairie, WI 53590

BACKGROUND The City of Sun Prairie is requesting relief from the 75-foot wetland buffer requirements as they pertain to a 15.5 acre farmed wetland complex located in areas recently annexed to the City in the vicinity of S. Grand Avenue and Blue Aster Boulevard. The subject wetlands have been farmed for decades, and as noted in a recent delineation report, are dominated by invasive plant species, specifically reed canary grass. Per the attached Stantec report regarding the Brooks Tractor Wetland Delineation, the wetland appears to meet the criteria for less susceptible wetlands with a required buffer per NR151.12 of 10 to 30 feet in width. The photos to the right are included in the Stantec report, and were taken while standing within the delineated wetland boundary. Based on information from the attached delineation reports, as well as a misunderstanding on the part of the City of the applicability of the buffer requirements in unmapped environmental corridors, development approvals have been granted by the City for some properties bordering the wetlands. Some grading activities have commenced on the properties in question in accordance with an NOI issued by the DNR for the project earlier this year. The wetlands are located on the four properties described and mapped below, three of which have received final development approvals from the City. The fourth property is in the process of being purchased by the City.

Site A - Menards: A 27.9-acre site located along the east side of Grand Avenue, between Blue Aster Boulevard and S. City Station Drive. In addition to the delineated wetlands, this site is also hindered by the presence of a natural gas pipeline within a 50-foot easement and an adjacent 10-foot utility easement, within which no structures may be located. Menard s proposed materials yard fence is allowed to cross the easement, but cannot run parallel with the pipeline within the easement. Site B Brooks Property: A 25.5-acre site located immediately south of the Menards property. Blue Aster Boulevard borders the site on the north, and Brooks Drive on the south. Zoning entitlements have been granted for a 228-unit apartment development on this site to be known as the Springs at Sun Prairie (Continental 345 Fund LLC). The same natural gas pipeline and utility easement extend through the Brooks Property, as well. Site C - West Prairie Village: Originally platted in 2005, the West Prairie Village plat was modified in 2016 to realign streets to better accommodate the pending development to the south. Site D - Schneider Property: The City of Sun Prairie is in the process of purchasing this 41+ acre site for the purpose of constructing a regional storm water facility on a portion of the property. The City plans to close on a portion of the property in March 2017. Although no final determination has been made at this time, it is likely that the balance of the property will be made available for development to help recover some of the acquisition costs. This property is included in this request due to the proximity of planned street connections to the wetlands, and because it is the only other undeveloped property that borders the subject wetland. WETLAND BUFFER REQUIREMENTS The Capital Area Regional Planning Commission (CARPC) enforces the following wetland buffer requirements regardless of the size or quality of wetlands involved: A 75-foot buffer around the perimeter of a wetland within which no impervious surfaces (buildings, roads, driveways, etc.) are permitted. A 30-foot no grading buffer around the perimeter of a wetland. The lands related to this request were included in the Sun Prairie Urban Service Area boundary by the Dane County Regional Planning Commission in its original delineation in 1980. No site-specific conditions of approval were included in the original delineation, and no environmental corridors were identified and mapped at that time. The City of Sun Prairie Municipal Code also contains a provision that requires a 75-foot buffer around delineated wetlands. However, the City s Planned Development District regulations provide a process for requesting the waiver or reduction of such zoning standards when deemed appropriate to provide flexibility that may be needed to address unique or challenging site conditions, to encourage more creative site planning, and to improve overall design quality. In the case of the developments described

