Zehnder Rittling Corporate Headquarters and Manufacturing Facility

Similar documents
NET ENERGY WATER LOOPS A clear path to net zero energy buildings

Designing Energy Efficient Outdoor Air Systems

Dehumidifying with Dedicated Outdoor Air

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin

PRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series

SEISCO APPLICATIONS & DIAGRAMS

Hydronic Heating Fan Coils Radiant ceiling systems Water Source Heat Pumps Alumline Radiant Heating and Cooling Ceiling Panels

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering

DEHUMIDIFICATION: Ice Arena Application & Product Guide. Design, construct and operate to control indoor humidity in ice rinks

Geothermal Heating and Cooling Using Ground Source Heat Pumps. Prepared by: Steven Forrester, P.E. Principal

7. MECHANICAL SYSTEM DESIGN

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

Zehnder Carboline Radiant Heating and Cooling Ceiling Panels. Cooling Fresh Air Clean Air

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN

CONTROLLED CHILLED BEAM PUMP MODULE

GETTING THE MOST OUT OF HYDRONIC HEATING SYSTEMS

Hydronic Heating Fan Coils Radiant ceiling systems Water Source Heat Pumps Rittling Econo-Line Enclosures

Rittling Induction Units Catalog

DES CHAMPS PRODUCTS. Specializing in: -- Air-to-Air Energy Recovery -- Conditioning Outdoor Air -- Controlling IAQ -- Indirect Evaporative Cooling

Heat pump and energy recovery systems

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards

KLDJ : Task 2 Farm Bill Geothermal Heat Pump Template Appendix A. Appendix A Engineering Design

NON-REVERSING, 100% OUTSIDE AIR HEAT PUMP FOR HEATING AND COOLING

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

Radiant Heating & Cooling for Commercial Buildings

Vertical Stack Water Source Heat Pumps

Technical Assignment 3 11/15/04. Executive Summary

CONTROLLED CHILLED BEAM PUMP MODULE

Modular Active. Chilled. Beams

Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 Prepared by: psuae

The Ed Roberts Campus Berkeley, CA

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

Richard Hiles ClimateMaster

Standards and Guidelines. Presented by: Aric Murray December 12, 2014

Rittling Fanvector. Installation, Operation and Maintenance. Cooling Fresh Air Clean Air

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION

Challenges and Methods of Estimating a Conceptual HVAC Design

AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Radiant Snap-In Formed Metal Panels

CHAPTER 4. HVAC DELIVERY SYSTEMS

Rittling Induction Units Catalog

Radiant Lay-In Formed Metal Panels

DADANCO Technical Paper

AHRI Certification Program Scopes - COOLING

Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. Contextual Reminder

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

EarthWise System Seminar

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

The School District of Philadelphia Administration Headquarters

NOVEMBER 2012 THE EUROPEAN EXPERIENCE

Heat Pumps COMFORT NEED IT. When You

GreenPac & GreenPac HGR Heat Pumps & Air Conditioners Models AVP

HVAC Mandatory Provisions Part II, Page 1

MAC N-407 Air-Cooled Chiller

Energy Efficiency & Commercial Building Natural Gas Technologies. Presented by: Eric Burgis Energy Solutions Center

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE

b.) Technical Information:

Rittling Element. Catalog

Chiller Plant Design. Julian R. de Bullet President debullet Consulting

Mechanical Analysis Energy Savings Graph 1 Built-up Roof Graph 2 Green Roof

CORAYVAC Helps Reduce Energy Bills and Improve Comfort

Air System Sizing Summary for AHU/CU-1 Project Name: Wilton Manors Fire Station#16 06/26/2016 Prepared by: L.N.I.

VERTICAL FAN COIL UNITS

ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY

Session: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island

IDL20e (2 way discharge) IDS60e (4 way discharge) Inffusers. UDI (vertical discharge) Frequently Asked Questions

HVAC 101. H V A C S y s t e m s

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

ZIP Radiant Heating and Cooling Ceiling Panels. Catalog

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH

VERTICAL AHU ENGINEERING SPECIFICATIONS BULLETIN

Geothermal. Comfort Systems

Submittal Data Performance Data Electrical Data

GARCIA GALUSKA DESOUSA Consulting Engineers

COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems

Technical Assignment 3. Mechanical Systems Existing Conditions Evaluation

LACLEDE ENERGY EFFICIENCY PROGRAMS

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

2009 IECC Commercial Mechanical Requirements

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

Scholar III Unit Ventilator

ENGINEERING. Edition No. 13 October 2002

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.

