CORALAIS BODYSPA BATH AND SHOWER FAUCET

Similar documents
Installation Guide. Engineering Excellence. Single Handle Tub & Shower Valve Set: 4010B 4011B

Instructions. Certifications Brass w/built-in Stop Valve. Pressure Balance Shower Valve. Tools Required. Important Points.

Handshower, Hose & Handshower Accessories

Cable Drain & Cable Drain Trim Kit

INSTALLATION INSTRUCTIONS

Handshower, Hose & Handshower Accessories

Lavatory Faucet INSTALLATION INSTRUCTIONS P24490-CR, P24490-LV, P24491-CR, P24491-LV, P24492-CR, P24492-LV, P24700, P24705, P24706, P24736, P24800

Single-Control Lavatory Faucet

INSTALLATION INSTRUCTIONS

WELLWORTH WATERGUARD VITREOUS CHINA SIPHON JET TOILET

Basin Set INSTALLATION INSTRUCTIONS

SS-THVD2-1/2 THERMOSTATIC VALVE WITH 2 WAY DIVERTER SS-THVD3-1/2 THERMOSTATIC VALVE WITH 3 WAY DIVERTER

Installation Guide ASME A ANSI A117.1 CUPC / IAPMO LISTED / ADA COMPLIANT. Engineering Excellence

INSTALLATION INSTRUCTIONS

TIMES SQUARE TWO-HANDLE THERMOSTAT

REVIVAL LITE VITREOUS CHINA REVERSE TRAP TOILET

SEABREEZE. SeaBreeze Rain Shower System Model #1086-CH Owner's Manual

Acrylic Claw Foot Tub

Single-Control Bathroom Sink Faucet

K-870-JA-AA K-872-JA-AA

SAN RAPHAEL PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET

SYSTEM BASIC WHIRLPOOLS

Kallista Bath Flip Drain

Vintage Whirlpool Baths: K-702-AC K-702-H-AC CA (9427) Copyright 1994 Kohler Co.

INSTALLATION INSTRUCTIONS

Installation Instructions / Warranty

Thermostatic Valve and Trim

COUTURE ECO-LITE VITREOUS CHINA REVERSE TRAP TOILETS

Installation Instructions

REVE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS 现代型分体座便器 CONTEMPORARY TWO-PIECE TOILET K-17178T-S/K-17178T-SP

INSTALLATION FOR THERMOSTATIC VALVES

PALARRE, ROCHELLE WATER-GUARD VITREOUS CHINA SIPHON JET TOILET

Acrylic Claw Foot Tub

REACH ORDERING INFORMATION NOTES T01-B

PORTRAIT LITE VITREOUS CHINA REVERSE TRAP TOILET

TUB AND SHOWER FAUCET

Infinity Whirlpool Bath: K-1477-V-AB K-1487-V-AB K-1482-V1-AB K-1484-V1-AB

3/4.8 AERODYNE 3/4.8L CLASS FIVE+

REVE ORDERING INFORMATION NOTES T01-E INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17178T-S2/K-17178T-SBG2/K-17178T-SP2

ANTARES ORDERING INFORMATION NOTES T01-G INSTALLATION INSTRUCTIONS

MEMOIRS VITREOUS CHINA TOILETS

Instructions. Certifications Chrome 2-handle Chrome 3-handle 10-B83-WCH-AD Chrome 3-handle 10-B82-WCH-AD Chrome 2-handle

SAN RAPHAEL GRANDE ORDERING INFORMATION NOTES T01-B INSTALLATION INSTRUCTIOINS 4.8L SKIRTED CLASS FIVE ONE-PIECE TOILET 4.

