Tokyo-wan Aqualine - Experience of Traffic and Safety

Similar documents
State of the Road Tunnel Safety Technology in Japan. Hideto Mashimo 1

PHASED CONSTRUCTION AND SAFETY IN MALA KAPELA TUNNEL

Appendix AUSTRIA Vienna Kaisermühlentunnel

Appendix SPAIN Madrid M30-Río-TUNNEL

Czech experience with supporting technologies for highways and tunnels. Libor Sušil, Sofia September 26 th, 2017, by invitation of SYSCOM ENGINEERING

Impact of quick incident detection on safety in terms of ventilation response

1. PIARC Update 2. Tunnel System

Sprinklers Modeling for Tunnel Road Fire Fighting

FIRE RESISTANCE OF ROLLING STOCK ELEMENTS STANDARD AND SPECIAL CASE OF TUNNELS

STUDY FOR SAFETY AT A RELATIVELY SHORT TUNNEL WHEN A TUNNEL FIRE OCCURRED

REVIEW OF TECHNICAL STANDARDS AND CALCULATION METHODS FOR DIMENSIONING OF SMOKE AND HEAT CONTROL SYSTEMS IN CASE OF FIRE IN UNDERGROUND CAR PARKS

BUILDING INDUSTRY TUNNEL RAIL TUNNEL FIRE FIGHTING WITH HIGH PRESSURE WATER MIST

FIRE DEPARTMENT - RULES FOR FIRE PROTECTION IN AUSTRIA

EUROPEAN BUREAU. EuroTAP European Tunnel Assessment Programme

Fire Protection and Safety in Tunnels Conference Opening Remarks. Dr Fathi Tarada Secretary, PIARC Tunnel Operations Committee

Sprinklers in Japanese Road Tunnels. Final Report

Japanese Case Study: How to maintain the fire safety in subway station and tunnel

EXPERIENCE WITH THE SAFETY AND VENTILATION DESIGN IN OPERATION OF THE PLABUTSCH TUNNEL

Increasing Fire Safety of Cologne Main Station by High Pressure Water Mist

ORAL PAPER PROCEEDINGS

Impact of Tunnel Ventilation on Tunnel Fixed Fire Suppression System

Petralba tunnel: A case of success

THE GOTTHARD BASE TUNNEL: FIRE / LIFE SAFETY SYSTEM

EMERGENCY VENTILATION FOR SMOKE CONTROL IN ROADWAY TUNNELS (NCHRP PROJECT TASK 363)

Full-scale Experiment of Longitudinal Ventilation Smoke Control System and Central Smoke Exhaust System in City Underwater Tunnel

Safety Inspections of Road Tunnels.

International Seminar on Long Tunnels - October 17-19, 2012 CHILE Santiago World Road Association (PIARC )

CHOOSING A FIRE VENTILATION STRATEGY FOR AN UNDERGROUND METRO STATION

COMPENSATORY EFFECTY OF FIXED FIRE FIGHTING SYSTEMS IN TUNNELS

Crossrail. Clare Hebden; September 2012

A brief presentation of the second fire in the Gudvanga tunnel

Proposed Commercial Project at Plot No. C3A, Sector-16B, Greater Noida West (U.P)

FINDINGS FROM FIRE TESTS IN TUNNEL CONSTRUCTIONS WITH VENTILATION SYSTEMS AND FIXED FIRE SUPPRESSION SYSTEMS

AUTOMATIC FIRE EXTINGUISHING and VISUAL GUIDE SYSTEMS for TUNNEL PROTECTION

RETOS Y TENDENCIAS DESARROLLO DE INFRAESTRUCTURA EN AUSTRIA. Leonardo Rosas Sánchez Bogotá Agosto 9 de 2018

Third Runway Project APM Depot Fire Engineering Design. Presented by Ir Wilson Sau-kit TSANG

Fire Safety Concept Hotel Jumeirah

EXHIBITION SITE. fieramilanocity. Exhibition Site Safety Document (An. IV and V Min. Decree 22/7/2014)