Heating and Cooling Ceiling Systems Comfortable and energy efficient. Heating Cooling Fresh Air Clean Air

USER S GUIDE. For all Packaged Systems (Air Conditioners and Heat Pumps)

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

Linear Radiant Ceiling Panels. Catalog. Cooling Fresh air Clean air

OWNER S MANUAL. Geothermal Heat Pumps. Product Family: HB, HP, HS, HW A NOTE ABOUT SAFETY ! WARNING YOUR NEW SYSTEM. Register Your System

Air-Handling System Cooling Options

EP Model. EP Model Water Source Heat Pump. ½ to 6 Ton

COOLflow 4E PRODUCT RANGE

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

A TRUE GAME CHANGER - The Vortex Heat Recovery Center CONDENSING EFFICIENCIES FOR TRADITIONAL BOILERS & HEATERS

Technical Development Program

Applications and Piping Strategies for Condensing Boilers - Introduction

Water Source / Geothermal Heat Pumps & Air Conditioners

Appendices. Included in this section are

Energy Management and Controls

Transcription:

Zehnder Rittling Corporate Headquarters and Manufacturing Facility Heating Cooling Fresh Air Clean Air Zehnder Rittling uses its own products to operate a highly energy-efficient manufacturing facility. From radiant ceiling panels, to geothermal heat pumps, to heat recovery technology, a minimal amount of energy is used to heat and cool the building. Waste energy is captured from the paint ovens and used to heat the ZIP Radiant Panels, keeping the 150,000 sq. ft. production area at a comfortable 70 F, even through the infamous Buffalo winters. www.zehnder-rittling.com

Historical data Zehnder Rittling is built upon a remediated brownfield on the former Republic Steel site. At its peak in the 1960 s, Republic Steel was the third largest steel producer in the United States. The company ceased operations in 1984, and the 250-acre site was considered hopelessly contaminated from decades of steel manufacturing and coke processing operations. Fortunately, the abandoned land was acquired by Steelfields, Ltd. in 2002. The $20 million remediation, one of the most expensive and largest privatelyfunded cleanup projects ever done under the NYS Voluntary Cleanup Program, began in 2003 and was completed in 2007. Zehnder Rittling owns a 31-acre parcel on the 185-acre site. Energy recovery ventilator During the winter months, heat is transferred from the warm inside air being exhausted to the fresh, but cold, supply air. During the summer months, the cool inside air chills the warmer supply air, thus reducing both winter heating costs and summer ventilation/cooling costs. Geothermal heat pump More than four miles of tubing is buried ten feet below the surface to use the moderate ground temperatures as a source for hydronic heating and cooling. As water runs through the tubing, it absorbs heat from the ground in winter and releases heat to the ground in summer, increasing system efficiency and reducing operational costs. Property: Zehnder Rittling Corporate Headquarters and Manufacturing Facility Location: Buffalo, NY Owner: Zehnder Rittling Architect: CK & Associates General contractor: The Krog Corp. Design/build contractor: Allied Mechanical Project cost: $8.5 million Footprint: 160,000 sq. ft. Customized solution Radiant Ceiling Panels Powder-coated aluminum ZIP Ceiling Panels create a pleasant, draft-free climate where the perceived temperature is higher than the air temperature. This effect can achieve energy savings of over 40% compared with other systems. Heat recovery coil A stainless steel hot water coil captures nearly one third of the waste heat from the powder coat paint line s bake oven. With a natural gas capacity of six million BTU/hr, it recovers enough energy to heat the radiant panels installed throughout the facility, keeping the boiler system inactive except for routine maintenance. Automatic blinds As the facilitator for the solar gain management strategy, the automatic blinds are the main component of a system that electronically senses changes in sunlight conditions and continuously adjusts to let in the optimum amount of light while regulating heat. Significant energy savings are achieved through reduction in heating and/or air conditioning costs. Energy savings Compared to the building the company previously occupied in Hamburg, NY, the result of the new construction and the technology utilized within the space has generated an estimated monthly energy savings of $15,000.