MINIATURE THERMOSTATIC VALVE

TUB AND SHOWER FAUCET

TRU-TEMP VALVE. Tru-Temp Pressure Balance 1/2" Rough-In Valve Owner's Manual 3001-RIV-PB-ORB 3001-RIV-PB-BN 3001-RIV-PB-CH 3003-RIV-PB-ORB

Karess ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS

BARRINGTON PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET K-4327

ARIN THERMOSTATIC SHOWER SYSTEM

RYLE WIDESPREAD FAUCET INSTALLATION

INSTALLATION. Glass Panel Doors (select models) CAUTION

Installation S IMPORTANT! Bradley Thermostatic Mixing Valve for Individual Showers. Table of Contents

TROCADERO ORDERING INFORMATION NOTES T01-H INSTALLATION INSTRUCTIONS

ADAIR ORDERING INFORMATION T01-A

8707T Includes seat. 8745T Includes Bowl

INSTALLATION GUIDELINES

INSTALLATION INSTRUCTIONS

WELLWORTH /HIGHLINE WITH PEACEKEEPER VITREOUS CHINA TOILET

Installation Instructions

Hourglass Whirlpool Bath: K-1506-H-AB Hourglass Optional Apron: K-1507-AA

Installation S

WATTS WALL-MOUNT WIDESPREAD BATHROOM FAUCET INSTALLATION

Installation Instructions

Installation Guide. Pedicure Spa D K-163, K-1006, K-1011, K-1012

INSTALLTION FOR THERMOSTATIC VALVES

Precedence Bath Whirlpools: K-1355-H1 K-1356-H1

Sign Planogram: Plumbing Repair Bay Name: Plumbing Repair 4.1. Toilet Repair. 72" from floor to bottom of AV. Replacing a Fill Valve

Instructions CH Chrome SS Stainless Steel Certifications. Single Handle, Pull-Down, Kitchen Faucet. Tools Required.

PERSUADETM ORDERING INFORMATION NOTES T01-D INSTALLATION INSTRUCTIONS 3/4.8L TWO-PIECE TOILET 3/4.8L K-3654T-W/K-3654T-CW

MEMOIRSS ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS (4.8L) VITREOUS CHINA ONE-PIECE TOILET(4.8L) K-3451T-*/K-3453T-*

SWIVEL HEAD WASTE AND OVERFLOW INSTALL

Instructions. 110-KVD-CYSCH-AD-Z Chrome 110-KVD-CYSSS-AD-Z Stainless Steel Certifications. Single Handle, Pull-Down, Kitchen Faucet

How To: PREPARATION REPLACE A KITCHEN SINK

Installation Guide BUBBLEMASSAGE. English page T01-A

MAKAI WIDESPREAD FAUCET INSTALLATION

ADAIR ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS 4.0L EXPOSED CLASS FIVE ONE-PIECE TOILET 4.0 K-5306T/K-5306T-S

ESCALE FREELANCE OVE BEFORE YOU BEGIN OR DE R ING INF OR MAT ION T01-E INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS. Cubix Widespread Faucet Part #: 3204, 5204, 3304, 5304 HANDLE STYLES

Installation S

Installation S

C-IV 60 CEILING FAN READ AND SAVE THESE INSTRUCTIONS. FAN RATING AC 120V. 60Hz

KATHRYN ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS 4.8 TM COMFORT HEIGHT 1-PC EB TOILET K-3940

ChicagoTM. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.

Orrin. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.

OVE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17737T/K-17737T-S

808 Series. Serie 808 Série 808

NATURAL GAS CONVERSION KIT

M INSTALLATION INSTRUCTIONS M FLEETWOOD SINGLE CROSS HANDLE PRESSURE BALANCE TRIM ONLY, TO SUIT M ROUGH

Butler Mill and Brassworks Ltd. Exposed 1/2 Thermostatic Valve Installation Instructions

SPEAKMAN SPEAKMAN SPECIFICATIONS

CB-4070 BLACK ARCHIPELAGO PRESSURE BALANCE MIXING VALVE TRIM ONLY, TO SUIT M ROUGH

DELEVINGNE WIDESPREAD FAUCET INSTALLATION

R89-CB 808-CB Series. Serie R89-CB 808-CB Série R89-CB 808-CB. Tub & Shower Shower Only Trim Kit

Installation Instructions

Instructions. Certifications CH Chrome SS Stainless Steel. Single Handle, Industrial Style, Pull-Down Kitchen Faucet.

