C I R R U S HEATING DESCRIPTION A. Cabin Air Heating System - Serials thru

Similar documents
CIRRUS AIRPLANE MAINTENANCE MANUAL

CIRRUS AIRPLANE MAINTENANCE MANUAL

CIRRUS AIRPLANE MAINTENANCE MANUAL

Environmental Systems

CIRRUS AIRPLANE MAINTENANCE MANUAL

CHAPTER 11 HEATING AND VENTILATION

CIRRUS AIRPLANE MAINTENANCE MANUAL

Instrument and Control Panels

Camaro A/C Install Instructions

Pressurization System

Gen II Heater with Defrost

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1968 CHEVROLET IMPALA

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST CHEVROLET NOVA

CHAPTER 21 AIR CONDITIONING

CIRRUS AIRPLANE MAINTENANCE MANUAL

ColorMax Cyclone Cleaning Kit

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST CHEVROLET CHEVELLE/ EL CAMINO NOTE: INSTRUCTIONS DEPICT CHEVELLE

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST FORD PICKUP

an ISO 9001:2015 Registered Company

JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30)

HEAT/ COOL/ DEFROST FORD THUNDERBIRD

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST MUSTANG

specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic hi l PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST FORD TRUCK

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST PLYMOUTH BELVEDERE

CABINET PARTS For Model: KSSS48QJX00 (Stainless Steel)

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

SAF-T-LINER MVP-ER PARTS MANUAL. Heaters Section. Page 8-1. Heaters 10/96

TOP AND CABINET PARTS

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST EARLY 1955 CHEVROLET PICKUP

NOTE ITEM PART NUMBER KIT CONTENTS QTY

an ISO 9001:2008 Registered Company GOLL ST. - SAN ANTONIO, TX ph fax MINI SPACE SAVER HEAT /COOL

Air Conditioner System ICA Supplement

Service Bulletin No.: DAC Rev 0 Date Issued: November 9, 1999 Title: Powerplant Cooling Page: 1 of 10

Canadair Regional Jet 100/200 - Water & Waste

DC3Training.com N28AA DC-3 Pilot s Handbook

CABINET PARTS For Model: KBLC36FMS02 (Stainless Steel)

KSSS42QDW05, KSSS42QDX05

Fountain Classic. Installation and Owner s Manual. Page 16

1956 FORD F-100 TRUCK

Installation Instructions

Installation Instructions

3500 SERIES CONVECTION STEAM COOKER PARTS AND SERVICE MANUAL

an ISO 9001:2008 Registered Company CORVETTE REV A 11/1/10, COVETTE EVAP INST PG 1 OF 24

CONTENTS CONSIDERATIONS. General Plumbing Component Connection ILLUSTRATION. Control System CONFIGURATION. Voltage Verification CONNECTION

AUTOMATIC WASHER HORIZONTAL AXIS. Product Type

TOP AND CABINET PARTS

Heating and ventilation system,

INSTALLATION INSTRUCTIONS

Air Conditioning System Installation Manual

an ISO 9001:2008 Registered Company MINI SPACE SAVER HEAT /COOL/DEFROST QUZ-A VUZ-A

2002 Dodge Caravan SE

Installation and Operation Manual CLEARVIEW DAY COVER CAUTION: To view a video scan the QR code above

SERVICE MANUAL DISHWASHERS DIVA ACCESSIBILITY DISHWASHERS

CATALOG OF REPLACEMENT PARTS HSROG SERIES SINGLE RACK OVEN. A product of HOBART CORPORATION 701 S. RIDGE AVENUE TROY, OHIO

TOP AND CABINET PARTS

These parts are in stock and for immediate sale

Heater with Air Conditioning. E-Series Ford Aeromaster

CABINET PARTS For Model: JS42CXFXDB00 (Etched Aluminum)

E32 CONVECTION OVEN SERVICE MANUAL -1- Revision 1/F3508

HEATING AND VENTILATION

Chevrolet Pickup Evaporator Kit (754563)

Indirect gas-fired air heater

TOP AND CABINET PARTS For Models: GHW9200LW0, GHW9200LQ0 (White/Grey) (White/Blue)

E25 CONVECTION OVEN E25MS CONVECTION OVEN SERVICE MANUAL

an ISO 9001:2008 Registered Company ShortPac HEAT/COOL (05000-QUX-A/05000-VUX-A)

