WorkWrite-Up and Bid Document

Similar documents
Work Write-Up and Bid Document

Work Write-Up and Bid Document

WorkWrite-Up and Bid Document

Work Write-Up and Bid Document

WorkWrite-Up and Bid Document

Work Write-Up and Bid Document

Work Write-Up and Bid Document

Work Write-Up and Bid Document

Work Write-Up and Bid Document

Geraldine Ogden 925 Chestnut Circle Vian, OK (918) EA 1'- -' 1 EAI _. Contractor Name. CoII tracto I' Signature.

WorkWrite-Up and Bid Document

WorkWrite-Up and Bid Document

Work Write-Up and Bid Document

Work Write-Up and Bid Document

Work Write-Up and Bid Document

WorkWrite-Up and Bid DocumentlBy Trade

WorkWrite-Up and Bid Document

WorkWrite-Up and Bid Document/By Trade. Contractor Name:

Work Write-Up and Bid DocumentlBy Trade

Work Write-Up and Bid Document

I~I. WorkWrite-Up and Bid DocumentlBy Trade. Gary & Lana Lively. 7 Contractor Signature: This document must be signed to be a valid bid.

WorkWrite-Up and Bid Document/By Trade

Work Write-Up and Bid Document

SAMPLE PUNCH LIST. Room Trade Item Work needed Completed? KITCHEN

About This Model. Series: Timberland Ranch Model: TL815A. Style: Ranch / Bedrooms: 3 / Bathrooms: 2 / Square Feet: Notes:

EXHIBIT H. Tobytown Renovation Specifications

2 BED- 2 BATH 787 SQ.FT. 8402D SHELF SHELF 3 BED- 2 BATH 944 SQ.FT. 8483D

MAINTENANCE STANDARD LABOR CHARGE ESTIMATE AMOUNTS

Single Family, Hamden, CT

Wood Manor. Developer. 24/28/32 Series. Developer. Your Local Wood Manor Dealer is: Some Items Shown May Be Optional

Scope of Work Single Family, San Diego, CA

About This Model. Series: Aurora Classic Ranch Modular Model: AW420A Savanna II. Style: Ranch / Bedrooms: 4 / Bathrooms: 2 / Square Feet: 2280.

McLean Overlake New Home Features

Single Family, Hamden, CT

Proudly made in. Canada. to Canadian Standards. The Columbia Series. 14 Wide Single Section Homes

TERRACE VIEW APARTMENTS


For more information contact Eva Elmore (910)

THE CROWN SERIES. Coco, Jackson & Myrtle Floorplans REV *With Craftsman Package

TERRACE VIEW APARTMENTS

McLean Overlake New Home Features

About This Model. Series: Richland ELITE Ranch Model: GF903A. Style: Ranch / Bedrooms: 3 / Bathrooms: 2 / Square Feet: 1813.

SUNSET RIDGE. We measure our success. by the size of your smile! San Jacinto Division

Celebrating 75 years of Schult excellence.

About This Model. Series: Richland Elite Modulars Model: GCM101A. Style: Cape / Bedrooms: 2 / Bathrooms: 2 / Square Feet: 1280.

PRESIDENTIAL SERIES 1

TERRACE VIEW APARTMENTS

Multi Family, New Haven, CT

CHARGES FOR REPAIRS AND SERVICES Please note prices are subject to change without prior notice.

TERRACE VIEW APARTMENTS

About This Model. Series: Pennwest 2-Story Modular Model: HS125A Millington. Style: 2-Story / Bedrooms: 4 / Bathrooms: 3 / Square Feet: 2406.

About This Model. Series: Cambridge 2 Ranch Collection Model: LX329A Magnifique Grand. Style: Ranch / Bedrooms: 3 / Bathrooms: 2 / Square Feet: 1804

28', 32' AND 42' SERIES FLOOR PLANS

TERRACE VIEW APARTMENTS

Nims Village New Home Features

About This Model. Series: Pennwest 2-Story Modular Model: HA402A Pennwest Ultra 5. Style: 2-Story / Bedrooms: 3 / Bathrooms: 3 / Square Feet: 2579

McLean Overlake New Home Features

Proudly made in. Canada. to Canadian Standards. The Columbia Series. 14 Wide Single Section Homes

About This Model. Series: Cambridge 2 2-Story Collection Model: HZ304A Crisfield. Style: 2-Story / Bedrooms: 3 / Bathrooms: 3 / Square Feet: 1812

MOVE OUT CLEANING CHECKLIST

About This Model. Series: Blue Ridge MAX Model: B Grandview Max. Style: Ranch / Bedrooms: 3 / Bathrooms: 2 / Square Feet: 1638.