CHALLENGES IN THE FIELD OF FIRE DEFENSE

NATIONAL COMPETENCY STANDARD

FROM THE CLASSICAL FIRE-FIGHTING WATER SUPPLY TO STRUCTURE AND SMOKE-GAS COOLING, TAKING THE GLEINALM TUNNEL AS AN EXAMPLE, PART I

The Use of Public Address System to Improve Tunnel Safety - Current Practices. Lim Hock Tay

Gerd Koffmane, Henrik Hoff, AP Sensing GmbH, Böblingen

Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS)

Delhi Metro System. Emergency and Fire Safety Measures in. - by Sanjeev Kumar & Kailash Chandra Joshi. Fire Protection & Safety

Outline of Measures for Fire Prevention and Safety under the Laws and Regulations of Fire Fighting

Date and Time of Incident. March 10, 1975

Enclosure 4- RISK ASSESSMENT

FORMULATION OF FIRE SAFETY REQUIREMENTS FOR NEW RAILWAY INFRASTRUCTURES

EARLY FIRE DETECTION IN SWISS ROAD TUNNELS WITH MORE THAN FIREGUARD SENSORS

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

TUNPROTEC. Active Tunnel Fire Protection

Case Study of Underground Car Park. Team Japan

Amagasaki, Hyogo Prefecture: Nagasakiya Department Store

Fire Safety in the Channel Tunnel

EXHIBITION SITE. Exhibition Site Safety Document (An. IV and V Min. Decree 22/7/2014)

The first tunnel fire. Benefits of fire

Technical Information

Quantitative risk assessment for a fire suppression system in the New Tyne Crossing. Dr Fathi Tarada

FIXED FIRE FIGHTING SYSTEMS IN TUNNELS INTEGRATION AND COMPENSATION

ABOUT US. Overview. Personnel and Apparatus

Tunnels, Risks & Design Mitigation

18.1 INTRODUCTION 18.2 ANALYSIS METHODOLOGY REGULATORY CONTEXT

Some Important Aspects of Fire Safety Regulations about High Rise Buildings

DISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL

Cumru Township Fire Department 4/27/10 Standard Operating Guidelines Page: 1 of 6 Section 15.07

SOLIT PROJECT: WATER MIST FIRE SUPPRESSION SYSTEMS AS PART OF THE TUNNEL SAFETY SYSTEM

FIRE SERVICE FEATURES

System development and performance evaluation of track intrusion in Taipei MRT system

Iroquois theatre, Chicago, The fire in this newly opened but badly planned theatre in Chicago in January 1904 caused 572 deaths

Operational Safety in the underground facilities of a deep geological disposal of nuclear waste

Fire protection on chemical manufacturing sites

RISK ASSESSMENT, DISASTER MANAGEMENT AND SAFETY MEASURES (ONSITE & OFFSITE)

SURVEY ON FIRE SERVICE INSTALLATIONS FOR OFFICE BUILDINGS IN HONG KONG

RAMBLER PARK FIRE SAFETY INFORMATION

INVESTIGATING BENEFITS EVACUATION AND EMERGENCY LIGHTING SYSTEMS IN TUNNELS BY USING INTELLIGENT. David Zamora, MariMils, Finland VP Marketing & Sales

FIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE FIRE MEDICAL EMERGENCY

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION)

FIRE PROTECTION SYSTEMS IN BURJ KHALIFA. By NAFFCO Fire Protection

Case Study 1 Underground Car Park

Proposed construction of National Institute of Homeopathy at Sec-A8, Narela Delhi by Ministry of Ayush. Risk Assessment

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

TUNNEL FANS STANDARD AND HOT SMOKE

Tunnel Axial Flow Fan

Fire Protection for Printing Machines with High Pressure Water Mist

Institute of Industrial Science, University of Tokyo Bulletin of ERS, No. 45 (2012) FAILURE OF CEILINGS IN AN AIRPORT BUILDING DURING THE 2011 OFF THE

FIRE EMERGENCY ACTION PLAN (EAP)

IMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE

General Principles of Smoke Control

Wilson County Emergency Management Agency 110 Oak Street Lebanon, Tennessee 37087