CABINET PARTS For Model: KSSO36FMX01 (Etched Aluminum)

DISHWASHER - PART RECOGNITION GUIDE

BC BRONCOS AIR CONDITIONING UNIT

CATALOG OF REPLACEMENT PARTS

2000 Lincoln Town Car V8-4.6L VIN W Copyright 2013, ALLDATA Page Remove the screws and the RH cowl vent screen.

Pellet Stove. Flex Pipe. Appliance Connector

TOP MOUNT REFRIGERATOR MODELS: WRT106TFDW01 (White) WRT106TFDB01 (Black) WRT106TFDT01 (Biscuit)


CABINET PARTS. For Models: KBLC36FMS00 (Stainless Steel) 9 05 Litho In U.S.A. (kdj) Part No " BOTTOM MOUNT BUILT IN REFRIGERATOR

COMPAC GEN II HEAT/COOL VUX-A. an ISO 9001:2008 Registered Company #10 SUCTION HOSE COMPRESSOR #8 DISCHARGE HOSE EVAPORATOR DRIER CONDENSER

INSTALLATION INSTRUCTIONS

CHAPTER 11 AIR CONDITIONING

Repair Parts List DISHWASHER MODEL NUMBER DW871UQA. When requesting service or ordering parts, always provide the following information:

Streamline Gen II Oval Control Panel Polished (48104-RHQ)

TOP AND CABINET PARTS For Model: GHW9160PW0 (White/Platinum)

E32 CONVECTION OVEN SERVICE MANUAL

CLe-series Dishwashers

E26 CONVECTION OVEN SERVICE MANUAL. Revision 1/F

All Freestanding SxS Refrigerators

GV Series 4 Section Assembly

A/C-HEATER SYSTEM - MANUAL

CABINET PARTS For Model: KSSC42QTS02 (Stainless Steel)

TC 222 TIRE CHANGER SPARE PART LIST 01

DaVinci Heat Exchanger Touch-Screen Version

Installation Instructions

TOYOTA FJ-40 DIRECTIONS

CHAPTER - 30 HIGHLIGHTS (Summary of Changes) Revision No. TR30-6 Dec 21/18 TO: HOLDERS OF THE AIRCRAFT MAINTENANCE MANUAL ( )

CIRRUS AIRPLANE MAINTENANCE MANUAL

11 05 litho in U.S.A. (cre) 1. Part No

3. DISCONNECT AIR CONDITIONING TUBE ASSY SST HINT: Disconnect in the same way as the cooler refrigerant suction hose No.1.

MINI SLIMLINE COOL VUY-A VUY-A

RF0809 SERVICE FLASH. Frost Build Up On Upright Freezer Door Dyke SERVICE FLASH BRAND MODEL/SERIAL # CAUSE

Climate Control System

OVEN PARTS For Models:WOC95EC0AB00, WOC95EC0AW00, WOC95EC0AS00, WOC95EC0AE00, WOC95EC0AH00 (Black) (White) (Stainless) (Black Ice) (White Ice)

Concepts Serving Systems

Transcription:

HEATING 1. DESCRIPTION This section covers those systems and components used to supply heated air. Includes items such as heater panels and other units, indicating systems related to heater operation, and wiring. A. Cabin Air Heating System - Serials 22-0002 thru 22-182 Heated air is available at floor level for all occupants. Positive pressure inside the engine cowling causes airflow from the inlet at the rear engine baffle to the engine exhaust muffler. The airflow is then ducted to the hot air valve mounted to the forward RH side of the firewall. When the hot air valve damper is closed, the heated air exits into the engine compartment and is exhausted overboard with the engine cooling airflow. When the hot air valve damper is open, heated air flows from the hot air valve into the air mixing chamber. The heated air is conditioned in the air mixing chamber by mixing it with fresh air (if desired) from the fresh air inlet on the right wing. From the air mixing chamber, the conditioned air is ducted to either the defroster or passengers. Defroster outlet holes are located in the glareshield just aft of the windshield. Forward passenger conditioned air enters the cabin through outlets in the kick panel at each position. Conditioned air for rear passengers is ducted to outlets on the sidewalls near floor level. The amount of heated air allowed into the air mixing chamber is controlled by rotating the Cabin Heat Control, located inboard of the Cabin Air Selector. The control is mechanically linked to a damper in a hot air valve between the heat exchanger and air mixing chamber. Rotating the control full counterclockwise (HEAT OFF) bypasses heated air from the heat exchanger into the engine compartment. Rotating the control clockwise opens the door in the hot air valve allowing heated air to enter the mixing chamber. The proportion of heated air to ventilation air mixed in the air mixing chamber is regulated by manipulating the Cabin Heat Control and Cabin Cold Control to obtain the desired temperature and flow. The pilot and co-pilot control the conditioning (mixing) of the heated and fresh air. B. Cabin Air Heating System - Serials 22-183 thru 22-243 Ram air from the upper RH cowl inlet flows through the upper cowl and is ducted to a heat exchanger surrounding the RH exhaust muffler. The heated air is routed to a hot air valve mounted to the forward side of the firewall. The hot air valve controls the entry of hot air into the cabin distribution system. When the hot air valve damper is open, the heated air flows into the air mixing chamber and is mixed with fresh air from the RH wing air inlet. When the hot air valve damper is closed, the heated air exits into the engine compartment and is exhausted overboard with the engine cooling airflow. Cabin heat is regulated by controlling the volume of hot air admitted into the distribution system s air mixing chamber. The proportion of heated air to fresh air is accomplished using the temperature selector mounted on the RH instrument panel. Conditioned air can be directed to passengers and/or the windshield diffuser by manipulating the cabin vent selector mounted on the RH instrument panel. The conditioned air enters the cabin through adjustable air vents located in each kick plate and through non-adjustable, floor level vents located in the rear cabin trim side panels. Conditioned air can also be distributed to the windshield diffuser in the glareshield. All Page 1 1 Jun 2010

C. Cabin Air Heating System - Serials 22-2438 & subs Ram air from the upper RH cowl inlet flows through the upper cowl and is ducted to a heat exchanger surrounding the RH exhaust muffler. The heated air is then routed to the air mixing chamber mounted to the forward side of the firewall. In the air mixing chamber, the heated air is mixed with fresh air from the NACA vent on the RH lower cowl. The mixed air is then distributed by either ram air or by optional blower fan to the distribution manifold mounted to the center, aft side of the firewall. The distribution manifold uses butterfly valves to control airflow to the floor and defrost vents. Cabin heat is regulated by controlling the volume of hot air admitted into the distribution system s air mixing chamber. The proportion of heated air to fresh air is accomplished using the temperature selector mounted on the RH instrument panel. Conditioned air can be directed to passengers and/or the windshield diffuser by manipulating the cabin vent selector mounted on the RH instrument panel. The conditioned air enters the cabin through adjustable air vents located in each kick plate and through non-adjustable, floor level vents located in the rear cabin trim side panels. Conditioned air can also be distributed to the windshield diffuser in the glareshield. D. Cabin Air Heating System - Serials 22T-0001 & subs Ram air from the rear ports of the intercoolers is ducted to a heat exchanger surrounding the crossover exhaust pipe. The heated air is then routed to the air mixing chamber mounted to the forward side of the firewall. In the air mixing chamber, the heated air is mixed with fresh air from the NACA vent on the RH lower cowl. The mixed air is then distributed by either ram air or by optional blower fan to the distribution manifold mounted to the center, aft side of the firewall. The distribution manifold uses butterfly valves to control airflow to the floor and defrost vents. Cabin heat is regulated by controlling the volume of hot air admitted into the distribution system s air mixing chamber. The proportion of heated air to fresh air is accomplished using the temperature selector mounted on the RH instrument panel. Conditioned air can be directed to passengers and/or the windshield diffuser by manipulating the cabin vent selector mounted on the RH instrument panel. The conditioned air enters the cabin through adjustable air vents located in each kick plate and through non-adjustable, floor level vents located in the rear cabin trim side panels. Conditioned air can also be distributed to the windshield diffuser in the glareshield. Page 2 1 Jun 2010 All