Coquille Indian Housing Authority Maintenance Report February 2017

Scope of Work Single Family, Canal Winchester, OH

WORK DESCRIPTION HOUSING REHABILITATION PROGRAM HOUSING DEVELOPMENT DIVISION CITY OF COLORADO SPRINGS

About This Model. Series: Rockbridge Modular Homes Model: RJ501A Grand Rockwell. Style: Ranch / Bedrooms: 4 / Bathrooms: 2 / Square Feet: 2280.

About This Model. Series: Richland ELITE Ranch Model: GF900A. Style: Ranch / Bedrooms: 3 / Bathrooms: 2 / Square Feet: 1493.

CENTRAL GREAT PLAINS SERIES

New Home Country Living

Make Ready Estimate. Total Tenant Charges $0

TERRACE VIEW APARTMENTS

Procurement Department ADDENDUM # 1

2011 Standard Features

Ph: (907) Quality Homes

You ll Love Life In A New Pentrex Home!

The Villas of Wyldewood


the Legacy collection MIDDLEBURY

1008 Twin Pine - Des Peres Wakefield Model $689,305

Oak Brook Sectional. The Home of Integrity

Closing Checklist. Mstr Hall/Clo. Mstr Bath. Guest Bath 1/2 Bath Kitchen Nook. Guest Hall. Utility Rm Garage Yard. Right Side Left Side Rear

PALM HAVEN. We measure our success. by the size of your smile! San Jacinto Division

Caywood Builders Standard Selections

Homes in Cates Bay - Overview

THERE IS NOTHING STANDARD ABOUT OUR FIXTURES AND FINISHES.

TRADITIONS 2017 COLLECTION SINGLE SECTION HOMES

MOVE OUT PACKET. 1. This is official notification that I intend to vacant the property listed below on the date indicated: NAME FOR ADDRESS:

APPLIANCES 30 Electric Range 18 Cu. Ft. 2-Door Frost Free Refrigerator with Icemaker Power Range Hood with Light 40 Gallon Electric Water Heater

Inspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc

Landscape Includes sprinkler system Irrigation, system maintenance, and landscape upkeep are all included in H.O.A. dues

Standard Features. ashbysbridge.com. Mobile: (757)

Safe at Home. Suggestions for Homeowner Created in partnership with the Administration on Aging. Assessor: Assessor: Homeowner Name: Address:


AMBER COVE. We measure our success. San Jacinto Division. By the size of your smile!

premier Home Series Make yourself at home >

Richland Ranch. Just the Right Appeal! 1 GF543A GF579A GF558A GF577A GF568A. Diamond Anniversary. est. 1952

Madison. The. leewoodfranklin.com THE MAD ON THE JEFFERSON THE MADISON

The Lake Country Series

Eastland Ranch. HUD & Value Modular. Photos Top to Bottom: A3177A, A3177A & A3162A. Diamond Anniversary. est. 1952

$759, Vinetta, Des Peres You ll Love Life In A New Pentrex Home! ~ Wakefield 1.5 Story Model ~

PLYMOUTH NJC Realty Holdings LLC Buildings Specification for: Pilgrim Circle Nashua NH. Total Living Space 1750 sq. ft.