Research on Mobile Water Spray Device Reducing the Temperature of Metro Fire

High Rise Floor Wardens

SIGNALISATION AND VISUAL GUIDE INTERACTIVE SYSTEM for EVACUATION ROUTES in TUNNELS and CONFINED AREAS

Underground fires in metro systems failures, accidents and terrorism

University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat,

EXHIBITION SITE. Exhibition Site Safety Document (An. IV and V Min. Decree 22/7/2014)

Emergency Action Plan Leading the Fight

Gothenburg dance hall, Sweden, 1998

The Social Accountability International (SAI) Fire Safety Checklist

Fire protection documentation. CFPA-E Guideline No 13:2015 F

Transcription:

Hisashi Iwata, Chief Engineer, Maintenance and Traffic Operation Department, Japan Highway Public Corporation, Japan Yoshikazu Ota, Chiyoda Engineering Consultants Co., Ltd., Japan 1. General planning The area around the Tokyo Bay locates the major Japanese industries, at the same, the dwelling area of about 30 million people, a quarter of the Japanese population. The conditions for this project have been difficult. The tunnel is located in a seismic active area, which consists of very soft soil that might be compared with soft cheese. In addition, the route crosses an important sea route with many international vessels, and it was necessary to maintain safety standards at highest level. In spite of these and other conditions, the road was realized with a total length of 15 km, consisting of a 9.5 km long tunnel to the west, a 4.4 km long bridge to the east, and two manmade islands. The connection was opened to traffic on December 18, 1997, and an average traffic volume of around 10,500 vehicles per day has been observed in January 2001 (Figure 1). In the first stage, the design consisted of an immersed tunnel with rectangular cross section and transverse ventilation, in combination with a bridge structure under the heavy sea traffic. Since the 1970 s, however, tunnel construction based on the shield methodology has been applied in Japan for a wide range of purposes such as High Speed Rails, metros, sewerage etc. In addition, the sea traffic on the west side of the route is very heavy. In 1985 it was therefore decided to change the first plans and to apply the shield methodology to construct a tunnel consisting of two tubes with an outer diameter of about 14 m, each with two traffic lanes (Figure 2). The excavation works were finished in June, 1997, and the route was opened to traffic on December 18, 1997. Figure 3 presents the general layout of the tunnel. This layout is representative for the whole tunnel. 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 1/15

Figure 1: Location map Figure 2: Shield machine transportation Symbols F A D 1 D 2 D 3 D 4 D 5 Layer Embankment Yurakucho layer No.7 layer Upper layer Lower layer Layer equivalent to lower Narita layer Layer equivalent to Naganuma, Byoubugaura layer Upper Joso layer Figure 3: General layout of Tokyo-Wan Aqualine [1] Figure 4 presents Ukishima portal with ventilation building, which is located at west side of tunnel. The Kawasaki Man-Made Island (Japanese: Kaze no Tou or Tower of Wind ) with a diameter of 100 m (Figure 5) has a twofold function: vertical shaft as base where the shield machines started during construction, and for tunnel ventilation during operation. 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 2/15

Figure 4: Ukishima Ventilation tower and entrance (west exit) Figure 5: Ventilation tower Kawasaki Man-Made Island (Kaze no Tou) The Kisarazu Man-Made Island (Japanese: Umi-Hotaru, or Sea-Firefly ) located on the east portal of the tunnel forms the connection between the bridge and the tunnel section. In the five story building on this island the power equipment room and equipment for tunnel users are installed, including: Information center for T.T.B. and the total Metropolitan Highway network Technical information center about T.T.B. Exhibition hall with information about emergency equipment Rest lounge with free of charge tea Restaurants, shops Parking area (for 80 trucks, 396 passenger cars). Because of its architecture and layout, the building gives the impression of being a large passenger ship (Figure 6). Figure 7 shows the Bridge section of Trans Tokyo Bay Highway. Figure 6: Kisarazu Portal on man-made island Figure 7: Bridge section [1] (Umi-Hotaru) 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 3/15

