Description. Main components. Lifting eyes To used for lifting and transport securing. Carrying bar Carries the cassettes and the pressure plate.

Similar documents
Instruction Manual Plate Condenser. AlfaCond 400/600/800. Part number

Channel plates Heat is transferred from one medium to the other through the thin channel plates.

HRS Heat Exchangers Instruction Manual

M3 M6 M10 TS6 T2 T5 TL3 TL6

eng ger fre Instruction Manual Plate Heat Exchangers spa M3 M6 M10 TS6 TL6 por ita swe dan fin dut rus pol Part number nor

COPYRIGHT Alfa Laval Lund AB, 2012 How to contact Alfa Laval Contact details for all countries are continually updated on our website.

Instruction Manual - Plate Heat Exchangers

PLATE HEAT EXCHANGERS. Operation and Maintenance Manual

The Alfa Laval. Cleaning procedures. for. HeatExchangers.

WesPlate. Operation, Maintenance & Installation Manual. Heat Exchanger. Models WP & WPDW

AQUAS POOL PACKAGE INSTALLATION INSTRUCTIONS FOR MODELS: APN 1000, 1250, 1500, and 2000 AQUAS Pool Package

Instruction and Maintenance Manual. Spiral Heat Exchanger

Installation, Operation and Maintenance Instructions for ThermaFlex Gasketed Plate Heat Exchangers

Operation and Maintenance Manual Sondex All-Welded Heat Exchangers (SAW)

Installation, Operation and Maintenance Instructions ThermaFlex Gasketed Plate Heat Exchanger OM010

Rycroft Supapac Plate Heat Exchangers

PLATE HEAT EXCHANGER

Operation of heat exchangers

Titanium Plate Heat Exchanger. Installation & Operating Manual

Evaporators. Direct Expansion Flooded Recirculated Over Feed

ANLAGENBAU HEAT EXCHANGER w w w. a nla g enba u-b oehm er. d e Version 05/2015

4 route 147, C.P.33 Coaticook, Qc J1A 2S8

UniAir UniBraz UniCompact UniGasket UniSystem UniTwist UniWeld

Carry Out Maintenance Procedures

AIC Brazed Plate Heat Exchanger Operating and Instruction Manual

LONGONI ENGINEERING SRL

PARTS CLEANING AND DEGREASING

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

Brazed Plate Heat Exchanger Operations Manual

Instruction Manual. Pharma-line ESE02198-EN Original manual

Descaler & Prevention

USER AND MAINTENANCE MANUAL

MRO CHEMICALS CLEANERS & DEGREASERS

ROTARY TUMBLER LORTONE INSTRUCTIONS AND PARTS LIST. Model 3-1.5B. Model 45C. Model 33B Cyrus Way Mukilteo, WA (425)

Aston Technology-Sondex A/S PHE - Design & Datalist V10A34 Aston Thomas McLaughlin 05/03/ ATESHEX S1 Item: 1

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

SERVICE MANUAL. For Service & Parts please call APK THERMAL at or SAFETY INSTRUCTION

Plate Type Heat Exchangers. Operation and Maintenance Manual

Pocket Hardmount. Preventative Maintenance.

TopWing Ultra-Hygienic Rotary Lobe Pumps

General Maintenance and Operating Instructions for Heat Exchangers

568X, 587X, 588X Series

Installation, Operation and Maintenance Manual

Technews. March-April 2004 EFFECTIVE CLEANING AND SANITIZATION OF DAIRY PLANTS: 2. COMMON PRACTICES

Montageanleitung RLO (Original) Mounting Instructions RLO (Translation of the original)

Patterson/AMT Inline Circulator Pump Refer to pump manual for General Operating and Safety Instructions.

INSTRUCTION MANUAL (English version) Water still

Where the tap has a removable aerator on the spout exit it can be removed and cleaned periodically to maintain optimum flow performance.

Patterson/AMT Inline Circulator Pump Refer to pump manual for General Operating and Safety Instructions.

INSTRUCTIONS AND PARTS LIST. Model 3A LORTONE Cyrus Way Mukilteo, WA (425)

SPIKA NG ICE MAKER MAINTENANCE

Why Clean? Sell more beer!

This chapter is devided into two sections:

Heating and ventilation system,

Installation and operating instructions. E.2 Series high efficiency circulator

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

Refrigerated Compressed Air Dryer

Model ESFR-17 Dry Type Pendent Sprinklers Early Suppression Fast Response 16.8 K-factor General Description

Patterson/AMT Inline Circulator Pump Refer to pump manual for General Operating and Safety Instructions.