herein, the justification for the buffer reductions granted by the City are described in the REQUESTED BUFFER REDUCTIONS section of this application. When City staff became aware of the need for CARPC and DNR approval of the buffer reductions, CARPC staff provided guidance as to the circumstances under which reduced wetland buffer widths might be considered. It was suggested that the following information be submitted in support of the petition: The petition for the wetland buffer reductions must be sponsored by the local governing authority. Attached please find City of Sun Prairie Ordinance #623 and Ordinance #647, approving the Planned Development General Development Plans for both the Menards and Brooks sites, respectively, within which the proposed buffer reductions were granted by the Sun Prairie Common Council. The Menards approval included the proposed street realignment in West Prairie Village (ie, Wigeon Way), which was designed in such a manner so as to allow the City to avoid direct encroachment into the wetlands when this street is extended in the future onto the Schneider Property (see the REQUESTED BUFFER REDUCTIONS section below for details). Due to current and past agricultural practices, the wetland in its current state provides little ecological or aesthetic value. To help account for the reduced buffer, a wetland restoration plan has been developed to improve the quality of this resource, a 15.48 acre wetland in a rapidly developing urban area. Further information regarding implementation of the restoration plan is provided under the WETLAND RESTORATION PLAN section of this application. NR 151 post-construction standards allow for some direct runoff to wetlands when other areas are over-treated and overall 80% TSS control is achieved. Post-construction stormwater management measures are planned to minimize direct impacts on the wetlands by providing pre-treatment of runoff within on-site storm water facilities prior to runoff entering the wetlands. A summary of these efforts is provided in the POST CONSTRUCTION STORM WATER MANAGEMENT PLAN section of this application. Construction site erosion control measures will also be implemented to account for grading within the 30 foot buffer. A summary of such erosion control measures is provided in the CONSTRUCTION SITE EROSION CONTROL PLAN section of this application. REQUESTED BUFFER REDUCTIONS The specific buffer reductions being requested and the proposed justification for granting the requested relief from the buffer requirements follow: Menards Property: The Menards development plan evolved over an extended period. The initial concept plan for the facility involved a smaller site that did not have access to the proposed extension of Blue Aster Boulevard, and would have resulted in a petition to the DNR to fill approximately 2.3 acres of the wetland in order to create a building site large enough for the store (see September 2014 Concept

Plan, right). At that time, City staff recommended that the concept plan be rejected, in part due to the wetland encroachment. However, as a result of public feedback received through a subsequent plan amendment process for this area of the City, the Plan Commission and City Council approved a plan that shifted the commercial site to the south to avoid the wetlands and to gain access to the signalized intersection at Grand Avenue and Blue Aster Boulevard. Upon approval of the Plan amendment, Menards negotiated the purchase of additional land to the south to comply with the intent of the City s action. In addition to the wetlands, development of the Menards site is further challenged by the presence of a natural gas pipeline that runs north-south through the easterly 1/3 rd of the property. No structures are allowed within the easement, and while the fencing that encloses the proposed materials yard may cross the easement, it may not run lengthwise within the easement parallel to the pipeline. The combination of wetlands and the restrictions within the easement create a challenging site that is difficult to design within, and the imposition of the full 75 buffer complicates the site even further. In considering the proposed buffer reduction as part of the Planned Development process, the City took into account Menard s willingness to adjust its plans to avoid the filling of the wetland as originally proposed, the complications created by the pipeline easement and its associated restrictions, the overall poor quality of the farmed wetlands, and the proposed storm water plan, which diverts water to several on-site detention and treatment facilities before being released back into the

natural drainage system in the area. As proposed, a 30-foot no-build buffer is maintained in all but one location on the property, with associated grading proposed within the remaining 30-foot buffer. In one location the materials enclosure comes within approximately 6 feet of the wetland boundary in one location where the wetland extends very close to the pipeline easement. Brooks Property: The Brooks property was recently annexed into the City and approved for a 228-unit apartment development. It is being developed by Continental 345 Fund LLC. The wetland occupies a substantial portion of this property, and the gas pipeline and easement also runs through this site. The Continental plan works around the wetland, but involves some development within the 75-foot buffer and grading within the 30-foot buffer (all proposed impervious surface other than a planned multi-purpose path would be located at least 30 feet from the wetland). To comply with recommendations of the City s Land Use Plan and Official Map, the development includes a north-south street through the property that connects from Brooks Drive on the south to Blue Aster Boulevard on the north. The alignment of this street is dictated on both the south and the north by prior decisions. At Brooks Drive to the south, the roadway lines up with a right of way purchased and platted by the Wisconsin Department of Transportation in the early 2000s as part of the Hwy 151/CTH C interchange project. At Blue Aster, the street is to line up with the approved entrance to the Menards property. This alignment dictates that the street be located near the edge of the wetland, but a 30-foot setback between the wetland and the edge of the right of way has been maintained. Grading for this roadway is proposed within the 30-foot buffer. The development includes a proposed multi-purpose path along the edge of the wetlands in response to the City s adopted land use plan and Official Map, which call for the development of a trail network around the wetland and storm water features in this vicinity as a means of providing recreational opportunities for residents in the area. Installation of the trail contributes to the extent of the grading that is proposed within the 30-foot no grading buffer. As with the Menards development, the City Council approved a reduction in the buffer as part of the Planned Development General Development Plan for this property, as noted on the Ordinance attached to this application. The quality of the wetland, the challenges presented by the location of the pipeline