Entertainment Faucet with Remote Valve

SUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV)

ARCHERTM ORDERING INFORMATION NOTES T01-C INSTALLATION INSTRUCTIONS VITREOUS CHINA ONE-PIECE TOILET K-3639T/K-3639T-C

PANACHE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS

Installation. S Series Navigator Thermostatic Mixing Valve

Transcription:

CORALAIS BODYSPA BATH AND SHOWER FAUCET 1. BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation sequences. Follow the sections that pertain to your particular installation. This will help you avoid costly mistakes. In addition to proper installation, read all operating and safety instructions. All information in these instructions is based on the latest product information available at the time of publication. Kohler Co. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. NOTES This instruction provides installation information for two faucet models. Be sure to follow only the steps that apply to your installation. The K-1097 uses two valves, one for the bath fill, and another for the shower. Pay special attention to this feature when planning your site preparation. Avoid excessive heat if you solder connections, to prevent damage to the fitting. Flush all piping thoroughly before installing the valve. Observe all local plumbing codes. Do not force the handle(s) in any direction. To turn the valve off, gently turn to the Off position. For the K-1097, do not use any plastic pipe between the Rite-Temp valve and spout. Do not connect a deck-mount spout, diverter, or hand shower to the spout outlet, unless you cap the shower outlet on valve. Install pipe or tube in a straight drop of 7 to 18 with only one elbow between the valve and the wall-mounted spout. Other types of installations may cause unsatisfactory shower performance. CAUTION: Risk of product damage. Remove the aspirator, plaster guards, and valve units before you apply heat to the yoke. TOOLS AND MATERIALS REQUIRED Assorted screwdrivers Plumbers putty Thread sealant Thread sealant tape Adjustable wrenches Strap wrench Pipe wrench 5/32 hex wrench 1/2 piping 1/2 elbows Solder/flux Propane torch Hacksaw or tubing cutter 1999 Kohler Co.

IMPORTANT INSTRUCTIONS READ AND SAVE FOR THE CONSUMER WARNING: Risk of scalding or other severe injury. Before completing installation, the installer must set the maximum water temperature setting of this valve to minimize the risks associated with scalding hazards according to ASTM F 444. Do not install a shut-off device on either outlet of this valve. The installation of any such device may create a cross-flow condition at the valve and affect the water temperature. Factors that change the temperature of the water supplied to the valve, such as seasonal water temperature changes, and water heater replacement or servicing, will change the maximum water temperature supplied by the valve and may create a scalding hazard. The pressure-balanced valve will not compensate for changes in the water supply temperature; adjust the maximum water temperature setting of this pressure-balanced valve when such changes occur. Pressure-balanced valves may not provide protection against scalding if there is a failure of other temperature-limiting devices elsewhere in the plumbing system. The installer is responsible for installing the valve and adjusting the maximum water temperature of this pressure-balanced valve according to instructions. This valve meets or exceeds ANSI A112.18.1M and ASSE 1016. If you do not understand any of the installation or temperature adjustment instructions in this document, in the United States please contact our Customer Service Department at 1-800-4-KOHLER. Outside the U.S. please contact your distributor. IMPORTANT: Please fill in the blanks below and on the valve label. Then insert these instructions into the plastic bag included with the valve package, and attach the plastic bag to the valve handle for the owner s reference. This device has been preset by of to ensure a safe maximum temperature. Any change in the setting may raise the discharge temperature above the limit considered safe, and lead to scalds. Date: 2