HOSHIZAKI MODULAR CRESCENT CUBER MODELS KM-280MAH KM-280MWH INSTRUCTION MANUAL

SB Series Brazed Plate Heat Exchanger Installation Manual

BRAZED INSPECTED PLATE HEAT EXCHANGER SCAMBIATORI DI CALORE SALDOBRASATI ISPEZIONABILI CIESSE

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i.

10 Quickbreak. Cleaning & Maintenance Products

Top performance when the going gets tough

Ice Machine Preventative Maintenance

TECHNOSKLO Ltd. Držkov

KM-900MAH KM-900MWH KM-900MRH KM-900MRH3

Friwa Compact. Operating instructions EN

p Permanent magnet water cooled motors Additional manual

The Solution to Your Marine-Based Water-Scale Problems! RYDLYME Marine

Inverted Bucket Steam Traps

Installation of Glass Lined Equipment

PLATE HEAT EXCHANGERS BETTER BY DESIGN

WHEELED STORED PRESSURE

Air Cross 21 Installation and User Manual

Case Study Opening and closing a film heat exchanger - SPX maintenance know-how brings plant back on line faster

HOSHIZAKI ICE DISPENSING BIN/ WATER DISPENSER MODEL DM-90A SERVICE MANUAL

Evaporators and condensers in a new dimension. The complete range

TECHNICAL DATA. Wet 26a. February 22, 2009

Installation Guide. Inline Chlorinator TM. Vitasalus, Inc Rankin Drive Troy, Michigan USA

Evaporation System: Types and Design Aspects

MNEFDD54 & MNBCDD54 GALVANIZED WALL FANS Installation, Operation, and Maintenance Instructions

82. Siphon all gas out of the tank. 83. Disconnect the fuel filler and vent tube with a Phillips screwdriver.

HORIZONTAL MULTISTAGE CENTRIFUGAL PUMP

Hoshizaki America, Inc.

G-10f/GCG-10f UPRIGHT COOLER

569, 570, 571, 572 Series

569, 570, 571, 572 Series

Brazed heat exchangers

ECONOPLATE BARE PLATE HEAT EXCHANGERS

RFP# FS REGION 8 TIPS FOOD PURCHASING CO-OP SANITATION AND CLEANING SUPPLIES FOR FOOD SERVICE AREA ONLY. Drop Ship 1 location 50 CT

SELF-CONTAINED CRESCENT CUBER

Heat Exchangers DKRCC.PF.000.G1.02 / 520H6410

TRI-PLATE B INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS PART NO EFFECTIVE MARCH 1, 1983 REPRINT APRIL 16, 1999

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR MODEL RH REMOTE HORIZONTAL AIR COOLED HEAT EXCHANGERS

OHM N PREPARATIONS & SUPPORT FOR A WATERTUBE BOILER Fax: P.O. Box 96. Russell, IL

UNDERCOUNTER LABORATORY REFRIGERATORS and FREEZERS Installation, Operation and Maintenance Instructions

VERSAFLOW VORTEX Supplementary instructions

Transcription:

Description English Description Main components Lifting eyes To used for lifting and transport securing Frame plate Carrying bar Carries the cassettes and the pressure plate. Support column Connections Holes through the frame plate, permitting the media to enter into the plate evaporator. Threaded studs around the holes secure the pipes to the apparatus. Metallic linings may be used to protect the holes against corrosion. Bolt protection Tightening bolts Press the channel plates together Guiding bar Keeps the cassettes in line at their lower end. Cassettes Heat is transferred from one medium to the other through the thin plates. Pressure plate Moveable steel plate, could have connections The number of cassettes determines the total heat transfer surface. Protective sheets Supplied on request. Plate Evaporator 1

English Description AlfaVap 350 AlfaVap 500 AlfaVap 650 AlfaVap 700 2 Plate Evaporator

Description English Function AlfaVap consists of a plate pack with plates welded together in pairs forming so-called cassettes. The cassette concept gives rise to two different type of channels - gasketed channels used for the evaporated media and welded channels used for the heating steam. The plate pack is assembled between a frame plate and a pressure plate and compressed by tightening bolts. The plate pattern is specifically designed for optimal evaporation, with higher pressure drop in the bginning of the evaporation channel thus securing the start of the evaporation process. This maximizes the heat transfer efficiency and minimizes fouling. Two feed connections are located centrally in the bottom of the frame plate. A double compartment system in the cassets ensures an even distribution of feed to every single channel also in very long plate packs. Evaporation takes place on the gasketed side of the cassette and the concentrated product along with evaporated vapour leaves the evaporator through a centrally placed connection in the upper part of the frame. The heating steam enters two connections in the upper part of the frame and condenses on the welded side of the cassettes. Condensate is taken out in the two outer connections in the bottom. Steam Condensate Juice Vapour AlfaVap 500 Plate Evaporator 3