2. TROUBLESHOOTING Serials 22-2438 & subs, 22T-0001 & subs: Trouble Probable Cause Remedy Cabin heat inoperable. Hot air valve duct disconnected or collapsed. Control linkage misaligned or disconnected. Faulty hot air valve damper. Cabin floor duct disconnected or collapsed. Connect or replace duct. (Refer to ) Adjust and secure control linkage. (Refer to 21-0) Replace hot air valve. (Refer to ) Connect or replace duct. (Refer to 21-20) Defroster system inoperable. Cabin occupants become disoriented, tired, or nauseated. Complaints of headaches. Cabin floor vents closed, blocked, or faulty. Control linkage misaligned or disconnected. Defroster vent holes blocked. Hot air valve duct disconnected or collapsed. Exhaust gases leaking into heater muffler. Open, remove restriction, or replace cabin floor vent. (Refer to 21-20) Adjust and secure control linkage. (Refer to 21-0) Remove restriction. Connect or replace duct. (Refer to ) Serials 22-0002 & subs: Perform Inspection/Check - Heat Exchanger. (Refer to 8-20) Serials 22T-0001 & subs: Perform Inspection/Check - Exhaust System. (Refer to 8-20) All Page 3 1 Jun 2010

3. MAINTENANCE PRACTICES A. Hot Air Valve - Serials 22-0002 thru 22-182 (See Figure 1) (1) Removal - Hot Air Valve (a) Remove engine cowling. (Refer to 1-10) (b) Remove clamp securing duct to hot air valve. (c) Disconnect hot air valve control cable from hot air valve. (d) Remove screws and washers securing hot air valve to firewall. (e) Serials 22-0011 & subs: Remove gasket from hot air valve. (2) Installation - Hot Air Valve (a) Acquire necessary tools, equipment, and supplies. Description P/N or Spec. Supplier Purpose Cable Ties 8 inch Any Source Secure air duct. High Temperature Silicone Sealant RTV 3 Dow Corning Corporation Midland, MI 488-0994 989-49-4400 Provide air-tight seal between cabin and engine compartment. (b) Solvent clean hot air valve and firewall mating surfaces. (Refer to 20-30) (c) Apply sealant to back side of hot air valve. (Refer to 20-10) (d) Position gasket on backside of hot air valve. (e) Apply sealant to back side of gasket. (f) Position hot air valve to firewall and secure with screws and washers. (g) Perform Adjustment/Test - Hot Air Valve Control Cable. (Refer to 21-0) (h) Position duct to hot air valve and secure with clamp. (i) Install engine cowling. (Refer to 1-10) Page 4 1 Jun 2010 Serials 22-0002 thru 22-182

B. Hot Air Valve - Serials 22-183 thru 22-243 (See Figure 1) (1) Removal - Hot Air Valve (a) Acquire necessary tools, equipment, and supplies. Description P/N or Spec. Supplier Purpose Flashlight - Any Source Inspection. Inspection Mirror - Any Source Inspection. (b) Remove engine cowling. (Refer to 1-10) (c) Remove hose clamp securing duct to hot air valve. (d) Set temperature control knob to maximum HOT position. (e) At hot air valve, remove RTV sealant covering bolt heads. (f) Remove bolts and washers securing hot air valve and gasket to firewall. (g) Using inspection mirror and flashlight, observe orientation of linkage hook and flapper door eyelet. (h) Rotate hot air valve 90 clockwise to disengage linkage hook from flapper door eyelet. Remove hot air valve. (2) Installation - Hot Air Valve (a) Acquire necessary tools, equipment, and supplies. Description P/N or Spec. Supplier Purpose Tongue Depressor - Any Source Fixture. Clamp - Any Source Fixture. -inch Scale - Any Source Measure. Dow Corning Silicone Sealant RTV 3 Any Source Seal. (b) To facilitate hot air valve installation, secure flapper door to closed position. 1 Rotate hot air valve flapper door to closed position. 2 Position tongue depressor into hot air valve firmly against closed flapper door. 3 Using clamp, secure tongue depressor to inner surface of hot air valve. Verify flapper door is secured to closed position. (c) Position gasket to hot air valve. Orient hot air valve 90 clockwise to installation location. (d) Latch linkage hook to flapper door eyelet on hot air valve. (e) Rotate hot air valve 90 counter-clockwise to engage hook into eyelet. (f) Remove clamp securing tongue depressor to hot air valve. (g) At coupler, apply silicone sealant around inner circumference of firewall pass-through. (Refer to 20-10) (h) Position hot air valve and new gasket to firewall and secure with bolts and washers. (i) Position duct to hot air valve and secure with clamp. (j) To secure attaching hardware, apply silicone sealant to bolt heads following installation. (k) Install engine cowling. (Refer to 1-10) Serials 22-183 thru 22-243 Page 1 Jun 2010