2. SITE PREPARATION ROUGH-IN PLUMBING Turn off the water supplies. Install or relocate the supplies as necessary to conform to the roughing-in dimensions. NOTE: If the bath or foot bath has already been installed, be sure to cover it to prevent damage before you proceed. Inspect the waste and supply tubing for damage. Replace if necessary. SUPPORT FRAMING K-1096 MODEL ONLY Determine the installation location of the valve, showerhead, and spout. Install the support framing as required. IMPORTANT! Secure the bath and shower piping to the support framing. Proceed to Fig. #3. 10 72 78 TO FLOOR (TYPICAL) 4 Fig. #1 SUPPORT FRAMING K-1097 MODEL ONLY Determine the installation location of both valves, the showerhead, and the spout. Install the support framing as required. IMPORTANT! Secure the bath and shower piping to the support framing. Proceed to Fig. #4. 72 78 TO FLOOR (TYPICAL) 48 TO FLOOR (SHOWER ONLY) 10 4 Fig. #2 3. PRE-INSTALLATION PROCEDURES K-1096 MODEL ONLY CAUTION: Risk of product damage. Remove the aspirator, plaster guards, and valve units before you apply heat to the yoke. Remove the valve units, plaster guards, and the aspirator from the yoke. Proceed to Fig. #5. Aspirator Yoke Valve Unit Plaster Guard Fig. #3 3

4. PRE-INSTALLATION PROCEDURES K-1097 MODEL ONLY To prevent damage to the Rite-Temp valve components due to heat while soldering, open the valve as follows: Remove and save the plaster guard and mud guard. Rotate the valve stem fully clockwise. Valve Body Stop Valve Stem Mud Guard If the valve has stops, rotate both stop adjustments fully counterclockwise. Plaster Guard Fig. #4 Proceed to Fig. #5. 5. INSTALLATION INSTALL 2-HANDLE YOKE ALL MODELS The yoke has a two-sided pipe adapter that can be reversed for use with either 1/2 N.P.T. pipe or copper tubing. Connect the hot and cold supplies to the yoke so they are between 2 and 3-1/2 from the finish wall. Ceiling Supplies Aspirator Cold The faucet fitting is factory assembled specifically for hot and cold water supplies from the floor. If installing the faucet for ceiling supplies, turn the yoke over so the supplies connect from the top. Hot For the K-1098, reinstall the aspirator at the top of the yoke. Do not overtighten. For the K-1097, discard the aspirator. D-shape Up Reinstall the valve units with the colored dot valve on the left side (right side for ceiling supplies). Reinstall the plaster guards. For K-1096 model, proceed to Fig. #6. For K-1097 model, proceed to Fig. #7. D-shape Down Fig. #5 INSTALL 2-HANDLE YOKE K-1096 MODEL Install elbows and adapters (if used) onto 1/2 copper tubing or 1/2 pipe of proper length. Connect the piping to both the shower and bath yoke outlets. IMPORTANT! Secure the tubing to the framing. Install temporary 1/2 nipples into the bath and shower ells. The temporary nipple used for slip-fit spout installations must extend at least 6 beyond the finish wall. Turn on the water supplies. Open both the hot and cold valves for about one minute to flush debris from the water lines. Complete the finish wall, and discard the plaster guards. Proceed to Fig. #12 or Fig. #13. Shower Ell Bath Ell Fig. #6 Shower Outlet 1/2 Copper or Pipe 1/2 Adapter or Solder Direct 1/2 Copper or Pipe Bath Outlet 4