English Installation Installation Requirements Heating steam Vapour Product Space 1500 mm minimum free space is needed for lifting plates in and out. Shut-off valves Shut-off valves should be provided in the media connections. Condensate Foundation Install on a flat foundation giving enough support to the frame. Before connecting any piping, make sure all foreign objects have been rinsed out of the system. When connecting the pipe system make sure the pipes do not subject the plate evaporator to stress or strain. To avoid water hammer, do not use fast-closing valves. Before start-up, check that all tightening bolts are properly tightened. Safety valves should be installed according to current pressure vessel regulations. If the plate evaporator surface temperature is expected to be hot or cold, the evaporator should be insulated. It is recommended that protective sheets are used to cover the plate evaporator. For each model, design pressures and temperatures are marked on the identification plate. Those must not be exceeded. 4 Plate Evaporator

Installation English Lifting Warning! Never lift by the connections or the studs around them. Straps should be used when lifting and transport securing. β β β 45 β >45 >45 For detailed information contact Alfa Laval Sales representive for document Cargo Securing Instructions (3490003791, 3490003792 and 3490003793). Plate Evaporator 5

English Installation Raising 1 Place two timber beams on the floor. 4 Place a strap into the notches as shown in the illustration. Only use a strap approved for the weight of the plate evaporator! 2 Lift the plate evaporator off pallet using e.g. straps. Warning! Do NOT use the in the delivery included lifting device to raise the plate evaporator. 3 Place the plate evaporator on the timber beams 6 Plate Evaporator

Installation English Lift the plate evaporator off the timber beams. Keep the strap stretched during the whole lifting procedure. Make sure the strap stays in place. Protect the feet of the plate evaporator from damaging. 5 6 Lower the plate evaporator to horizontal position and place it on the floor.mount the enclosed lifting devices. Plate Evaporator 7

English Operation Operation Start-up The following instructions are general and apply only to the Plate Evaporator not to the installed system. 2 Check that the Plate Evaporator is fully isolated, i.e. all valves in connected pipework should be closed. If several pumps and valves are included in the system, make sure you know which ones should be opened first. Adjustments of cooling water flow rate should be made slowly in order to avoid the risk of water hammer. Open 1 Water hammer is a shortlasting pressure peak that can appear during start-up or shut-down of a system, causing liquids to travel along a pipe as a wave at the speed of sound. This can cause considerable damage to the equipment. Before start-up, check that all tightening bolts are properly tightened and that measurement A is correct. For A, see enclosed Plate Evaporator drawing. 3 4 Closed Open all valves in the condensate lines. This will allow non-condensable gases to leave the heat exchanger. On the product side, check that the valve is closed between the pump and the unit controlling the system flow rate. 5 If there is an airvent valve at the exit, make sure it is fully open. 6 Start the product supply pump and open the supply valve/s slowly. 7 IWhen all air is out, close the air vent valve.. 8 Open the steam valve gradually. 8 Plate Evaporator

Operation English Unit in operation Adjustments of flow rates should be made slowly in order to protect the system against sudden and extreme variations of temperature and pressure. During operation, check that media temperatures and pressures are within the limits stated on the plate evaporator drawing no leakages appear due to faulty tightening of the plate pack or to defective or damaged gaskets carrying bar and guiding bar are kept clean and greased Shut-down 1 2 The following instructions are general and apply only to the Plate Evaporator not to the installed system. If several pumps and valves are included in the system make sure you know which ones should be closed first. Steam supply Slowly close the steam supply valves. Product supply Slowly close the product supply valve. the bolts are kept clean and greased. 3 When the valve is closed, stop the pump. Close Clean and greased No leakage Always consult your local Alfa Laval office for advice on new plate pack dimensions if you intend to change number of plates selection of gasket material if operating temperatures and pressures are permanently changed, or if another medium is to be processed in the plate evaporator. 4 5 6 Continue to fully isolate the Plate Evaporator, i.e. all valves in connected pipework should be closed. Adjust the pressure to atmospheric pressure (only when opening the Plate Evaporator). If the Plate Evaporator is shut down for several days or longer, it should be drained. Draining should also be done if the process is shut down and the ambient temperature is below freezing temperature of the media. Plate Evaporator 9

