Series 5000 Industrial Modular Cooling Tower. Series 5000 Cooling Tower. engineering Data

Similar documents
CXVB Evaporative Condenser TABLE OF CONTENTS E112 ENGINEERING DATA CXVB EVAPORATIVE CONDENSERS E144 STRUCTURAL SUPPORT CONSTRUCTION DETAILS

Product Introduction...D9. Benefits...D11. Construction Details...D13. Custom Features & Options...D15. Accessories...D18. Engineering Data...

Compass Series Open Cooling Towers

Product Introduction...D33. Benefits...D35. Construction Details...D37. Custom Features & Options...D39. Accessories...D41. Engineering Data...

Un-Used Series CXV Evaporative Condenser

Evaporative Condensers

Product Introduction...E11. Benefits...E13. Construction Details...E15. Custom Features & Options...E19. Accessories...E23. Structural Support...

VTL Open Cooling Towers... B98. Benefits... B100. Construction Details... B102. Custom Features and Options... B103. Accessories...

Series 1500 Cooling Tower Specification

Efficient, Long Lasting Evaporative Condensers

Michigan State University Construction Standards. COOLING TOWERS Page SECTION COOLING TOWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS

LSFG-8 LOW SOUND & SLSFG-10 SUPER LOW SOUND TOWER FEATURES

Engineering Specifications for HXV Closed Circuit Hybrid Cooling Tower

CROSSFLOW REPLACEMENT FILL KITS. Replacement Fill Kits Specifically Designed for All Types of Crossflow Cooling Towers (BAC, Marley, etc.

SECTION COOLING TOWERS

SECTION COOLING TOWERS

XLP2 Evaporative Condensers

Product Introduction...D85. Benefits...D87. Construction Details...D89. Custom Features & Options...D91. Accessories...D93. Engineering Data...

Product Introduction...E35. Benefits...E37. Construction Details...E39. Custom Features & Options...E41. Accessories...E44. Engineering Data...

Reliable products with long-term, low cost of ownership

Evaporative Condensers

Bulletin 241B. Mark owned by the Cooling Technology Institute

How about Savings in Time, Money, Energy and Longer Life?

Closed Circuit Cooling Towers

COOLING TOWERS SERIES 3000 COOLING TOWERS CONDENSERS EVAPORATIVE CLOSED CIRCUIT COOLING THERMAL STORAGE

Closed Circuit Hybrid Cooling Towers. Product Introduction...E61. Benefits...E63. Construction Details...E65. Custom Features & Options...

/ Aquatower Fiberglass Cooling Tower /

Improving Condenser Safety In Cold Chain Facilities

Evaporative Cooling Equipment Installer / Contractor Pre Start-Up Checklist

ENGINEERING DATA AND SPECIFICATIONS. Marley Aquatower FIBERGLASS CROSSFLOW COOLING TOWER

BECAUSE TEMPERATURE MATTERS: MAINTAINING COOLING TOWERS

What is a Closed circuit Cooling Tower (CCT)?

Aquatower STEEL COOLING TOWER. engineering data and specifications

DESCRIPTION WATER COOLING TOWER TAS/TASF (*) SERIES

QuadraFlow Cooling Tower

CROSSFLOW FILM FILL PACKAGE COOLING TOWER. Number TYH SERIES LOW NOISE - ENERGY SAVINGS. Thermal-Cell Sdn Bhd ( M)

Baltimore Aircoil RCF CLOSED CIRCUIT COOLING TOWERS. ...because temperature matters COUNTERFLOW INDUCED DRAFT

Alfa Laval Wet Surface Air Coolers (WSAC ) FAQs

DESCRIPTION OF COOLING TOWERS SERIES TAT

POWER TOWER SERIES Fiberglass Construction 45 to 540 Tons

MAINTENAN PARTS & MAINTENANCE GUIDE

parts Fans & Drives water distribution controls retrofits Reference

Maintain. a TOWER of POWER. Part One How to. Don t let out of site, out of mind prevent you from keeping cooling towers running efficiently

JCseries EVAPORATIVE CONDENSER. engineering data

NC stainless steel COOLING TOWER. specifications

Layout. Guidelines11. Chapter 11: Layout Introduction

Series 3000 and XE-Series Cooling Towers OPERATION & MAINTENANCE MANUAL

Fibreglass reinforced polyester (FRP) water collection basin with sloping base and smooth internal finish with rounded corners for easy cleaning.