Transcription:

WorkWrite-Up and Bid Document Rose Yahola 519 Main 8T Marble city, OK 74945- (918) 525-2660 Contractor Name Contractor Signature Bid Due Date: Trade Area Description Comments Manual Spec Quantity Enter Bid Appliances 1 KITCHEN Oryer Vent/Replace. Replace existing dryer replace dryer vent vent with new louvered dryer vent and ducting. 10.0.2.0. 1 EA 1'--- _ 2 Range Oven/30"/Free Standing. Install new replace oven 30" range/oven. 10.F 1 EAIL- _ 3 Refrigerator/12 C. F.llnstall new replace fridge refrigerator/12 C. F. 4 Vent-A-Hood/30"/Ext. Vented/Install new replace venthood kitchen vent-a-hood (ext.vent)/30" 10.F 1 EAI _ 10.0.3.0 1 EAI _ Carpentry BATHROOM #1 Tuesday, April 05,2016 519 Main ST Marble city, OK Page I 0/20

Carpentry BATHROOM #1 5 Closet ShelflWood. Install new closet shelf/ replace wood 6.Z. 8 LF I 1" x 12". shelves in bathroom 6 Medicine Cabinet/Steel. Replace existing replace medicine 11.2.Z 1 EA I medicine cabinet with new medicine cabinet cabinet/steel frame w/mirror-16"x 22". 7 Paper Holder/Replace paper holder replace paper holder 10.E.2. 1 EA I 8 Passage Door/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung replace entry door 8.A 1 EA I 6-Panel. Work shall include paint both sides. 9 Towel Bar/Install new towel bar/24". replace towel bars 10.E.2. 2 EA I BATHROOM #2 10 Closet ShelflWood. Install new closet shelf/ replace wood selves 6.Z. 8 LF I 1" x 12". 11 Medicine Cabinet/Steel. Replace existing replace medicine 11.2.Z 1 EA I medicine cabinet with new medicine cabinet cabinet/steel frame w/mirror-16"x 22". Tuesday, April OS, 2016 519 Main ST Marble city, OK Page2of20

Carpentry BATHROOM #2 12 Paper Holder/Replace paper holder replace paper holder 10.E.2. 1 EA I 13 Passage Door/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung replace entry door B.A 1 EA I 6-Panel. Work shall include paint both sides. 14 Towel Bar/Install new towel bar/24". replace towel bars 10.E.2. 2 EA I BEDROOM #1 15 Closet ShelflWood. Install new closet shelf/ replace shelves in 6.Z. 14 LF 1" x 12". closet 16 Clothes Rod/Install. Install new closet replace rod in closet 6.Z. 14 LF I clothes rod. 17 Passage Door/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung replace closet door B.A 1 EA I 6-Panel. Work shall include paint both sides. 18 Passage Door/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung replace entry door B.A 1 EA I 6-Panel. Work shall include paint both sides. Tuesday, April 05,2016 519 Main ST Marble city, OK Page 3 0/20

Carpentry BEDROOM #1 19 Window Stool/Replace window stool. replace window B.R 6 LF I stool and sill 20 Window/ReplaceNinyl. Replace window replace windows B.G 2 EA I with new Solid Vinyl window/single hung/use American Craftsman Series 2160- Vinyl or written approved equal. Include frame, sill, sash, trim, hardware, screen, repair & paint of interior and exterior surfaces. BEDROOM #2 21 Closet ShelflWood. Install new closet shelf/ replace shelves in 6.Z. 6 LF 1" x 12". closet 22 Clothes Rodllnstall. Install new closet replace metal rod in 6.Z. 6 LF I clothes rod. closet 23 Passage Door/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung replace closet door B.A 1 EA I 6-Panel. Work shall include paint both sides. 24 Passage Door/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung replace entry door B.A 1 EA I 6-Panel. Work shall include paint both sides. Tuesday, April 05,2016 519MainST Marble city, OK Page 4 0/20

Carpentry BEDROOM #2 25 Window Stool/Replace window stool. replace sill and stool B.R 3 LF I 26 Window/ReplaceNinyl. Replace window replace window B.G 1 EA I with new Solid Vinyl window/single hung/use American Craftsman Series 2160- Vinyl or written approved equal. Include frame, sill, sash, trim, hardware, screen, repair & paint of interior and exterior surfaces. BEDROOM #3 27 Closet ShelflWood. Install new closet shelf/ replace shelves in 6.Z. 8 LF 1" x 12". closet 28 Clothes Rod/Install. Install new closet replace rod in closet 6.Z. 8 LF I clothes rod. 29 Passage Door/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung replace entry door B.A 1 EA I 6-Panel. Work shall include paint both sides. 30 Passage Door/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung replace closet door B.A 1 EA I 6-Panel. Work shall include paint both sides. Tuesday, April 05,2016 519 Main ST Marble city, OK Page 5 0/20

