Phase II Storm Water Permit Program MS4 Permit

Similar documents
MS4 Permit and Storm Water Management Program Overview

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

How to Update a Storm Water Management Program (SWMP) to Incorporate Total Maximum Daily Load (TMDL) BMPs

THE CITY OF DELAWARE, OHIO ILLICIT DISCHARGE DETECTION AND ELIMINATION PLAN

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility

4. Contractor (and subcontractors if applicable) certification statement(s)

The Road to Stormwater Management: MDOT s MS4 Permitting. Meredith Cote Dan DeVaun Chris Potvin June 2017

City of Richland Stormwater Management Plan

NJDEP Stormwater Initiatives: MS4s & GIS

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

Stormwater Program Coordinator: Title: Office Phone #: Emergency Phone #: Public Notice Coordinator: Title: Office Phone #: Emergency Phone #:

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

New Development Stormwater Guidelines

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Post Construction BMPs

Technical guidance to meet stormwater management design requirements; and,

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Huntington Stormwater Utility

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Stormwater Prevention and Control

ROGUE VALLEY SEWER SERVICES STORMWATER MANAGEMENT PROGRAM (SWMP)

Annual Report East Pennsboro Township s Stormwater Management Program

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

Green Infrastructure & Low Impact Development

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Article 20 Stormwater Management

NOTE: The public involvement and participation program is included in the public education & outreach program.

Phase II NPDES Permit application for the Montgomery County Department of Parks

Stormwater Protection Program October 15, 2015

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN


MS4 PROGRAM COST SAVINGS THROUGH COMMUNITY PARTNERSHIPS

Storm Water Managament at the University of Michigan

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

Post - Construction Hydromodification Development Requirements

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Sewer & Storm Drain Systems

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Maintenance Plan for Vegetated Portions of the MS4

New State Storm Water Rules: WHAT MUNICIPALITIES NEED TO KNOW &

Impervious Cover Reduction Action Plan for Hampton Township, Sussex County, New Jersey

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Best Management Practices are derived from the Notice Intent for the March 1, February 28, 2021 permit.

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

Preparing for MS4 in the Neponset Valley. December 4, 2015

When planning stormwater management facilities, the following principles shall be applied where possible.

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Outflow to Saw Mill Run

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

Watershed Planning Workshop

Draft Rhode Island Stormwater Design and Installation Standards Manual

4. CONCEPT PLAN DEVELOPMENT

MS4 PROGRAM DOCUMENTATION

Draft. Impervious Cover Reduction Action Plan for Fair Haven, Monmouth County, New Jersey

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend

Just The Basics: Illicit Discharge. What does it mean to me?

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Gravel Roads and Parking

STORMWATER POLLUTION PREVENTION PLAN FOR THE TOWNSHIP OF HADDON

Melissa Bernardo Hess, PE, CFM February 18, 2016

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2008 ANNUAL REPORT

3. Are there any projects exempt from the definition of Regulated Projects?

Inventory and Assessment of Stormwater Infrastructure

APPLICATION FOR MINOR SITE PLAN REVIEW

Vegetated Filter Strips and Buffers

Inventory and Assessment of Stormwater Infrastructure

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Do you know there your MS4 is?

Stormwater Management Conference October 19, 2016 Connecticut MS4 Program New Mapping Requirements

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Chapter 4 - Preparation of Stormwater Site Plans

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA PROCEDURES RELATIVE TO CITY COUNCIL PUBLIC HEARINGS

Preventing Storm Water Pollution

SMALL MS4 ANNUAL REPORT FORM

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

Stormwater Utility and Connection Fees

Preventing Storm Water Pollution

Action Plan for Retrofitting Structural BMPs

Non-Residential&Multi-Family PropertyCreditManual

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

ANNUAL FACILITY INSPECTION REPORT. June 1, May 31, 2018 NPDES PERMIT FOR STORM WATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

Presenting a live 90-minute webinar with interactive Q&A. Today s faculty features: John Epperson, Partner, Cooper White & Cooper, San Francisco

Draft Impervious Cover Assessment for Fair Haven Borough, Monmouth County, New Jersey

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

water that enters our streams during storms. Any water the rain garden can t accept will continue into the storm sewer system.

Vegetated Filter Strips and Buffers

MCM1 Public Education and Outreach Draft Public Education and Outreach Program

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Transcription:

Phase II Storm Water Permit Program MS4 Permit Karen Katamay Environmental Protection Engineer/CPESC Illinois EPA Des Plaines Regional Office karen.katamay@illinois.gov 847-294-4043

Types of Storm Water Permits Construction (ILR10 ) for construction sites greater than or equal to one acre Industrial (ILR00 ) for industries that have the potential to impact storm water MS4 (ILR40 ) for communities that meet the criteria as defined in CFR122.26(b)(16). Urbanized area, population density, potential to impact storm water.

MS4 Definitions Municipal Separate Storm Sewer System Includes roads with drainage systems Municipal streets, catch basins, curbs and gutters Storm ditches, man-made channels, storm drains Doesn t have to be a pipe, just a means of conveying storm water Doesn t include combined sewers or sanitary sewers

Covered Entities Cities in urbanized areas with combined populations of 50,000 people or more and/or a population density of 1,000 people per square mile Townships in urbanized areas Counties DOT, drainage districts or similar entities Other communities as designated based on watershed criteria

Phase II Small MS4 Permit Renewal Changes New Permit became effective April 1, 2009 Notice of Intent for future Renewals Submit electronically to Agency Agency will post on website Annual Inspections Submit electronically to Agency Agency will post on website 5