High Plume Blowers Suggested Specification Section (Master Format 1996) Suggested Specification Section (Master Format 2004)

Maximum Capacity and Highest Quality to the. Lowest Shipping Costs! Engineered to Deliver the. Worldwide Market - with the.

MAINTENANCE GUIDE PARTS & ENERGY SAVING RETROFITS

steel COOLING TOWER specifications

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

ENGINEERING DATA AND SPECIFICATIONS. MH Fluid Cooler

TM Series. Induced Draft, Counter Flow Optional Accessories

Closed Circuit Coolers Technology for the Future, Available Today

Bulletin 241-E Metric C E R T I F I E D E N I S O Mr. GoodTower

Since its founding in 1976, EVAPCO,

Series. Packaged Rooftop Units, heat pumps and Outdoor air handling Units. Features:

Lenntech. Tel Fax

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March

Screw Compressors SM SERIES. Capacities from: 16 to 54 cfm Pressures from: 80 to 217 psig

Mr. GoodTower Service Center

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION EXHAUST FANS

RCF Closed Circuit Cooling Towers RCC Evaporative Condensers

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

Industrial Fans & Blowers

INFO. Stainless Steel Evaporative Cooler. The New Choice In Evaporative Cooling

Bulletin 242-E Metric C E R T I F I E D E N I S O Mark owned by the Cooling Technology Institute

A. Codes and Standards that are Standard at the University:

Turning Air Into Solutions. TUBEAXIAL PAINT SPRAY BOOTH EXHAUST FANS. Model TCBS

Available in Capacities from 208 to 2,050 Ammonia Tons!

Air Handling Units. Ranging from 15 to 2,000+ tons and 500 to 400,000+ CFM

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup.

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

MH fluid cooler. engineering data and specifications

COOLING TECHNOLOGY INSTITUTE

Screw Compressors AS SERIES. Capacities from: 59 to 124 cfm Pressures from: 80 to 217 psig

Update In Progress. Division 23 Heating, Ventilation, and Air Conditioning Page Section FLUID SYSTEMS EQUIPMENT PART 1 GENERAL

Downtime Instructions

SUPERCHILL Australia Pty Ltd

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

Direct Fired Heater Model AD Specification

cooling tower downtime instructions

Vibration Of Cooling Tower Fans. Barry T. Cease Cease Industrial Consulting Vibration Institute 2015

IDCF & IDC3 Evaporative Condensers

and SHUTTERS Made to Work. Built to Last.

Heat Pumps SA SERIES. Vertical Self-Contained Unit Water-Source Heat Pumps (23-70 tons) Features:

Series V VCA Evaporative Condenser

ENGINEERING AND SPECIFICATIONS. Marley MC FLUID COOLER

Series 1500 Cooling Towers OPERATION & MAINTENANCE MANUAL

Lenntech. Tel Fax Engineering Data & Specifications

Series 3000 Cooling Tower

DIVISION 15 MECHANICAL

C E R T I F I E D E N I S O

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

Flygt Top-Entry Agitators CONVENIENT AND EFFICIENT

Plenum Fans. Model HPA. Direct Drive

SECTION STEAM CONDENSATE PUMPS

A. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters.

Transcription:

Series 5000 Industrial Modular Cooling Tower Table Of Contents B9 Series 5000 Cooling Tower B41 Structural Support B15 Construction Details B43 alternative Structural Support B17 Custom Features & Options B30 engineering Data PRODUCT & APPLICATION HANDBOOK VOLUME V B8

Highest Reliability, Easiest Maintenance The Series 5000 Industrial Grade Modular Cooling Tower provides superior performance with BAC s patent pending ENDURAFLOW Heat Transfer System for dirty water applications. The Series 5000 also offers the most corrosion resistant materials package, including EVERTOUGH Construction, combined with the most reliable drive options, including the ENDURADRIVE Fan System. B9 Questions? Call 410.799.6200 or visit www.baltimoreaircoil.com