C. Air Mixing Chamber - Serials 22-2438 & subs, 22T-0001 & subs (See Figure 2) (1) Removal - Air Mixing Chamber (a) Acquire necessary tools, equipment, and supplies. Description P/N or Spec. Supplier Purpose Flashlight - Any Source Inspection. Inspection Mirror - Any Source Inspection. (b) Remove engine cowling. (Refer to 1-10) (c) Remove clamp securing fresh air duct to air mixing chamber. (d) Remove clamp securing heat exchanger duct to air mixing chamber. (e) Remove bolt and wire stop securing temperature control cable to actuation arm on air mixing chamber. (f) Remove bolt, washers, and nut securing temperature control cable and clamp to bracket on air mixing chamber. (g) Set temperature control knob to maximum HOT position. (h) At air mixing chamber, remove RTV sealant covering bolt heads. (i) Remove bolts and washers securing air mixing chamber and gasket to firewall. (j) Using inspection mirror and flashlight, observe orientation of linkage hook and flapper door eyelet. (k) Rotate air mixing chamber 90 clockwise to disengage linkage hook from flapper door eyelet. Remove air mixing chamber from airplane. (2) Installation - Air Mixing Chamber (a) Acquire necessary tools, equipment, and supplies. Description P/N or Spec. Supplier Purpose Tongue Depressor - Any Source Fixture. Clamp - Any Source Fixture. -inch Scale - Any Source Measure. Dow Corning Silicone Sealant RTV 3 Any Source Seal. (b) (c) (d) (e) (f) (g) (h) To facilitate air mixing chamber installation, secure flapper door to closed position. 1 Rotate hot air valve flapper door to closed position. 2 Position tongue depressor into hot air valve firmly against closed flapper door. 3 Using clamp, secure tongue depressor to inner surface of air mixing chamber. Verify flapper door is secured to closed position. Position gasket to air mixing chamber. Orient air mixing chamber 90 clockwise to installation location. Latch linkage hook to flapper door eyelet on air mixing chamber. Rotate air mixing chamber 90 counter-clockwise to engage hook into eyelet. Remove clamp securing tongue depressor to hot air valve. At coupler, apply silicone sealant around inner circumference of firewall pass-through. (Refer to 20-10) Position air mixing chamber and new gasket to firewall and secure with bolts and washers. Page 1 Jun 2010 Serials 22-2438 & subs, 22T-0001 & subs

(i) Position temperature control cable and clamp to bracket on air mixing chamber and secure with bolt, washers, and nut. (j) Position temperature control cable and wire stop to actuation arm on air mixing chamber and secure with bolt. (k) Position fresh air duct to air mixing chamber and secure with clamp. (l) Position heat exchanger duct to air mixing chamber and secure with clamp. (m) To secure attaching hardware, apply silicone sealant to bolt heads following installation. (n) Install engine cowling. (Refer to 1-10) Serials 22-2438 & subs, 22T-0001 & subs Page 1 Jun 2010

D. Cabin Air Coupler - Serials 22-183 thru 22-243 (See Figure 1) (1) Removal - Cabin Air Coupler (a) Remove engine cowling. (Refer to 1-10) (b) Remove RH kick plate. (Refer to 2-10) (c) Remove clamp securing duct to coupler. (d) Remove nut, washers, and spacer securing hot air valve linkage to coupler. (e) Remove nut, washers, and spacer securing vent, fan, or evaporator linkage to coupler. (f) Remove nut, washers, and spacer securing distribution manifold linkage to coupler actuation arm. (g) Remove bolt, washer, and clamp securing distribution manifold linkage to coupler mounting plate. (h) Remove bolts and washers securing coupler and gasket to firewall. (2) Installation - Cabin Air Coupler (a) Position coupler and new gasket to firewall and secure with bolts and washers. (b) Position distribution manifold linkage to coupler actuation arm and secure with spacer, washers, and nut. (c) Position distribution manifold linkage to coupler mounting plate and secure with bolt, washer, and clamp. (d) Position vent, fan, or evaporator linkage to coupler and secure with spacer, washers, and nut. (e) Position hot air valve linkage to coupler and secure with spacer, washers, and nut. (f) Position duct to coupler and secure with clamp. (g) Install RH kick plate. (Refer to 2-10) (h) Install engine cowling. (Refer to 1-10) Page 8 1 Jun 2010 Serials 22-183 thru 22-243