2. Safety Facilities for the Tokyo-Wan Aqualine 2.1 Ventilation system As described above, in the first planning stage an immersed tunnel was considered with a transverse ventilation system. Since the late 1960 s, emission of exhaust gas from vehicles has been regulated, resulting in a reduction of carbon monoxide emission, and required air volume for tunnel ventilation is often controlled by visibility based on the haze. After that, longitudinal ventilation with electrostatic precipitators was developed in the 1970 s. This system removes soot from the tunnel space and the ventilation air volume can be reduced, and was verified to be more economic both in terms of cross section and power consumption for ventilation system for T.T.B. in this way. Table 1 presents the basic conditions of the tunnel ventilation planning. Table 2 presents the calculated results of required air volume for tunnel ventilation. Figure 8 presents the total ventilation system. Type of ventilation Design traffic volume Large veh.(diesel)content 28% Longitudinal system with vertical shaft and electrostatic precipitator 2,470 veh./hour/tube (m 3 / s x tube) Smoke visibility Design vehicle velocity 50 km/h East bound 1,622 461 Cross section A r =78.4 m 2 West bound 1,532 461 Hydraulic diameter D r =9.1 m Visibility,K =40%(per 100 m), K=9 10 Concentr. carbon monox. CO:100 ppm Carbon monoxide Table 1: Condition for tunnel ventilation [3] Table 2: Required air volume [3] Figure 8: Total ventilation system of T.T.B. [2] 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 4/15

Five electrostatic precipitators have been applied to the ceiling near the exit portal at the Kisarazu Man-Made Island in the up grade section of the east bound tube. Normally, a bypass tunnel is constructed for electrostatic precipitators, but in this tunnel built with shield method this was not possible for construction reasons. Instead, the electrostatic precipitators were installed at the top of the roadway space. 2.2 Smoke and fire control in the case of fire The Japanese law does not allow the transportation of dangerous goods through underwater tunnels and long tunnels of over 5,000 m, which law also applies to the tunnel. The ventilation operation system for tunnels with a longitudinal ventilation system is such that in case of fire outbreak, a flow with velocity of more than 4.5 m/s in entrance part (with 4 % vertical inclination) and 2.5 m/s in other parts must be maintained in the same direction as the traffic, in order not to let the smoke flow in the direction of the tunnel entrance. 2.3 Safety equipments 2.3.1 Introduction In order to limit the damage in case of fire and other incidents as much as possible, safety facilities are installed in accordance with the Japanese Road Law. The design and installation of the tunnel equipment follows the principles as other large-scale road tunnels. Figure 9 shows the representative layout of the safety system in the tunnel. Table 3 presents the safety facilities of the Tokyo-wan Aqualine. 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 5/15

Figure 9: Standard cross section tunnel section [2] 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 6/15

Spacing, Position, etc Function Item Above road surface Evacuation space carriage way Remark Fire detection Emergency telephone 150 m Near escape route Push button 50 m - Combined with fire hydrant Fire detector Approx. 25 m - Situation monitoring ITV cameras Approx. 150 m - Initial fire fighting Fire extinguisher 50 m - Combined with fire hydrant Fire hydrant 50 m - Control of fire spread Water sprinkler Installed - With foam possibility Guidance for evacuation Fire fight support Escape oute Information to drivers Guidance facilities Access Equipment Safety environment Uninterruptible power equipment Escape route (slide) Emergency sign board Before entrance or in tunnel Near portal or in tunnel 300 m - Located in combination with Fire Brigade entrance Broad casting Installed - Leaky feeder cables Guidance panels Loudspeakers Fire bridge entrance 150 m 300 m Near evacuation way 300 m Above road surface: escape guidance panels, emergency indication lamp In duct under road way: located near escape route Located in combination with evacuation route Tunnel information facilities Installed - On Kawasaki and Kisarazu side Rescue Vehicles in evacuation space Helicopter platform Ship landing space Water hydrant Water hydrant system Wireless communication (tunnel inside to tunnel entrance) Smoke extraction in combination with ventilation system Lighting Uninter. Lighting system Uninter. Power supply - Installed Kawasaki, Kisarazu Man-made Island 150 m Near portal or at Kawasaki Man-made Island Installed Installed Installed Installed Installed Near route for Fire Brigade - Specialized 2 t truck Above road surface: located in accordance with entrance for Fire Brigade Leaky feeder cable Overpressure for smoke control Table 3: Safety facilities of Trans Tokyo Bay Tunnl [3] 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 7/15