English Maintenance Maintenance Cleaning-In-Place (CIP) The Cleaning-In-Place (CIP) equipment permits cleaning of the plate evaporator without opening it. The following Alfa Laval-CIP models can be used: CIP75, CIP200, CIP400 and CIP800. If CIP cannot be done, cleaning must be performed manually, see section Manual cleaning. CIP performs cleaning of fouling and descaling of lime deposits passivation of cleaned surfaces to reduce susceptibility to corrosion neutralization of cleaning liquids before draining. Follow the instructions of the CIP equipment. Cleaning liquids Cleaning liquid AlfaCaus AlfaPhos AlfaPass AlfaNeutra Alfa P-Scale Alfa P-Neutra AlfaAdd Alpacon Descalant Alpacon Degreaser Description A strong alkaline liquid, for removing paint, fat, oil and biological deposits. An acid cleaning liquid for removing metallic oxides, rust, lime and other inorganic scale. An alkaline liquid for passivation (inhibition of corrosion). A strong alkaline liquid for neutralization of AlfaPhos before drainage. An acidic cleaning powder with a corrosion inhibitor particularly effective for removing of calcium carbonate and other inorganic scale. An alkaline powder for neutralization of used Alfa P-Scale prior to disposal. A neutral cleaning strengthener to be used with AlfaPhos, AlfaCaus and Alfa P-Scale. Provides better cleaning results on oily, fatty surfaces and where biological growth occurs. AlfaAdd also reduces any foaming. An acidic, water based, non-hazardous cleaning agent designed for removal of scale, magnetite, algae, humus, mussels, shellfish, lime and rust. Containing BIOG ACTIVE, a biological mixture made from renewable materials, as an active ingredient. A neutral degreaser to be used with Alpacon Descalant. Effectively removes oil, fat or grease layers, but also reduces foaming. Containing BIOG ACTIVE, a biological mixture made from renewable materials, as an active ingredient. 10 Plate Evaporator

Maintenance English Manual cleaning Warning! To avoid hand injuries owing to sharp edges, protective gloves should always be worn when handling cassettes and protective sheets. Opening Warning! If the plate evaporator is hot, wait until it has cooled down to about 40 C (104 F). 1 2 Drain the plate evaporator. Inspect the sliding surfaces of the carrying bar and wipe clean. 3 Mark the plate assembly on the outside by a diagonal line. Mark Plate Evaporator 11

English Maintenance 4 Measure and note down the dimension A. 6 The pairs of bolts that are fitted with bearing boxes are opened alternately and diagonally in two steps, see figures below. Step Bolt No. To dimension 1 1 2 3 4 1,05 A 2 1 2 or 3 4 Opening Be careful so that the frame plate and pressure plate are always in parallel. Skewing of the pressure plate during opening must not exceed 10 mm (2 turns per bolt) across the width and 25 mm (5 turns per bolt) vertically. 5 Loosen the bolts which are not fitted with bearing boxes and remove them. Step 1: Loosen the four bolts alternately and diagonally until the plate package measures 1,05A. Remove the bolts Remove the bolts Step 2: Loosen the two diagonal pairs of bolts are loosened alternately, as shown in the figure below. 12 Plate Evaporator

Maintenance English AlfaVap 650: Loosen the five bolts alternately until the plate package measures 1,05A 7 Open the plate pack by letting the pressure plate glide on the carrying bar. If cassettes are to be numbered, do this before removing the cassettes. 5 Cassettes need not to be removed if cleaning is done using only water, i.e. without cleaning agent. 3 1 2 4 Remove the cassettes Plate Evaporator 13

English Maintenance Manual cleaning of opened units Caution! Never use hydrochloric acid with stainless steel plates. Water of more than 330 ppm Cl may not be used for the preparation of cleaning solutions. Be careful not to damage the gasket during manual cleaning. Deposits removable with water and brush Plates need not to be removed from the plate evaporator during cleaning. Remove deposits using a soft brush and running water. 1 2 Rinse with water using a high pressure hose. Deposits not removable with water and brush Plates must be removed from the plate evaporator during cleaning. Brush with cleaning agent. 1 2 Rinse with water. 14 Plate Evaporator