and easement on the property, and the desire to encourage a moderate density development on this site, which is within walking distance of several nearby retail businesses, entertainment venues and offices, provided the justification for the buffer reductions. West Prairie Village Plat: The West Prairie Village First Addition plat was recorded in 2005, but the streets south of W. Main Street have not yet been developed. In order to better connect with the Menards development and facilitate access from Menards to W. Main Street, the developers of West Prairie Village agreed to the replatting of this portion of their development to realign the streets, including the realignment of Wigeon Way. In agreeing to do so, West Prairie Village LLC was concerned about the creation of unusable parcels to the south of Wigeon Way, and requested that Wigeon be moved to the south to maintain as much developable land as possible within their plat. Initially, the realigned Wigeon Way was to be located outside of the 30-foot no grading buffer. However, as part of these discussions the City was also able to negotiate the adjustment of the right of way of the north-south aligned S. Mallard Drive, which is planned to run generally parallel to the east side of the wetlands, with a multi-purpose path along its west edge to offer public access and enjoyment of the wetlands. This right of way was shifted to the east so that as it extends into the Schneider property in the future it can avoid disturbance of the wetlands that have recently been delineated. Unfortunately, in doing so this also required the adjustment of Wigeon Way, which shifted closer to the wetland in order to square up the intersection of Wigeon and S. Mallard. As a result, Wigeon Way is now platted within the 30-foot no grading buffer. Given the circumstances and the fact that this adjustment was done to help avoid the need to fill wetlands in the future as the street system is extended, the City felt that this was a good compromise and approved the reduction in the buffer in this area. We are requesting similar action from CARPC and the DNR. Initial realignment of Wigeon Way. Final realignment of Wigeon Way.

Schneider Property: As mentioned earlier, the City is in the process of purchasing the Schneider Property in order to use a portion of the site for a regional storm water management facility. This facility will likely be located on the eastern 1/3 rd of the property, and the balance of the land will likely be sold for development to recover some of the acquisition costs. As such, there is no current development plan for the lands located adjacent to the wetlands other than the City s future land use plan. As noted above, as Mallard Drive is extended south into the Schneider Property, the City s aim is to avoid disturbance of the wetland recently discovered in this vicinity. The shift in the right of way should provide enough room to avoid impacts on the wetland, but the street and associated grading will very likely be within the 75-foot buffer. Grading activities will likely be located within the 30-foot buffer, as well. For the balance of S. Mallard Drive, the City would like to have the flexibility to locate all or portions of S. Mallard within the 75-foot buffer, provided that all associated grading remains outside of the 30-foot no grading buffer and stormwater generated from the future road will be treated prior to drainage to the wetland. One goal in this vicinity is to locate a multi-purpose path along the west side of Mallard Drive near the wetlands to provide access to this area for the public.