INSTALL 2-HANDLE YOKE K-1097 MODEL Install elbows and adapters (if used) onto 1/2 copper tubing or 1/2 pipe of proper length. Connect the piping to the bath yoke outlet. IMPORTANT! Secure the tubing to the framing. Shower Outlet Plug 1/2 Adapter or Solder Direct 1/2 Copper or Pipe Install a temporary 1/2 nipple into the bath ell. Bath Outlet Install a plug in the shower outlet. Use thread sealant. Bath Ell Fig. #7 INSTALL SINGLE-CONTROL VALVE K-1097 MODEL Install elbows and adapters (if used) onto 1/2 copper tubing or 1/2 pipe of proper length. Connect the piping to the shower yoke outlet. Be sure the UP marking on the valve body is facing upward. Use thread sealant on all threaded connections. IMPORTANT! Secure the tubing to the framing. Install a temporary 1/2 nipple into the shower ell to extend at least 2 beyond the finish wall. Install a pipe cap on the bath outlet. Use thread sealant. 1/2 Copper or Pipe 1/2 Adapter or Solder Direct Shower Outlet Hot Side 1/2 Pipe Cap Shower Ell Fig. #8 INSTALL SINGLE-CONTROL VALVE K-1097 MODEL CAUTION: Risk of product damage. The shower valve contains plastic components. Do not apply excessive heat if you solder the valve connections. NOTE: If the valve is to be installed in a two valve, back-to-back configuration, proceed to Back-to-Back Installation procedures on Page 5. 1/2 Adapter or Solder Direct 1/2 Copper or Pipe Hot Supply 1/2 Elbow To Showerhead Connect the hot and cold supplies to the valve body using elbows, 1/2 copper tubing or pipe, and adapters (if used) as illustrated. Fig. #9 Cold Supply INSTALL SINGLE-CONTROL VALVE K-1097 MODEL Back-to-Back Installation: Never install the valve body upside down. If the two valves are installed in a back-to-back configuration, install them as previously described. The supplies to one of the valves will now be reversed. Valve Body Hot Supply Cap Assembly Remove the cap assembly from the valve with the reversed supply connections. Rotate the cap assembly 180, so the tab is on the bottom. Reattach the cap assembly with two screws. Cold Supply Screw 180 Fig. #10 Tab 5

INSTALLATION CHECKOUT ALL MODELS Install caps on the temporary bath and shower nipples. Turn on the hot and cold water supplies, and check the new installation for leaks. Remove the caps from the temporary nipples. Turn the valve control to the On position, and cycle the control through the operating range. Check for leaks. Turn the valve control off. If the valve has stops, rotate both stop adjustments fully clockwise. Turn the valve control On, and note that water does not flow. Turn the valve control Off, and rotate both stop adjustments fully counterclockwise. INSTALL PLASTER GUARD K-1097 MODEL Thick Wall Installation (Tile, Plaster, Marble, etc.): Cut a 5-9/16 diameter hole in the rough wall material. Identify the plaster guard side that must face out for thick wall installation. Install the plaster guard and mud guard over the cap assembly, and secure them to the valve body with screws. NOTE: The finish wall must line up within the front-to-back depth of the installed plaster guard. The plaster guard may be removed after the wall is completed. Remove and discard the mud guard. Thin Wall Installation: Cut a 4 diameter hole in the wall material. Identify the plaster guard side that must face out for thin wall installation. Install the plaster guard and mud guard over the cap assembly, and secure them to the valve body with screws. Valve Body Thick Wall Installation Thin Wall Installation Plaster Guard Mud Guard Screws Remove and discard the mud guard after the finish wall is completed. NOTE: The plaster guard should remain installed to the valve body behind the finish wall. PLASTER GUARD FINISH WALL PLASTER GUARD THIN WALL UP HOT UP 5-9/16 D. HOT 4 D. 2-3/4 4 ROUGH-IN DEPTH THICK WALL 2-3/4 ROUGH-IN DEPTH THIN WALL Fig. #11 6