Maintenance English Cleaning agents Incrustation, scaling Concentration max 4 % Temperature max 60 C (140 F) Incrustation Scaling Sediment Cleaning agent Calcium carbonate Corrosion products Nitric acid Calcium sulphate Metal oxides Sulfamic acid Silicates Silt Citric acid Alumina Diatomic organisms and their excrement of various colours Phosphoric acid Complexing agents (EDTA, NTA) Sodium polyphosphates Cleaning agents Biological growth, slime Concentration max 4 % Temperature max 80 C (176 F) Biological growth Slime Bacteria Nematodes Protozoa Sodium hydroxide Sodium carbonate Cleaning agent Cleaning effect can be considerably increased by the addition of small quantities of hypochlorite or agents for the formation of complexes and surfactants. Caution! The following solutions should not be used: Ketones (e.g. Acetone, Methyletylketone, Methylisobutylketone Esters (e.g. Ethylacetate, Butylacetate) Halogenated hydrocarbons (e.g. Chlorothene, Carbon tetrachloride, Freons) Aromatics (e.g. Benzene, Toluene). Plate Evaporator 15

English Maintenance Closing 1 2 Check that all the sealing surfaces are clean. Brush the threads of the bolts clean, using a steel wire brush. Lubricate the threads with a thin layer of grease, e.g. Gleitmo 800 or equivalent. 5 Press the plate assembly together. Tightening is done in two steps, see figures below. Be careful so that the frame plate and the pressure plate are always in parallel. Step Bolt No. To dimension 1 1 2 or 3 4 1,10 A 2 1 2 3 4 A Step 1: Tighten the two diagonal pairs of bolts alternately until the plate package measures 1,10A. 3 Attach gaskets to the cassettes or check that all the gaskets are properly attached. If the gasket is wrongly positioned, it will show by the fact that it rises out of the gasket groove or that it is positioned outside the groove. 4 Insert the cassettes with the gaskets turned towards the frame plate. Step 2: After that bolts are tightened alternately and diagonally, as shown in the figure below. Check the dimension A during tightening at the positions of the bolts that are being used. 16 Plate Evaporator

Maintenance English AlfaVap 650: Tighten the five bolts alternately until the plate package measures 1,10A. 2 5 3 1 4 6 Place the other bolts in position. Inspect the washers. When fully tightened, the bolts should all be equally tensioned. The difference between the plate package lengths (the dimension A) measured at adjacent bolts should not exceed: 2 mm when A < 1000 mm 4 mm when A > 1000 mm. The plate package length at all bolts must not differ more than 1 %. If the unit does not seal fully, it can be tightened to give dimension A - 1 %. The maximum tightening torque must not, however, be exceeded. Max tightening torque When a pneumatic tightening device is used, see table below for maximum torque. Measure dimension A during tightening. Bolt size Bolt with bearing box Bolt with washers Nm Kpm Nm Kpm M39 1300 130 2000 200 M48 2100 210 3300 330 For manual tightening, the tightening torque has to be estimated. If dimension A cannot be reached Check the number of cassettes and the dimension A. Check that all the nuts and bearing boxes are running freely. If not, clean and lubricate, or replace. The dimension A can be exceeded to A + 1 % in exceptional cases. 7 If the cassettes are correctly assembled, the edges form a honeycomb pattern, see picture below. If the plate pack has been marked on the outside (see step 3 in section Opening ), check that the cassettes have been assembled in correct order. Plate Evaporator 17

English Maintenance Regasketing 1 Open the plate evaporator according to page 8. Glued gaskets Separate gluing instructions will be delivered together with the glue. 2 Glued gaskets Clip-on gaskets Remove the old gaskets. 3 4 Attach the clip-on gasket to the cassette. Slip the gasket prongs under the edge of the cassette. Make sure the two gasket prongs are in correct position. Clip-on gaskets 5 Close the plate evaporator according to page 13. 18 Plate Evaporator

Maintenance English Pressure test after maintenance Before start-up of production, whenever plates or gaskets have been removed, inserted or exchanged, it is strongly recommended to perform a pressure test to confirm the internal and external sealing function of the PHE. At this test, one media side at the time must be tested with the other side open to the atmosphere. Caution! The pressure testing shall be performed at a pressure equal to the operating pressure of the actual unit but never above the design pressure as stated on the nameplate. The recommended test time is 10 minutes. Please note that PHE units for refrigeration applications and units with media not mixable with water must be dried after hydrostatic pressure testing. Please consult the local office/representative of the supplier for advice on the pressure testing procedure Plate Evaporator 19

English Maintenance 20 Plate Evaporator