This page left intentionally blank.

Similar documents
FDOT D4 Complete Streets

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Executive Summary. NY 7 / NY 2 Corridor

City of Hermosa Beach Administrative Policy #

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

DRAFT Subject to Modifications

Rezoning Transportation Analysis Petition Number: General Location Identifier:

TRANSPORTATION ELEMENT

ARTICLE 13 STREETS General

Lambeth Main Street Streetscape Improvements

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

STAFF REPORT. To: Planning Commission Meeting Date: April 12, City of North Las Vegas

COMPLETE GREEN STREET CHECKLIST

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

ARTICLE 13 STREETS General

EXECUTIVE SUMMARY. Introduction

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Public input has been an important part of the plan development process.

DRAFT. 10% Common Open Space

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

Toronto Complete Streets Guidelines

Route 1 Corridor Study

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

City of Bristol Route 6 Corridor Implementation Program

Implementation Guide Comprehensive Plan City of Allen

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Transportation Research Center

TAC/CAC, TPO Project Update February 2016

PLANNING COORDINATING COMMITTEE

Dallas Complete Streets Initiative and Design Manual. City Council Briefing December 2, 2015

11.0 TRANSPORTATION ELEMENT

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL PRESENTATION AUGUST 22, 2017

I. INTRODUCTION. Project Background and Study Area

2040 Long Range Transportation Plan

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE.

3. ELEMENTS OF THE METRO VISION 2035 PLAN

Chapter 1: Introduction

St. Clair Avenue West Area Transportation Master Plan

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

Transportation. Strategies for Action

TRANSIT ORIENTED DEVELOPMENT PINELLAS COUNTY MPO LIVABLE COMMUNITIES INITIATIVE PINELLAS COUNTY COMPREHENSIVE PLAN AMENDMENTS

Designing INSIDE the Box

Welcome to the. Open House

GOALS, OBJECTIVES, POLICIES & PROGRAMS

DAVIDSON MOBILITY PLAN REQUEST FOR PROPOSALS. Town of Davidson, NC June 12th, 2017

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

appendix and street interface guidelines

Rezoning Transportation Analysis Petition Number: General Location Identifier: , ,

Potential Green Infrastructure Strategies May 6, 2015 Workshop

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

What s the role of a Gateway?

Toronto Complete Streets Guidelines

4-Town Comprehensive Plan DRAFT 7/30/07

7Page 72 CLEMMONS COMMUNITY COMPASS 5 DEVELOPMENT AND GROWTH

38 Queen s University Campus Master Plan Part 1

Access Management Strategies for Major Corridors. Town of Amherst, New York Erie County

Lesson 6. Corridor Planning

III - design standards

PARKLET PROPOSAL PACKAGE & PROCESS

TORONTO COMPLETE STREETS GUIDELINES

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

EXISTING COMPREHENSIVE PLAN

1 ESRI User Conference Eastside Greenway

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

East Corridor Final Environmental Impact Statement

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. Board of County Commissioners Public Hearing

Zoning Code Issues Prioritization

Blueprint Denver A BLUEPRINT FOR AN INCLUSIVE CITY. Executive Summary

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

CHAPTER 7: Transportation, Mobility and Circulation

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

RIVER ARTS DISTRICT TRANSPORTATION PROJECT

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

A RESOLUTION SETTING FORTH CATS S COMMITTMENT TO COMPLETE STREETS

Planning Roles. Responsibilities

Planning Charlotte s Future. Transportation & Planning Committee March 14, 2016

Biscuit Run Gateway. TJPDC staff recommends combining the following projects:

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

Issues Requiring Future Study

EXPANDING THE NETWORK ALEXANDRIA, VIRGINIA

Preserving Green Streetscape Character on Hillside Drive

Complete Streets in Lancaster County

ROCKY MOUNTAIN LAND USE INSTITUTE

Chapter 1.0 Introduction

4 CIRCULATION AND TRANSPORTATION

Pine Island Road Corridor Master Plan

Toronto Complete Streets Guidelines Stakeholder Advisory Group #

Ann Arbor Downtown Street Design Manual. Ann Arbor DDA IDA 2015 Awards Planning Category

Access Management: An Overview

2. MULTI-MODAL TRANSPORTATION ELEMENT Goals, Objectives, and Policies

Subregion 4 Central Avenue-Metro Blue Line Corridor Transit-Oriented Development (TOD) Implementation Project. Community Meeting April 27, 2011

Iowa s Statewide Urban Design Standards Promote Improved Access Management

Section 1. Executive Summary

Transcription:

July 2012

This page left intentionally blank.