INSTALL SLIP-FIT SPOUT ALL MODELS NOTE: To improve clarity, only the diverter spout used for the K-1096 model is shown. Installation of both diverter and non-diverter spouts is identical. CAUTION: Risk of internal seal damage. Loosen spout setscrew with a 5/32 hex wrench prior to installing the spout. CAUTION: Risk of internal seal damage. Do not use petroleum-based lubricants. If spout will not slide over tubing, use soapy water or a silicone-based lubricant. Cut the tubing so it extends between 1-1/2 and 2-7/8 beyond the finish wall. Loosen spout setscrew with 5/32 hex wrench. Slide the spout over the 1/2 copper tube, and carefully retighten the setscrew. 1/2 Copper Tube Slip-Fit Spout 1-1/2 to 2-7/8 Setscrew Fig. #12 Flush hot and cold water through the spout for one minute. INSTALL N.P.T. SPOUT ALL MODELS NOTE: To improve clarity, only the diverter spout used for the K-1096 model is shown. Installation of both diverter and non-diverter spouts is identical. Remove the temporary nipple from the bath ell. Apply thread sealant to the threads of a 1/2 nipple. Install the nipple to the bath ell so it extends 3-7/8 beyond the finish wall. Carefully thread the spout to the nipple with a clean strap wrench. 3-7/8 Nipple N.P.T. Spout Flush hot and cold water through the spout for one minute. Fig. #13 INSTALL SHOWER ARM AND SHOWERHEAD ALL MODELS CAUTION: Risk of product damage. To avoid plugging the showerhead spray outlets, use thread sealant tape on shower arm threads. Do not use thread sealant (pipe dope). Remove the temporary nipple from the shower ell. Apply a bead of plumbers putty or other sealant around the wall flange according to the manufacturer s instructions. Slide the wall flange onto the shower arm. Apply thread sealant tape to the shower arm threads. Thread the shower arm into the shower ell. Tighten with a clean strap wrench. Slide the wall flange against the wall, and tighten the setscrew. Remove any excess sealant. Shower Ell Wall Flange Shower Arm Plumbers Putty Setscrew Showerhead Fig. #14 Flush hot and cold water through the shower arm for one minute. Install the showerhead to the shower arm using thread sealant tape. Tighten with a clean strap wrench. 7

SHOWERHEAD OPERATION ALL MODELS For three-way showerhead operation, grasp the outer ring of the showerhead, and gently rotate it clockwise or counterclockwise. There are two small detents within the outer ring to provide three operating positions. Fig. #15 6. ADJUSTMENTS K-1097 MAXIMUM WATER TEMPERATURE ADJUSTMENT If the handle and face plate are installed, remove them. Turn on the water to the maximum temperature by rotating the valve stem fully clockwise. To adjust the maximum temperature, slide the O-ring out of the groove, and part way up the valve stem. Move the upper limit stop part way up the valve stem. Rotate the valve stem until the desired maximum water temperature is achieved. Rotate the lower limit stop until it contacts the tab. Slide the upper limit stop down the valve stem to engage the lower limit stop. Slide the O-ring into the valve stem groove. Rotate the valve stem counterclockwise to shut the water off. Reinstall the handle and face plate. 7. INSTALL VALVE TRIM Fig. #16 INSTALL ESCUTCHEONS TO 2-HANDLE Finish Wall YOKE ALL MODELS Apply a bead of plumbers putty or other sealant to the escutcheon according to the putty manufacturer s instructions. Install the escutcheons over the threaded Plumbers Putty sleeves, and align on the wall. Remove any excess putty or sealant. Fig. #17 INSTALL HANDLES TO 2-HANDLE YOKE ALL MODELS Disassemble the handle components. Correct Handle Alignment (off position) Slide the insert over the valve so the external threads face outward. Press the handle adapter onto the valve stem, and secure with the screw. Press the handle onto the handle adapter so the slots and tabs engage, then thread the insert into the handle. Securely hand tighten. Fig. #18 Valve Tab Lower Limit Stop Groove Upper Limit Stop O-Ring Valve Stem Threaded Sleeve Escutcheon Insert Handle Adapter Screw Handle INSTALL SINGLE-CONTROL HANDLE K-1097 MODEL Slide the faceplate over the valve stem, and carefully secure it with two long screws. Do not overtighten. Valve Stem Fig. #19 Faceplate Screw 8