BAC s Series 5000 Industrial Modular Cooling Tower: Fast, Modular Installation Δ Δ Δ Highest Reliability IBC Compliant Δ Dirty Water Applications Δ Full Tilt Operation Without A Clog Easiest Modular Inspection, Configuration Maintenance, and Cleaning Fan System PRO D U C T & APPLI C A T ION H AN D B OO K V O L U M E V B10

Series 5000 Benefits Industrial Grade Construction EVERTOUGH construction (option) TriArmor Corrosion Protection System on Cold Water Basin Thermosetting Hybrid Polymer on Structure Fiberglass Reinforced Polyester Hot Water Basins A custom mix of component materials Thermosetting Hybrid Polymer Coated Construction G-235 Galvanized Steel Construction Stainless Steel Construction Reliable Year-Round Operation BALTIDRIVE Power Train Fan System ` ` Optional ENDURADRIVE Fan System backed by a 7 year warranty Superior winter operating performance ` ` Optimized louver design reduces splash out compared to bolt-on designs Meets wind and seismic requirements of the International Building Code (IBC) Installation Flexibility Basinless design allows placement over existing concrete sumps Modular Configuration beats installation time of field-erected units Replaces counterflow equipment with the improved access and service features of a crossflow design Series 5000 Cooling Tower Series 5000 Cooling Tower B11 Questions? Call 410.799.6200 or visit www.baltimoreaircoil.com

Lowest Maintenance Costs Fastest access to: Cold water basin Hot water basin during operation Drive system Patented hygienic cold water basin reduces maintenance Factory assembled access options available for ease of maintenance ENDURADRIVE Fan System offers the lowest drive maintenance in the industry (option) ENDURAFLOW Heat Transfer System with lineof-sight cleanability Large Plenum allows for easy maintenance Large doors allow easy access Full coverage internal platform for unparalleled ease of maintenance Internal Drift Eliminators are service-friendly External Louvers allow easy inspection of ENDURAFLOW Heat Transfer System Series 5000 Cooling Tower Series 5000 Cooling Tower PRODUCT & APPLICATION HANDBOOK VOLUME V B12

Series 5000 Construction Options BAC MOTOR & DRIVE 5YEAR W A R R A NTY 5 4 3 1 2 6 B13 Questions? Call 410.799.6200 or visit www.baltimoreaircoil.com

1 2 ENDURAFLOW Heat Transfer System Superior low-clog performance Allows for easiest cleaning and reduces downtime Highest thermal performance Straight through visibility allows for fastest inspections Internal baffles Internal Drift Eliminators 5 6 ENDURADRIVE Fan System The only variable speed direct drive solution for modular cooling towers Reduces maintenance by 90% 100% reliability on transmission components Industry-best 7-year motor warranty TriArmor Corrosion Protection System Three layers of corrosion-resistant protection Service-friendly, easy to remove Leak tested for reliability Reduces maintenance and service time 5-year leak and corrosion basin warranty 3 External Louvers ` ` Requires nearly zero maintenance Allows for easy visual inspection of ENDURAFLOW Heat Transfer System 4 Gravity Fiberglass Reinforced Polyester Hot Water Basins Increased reliability and lifespan Easy accessibility and serviceability of spray water system PRODUCT & APPLICATION HANDBOOK VOLUME V B14

