Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Similar documents
Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Master Facility Planning Update School Board Meeting May 26, 2016

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

2014 Bond Project Guide

Master Project List Report

REPORT CARD TO THE COMMUNITY MAY 15, 2018

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Forest Hills Facilities Plan

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Briar Crest Elementary

Proposed Bond Construction Projects

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Design Presentation. Chief Operations Officer Willie Burroughs

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Measure R Summary Through February 28, 2015 Board Meeting March 17, 2015

Measure R Summary Through April 30, 2015 Board Meeting May 19, 2015

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

LKA Partners. A Professional Corporation for Architecture/Planning. 430 North Tejon Street Colorado Springs, CO /

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

Greater Albany Public Schools May 2017 Ballot Measure for School Repairs, Crowding and Job Training

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

New High School Concept

Edward Jenner Elementary Academy of the Arts

5 Year Capital Improvement Plan Update

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

PLATTEVILLE MIDDLE SCHOOL

Electrical Inspection Special Electrical

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

Arena Elementary School 314 Willow St. Arena, WI 53503

Florence High School / Middle School Page 1 of 3 Florence, WI

NYC Department of Education

Tillamook High School Bond Projects

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

Calmeca Academy of Fine Arts and Dual Language

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

Warren County Schools Plant and Operations

Richard Henry Lee Elementary School

School District of Milton 5- Year Capital Maintenance and Improvement Plan

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

Ashland School District Facility & Capacity Assessment Report 2005

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

MADISON ELEMENTARY SCHOOL

NYC Department of Education

Plain Elementary School 1370 Cherry St. Plain, WI 53577

Washington Irving Elementary School

Facilities Master Planning

Cherry Hill Public Schools BUILDING A SOLID FUTURE

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Agustin Lara Elementary Academy

FACILITIES CONDITION ASSESSMENT WAGNER RANCH ELEMENTARY SCHOOL. Orinda Union School District Facilities Master Plan

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

Joseph Brennemann Elementary School

30% Design Community Meeting

Charles W Earle Elementary School

Community Unit School District 200 Facilities

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

Long-Range School Facility and Technology Improvement Plan

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Josefa Ortiz De Dominguez Elementary School

Genevieve Melody Elementary School

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

Sidney Sawyer Elementary School

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

NYC Department of Education

MEASURE A. Completed Bond Projects

HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE)

2005 Proposition II. Bond Construction & Projects Report

Oscar DePriest Elementary School

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan

SPLOST I, II, III,IV

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Oconomowoc Area School District Facility Construction Update August 25, 2017

Alessandro Volta Elementary School

Custom Report // Priorities 1+2

PROCTOR TERRACE ELEMENTARY SCHOOL

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

White Bear Lake Area Schools District 624 ENERGY GUIDELINES

DRAFT. Widen Elementary School Site Summary 74,523 SF. Introduction

S AGE E NGINEERING A SSOCIATES, LLP

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

Updated: 8/16/ Facilities Profile

River Valley High School 660 Varsity Blvd. Spring Green, WI 53588

OPERATING. Salaries, wages, and benefits personnel costs for repairs and maintenance functions, including living or accommodation allowances.

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

Electrical Inspection Service & Distribution

DeWitt Clinton Elementary School

Riverview West Side Elementary 160 Isabel Avenue East

Transcription:

Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical system, fire protection system, $2,459,220 mechanical system, and plumbing upgrades Classroom, stage/music area, and administrative office additions; art 1990 room, cafeteria, and media area renovations 1999 HVAC system replacement General and special education classroom, corridor, kitchen, music room, gym, cafeteria, library, computer lab, art room, student restroom, and administrative office remodeling; fire alarm system, flooring, and minor plumbing upgrades; lighting and ceiling replacements; asphalt playground repairs; rotomilling and installation of new topping to existing asphalt drives and parking lots; landscape and irrigation work Security camera and DVR to digital IP system, retaining wall, exterior lighting, gym dimming system, kiln hood, relief fans, gate valve, and domestic expansion tank upgrades; gym unit modification; roof and playbox wood timber replacements 101

Summit Elementary School 18201 East Quincy Avenue Aurora, Colorado 80015 Year Opened 1988 Current Square Footage 52,800 Site Acreage 11.61 summit.cherrycreekschools.org $811,200 Asphalt and concrete work; roof replacement 2003 HVAC system replacement Lighting, electrical distribution system, and minor plumbing upgrades; intercom system replacement Security camera and DVR to digital IP system, fire alarm notification system, exterior lighting, gym dimming system, gate valve and domestic expansion tank, gym sound system and main switchboard, and door hardware/keying upgrades; classroom and media center carpeting and back-up generator replacements; exterior painting; kiln hood installation 102