Table of Contents Appendix A : Project Development Checklist Appendix B: At-Grade Rail Crossings Appendix C: Maintenance and Operations Examples Appendix D: Curb Ramps Appendix E: Drainage Grates 2 8 36 40 54 1 07/12/2012 Appendix A

Appendix A Project Development Checklist Appendix A 2

NCDOT Complete Streets Project Development Checklist Background Per the 2009 NCDOT Complete Streets Policy, the NCDOT, in its role as stewards over the transportation infrastructure, is committed to: Figure 2: Project Development Process Providing an efficient multi-modal transportation network in North Carolina such that the access, mobility, and safety needs of motorists, transit users, bicyclists, and pedestrians of all ages and abilities are safely accommodated; Caring for the built and natural environments by promoting sustainable development practices that minimize impacts on natural resources, historic, businesses, residents, scenic and other community values, while also recognizing that transportation improvements have significant potential to contribute to local, regional, and statewide quality of life and economic development objectives; Working in partnership with local government agencies, interest groups, and the public to plan, fund, design, construct, and manage complete street networks that sustain mobility while accommodating walking, biking, and transit opportunities safely. Existing and Future Conditions Goals and Objectives Decision-Making Define Land Use Context Identify Issues and Opportunities Define Alternative Contextual Solutions Design Input Team Define Transportation Context Define Objectives Deliberate Trade-Offs Among Alternatives Recommended Alternative The following is a checklist that reflects Figure 2 and is intended to document how complete streets have been considered in the planning and design of a project. The design input team formed for the project should complete the appropriate portion of this checklist at each project milestone. This checklist should be used for all projects related to the design, construction or modification of streets. 3 Appendix A

Evaluation of Existing and Future Conditions Define Land Use Context: Note: refer to Chapter 3 of the Guidelines for a detailed description of area types) Existing conditions Is this an urban area, a rural area or an area of transition (urban to rural or rural to urban)? What is the jurisdiction land use and zoning for the area? What is the existing land use mix and density? What are the typical building types, their scale, setbacks, urban design characteristics, relation to the street? Future conditions Are there any development pressures on the area? What is the nature of the emerging land use context? What is the jurisdiction s future land use vision (as identified in a comprehensive plan, corridor plan, policies, or other sources)? Does the adopted plan(s) make specific recommendations regarding density, setbacks, urban design, etc. through the project area? Define Transportation Context: Existing conditions What is the character of the street? What does the area look and feel like? How does the street currently function? What are the daily and hourly traffic volumes? Operating and posted speeds? Appendix A 4

How does this corridor function within the larger transportation network? What design features and accommodations for bicyclists, pedestrians and transit users are included on the corridor (number of lanes, sidewalk availability, bicycle facilities, transit service and stops, traffic control, etc.)? What is the existing quality of service (safety and accessibility) for each mode? What is the general crash history for motorists, bicyclists, and pedestrians (are there any specific safety issues to be addressed)? What trip generators (existing and future) are in the vicinity of the proposed project that might affect travel patterns and connections in and around the corridor? What are the locally adopted multimodal plans or policies affecting bicycle, pedestrian, or transit use? Are there any planned transportation projects in the larger area that would affect the street segment? Future conditions What are the projected traffic volumes along the corridor? 5 Appendix A

Establish Goals and Objectives Identify Issues and Opportunities: What are the deficiencies/problems with the street today? º Are there gaps in the bicycle or pedestrian network near or along the street? º Are there gaps in the overall street network (connectivity, capacity, etc.)? º Are there inconsistencies between the amount or type of transit service provided along the street and the types of facilities and/or land uses adjacent to the street? What are the key opportunities with this project (i.e. a tool for economic development or improved community health, a missing link in the bicycle, pedestrian, or vehicular system, improving the level or quality of service for a particular mode, etc.)? Define Objectives: How do the local government, community, and all users want the street and neighborhood to change, if at all? What are the existing functions that need to remain in place? How can those functions be balanced with new users of the street? How would this project increase the connectivity of the larger network? How would this project improve the mobility and safety of all potential users of the street? How would this project meet the needs of the community? Decision-Making Develop Alternatives (Note: refer to Chapter 4 of the Guidelines for detailed street typologies): How will the proposed project accommodate existing and planned bicycle, pedestrian, and transit facilities? Appendix A 6