Psychrometric Test Laboratory The Zehnder Rittling Psychrometric facility is an 8-ton, single-chamber laboratory that tests the safety, reliability and various aspects of performance of Zehnder Rittling products in a controlled environment, meeting specifications under which the equipment will operate. The test chamber allows Zehnder Rittling to determine equipment range of operation, determine performance of custom products and expedite product development, bringing new features and equipment to market faster. Specification Test chamber Airflow module Fluid module Useable space Airflow Description Room: 11' W x 11' L x 12' H Door: 5' W x 8' H 10,000 SCFM Temperature range 32 F to 120 F DB ±0.5 F Humidity range 37 F to 75 F WB ±0.5 F (95% RH maximum) Capacity 8 ton Cooling system 25 HP water-cooled DX refrigeration Heating system Sheathed Incoloy elements Temperature control UUT inlet via ASHRAE sampling tube Electrical 0 to 460VAC, 1 and 3ø, 60 Hz Design ASHRAE Standard 37-1988 Flow range 65 to 3,000 SCFM ±1.0% Nozzles 2", 3", 5.5", 6" Flow range 2 to 20 gpm ±1.0% Temperature range 40 F to 220 F Heating capacity Cooling capacity Reservoir 30 kw 96,000 Btu/hr 40 gallons

Radiant heat & cooling The radiant system operates at lower heating (125 F) and higher cooling (60 F) fluid temperatures than a comparable air system. In cooling mode, the building automation system monitors the dew point along with the humidity levels and responds in all zones accordingly. When the humidity level rises, the system will either turn the panels off or raise the temperature via the heat pump. Geothermal heat pump More than four miles of tubing is buried ten feet below the surface to use moderate ground temperatures as a source for hydronic heating and cooling. As water runs through the tubing, it absorbs heat from the ground in winter and releases heat to the ground in summer, increasing system efficiency and reducing operational costs. Automatic blinds The automatic blinds are the facilitator for Zehnder Rittling s solar gain management strategy. The blinds are operational above 33 F and with wind speeds below 15 mph to prevent damage due to ice build up and high winds. The light enable set point to lower the blinds is 85% or higher for optimum solar control, blocking summer heat and retaining winter warmth.

ZIP Radiant Ceiling Panels Powder-coated steel ZIP Ceiling Panels create a pleasant, draftfree climate where the perceived temperature is higher than the air temperature. This effect can achieve energy savings of over 40% compared with air systems. Run at 130 F AWT 150,000 sq. ft. facility Average winter temperature: 19 F to 43 F Heat recovery coil Zehnder Rittling utilizes an air-towater heat exchanger to collect waste process heat from the paint line bake oven. Warm air from the 400 F oven is discharged through a stainless steel coil which heats the water to 135 F. The warmed water heats the ZIP Radiant Ceiling Panels to provide heat to the shop floor. The facility s boiler system is inactive except on winter weekends when the plant is closed and when needed for routine maintenance. Heat recovery ventilator The heat recovery ventilator uses a cross-flow heat exchange membrane that is 90% efficient. During the winter months, heat is transferred from the warm inside air to the fresh, but cold, supply air. During the summer months, the cool inside air chills the warmer supply air reducing both winter heating costs and summer ventilation/cooling costs.

Schematic: Office area CHWR CHWS Outdoor geothermal loop WSHP Fan Coil WSHP Radiant Ceiling Panels WSHP Cross Flow Ventilator Supply diffuser Radiant Ceiling Panel O.A. intake Fan Coil Cross flow heat recovery ventilator Exhaust Return air grill Automatic blinds

Schematic: Shop floor, heat recovery loop HWS Paint oven exhaust with heat recovery coil HWR ZIP Radiant Ceiling Panel 3-way valve HWR P1 Pumps Boilers are for backup purposes only B1 B2 P2 Boilers run 3 hours per day on weekends between November and March, but only when the plant is closed and the waste process heat from the paint line bake oven is not available. The boilers also run about 6 hours per year for routine maintenance.

Zehnder Rittling 100 Rittling Blvd. Buffalo, NY USA 14220 T 716-827-6510 F 716-218-2805 sales@zehnder-rittling.com www.zehnder-rittling.com Zehnder Rittling April 2014, English, subject to change without notice