Carpentry BEDROOM #3 31 Window Stool/Replace window stool. replace stool and sill 8.R 6 LF I 32 Window/ReplaceNinyl. Replace window replace windows 8.G 2 EA I with new Solid Vinyl window/single hung/use American Craftsman Series 2160- Vinyl or written approved equal. Include frame, sill, sash, trim, hardware, screen, repair & paint of interior and exterior surfaces. EXTERIOR 33 Door/Exterior/6-Panel Steel/Pre- replace entry doors 8.A. 2 EA I Hung/Replace. Replace exterior entrance door with new pre-hung-steel six panel. Use Stanley #13757 or written approved equal. Work shall include paint-both sides. GARAGE 34 Door/Exterior/6-Panel SteeliPre- replace entry doors 8.A. 2 EA I Hung/Replace. Replace exterior entrance door with new pre-hung-steel six panel. Use Stanley #13757 or written approved equal. Work shall include paint-both sides. 35 Garage Vehicle Door/9' x 7'/lnstall new replace garage door 8.C 1 EA I overhead garage vehicle door--9' X 7'. Tuesday, April 05,2016 519 MaillST Marble city, OK Page 60/20

Carpentry 36 GARAGE Passage Door/Pre-Hung/6-Panel/Replace replace water passage door & lockset with new pre-hung heater, and hvac B.A 2 EA I 6-Panel. Work shall include paint both sides. closet doors 37 HAllWAY #1 Closet ShelflWood. Install new closet shelf/ replace wood 1" x 12". shelves in hallway 6.Z. 4 LF I closet 38 Clothes Rod/Install. Install new closet replace clothes rod clothes rod. in hallway closet 6.Z. 4 LF I 39 Passage Door/Pre-Hung/6-Panel/Replace replace closet door passage door & lockset with new pre-hung in hallway B.A 1 EA I 6-Panel. Work shall include paint both sides. INTERIOR 40 Base Trim/Oak Colonial 2-1/4"/Replace. replace all trim, 6.N 450 LF I Replace base trim, colonial, oak, 2-114". paint white. KITCHEN 41 Base Cabinets/Replace/Oak. Replace base replace base 6.0.2 11 LF I cabinets with new cabinets, pre-finished cabinets oak. Use Mill's Pride "York" or written approved equal. Tuesday, April OS, 2016 519 Main ST Marble city, OK Page 70/20

Trade Area Description Comments Manua/Spec Quantity Enter Bid Carpentry KITCHEN 42 Closet Door/Bi-Fold/Replace door with new replace double B.A. 1 EA I bi-fold closet door/complete with trim. Work doors on washer shall include paint both sides. room 43 Closet ShelflWood. Install new closet shelf/ replace shelves in 6.Z. 12 LF 1" x 12". pantry 44 Closet ShelflWood. Install new closet shelf/ install shelves in 6.Z. 12 LF 1" x 12". washer room 45 Countertop/Replace. Remove existing replace countertop 6.0.4 11 LF I countertop and replace with new countertop and backsplash. 46 Door/Exterior/6-Panel SteellPre- Hung/Replace. Replace exterior entrance Replace entry door B.A. 1 EA I door with new pre-hung-steel six panel. Use Stanley #13757 or written approved equal. Work shall include paint-both sides. 47 Passage Door/Pre-Hung/6-PaneIlReplace replace pantry door B.A 1 EA I passage door & lockset with new pre-hung 6-Panel. Work shall include paint both sides. Tuesday, April 05,2016 519MainST Marble city, OK Page 8 of20

Carpentry 48 KITCHEN Wall Hung Cabinets/Replace/Oak. Replace replace wall hung all wall hung cabinets with new cabinets/ pre- cabinets 6.0.2 18 LF I finished oak/use Mill's Pride "York" or written approved equal. 49 Window Stool/Replace window stool. Replace window stool and sill 8.R 3 LF I 50 Window/ReplaceNinyl. Replace window Replace window 8.G 1 EA I with new Solid Vinyl window/single hung/use American Craftsman Series 2160- Vinyl or written approved equal. Include frame, sill, sash, trim, hardware, screen, repair & paint of interior and exterior surfaces. LIVING ROOM #1 51 Door/Exterior/6-Panel Steel/Pre- Replace entry door 8.A. 1 EA I Hung/Replace. Replace exterior entrance door with new pre-hung-steel six panel. Use Stanley #13757 or written approved equal. Work shall include paint-both sides. 52 Window Stool/Replace window stool. Replace window 8.R 6 LF I stool and sill Tuesday, April 05,2016 519MainST Marble city, OK Page 90/20