What modes does each alternative scenario serve and how? How do the alternatives fit within the land use and transportation context and defined objectives? How will the alternative scenarios under consideration meet the needs of stakeholders? Deliberate Trade-Offs: All of the scenarios identified should be tested against the land use and transportation context and the objectives for the project to determine any inconsistencies or constraints. The solutions within the alternatives will likely vary. An evaluation and description of trade-offs is required prior to the selection of the recommended alternative. Design plans that are under development allow for comparison of tradeoffs in street crosssections and the ability of the alternatives to meet identified objectives, etc. At the end of the deliberation process, the reasons behind the selected cross-section should be transparent and understood. Therefore, describe the trade-offs made, if any, and how they have been evaluated. Items to be considered include but are not limited to: Consistency with local context, land use and transportation plans and policies, and project objectives, as defined through this process; Balanced modal capability (to achieve functionality for all users); Accessibility to achieve functionality for all users; Right-of-way availability; Environmental (natural and human) considerations; Overall costs; and Any other considerations specific to this project. Recommended Alternative: Once trade-offs have been evaluated and described among alternatives, the team will come to a recommended alternative. Describe how the recommended alternative reflects the ultimate design for the project: 7 Appendix A

Appendix B At-Grade Rail Crossings Appendix B 8

9 Appendix B

Appendix B 10

11 Appendix B

Appendix B 12

13 Appendix B

Appendix B 14

15 Appendix B

Appendix B 16

17 Appendix B

Appendix B 18

19 Appendix B

Appendix B 20

21 Appendix B

Appendix B 22

23 Appendix B

Appendix B 24

25 Appendix B

Appendix B 26

27 Appendix B

Appendix B 28

29 Appendix B

Appendix B 30

31 Appendix B

Appendix B 32

33 Appendix B

Appendix B 34

This page left intentionally blank. 35 Appendix B

Appendix C Maintenance and Operations Examples Appendix C 36

Complete Streets Implemented in Maintenance Projects The following pages illustrate examples of North Carolina projects that successfully applied complete streets strategies as part of maintenance projects. BEFORE AFTER Road Diet with Bicycle Lanes and Adjacent Parking Project Location: Mint Street, Charlotte Project Type: Resurfacing with utility relocation and sidewalk Description: Consistent 4-lane undivided cross-section between West Boulevard and Penman Street was converted to two 11-foot travel lanes along with 5-foot bicycle lanes and 7-foot parking bays on one side only. 37 Appendix C

Mid-block Crossing on Third Street Example of Use of New Technology Project Location: Third Street/Ann Street, Wilmington Project Type: Pedestrian Crossing Applying New Technology Description: This project provides a marked crosswalk for pedestrians and bicyclists to cross South 3rd Street at Ann Street, which is midway between the traffic signals at Castle Street and Market Street. The project includes the installation of a Rectangular Rapid Flash Beacon, which is the first in the state to be installed. This beacon has been used in other locations throughout the country including St. Petersburg, Florida and Boulder, Colorado. The funding for this project was a joint effort between the City Appendix of Wilmington C and the residents of Old Wilmington. 38 Rectangular Rapid Flash Beacon Note: any new and/or experimental traffic control devices need to be approved in coordination with NCDOT and the NCDOT Regional Traffic Engineer.

Reduced Shoulder Width Example of Exceptions Implemented due to Roadway Restrictions Project Location: Morganton two examples Project Type: Examples of complete streets applications with reduced ROW Shared Use Path Crossing Sidewalks to Connect Bike Routes to topography, however, it was not possible to provide wider roadways with bike allowances. A compromise was used to widen the sidewalk on one side to provide a shared use path with the understanding that the shared use path had driveway crossings. Description: In some areas topography would require additional right of way, grading, and significant cost to provide an improvement. In the left example, an edge stripe is used with a reduced shoulder width. In the right example, there was desire to connect two bicycle routes. Due 39 Appendix C

Appendix D Curb Ramps Appendix D 40

41 Appendix D

Appendix D 42

43 Appendix D

Appendix D 44

45 Appendix D

Appendix D 46

47 Appendix D

Appendix D 48

49 Appendix D

Appendix D 50

51 Appendix D

Appendix D 52

This page left intentionally blank. 53 Appendix D

Appendix E Drainage Grates Appendix E 54

55 Appendix E

Appendix E 56

57 Appendix E

Appendix E 58