WETLAND RESTORATION PLAN In association with the pending development projects, the improvement of the existing 15.5 acres of farmed wetlands is being proposed to offset the requested reductions in the wetland buffers. A summary of the buffer treatments and planned wetland enhancement is provided on the attached restoration plan, and involves the reseeding of the buffers and wetland with a range of native vegetation (wet detention seed mix, native mesic prairie seed mix, and wet mesic prairie seed mix). In addition, wetland buffers will be seeded with a no mow seed mix to help stabilize these areas and prevent erosion. In conjunction with the Menards and Continental construction plans, each developer will be responsible for implementing the wetland restoration plan on their perspective property as indicated. A three-year maintenance plan will be established and enforced to ensure that weeds are controlled, woody species are removed, and native plantings are provided the opportunity to flourish and take hold. Activities will include, but may not be limited to, maintenance mowing or spot mowing once or twice annually to a minimum height of 6-12 inches until the native plantings are adequately established. POST CONSTRUCTION STORMWATER MANAGEMENT PLAN Post-construction stormwater management measures have been proposed for the Menards development (which includes the West Prairie Village street network) as well as the Brooks Property (Continental 345 Fund LLC). These developments have submitted Stormwater Management Plans to conform to Chapter 15.30 of the Sun Prairie s Stormwater Management Ordinance and Chapter 14 of the Dane County Manure Management, Erosion Control and Stormwater Management Ordinance. In addition to the County Ordinance for peak runoff control, the City of Sun Prairie also requires that the proposed development limit the peak runoff rate for the 10 year through the 25 year events to the 5 year predevelopment runoff rate. Menards: A wet detention pond is proposed on the north side of the site, separated by an access road but connected with an equalizer pipe. This pond will handle runoff from portions of City Station Drive, Wigeon Way and the majority of the Menards parking lot. An infiltration basin on the east side of the site will handle runoff from the Menards building, warehouse and the outdoor yard area. A third pond will be constructed on the south side of the Menards site and will handle runoff from the nearby road to the south and the future development of Lot 2 and Blue Aster Boulevard. In addition to treating the Menards site, developer is also treating approximately 3 acres from Grand Avenue that drained to the wetland network pre-development, further improving the water quality entering the wetlands. Continental: Two wet detention ponds are proposed for water quality treatment. The first basin is located in the northeast corner of the property that treats buildings, parking lots and a portion of the proposed Spring Street. The second basin is centrally located on the opposite side of Spring Street from the wetland. This facility handles the majority of runoff from development on the west side of Spring Street.

As it pertains to the wetlands, the individual stormwater management plans result in improving the water quality before it enters the wetlands. The pre-development conditions included farmed cropland and portions of Grand Avenue stormwater draining to the farmed wetlands. Combined with the wetland restoration plan, the development stormwater facilities will provide improved water quality, enhanced groundwater recharge and improved aesthetics with improved accessibility to create a valuable public recreation feature out of the existing wetlands. City Staff, along with MSA Professional Services, the City s consulting engineer, continues to review and comment on Menard s and Continental s stormwater management plans. Both current stormwater management plans are included in the attach materials. MSA s status of review memo, which also includes responses to Tony Vandermuss review comments, is also included. CONSTRUCTION SITE EROSION CONTROL PLAN Prior to any land disturbance or grading that is related to development outside the wetlands, construction site erosion control measures will be implemented. Anticipated measures will include the following: 1. Silt fence (WDNR Conservation Practice Standard 1056) will be placed around the perimeter of the entire delineated wetland. Silt fence will also be implemented at perimeter locations of the site where sheet flow drainage has the potential to transport sediment offsite. 2. Temporary sediment traps (WDNR Conservation Practice Standard 1063) will be constructed at the same locations where bioretention basins are sited. Following 85 percent build out of the subdivision, the temporary sediment basins will be removed and replaced with the bioretention basins. 3. Minimum no grading vegetative buffers of 5 to 30 feet or more will be maintained around the perimeter of the wetlands, with the exception of the small area on the Menards site where the wetland is only 6 feet from the pipeline easement. The buffer areas will be seeded with a no mow fescue seed mix. 4. Install stone tracking pads (WDNR Conservation Practice Standard 1057) at all points of construction traffic egress. 5. Implement Class II, Type C organic erosion control revegetative mat on all side slopes greater than 4:1. This type of mat is typically used adjacent to environmentally and biologically sensitive areas where plastic netting is inappropriate and will generally last three-years or greater also. As final design of each development is advanced, detailed Construction Site Erosion Control Plans will be developed and submitted for review and approval.

Wetland Restoration Seed Mix Examples No Mow Seed Mix Wet Detention Seed Mix Native Mesic Prairie Seed Mix Wet Mesic Prairie Seed Mix

W. Main St Site C S. Grand Avenue Site A Wigeon Way Site D Blue Aster Blvd Gas Pipeline Easement Site B Brooks Drive