Series 5000 Custom Features & Options Materials of Construction BAC provides the widest variety of material of construction options in the industry and has the ability to provide a solution to meet all conditions and budgets. Standard features such as the TriArmor Corrosion Protection System and EVERTOUGH Construction provide superior corrosion resistance and durability, maximizing reliability. Evertough Construction (OPTION) Designed for the most adverse conditions, EVERTOUGH Construction includes the most corrosion-resistant option on every component. Standard Construction Installation TriArmor Corrosion Protection System basin Thermosetting hybrid polymer structure Fiberglass reinforced polyester (FRP) hot water basins Remaining components created from a custom mix of materials Louver-to-Louver SM 5-year warranty 5-year leak and corrosion basin warranty TriArmor Corrosion Protection System (standard) Three layers of protection form a completely seamless cold water basin for the most leak-resistant and durable basin in the industry. Heavy gauge G-235 mill galvanized steel basin Thermosetting hybrid polymer fully encapsulates basin Polyurethane barrier on submerged surfaces Stainless steel construction on remainder of basin components 5-year leak and corrosion warranty on basin TriArmor Corrosion Protection System Triple Layer Protection of the Cold Water Basin welded Stainless Steel cold water basin Seams between panels inside the cold water basin are welded, minimizing susceptibility to leaks. Leak tested at the factory 5-year, leak-proof warranty. Application of TriArmor Corrosion Protection System B15 Questions? Call 410.799.6200 or visit www.baltimoreaircoil.com

JE Premier Series COnstruction All structural elements, casing panels, louvers, and the hot and cold water basins are constructed of stainless steel. Seams between panels inside the cold water basin are welded, minimizing susceptibility to leaks at basin seams. The basin is leak tested at the factory and welded seams are provided with a 5-year leak-proof warranty. Louver-to-Louver SM 5-year warranty Steel CASING PANELS and Louvers Steel casing panels and louvers are available in G-235 mill galvanized steel, thermosetting hybrid polymer, and stainless steel. EVERTOUGH Construction Installation Basinless Unit Construction Basinless Unit Construction (Option) The basinless unit construction option enables Series 5000 Cooling Towers to be directly installed on new or existing cold water basins. Simplifies piping and pumping requirements Eliminates concern for basin corrosion and extends equipment life Provides the most cost-effective option to replace field-erected equipment JE PREMIER SERIES Construction Welded Stainless Steel Cold Water Basin Basinless Construction PRODUCT & APPLICATION HANDBOOK VOLUME V B16

Series 5000 Custom Features & Options Drive System Options BAC cooling tower duty motors are specially designed for the harsh environment inside a cooling tower and have permanently lubricated bearings, drastically decreasing the maintenance requirement of the motor. BAC belt drive systems are the most maintenance-friendly drive systems on the market, including single nut adjustment to make belt tensioning simple. Standard BALTIDRIVE Power Train The BALTIDRIVE Power Train utilizes special corrosion resistant materials of construction and state-of-the-art technology to ensure ease of maintenance and reliable year-round performance. Powerband and two cast aluminum sheaves located at minimal shaft centerline distances, maximizing belt life. Requires only periodic inspection of components Single nut adjustments belt tensioning requires less downtime Suitable for VFD applications without optional accessories extended lubrication lines (Option) Extended lubrication lines are available for lubrication of the fan shaft bearings. Fittings are located on the exterior casing panel next to the access door. BALTIDRIVE Power Train Fan System BALTIGUARD Fan System Provides Built in Redundancy ENDURADRIVE Fan System (Option) The only variable speed direct drive solution for modular cooling towers. Reduces drive maintenance by 90% 100% reliability on transmission components Industry best 7 year motor warranty and 5 year VFD limited warranty ENDURADRIVE Fan System BAC MOTOR & DRIVE 5YEAR W A R R A NTY B17 Questions? Call 410.799.6200 or visit www.baltimoreaircoil.com

Gear Drive System, Close-Coupled Motor (Option, Standard on 55E-1222-14T and 55E-1424-14T) A gear drive system is available as a fan drive option on the Series 5000. Both the gear drive and couplings are selected with a 2.0 service factor. Gear construction includes a nickel-alloy steel shaft, casehardened gears, self lubrication, and a single piece, gray iron housing. This drive system ships completely installed and aligned. Gear Drive System, Externally Mounted Motor (Option) A gear drive system with a TEFC motor mounted outside the airstream is also available on the Series 5000. A non-corrosive carbon-fiber composite drive shaft with stainless steel hubs is selected with a 2.0 service factor. The motor and drive shaft ship separately for easy field installation. BALTIGUARD PLUS Fan System Used for VFD Applications Vibration Cutout Switch (Option) A factory mounted vibration cutout switch is available to effectively protect against rotating equipment failure. BAC can provide either a mechanical or solid-state electronic vibration cutout switch in a NEMA 4 enclosure to ensure reliable protection. Additional contacts can be provided on either switch type to activate an alarm. Remote reset capability is also available on either switch type. Extended Lubrication Lines with Grease Fittings Located by the Access Door Vibration Cutout Switch PRODUCT & APPLICATION HANDBOOK VOLUME V B18