Trade Area Description Comments Manual Spec Quantity Enter Bid Carpentry 53 LIVING ROOM #1 Window/ReplaceNinyl. Replace window replace window with new Solid Vinyl window/single hung/use American Craftsman Series 2160- Vinyl or written approved equal. Include frame, sill, sash, trim, hardware, screen, repair & paint of interior and exterior surfaces. 8.G 2 EA 1 --' CarpentrylP lumb ing 54 BATHROOM #1 Vanity Base Cabinet, Faucet, Top. Replace existing with new lavatory/vanity base cabinet (pre-finished oak), cultured marble top (1" overlap) and faucet (Moen one handle # P84521) or written approved equal. Match existing size. replace vanity cabinet, top sink and faucet. Match existing size. 11.4. 1 EAI _ 55 BATHROOM #2 Vanity Base Cabinet, Faucet, Top. Replace existing with new lavatorylvanity base cabinet (pre-finished oak), cultured marble top (1" overlap) and faucet (Moen one handle # P84521) or written approved equal. Match existing size. replace vanity and top, sink and faucet, match existing 11.4. 1 EAI _ Drywall & Finish Tuesday, April 05,2016 INTERIOR 519MainST Marble city, OK Page 10 of 20

Drywall & Finish 56 INTERIOR Drywall/Wall/Replace 1/2" drywall on Remove all 9.0 1600 SF I wall/finish completely. Work shall include sheetrock, on walls tape, bed, texture and paint to match and replace all existing surfaces. sheetrock on interior walls. Electrical 57 BATHROOM #1 Light Fixture & SwitchlWet Area/Replace. replace light above Replace existing light fixture and switch with sink 13.0. 1 EA I new wet-area approved light fixture and switch. 58 Light Fixture/Heat-Vent-Lightllnstall new replace heat vent bathroom light (100 watt), heater (1450 light 13.0.16 1 EA I watt), vent fan (70 CFM) and switch. Use Broan model 655 or written approved equal. 59 BATHROOM #2 Light Fixture & SwitchlWet Area/Replace. replace light above Replace existing light fixture and switch with sink 13.0. 1 EA I new wet-area approved light fixture and switch. Tuesday, April 05,2016 519 Main ST Marble city, OK Page 110/20

Electrical 60 BATHROOM #2 Light Fixture/Heat-Vent-Lightllnstall new bathroom light (100 watt), heater (1450 repair heat vent light 13.D.16 1 EA I watt), vent fan (70 CFM) and switch. Use Broan model 655 or written approved equal. 61 BEDROOM #1 Ceiling Fan & Light Kitl52"/lnstall ceiling fan (52") with light kit, switch, cover plate and replace ceiling fan 13.D.9.B 1 EA I wiring/use Hunter "Greenwich" or written approved equal (lifetime warranty). 62 Light Fixture, Switch & Circuit/Roomllnstall new semi-flush mount ceiling light fixture, replace closet light 13.D.9 1 EA I switch, cover plate and circuit. Use Angelo model 66201. 63 Smoke Detector/Battery Operated/Install new smoke detector, battery operated (10 replace detector 13.D.11 1 EA I year lithium battery). All bedrooms and hallways adjacent to bedrooms. Use Firex #4015 or written approved equal. BEDROOM #2 64 Ceiling Fan & Light Kit/52"lInstall ceiling fan replace ceiling fan 13.D.9.B 1 EA I (52") with light kit, switch, cover plate and wiring/use Hunter "Greenwich" or written approved equal (lifetime warranty). Tuesday, April 05,2016 519MainST Marble city, OK Page 12 0/20