E. Cabin Air Coupler - Serials 22-2438 & subs, 22T-0001 & subs (See Figure 2) (1) Removal - Cabin Air Coupler (a) Set BAT 1, BAT 2, and AVIONICS switches to OFF positions. (b) Serials w/o Perspective Avionics: Pull COMPRESSOR/CONTROL circuit breaker. (c) Serials 22-302 & subs w/ Perspective Avionics: Pull A/C COMPR/CONTROL circuit breaker. (d) Serials 22T-0001 & subs: Pull CABIN AIR CONTROL and A/C COMPR circuit breakers. (e) Remove engine cowling. (Refer to 1-10) (f) Remove RH kick plate. (Refer to 2-10) (g) Disconnect coupler drive assembly electrical connectors. (h) Serials 22T-0001 & subs: Remove temperature sensor. (i) Remove clamp securing duct to coupler. (j) Remove nut, washers, and spacer securing air mixing chamber linkage to coupler. (k) Remove bolts and washers securing coupler and gasket to firewall. Remove coupler from airplane. (2) Installation - Cabin Air Coupler (a) Position coupler and new gasket to firewall and secure with bolts and washers. (b) Position air mixing chamber linkage to coupler and secure with spacer, washers, and nut. (c) Position duct to coupler and secure with clamp. (d) Serials 22T-0001 & subs: Install temperature sensor. (e) Connect coupler drive assembly electrical connectors. (f) Install RH kick plate. (Refer to 2-10) (g) Install engine cowling. (Refer to 1-10) (h) Serials w/o Perspective Avionics: Reset COMPRESSOR/CONTROL circuit breaker. (i) Serials 22-302 & subs w/ Perspective Avionics: Reset A/C COMPR/CONTROL circuit breaker. (j) Serials 22T-0001 & subs: Reset CABIN AIR CONTROL and A/C COMPR circuit breakers. Serials 22-2438 & subs, 22T-0001 & subs Page 9 1 Jun 2010

F. Baffle Duct - Serials 22-183 & subs (See Figure 1) (1) Removal - Baffle Duct (a) Remove lower engine cowling. (Refer to 1-10) (b) Remove bolt, washers, nut, and clamp securing duct to engine mount. (c) Remove clamp securing duct to engine baffling. (d) Remove clamp securing duct to heat exchanger. Remove duct from airplane. (2) Installation - Baffle Duct (a) Position duct to heat exchanger and secure with clamp. (b) Position duct to engine baffling and secure with clamp. (c) Position duct to engine mount and secure with clamp, bolt, washers, and nut. (d) Install lower engine cowling. (Refer to 1-10) Page 10 1 Jun 2010 Serials 22-183 & subs

G. Hot Air Valve Duct - Serials 22-183 thru 22-243 (See Figure 1) (1) Removal - Hot Air Valve Duct (a) Remove lower engine cowling. (Refer to 1-10) (b) Remove clamp securing duct to heat exchanger. (c) Remove clamp securing duct to hot air valve. Remove duct from airplane. (2) Installation - Hot Air Valve Duct (a) Position duct to hot air valve and secure with clamp. (b) Position duct to heat exchanger and secure with clamp. (c) Install lower engine cowling. (Refer to 1-10) Serials 22-183 thru 22-243 Page 11 1 Jun 2010

H. Air Mixing Chamber Duct - Serials 22-2438 & subs, 22T-0001 & subs (See Figure 2) (1) Removal - Air Mixing Chamber Duct (a) Remove lower engine cowling. (Refer to 1-10) (b) Remove clamp securing duct to heat exchanger. (c) Remove clamp securing duct to air mixing chamber. Remove duct from airplane. (2) Installation - Air Mixing Chamber Duct (a) Position duct to air mixing chamber and secure with clamp. (b) Position duct to heat exchanger and secure with clamp. (c) Install lower engine cowling. (Refer to 1-10) Page 12 1 Jun 2010 Serials 22-2438 & subs, 22T-0001 & subs