Series 5000 Custom Features & Options Cold Water Basin The cooling tower water collects in the cold water basin which provides the required head pressure for the cooling system pump. The Series 5000 cold water basin includes BAC s patented hygienic cold water basin design. During operation, BAC s patented hygienic cold water basin helps eliminate any stagnant water zones, which are susceptible to biological growth. Standard Mechanical Water Level Control Mechanical make-up valves must operate continuously in the moist and turbulent environment existing within evaporative cooling equipment. Due to this environment, the operation of the valve must be simple, and the valve must be durable. BAC s high quality mechanical water level control assembly is standard with all units, and has been specially designed to provide the most reliable operation while being easy to maintain. This accessory is omitted for remote sump applications. ` ` Side Outlet Depressed Sump Box (Option) A side outlet depressed sump box is available for field installation below the base of the tower. This option facilitates horizontal piping below the basin, and is a compact alternative to using an elbow in the piping arrangement, saving on both installation time and cost. The outlet connection is designed to mate with an ASME Class 150 flat face flange. See the Connection Guide on page J176 for more information on standard and optional unit connection types. Mechanical Water Level Control B19 Questions? Call 410.799.6200 or visit www.baltimoreaircoil.com

Basin Heaters (Option) Evaporative cooling equipment exposed to below freezing ambient temperatures require protection to prevent freezing of the water in the cold water basin when the unit is idle. Factory-installed electric immersion heaters, which maintain 40 F (4.4 C) water temperature, are a simple and inexpensive way of providing such protection. Low and High Level Alarm float switches (Option) Low and high level alarm float switches are available to provide added control to your equipment operation. Level alarms can alert operators to an abnormal operating condition to ensure the highest system efficiency with minimal water usage. Basin Heater PRODUCT & APPLICATION HANDBOOK VOLUME V B20

Series 5000 Custom Features & Options Multi-Cell Unit Options Special care must be taken for multi-cell installations to ensure balanced water levels in the cold water basins across cells. If measures are not put in place to ensure balanced basin water levels, a potential exists that one basin may overflow and dump water, while the water level in another tower goes low and requires make-up. This leads to unnecessary water waste. To prevent this from occurring, BAC provides two options for balancing water levels and recommends that the installation be designed to ensure balanced flows to and from each tower. Flume Box Standard on all Multi-Cell Units A flume box is provided as standard for multi-cell units to balance the water level in the cold water basins. See the Connection Guide on page J176 for more information. Equalizer (Option) Equalizer connections are available as an option for multi-cell cooling towers in lieu of a flume box. Use of an equalizer allows for easy isolation of a cell for winter operation, maintenance, or inspection while continuing system operation. See Cooling Towers in Parallel on page J167 for more information. Water Distribution System The Series 5000 Cooling Tower utilizes a low pump head gravity distribution system with large orifice non-clogging nozzles that requires less pump energy than a pressurized distribution system. Flume Box Flume Box Standard Top Inlet Connections The Series 5000 comes standard with top inlet connections to each of the hot water basins. Hot water basin covers matching the unit material of construction come in easy to handle sections for easy access and inspection of the distribution system. The use of gravity distribution minimizes pump head requirements and allows for maintenance during unit operation. BAC s patented non-clog nozzles ensure even flow over the fill area and are simple to remove for maintenance. B21 Questions? Call 410.799.6200 or visit www.baltimoreaircoil.com Top Inlet Connections