Sunrise Elementary School 4050 South Genoa Way Aurora, Colorado 80013 Year Opened 1984 Current Square Footage 72,507 Site Acreage 13.3 sunrise.cherrycreekschools.org Asphalt and concrete work; carpet/flooring replacements; fire protection $1,657,420 system, mechanical system, and plumbing upgrades 1990 Building addition and renovation 2003 HVAC system replacement Lighting system upgrade; plumbing fixture, and piping replacements Security camera and DVR to digital IP system, fire alarm notification system, exterior lighting, gate valve, water fountain, boiler and chiller upgrades; door hardware/keying, roof, and mechanical system replacements; restroom floor repairs; door glazing/framing at north and south ends of building; kiln hood installation 103

Timberline Elementary School 5500 South Killarney Street Aurora, Colorado 80015 Year Opened 1986 Current Square Footage 52,800 Site Acreage 10.26 timberline.cherrycreekschools.org $ 75,000 Carpet/flooring replacement 2003 HVAC system upgrade Lighting system upgrade; plumbing fixture and domestic hot water system replacements Security camera and DVR to digital IP system, exterior lighting, kiln hood, gate valve, exhaust fan, water fountain, gym sound system, gym dimming system, and crawlspace drainage upgrades; door hardware/keying, media center carpet, and roof replacements; restroom and cafeteria floor repairs; interior painting 104

Trails West Elementary School 5400 South Waco Street Centennial, Colorado 80015 Year Opened 1980 Current Square Footage 55,119 Site Acreage 9.46 trailswest.cherrycreekschools.org $ 500,000 Innovation $3,099,935 Asphalt and concrete work; fire protection system, mechanical system and plumbing upgrades; roof replacement 1990 Classroom additions; stage/music area, administrative office, media center, and cafeteria renovations 2003 HVAC system renovation General and special education classroom, corridor, kitchen, music room, gym, cafeteria, library, computer lab, art room, student restroom, and administrative office remodeling; flooring and fire alarm system upgrades; lighting, electrical distribution system, and ceiling replacements; asphalt playground repairs; rotomilling and installation of new topping to existing asphalt drives and parking lots; landscape and irrigation work Security camera and DVR to digital IP system, exterior lighting, gate valve, gym dimming system, and generator upgrades; kiln hood installation 105

Village East Community Elementary School 1433 South Oakland Street Aurora, Colorado 80012 Year Opened 1971 Current Square Footage 69,650 Site Acreage 6.64 villageeast.cherrycreekschools.org $2,217,250 Cafeteria renovation; asphalt and concrete work; carpet/flooring and roof replacements 2003 Building addition and renovation Gym lighting upgrade Security camera and DVR to digital IP system, gym dimming system, gym sound, gate valve, exhaust fan, plumbing fixture, and backflow device upgrades; kiln hood installation 106

Walnut Hills Community Elementary School 8195 East Costilla Boulevard Centennial, Colorado 80112 Year Opened 1969 Current Square Footage 54,940 Site Acreage 4.68 walnuthills.cherrycreekschools.org $183,420 Concrete work; carpet/flooring replacement; fire protection system upgrade 1995 HVAC system replacement 1999 Building addition and renovation Security cameras and DVR to digital IP system, gym dimming system, exterior lighting, building drainage, mechanical system, and boiler upgrades; gym carpet and kiln hood installations; glazing/framing of all doors with single pane windows 107

Willow Creek Elementary School 7855 South Willow Way Centennial, Colorado 80112 Year Opened 1977 Current Square Footage 52,066 Site Acreage 7.47 willowcreek.cherrycreekschools.org $ 500,000 Innovation Concrete work; window/caulking, fire protection system, mechanical system, $2,521,820 and plumbing upgrades Administrative area and stage addition; cafeteria, media center and art room 1990 renovations 2003 HVAC system replacement General and special education classroom, corridor, kitchen, music room, gym, cafeteria, library, computer area, art room, student restroom, and administrative office remodeling; kitchen exhaust system, classroom carpeting, lighting and ceiling replacements; asphalt playground repairs; rotomilling and installation of new topping to existing asphalt drives and parking lots; site grading; landscape and irrigation work; electrical distribution system and fire alarm system upgrades Security camera and DVR to digital IP system, retaining wall, exterior lighting, gate valve, and gym dimming system upgrades; playground equipment and back-up generator replacements; kiln hood installation 108