Electrical 65 BEDROOM #2 Light Fixture, Switch & Circuit/Room/Install new semi-flush mount ceiling light fixture, replace closet light 13.0.9 1 EA I switch, cover plate and circuit. Use Angelo model 66201. 66 Smoke Detector/Battery Operated/Install replace detector 13.0.11 1 EA I new smoke detector, battery operated (10 year lithium battery). All bedrooms and hallways adjacent to bedrooms. Use Firex #4015 or written approved equal. BEDROOM #3 67 Ceiling Fan & Light Kitl52"lInstall ceiling fan replace ceiling fan 13.o.9.B 1 EA I (52") with light kit, switch, cover plate and wiring/use Hunter "Greenwich" or written approved equal (lifetime warranty). 68 Light Fixture, Switch & Circuit/Room/Install replac3e light in new semi-flush mount ceiling light fixture, closet 13.0.9 1 EA I switch, cover plate and circuit. Use Angelo model 66201. 69 Smoke Detector/Battery Operated/Install replace detector 13.0.11 1 EA I new smoke detector, battery operated (10 year lithium battery). All bedrooms and hallways adjacent to bedrooms. Use Firex #4015 or written approved equal. ELECTRICAL Tuesday, April 05,2016 519 Main ST Marble city, OK Page 13 0/20

Electrical ELECTRICAL 70 Light Fixture/Porch/Ceiling Mounted/Install replace all porch 13.0.9 3 EA I new exterior porch light and circuit wiring. lights 71 GARAGE Light Fixture, Switch & Circuit/Room/Install replace light in new semi-flush mount ceiling light fixture, garage 13.0.9 1 EA I switch, cover plate and circuit. Use Angelo model 66201. 72 HALLWAY #1 Light Fixture, Switch & Circuit/Room/Install replace light in new semi-flush mount ceiling light fixture, hallway closet 13.0.9 1 EA I switch, cover plate and circuit. Use Angelo model 66201. 73 Light Fixture/Room/Replace. Replace replace light in existing light fixture with new semi-flush hallway 13.0.9 1 EA I mount ceiling style light fixture. Use Angelo model 66201. 74 HALLWAY #2 Light Fixture, Switch & Circuit/Room/Install new semi-flush mount ceiling light fixture, replace light 13.0.9 1 EA I switch, cover plate and circuit. Use Angelo model 66201. Tuesday, April 05,2016 519 Main ST Marble city, OK Page I4 0/20

Electrical HALLWAY #2 75 Smoke Detector/Hard Wired with Battery replace detector 13.0.11 Back-Upllnstall new smoke detector, hard 1 EAI wired with battery backup. All bedrooms and hallways adjacent to bedrooms. Use Firex #045186 or written approved equal. INTERIOR 76 Cover Plate/Outletllnstall new outlet cover remove and replace 13.0.6. plate all outlets, switches 30 EA I and cover plates. KITCHEN 77 Ceiling Fan & Light Kit/52"lInstali ceiling fan Replace ceiling fan 13.0.9.B (52") with light kit, switch, cover plate and 1 EA I wiring/use Hunter "Greenwich" or written approved equal (lifetime warranty). 78 Light Fixture, Switch & Circuit/Kitchen install new light Sink/Install new switched light over kitchen above kitchen sink 13.0.9 1 EA I sink. Include new wiring circuit, switch and cover plate. 79 Light Fixture/Room/Replace. Replace replace light in existing light fixture with new semi-flush washer room 13.0.9 1 EA I mount ceiling style light fixture. Use Angelo model 66201. Tuesday, April 05,2016 519 MainST Marble city, OK Page 150/20

Electrical KITCHEN 80 Smoke Detector/Battery Operated/Install Replace smoke 13.0.11 1 EA I new smoke detector, battery operated (10 alarm year lithium battery). All bedrooms and hallways adjacent to bedrooms. Use Firex #4015 or written approved equal. LIVING ROOM #1 81 Ceiling Fan & Light Kit/52"lInstall ceiling fan Replace ceiling fan 13.D.9.B 1 EA I (52") with light kit, switch, cover plate and wiring/use Hunter "Greenwich" or written approved equal (lifetime warranty). 82 Smoke Detector/Battery Operated/Install Replace smoke 13.0.11 1 EA I new smoke detector, battery operated (10 detector year lithium battery). All bedrooms and hallways adjacent to bedrooms. Use Firex #4015 or written approved equal. Flooring INTERIOR 83 Vinyl Floor Tile/Install new vinyl floor tile/12" install new tile 9.L 1190 SF I x12"x1/8". throughout house, including closets. 84 Vinyl Floor Tile/Remove vinyl/composition remove all tile inside 9.L 1190 SF I floor tile. house Tuesday, April 05,2016 519 Main ST Marble city, OK Page 16 0/20