Figure 10 presents the whole view of carriageway after open to traffic in 1998. Figure 10: Whole view of the carriageway 2.3.2 Evacuation facilities In the earliest planning stage, on emergency cross-passage between the two tubes was planned at intervals of approximately 750 m, as presented in Figure 11. According to surveys and research carried out in Japan, the size of the emergency exit should be designed to be wide enough to allow two people to pass simultaneously, i.e., an effective width of at least 1.7 m. Because the two tunnel tubes will move separately in case of an earthquake occurring in soft soil 60 m under the sea level, resulting in a large stress-strain force working on the connecting part, it was decided not to install cross-passages (Figure 11). Instead, it was decided to use the space below the road surface as evacuation space. The basic policy is as shown in Figure 12, consisting of equipment to evacuate from the inspection gallery to the space under the road surface. Such an arrangement reduces the space of the tunnel structure, installing it impossible to install ordinary staircases. 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 8/15

Figure 11: Figure 12: Abandoned plan of cross passage Principle of evacuation from road surface to evacuation space under road revel To produce a full-scale test structure of wood and verify the performance for actual tunnel users and fire brigade. These test structures were placed in a test tunnel to carry out a first survey, which resulted in the slide to be selected as the best structure for an evacuation route. Figure 13 shows members of a rescue team inspecting the slide. Following this test, the fire brigade was allowed to verify the fundamental quality of the slide, since firemen will also use the slides during their activities. Figure 14 shows the fire brigade testing the slide in the full scale model. Figure 13: Figure 14: Simulation of evacuation facilities Firemen verifying the quality of slides 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 9/15

The capacity of the evacuating people for the slide is about one-half to one-third that of connecting routes with escape doors. Therefore, in order to obtain the same capacity as ordinary cases in Japan, it was necessary to install the slides at intervals of one-half to one-third of normal cases. Because intervals between connecting routes are about 750 m, the slides had to be installed at intervals of about 300 m. During the full-scale experiment, it was relatively easy to evacuate from the road surface to the evacuation space under the road surface, but ascending to the road surface from the evacuation space was rather difficult. Also, if the slide gets wet from water used in firefighting, the slide gets slippery, and the slide was made anti-slip. Figure 15 shows an example of a slide installed in a real tunnel. Based on experiment results, the slide consists of pipes. Figure 16 shows the service tunnel below the carriage way. Figure 15: Slide connecting the carriage way and the evacuation space Figure 16: Service tunnel below carriage way possibility to operate small emergency vehicle) 2.3.3 Tunnel structure for safety On the side of the road there is a sidewalk 1 m high and 75 cm wide. This type of high side walk is generally applied in large scale tunnels in Japan. A main advantage of this height is that normal maintenance works can be carried out safely and rapidly, even with traffic passing by at high velocities. Because maintenance of this equipment over the whole length of the tunnel is timeconsuming, small vehicles can run over a rail on the sidewalk for maintenance works without having to regulate the traffic (Figure 17). 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 10/15

Figure 17: Maintenance vehicles 3. Public Relations for Tunnel Safety 3.1 General In 1979, a serious tunnel fire occurred at the Nihonzaka Tunnel in Japan, leaving seven people dead, two people injured and 173 vehicles burnt out. Following the incident, many discussions between related agencies resulted in the recognition that public relation towards the tunnel users is highly important. The following two measures have since been implemented: Full-size emergency equipment is placed at service areas near tunnels for demon- (Figure stration. Explain how equipment is used and let tunnel users try to use this equipment 18). Leaflets are placed at all service areas and parking areas to explain clearly about how to use the tunnel equipment and which activities to take in case of emergency in the tunnel. The leaflet is free, can be obtained by anyone, and is compact so that it can be kept in the vehicle for reference at all time (Figure 19). 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 11/15