Standard Weir Dams Reducing water flow through a unit below the recommended level may potentially create uneven water distribution through the heat transfer section, causing scale build up, splash out/drift, and icing. To successfully modulate the water flow while avoiding potential complications, weir dams may be installed in the hot water basin. With a weir dam, the hot water basin can accommodate a flow range of 50% to 100% of the design flow. ENDURAFLOW Heat Transfer System Superior low clog performance for dirty water applications, reduces fill replacement and downtime. Weir Dams Patent pending technology Maximizes thermal performance in demanding power and process applications Accessible design Allows for cleaning while tower is in operation, reducing downtime line of sight cleanability Reduces maintenance to ensure thermal performance and uptime Capacity Enhancement The need to enhance the capacity of a unit may be necessary when layout is restricted or if capacity requirements have increased and exceed an existing unit s capabilities. By enhancing the capacity of a unit, it may be possible to use a smaller foot print while still meeting thermal requirements of the installation. Velocity Recovery (VR) Stacks (OPTION) A VR stack is a conical fan cowl extension that reduces the discharge pressure the fan has to work against, allowing the fan to move more air for the same energy input. By moving more air through the same unit, the cooling capacity is increased without increasing horsepower or footprint. Effectively, the amount of energy required for each ton of cooling capacity is reduced. VR stacks are factory assembled, CTI certified, and can be configured during initial unit purchase to reduce energy requirements or through the aftermarket to increase capacity. BACross Fill Manufacturing Note: For all fill options contact your local Representative. Velocity Recovery (VR) Stacks PRODUCT & APPLICATION HANDBOOK VOLUME V B22

Series 5000 Custom Features & Options Shipping and Rigging BAC units are factory-assembled to ensure uniform quality with minimum field assembly. Each unit has been designed with rigging and assembly in mind and includes features to minimize the number of tools required and installation time. Standard Rigging Guides Rigging guides allow for the upper and lower section of units with a two piece rig to align and engage. The guides ensure proper placement of the top section for multi-cell installations, making rigging much simpler and reducing the time required. This is especially critical during multi-cell installations when units are rigged side-by-side. Knockdown Units (OPTION) Knockdown units are available for jobs where access to the cooling tower location is limited by elevators, doorways, or similar obstacles, where lifting methods impose very strict weight limits, or where the shipping cost of a fully assembled tower is excessive. Welded stainless steel cold water basins and TriArmor Corrosion Protection System cold water basins are excluded. Access Options BAC provides a broad offering of access options. Our evaporative equipment is designed to be the most easily maintained for sustaining capacity over a longer life. All BAC platforms and ladders are OSHA compliant to ensure personnel safety and code compliance. Rigging Guides Ensure Alignment Knockdown Unit Installation Motor Removal System (Option) All motor removal system options include modular davit arm(s) to facilitate motor replacement. B23 Questions? Call 410.799.6200 or visit www.baltimoreaircoil.com

NOTE: Platforms, ladders, handrails, safety gates, and safety cages can be added at the time of order or as an aftermarket item. External Platforms and Ladder Packages (OPTION) External platforms and ladder packages (now factory assembled prior to shipping) are available to provide safe access to key components of the unit for maintenance. Multiple configurations are available, including louver face platforms to gain access to the distribution system and motor access platforms for externally mounted gear drive motors. Access Door Platform and Ladder Packages (OPTION) An access door platform is available to allow access to the unit when installed on elevated supports (these are now factory assembled prior to shipping). This option allows for safe access to the unit, as well as a working platform to stage tools for maintenance. External Ladder and Platform Handrail packages (OPTION) Handrail packages are available to provide safe access to the top of the unit for maintenance to the distribution system. Fan deck extensions are available for passage around the fan on units designed with maximized fan diameters, Velocity Recovery (VR) Stacks, or discharge sound attenuation. The specially designed handrail packages are secured for compact shipping in the cold water basin to minimize shipping costs and are ready for field assembly. External Ladder, Safety Cage, and Handrail Internal Walkway (OPTION) An internal walkway is available, allowing access to the spacious plenum area for maintenance and inspection of the cold water basin, make-up, fill, and drive system. Internal Service Platform and Ladder Packages (OPTION for two piece units) A coverage service platform facilitates access to the fan drive components and inspection of upper level eliminators, baffles and heat transfer components. Designed to meet OSHA requirements, this platform provides ultimate ease of maintenance. An internal walkway is required with this package. Internal Ladder, Service Platform, and Walkway PRODUCT & APPLICATION HANDBOOK VOLUME V B24