HVAC GARAGE 85 Central Air (13 SEER) & Heatl1,001 to replace with 3 ton 12 1300 SF I 1,600sf/lnstall central air (13 SEER) and unit, to include heat (gas-80% AFUE)/Complete lineset, filter, filter system/building sizes between 1,001 and grill and stat 1,600sf. Paint & Finish EXTERIOR 86 Exterior Surfaces/Paint entire Paint exterior, to 9.N.4 400 SF I exterior/siding, trim, soffit and fascia/two include caulk all Coats. Include minor repairs to all surfaces. cracks joints of NOTE:SF=FLOOR AREA/BID TO PAINT siding, make repairs ALL EXTERIOR SURFACES. as needed. INTERIOR 87 Interior Surfaces/Paint all interior surfaces Paint all interior, 9.N. 1600 SF I of structure - Two Coats. Entire interior includeing closets excluding kitchen and bath cabinets. Work and water heater shall include minor repairs to all surfaces. and hvac closet. SF=FLOOR AREA OF ENTIRE Paint all interior off STRUCTURE. white Plumbing BATHROOM #1 Tuesday, April 05,2016 519 Main ST Marble city, OK Page 170/20

Plumbing BATHROOM #1 88 Bathtub-Shower Combination/Pre-Fab/2 replace shower 11.A 1 EA I Piece/lnstall new 2 piece tub/shower unit. Use Lasco 2603-2PRHW or written approved equal. 89 Commode & Seat/Install new commode, replace stool 11.A 1 EA I seat, supply line, shutoff and wax seal. Use American Standard Cadet or written approved equal. 90 Shower Faucet & Diverterllnstall new replace faucet and bath/shower faucet with diverter. Use Delta head on shower 11.A 1 EA I model N1348 or written approved equal. 91 BATHROOM #2 Shower Faucet & Diverter/lnstall new replace in bathroom bath/shower faucet with diverter. Use Delta #2 11.A 1 EA I model N1348 or written approved equal. 92 Shower Stall & Glass Door/36" x 36". Install replace stand up shower stall with glass door and trim. 36" x shower 11.A 1 EA I 36" GARAGE Tuesday, April 05,2016 519 Main ST Marble city, OK Page 180/20

Plumbing 93 GARAGE Water Heater/Gas/40 Gallon/Install new 40 gal. gas water heater. Work shall include replace water heater 11.A 1 EA I elevating to 18" (if in garage), replacement of TPR, all combustion air and gas & electrical hook-ups for code legal installation. 94 KITCHEN Sink & FauceUKitchen. Install new kitchen install new faucet sink (33" x 22") & Faucet (Use Delta single- and sink, to include 11.A 1 EA I handle model1 OO-WF or written approved new drain lines and equal). Work shall include new drain lines trap. and trap. 95 Washer Box, Valves & Drain. Install new install new washer washer box) valves and drain line. box 11.A 1 EA I Roofing EXTERIOR 96 Roof/shinglesllnstall. Install new 30 year remove and replace 7.A. architectural shingles as per manufacturer's all shingles, drip 26 S I recommendations. edge, roof jacks, felt and flashing. Site Work EXTERIOR Tuesday, April 05,2016 519MainST Marble city, OK Page 190/20

Site Work 97 EXTERIOR Cleanup/Final. Project. Final cleanup of entire clean entire work area up, mow yard, remove all trash and debris inside and outside 1 SF 1'--- _ Thermal Protection 98 INTERIOR Insulation/Add/Open Exterior Wall/R-13. Add R-13 insulation to exterior wall. Use R- 13/kraft faced batts. Remove all old insulation and install new on all exterior walls 14 800 SF 1 _ TOTAL Tuesday, April 05,2016 519MainST Marble city, OK Page 200/20