I. Cabin Air Coupler Duct - Serials 22-183 & subs, 22T-0001 & subs (See Figure 1) (1) Removal - Cabin Air Coupler Duct (a) Remove RH kick plate. (Refer to 2-10) (b) Remove sidewall air duct trim. (Refer to 2-10) (c) Remove clamp securing duct to coupler. (d) Serials 22-183 & subs, 22T-0001 & subs w/o Fan: Remove clamp securing duct to vent assembly. (e) Serials 22-1821, 22-183 & subs, 22T-0001 & subs w/ Fan: Remove clamp securing duct to fan assembly. (f) Serials 22-102, 22-1840, 22-183 & subs, 22T-0001 & subs w/ Air Conditioning: Remove clamp securing duct to evaporator. (g) Remove cable ties securing duct to fuselage. Remove duct from airplane. (2) Installation - Cabin Air Coupler Duct (a) Serials 22-183 & subs, 22T-0001 & subs w/o Fan: Position duct to vent assembly and secure with clamp. (b) Serials 22-1821, 22-183 & subs, 22T-0001 & subs w/ Fan: Position duct to fan assembly and secure with clamp. (c) Serials 22-102, 22-1840, 22-183 & subs, 22T-0001 & subs w/ Air Conditioning: Position duct to evaporator and secure with clamp. (d) Position duct to coupler and secure with clamp. (e) Position duct to fuselage and secure with cable ties. (f) Install sidewall air duct trim. (Refer to 2-10) (g) Install RH kick plate. (Refer to 2-10) J. Defrost Diffuser The defrost diffuser is integral to the lower windshield trim assembly. For maintenance practices pertinent to the lower windshield trim assembly, see Chapter 2, Cabin. (Refer to 2-10) K. Heat Exchanger For maintenance practices pertinent to the heat exchanger, see Chapter 8, Noise Suppressor. (Refer to 8-20) All Page 13 1 Jun 2010

AIR MIXING CHAMBER 2 1 3 4 ENGINE BAFFLE FIREWALL HEAT EXCHANGER Serials 22-0002 thru 22-101, 22-103 thru 22-1820, 22-1822 thru 22-1839, 22-1841 thru 22-182. LEGEND 1. Hot Air Valve 2. Gasket 3. Screw 4. Washer. Hot Air Valve Duct. Clamp. Baffle Duct SR22_MM21_1404D Page 14 1 Jun 2010 Figure 1 Hot Air Valve Installation - Serials 22-0002 thru 22-182 (Sheet 1 of 2) Serials 22-0002 thru 22-182

2 8 9 4 9 4 2 1 ENGINE BAFFLE FIREWALL HEAT EXCHANGER LEGEND 1. Hot Air Valve 2. Gasket 4. Washer. Hot Air Valve Duct. Clamp. Baffle Duct 8. Cabin Air Coupler 9. Bolt Serials 22-183 thru 22-243 Serials 22-102, 22-1821, 22-1840, 22-183 thru 22-2333, 22-233 thru 22-2419, 22-2421 thru 22-243. Figure 1 Hot Air Valve Installation - Serials 22-183 thru 22-243 (Sheet 2 of 2) SR22_MM21_2322A Page 1 1 Jun 2010

4 9 2 8 ENGINE BAFFLE 9 4 4 3 9 4 1 2 FIREWALL ENGINE MOUNT HEAT EXCHANGER LEGEND 1. Air Mixing Chamber 2. Gasket 3. Nut 4. Washer. Air Mixing Chamber Duct. Clamp. Baffle Duct 8. Cabin Air Coupler 9. Bolt Serials w/ Normally Aspirated Engine & Perspective Avionics. SR22_MM21_28A Page 1 1 Jun 2010 Figure 2 Air Mixing Chamber Installation - Serials 22-2438 & subs (Sheet 1 of 2) Serials 22-2438 & subs

NOTE Existing bolt and washer from lower aft RH side of oil pan. 4 3 FIREWALL 2 3 ENGINE MOUNT 2 INTERCOOLER 11 10 1 10 11 3 3 4 Serials 22T-0001 thru 22T-0020, 22T-0022, 22T-0024, 22T-002 before SB 2X-2-01. Serials 22T-0001 thru 22T-0020, 22T-0022, 22T-0024, 22T-002 after SB 2X-2-01. 11 3 12 3 11 3 10 11 8 9 CROSSOVER TUBE LEGEND 1. Air Mixing Chamber 2. Gasket 3. Bolt 4. Washer. Clamp. Cabin Air Coupler. Duct 8. Inlet Weldment 9. Blast Tube Tee 10. Nut 11. Washer 12. Bracket Serials 22T-0001 & subs. SR22_MM21_320A Serials 22T-0001 & subs Figure 2 Air Mixing Chamber Installation - Serials 22T-0001 & subs (Sheet 2 of 2) Page 1 1 Dec 2014

Intentionally Left Blank Page 18 1 Jun 2010 All