MS4 Storm Water Permit Changes NOI is now required for municipal construction projects Submit Notice of Intent (NOI) for all construction activity 1 or more acres Submit NOI with original signature at least 30 days before construction begin date retained automatic coverage of construction sites for MS4s Submit Electronic Copy of SWPPP 30 Day mandatory review period IEPA will post NOI s on website for 14 days Submit NOT when site is properly stabilized 6

General Permit Requirements Notice of Intent (NOI) Previously covered - submit new NOI within 90 days of effective permit date (April 1, 2009) Not previously covered, but notified by Agency that coverage is now required - submit NOI within 180 days of notification. Include all information specified in permit Submit both electronically AND hard copy with original signature

Partnership and Qualifying Programs You may partner with other MS4s Must have agreement on who is doing what and the partner must implement the BMP Partnership Examples: Household hazardous waste collections Share publications, links to other websites with useful information Shared training programs for staff and public Shared water monitoring for watersheds Qualifying local programs include county and municipal ordinances and enforcement programs

Total Maximum Daily Loads (TMDLs) Some watersheds are subject to TMDLs If your system discharges to a TMDL listed watershed, you must evaluate your program and include BMPs for storm water related TMDL requirements.

Monitoring Requirements Must evaluate program compliance and effectiveness Must include: at least annual monitoring of receiving waters upstream and downstream, and/or Indicators to gauge effects on physical/habitat related aspects of receiving waters, and/or Any other monitoring needed to evaluate effectiveness of BMPs and show reduction of pollutants

Recordkeeping Must post your NOI, your SWMP and your annual reports on your website Records must be kept to show compliance with program Records must be available for inspections Records must be available to public (storm sewer maps exempted)

Reporting Must submit annual reports by June 1 st Must be submitted electronically Report covers from March thru March Must include permit requirements, including: Status of program and effectiveness Results of any monitoring data Any changes to program

Storm Water Management Program (SWMP) Six Minimum Control Measures Public education on storm water impacts Public involvement and participation Illicit discharge detection and elimination Construction site runoff control Post construction controls on new development and redevelopment Pollution prevention/good housekeeping for municipal operations 13

Definitions Measureable Goal narrative or numeric standards used to gauge program effectiveness Measureable Goal requirements: Include activity or BMP to be completed Schedule or date for completion Quantifiable target to measure progress toward achieving activity or BMP Measurement can be in percentages, numbers, data results, or dates of completion. Include measureable goals with all six MCMs

Definitions Green Infrastructure: Approaches and technologies that utilize, enhance or mimic natural conditions Examples include green roofs, rain gardens, trees Examples include green roofs, rain gardens, trees and tree boxes, vegetated swales, pocket wetlands, infiltration planters, porous and permeable pavements, porous piping, vegetated median strips, rain barrels, riparian buffers, etc.

Public Education and Outreach on Storm Water Impacts Distribute educational materials to community Provide info on a website Do a public service announcement at a movie theater or local event Conduct equivalent outreach activities Focus on household issues (pet waste, car washing, fertilizers, used motor oil) Include information on green infrastructure strategies 16

Public Involvement and Participation Volunteer programs (clean-up days, adopt a street or storm drain programs, etc.) Volunteer water monitoring Boy scout and girl scout watershed projects Work with local teachers, community and environmental groups Work with local conservation districts and park districts 17

Illicit discharge detection and elimination (IDDE) Storm sewer map (if not already done) Update local ordinances to allow regulation and enforcement Require reporting of all releases and spills Develop an IDDE plan for community Educate businesses and public about illicit discharge Train employees to detect illicit discharge Inspect all stormwater outfalls at least once/year Recommendation: Utilize trained professionals, like fire, police, pretreatment coordinators 18

19

Construction Site Runoff Control Develop, implement and enforce program for sediment & erosion control for construction sites greater than or equal to one acre Require controls for construction activity wastes (garbage, concrete washout, spills, sanitary wastes) Train inspectors to do erosion inspections Encourage use of green infrastructure 23

24

25

26

27

28

Post Construction Controls on New Development and Redevelopment Incorporate storm water infiltration, reuse and evapotranspiration whenever possible Reduce volume, velocity and pollutants as much as possible Preserve natural features and existing waterways as much as possible Minimize impervious surfaces Require post construction management plans Train employees on green infrastructure alternatives for maintenance and repair 29

Morton Arboretum Parking Lot 30

31

Pollution Prevention/Good Housekeeping for Municipal Operations Develop storm water management plan for municipal operations Review all operations for impact on storm water (salt storage, vehicle maintenance, pesticide/herbicide use, waste handling, etc.) Determine BMPs for municipal operations Collect and properly dispose of wastes from cleaning storm sewers and street sweepings Train employees in P2 and good housekeeping 32

Email Addresses Storm water coordinator : terri.lemasters@illinois.gov Permit manager: al.keller@illinois.gov 217/782-0610 (permit section) Submittals SWPPPs - epa.constilr10swppp@illinois.gov ION epa.swnoncomp@illinois.gov MS4 NOI -epa.ms4noipermit@illinois.gov Annual Inspection epa.ms4annualinsp@illinois.gov Industrial SWPPPs epa.indilr00swppp@illinois.gov 33

Website Addresses www.epa.state.il.us MS4 NOI for Permit and Permit Renewal http://www.epa.state.il.us/water/permits/storm-water/ms4.htmlwater/ms4.html NOIs, NOTs, IONs and Construction Site Permit http://www.epa.state.il.us/water/permits/storm- water/construction.html Public Notification List of NOI Applicants http://www.epa.state.il.us/water/permits/storm-water/noi/ water/noi/ Public Notification List of SWPPPs http://www.epa.state.il.us/water/permits/storm-water/noi-docs/ USEPA guidance documents and fact sheets http://cfpub.epa.gov/npdes/stormwater 34

Any Questions? 35