Figure 18: Display of fire-fighting equipment Figure 19: Front page of emergency leaflet and systems at the service area near tunnel ("In case of tunnel emergency ) 3.2 Public Relations for Safety at the T.T.B Tunnel The T.T.B. Tunnel is the longest under water road tunnel in Japan, and is equipped with safety equipment that combines the newest technology. On the other hand, most drivers have never used these facilities. Also, the tunnel layout and structure is different from other Japanese tunnels. Therefore, it is necessary to well inform tunnel users about the newest tunnel facilities. For these reasons, there is an exhibition hall in the service area of the Kisarazu Man-Made Island (Umi Hotaru). Displays of the tunnel facilities, safety equipment, and the tunnel characteristics (Figure 20-23) are available, including: An introductory video describing the total T.T.B. Project; A driving simulator and video about emergency situations; A full-scale emergency door and slide; A fire hydrant, fire extinguisher, emergency telephone; A leaflet explaining emergency facilities; An information center. The exhibition hall is open to public everyday at no charge, and visitors can touch all of the equipment a display. 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 12/15

Figure 20: General view of exhibition hall Figure 21: Full-scale fire fighting equipment and push button displays Figure 22: Full-scale slide for evacuation Figure 23: Driving simulator for emergency 3.3 Operation system of the Trans Tokyo Bay Highway The control system of the total route is incorporated in the highway network of Tokyo area, which control is carried out by the main control center located at about 100 km from the tunnel. The communication in case of emergency is regulated in such way that the Police and Fire Brigade are alerted immediately, in order to assure optimal action in accordance with the accident scale. Before opening, a large scale exercise was conducted in the completed T.T.B. tunnel, involving tunnel controllers, Police, Fire Brigade, local hospital and other related parties. The management system for emergency cases was further explained and tested. Also after opening to traffic, similar exercises have been conducted. 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 13/15

In case of tunnel fire, the variable message boards at the tunnel entrance and inside the tunnel are set to stop vehicles from further entering the tunnel. At the same time, the vehicle velocity at downstream from fire point is higher than the smoke velocity. Therefore, no information is given to the drivers between fire and tunnel exit, in order to let them leave the tunnel at normal speed and without panic. This means that information to drivers will not be the same over the whole length of the tunnel. 4. Conclusions The T.T.B. Highway project represents the highest levels of Japanese construction and technology. The project is internationally well known for its rapid completion time of 8 years 7 months. It will serve as experience for future project, both in Japan and internationally. No fire has occurred in the tunnel, and the tunnel is operating successfully in serving to transport drivers across the Tokyo Bay rapidly and safely. In recent years, a number of large-scale fires have occurred in vehicle tunnels. We, as tunnel engineers, should take these facts very seriously, and should at the same time ensure that correct information about these facts is available to each other. In Japan, a number of road tunnels, including large-scale urban tunnels, are in planning and construction phase at the moment, and investigations concerning tunnel fire and tunnel safety are being repeated. In order to further improve the technology level for tunnels, also from now on it is necessary to maintain information exchange on an international level. 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 14/15

References [1] Trans-Tokyo Bay Highway Corporation 1995. Trans-Tokyo Bay Highway (brochure, Japanese) [2] Trans-Tokyo Bay Highway Corporation 1997. Tokyo Bay Aqualine (brochure, Japanese) [3] N. Yamada & S. Kusumoto1998. Utilization of space under carriage way slab at Trans-Tokyo Bay Highway Tunnel (Japanese), proceeding of Symposium an Underground Space, Vol.3, Japan Society of Civil Engineers [4] Tokyo Wan Odan Doro no Subete (All about Trans-Tokyo Bay Highway, Japanese) 1997, Nikkei Construction Books [5] PIARC, Road Tunnels 1995. Report of the Committee, XXth World Road Congress, Montreal (3-9 Sept.1995) 1 st International Conference on Traffic and Safety in Road Tunnels 28/29 May 2001 in Hamburg 15/15