Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Similar documents
Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

2014 Bond Project Guide

Master Project List Report

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

REPORT CARD TO THE COMMUNITY MAY 15, 2018

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Master Facility Planning Update School Board Meeting May 26, 2016

Briar Crest Elementary

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Forest Hills Facilities Plan

Proposed Bond Construction Projects

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

New High School Concept

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

School District of Milton 5- Year Capital Maintenance and Improvement Plan

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

2014 Bond District-wide Facility Repairs

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

2014 Bond District-wide Facility Repairs

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

Design Presentation. Chief Operations Officer Willie Burroughs

PLATTEVILLE MIDDLE SCHOOL

Oconomowoc Area School District Facility Construction Update August 25, 2017

Edward Jenner Elementary Academy of the Arts

NYC Department of Education

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Tillamook High School Bond Projects

Greater Albany Public Schools May 2017 Ballot Measure for School Repairs, Crowding and Job Training

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

LKA Partners. A Professional Corporation for Architecture/Planning. 430 North Tejon Street Colorado Springs, CO /

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Calmeca Academy of Fine Arts and Dual Language

Cherry Hill Public Schools BUILDING A SOLID FUTURE

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

Richard Henry Lee Elementary School

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

5 Year Capital Improvement Plan Update

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Oxford Hills School District Capital Renewal Plan Updated March 2017

Washington Irving Elementary School

Riverview West Side Elementary 160 Isabel Avenue East

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Josefa Ortiz De Dominguez Elementary School

NYC Department of Education

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

Measure R Summary Through February 28, 2015 Board Meeting March 17, 2015

Electrical Inspection Special Electrical

Agustin Lara Elementary Academy

Measure R Summary Through April 30, 2015 Board Meeting May 19, 2015

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

Joseph Brennemann Elementary School

2005 Proposition II. Bond Construction & Projects Report

Charles W Earle Elementary School

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

Exhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS

Facilities Master Planning

Arena Elementary School 314 Willow St. Arena, WI 53503

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska

NYC Department of Education

Genevieve Melody Elementary School

Ashland School District Facility & Capacity Assessment Report 2005

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

MADISON ELEMENTARY SCHOOL

LONG-TERM OPERATIONS AND MAINTENANCE PLAN

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Ohlone College Measure G Project Scope Revisions

Plain Elementary School 1370 Cherry St. Plain, WI 53577

Safety & Security. Plainview-Old Bethpage Central School District

Oscar DePriest Elementary School

Facilities Management State-Funded and Billable Services

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

MEASURE A. Completed Bond Projects

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

GOCO Grants Awarded to Projects in Arapahoe County through June 2015

HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE)

Sidney Sawyer Elementary School

Florence High School / Middle School Page 1 of 3 Florence, WI

Francis M McKay Elementary School

DeWitt Clinton Elementary School

Massachusetts School Building Authority

FACILITIES CONDITION ASSESSMENT WAGNER RANCH ELEMENTARY SCHOOL. Orinda Union School District Facilities Master Plan

Facilities Management Services

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

Updated: 8/16/ Facilities Profile

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

White Bear Lake Area Schools District 624 ENERGY GUIDELINES

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES

30% Design Community Meeting

S AGE E NGINEERING A SSOCIATES, LLP

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

John Palmer Elementary School

Transcription:

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical system, fire protection system, and playground upgrades 1990 HVAC system upgrades; classroom addition Main office renovation; parking lot addition; temperature control 2003 upgrades Univent mechanical system (for code compliance) and ceiling replacements; flooring, minor plumbing, and landscape upgrades; lighting system retrofit; fire suppression system installation Flooring replacement involving asbestos abatement; interior painting; floor repairs at stair treads; security camera and DVR to digital IP system and service conductor upgrades; dimming system and exterior lighting installations; chiller, kiln hood, domestic water supply, and plumbing fixture replacements 83

Heritage Elementary School 6867 East Heritage Place South Centennial, Colorado 80111 Year Opened 1976 Current Square Footage 40,600 Site Acreage 8 heritage.cherrycreekschools.org Proposed $ 22,500 Asphalt and concrete upgrades 1990 Classroom additions 1999 HVAC system replacement General and special education classroom, corridor, kitchen, music room, gym, cafeteria, library, computer lab, art room, student restroom and administrative office remodeling; fire alarm system and flooring upgrades; electrical distribution system, plumbing fixture, lighting and ceiling replacements; asphalt playground repairs; rotomilling and installation of new topping to the existing asphalt drives and parking lots; landscape and irrigation work; fire suppression system installation Security camera and DVR to digital IP system, exterior lighting, and gym sound upgrades; gate valve, kitchen air unit and kiln hood installations; door hardware/keying replacements 84

High Plains Elementary School 6100 South Fulton Street Englewood, Colorado 80111 Year Opened 1978 Current Square Footage 55,119 Site Acreage 9.36 highplains.cherrycreekschools.org Asphalt and concrete work, fire protection system upgrades; roof $844,085 replacement Classroom additions; stage/music area, administrative area, media center, and 1990 cafeteria renovations 1999 HVAC system replacement General and special education classrooms, corridor, kitchen, music room, gym, cafeteria, library, computer lab, art room, student restroom, and administrative office remodeling; fire alarm system and flooring upgrades; electrical distribution system, partial HVAC system, lighting and ceiling replacements; asphalt playground repairs; rotomilling and installation of new topping to existing asphalt drives and parking lots; landscape and irrigation work; minor plumbing and sanitary system repairs Exterior lighting and security camera and DVR to digital IP system upgrades; back-up generator, main switch board, dimmer system, cabinet unit heaters, roof fans, and gate valve replacements; kiln hood installation 85

Highline Community Elementary School 11000 East Exposition Avenue Aurora, Colorado 80012 Year Opened 1991 Current Square Footage 53,600 Site Acreage 12.25 highline.cherrycreekschools.org $415,420 Door/hardware, window/caulking, carpet/flooring, electrical system, and fire protection system upgrades Lighting system retrofits; HVAC control system and minor plumbing upgrades Cafeteria floor repair; interior painting; security camera and DVR to digital IP system, fire alarm notification system, exterior lighting, gym sound system, mechanical system, boiler, plumbing, and back-up generator upgrades; kiln hood installation 86

Holly Hills Elementary School 6161 East Cornell Avenue Denver, Colorado 80222 Year Opened 1958 Current Square Footage 38,292 Site Acreage 9.87 thehollys.cherrycreekschools.org $200,000 Playground upgrades 1988 Building addition and renovation 1995 HVAC system upgrade 2003 Partial HVAC system improvement Lighting system, partial HVAC system and plumbing fixture replacements Interior wall covering and door hardware/keying replacements; interior and exterior painting; security cameras and DVR to digital IP system, site drainage, playground, fire alarm notification system, exterior lighting, plumbing, and mechanical system upgrades; back-up generator replacement; dimming system and kiln hood installations 87

Holly Ridge Primary School 3301 South Monaco Parkway Denver, Colorado 80222 Year Opened 1962 Current Square Footage 37,894 Site Acreage 6.72 thehollys.cherrycreekschools.org $780,450 Asphalt and concrete work; cafeteria renovation 1995 HVAC system upgrade 2003 Building renovation; HVAC system and window replacements Lighting, electrical distribution system, and control system upgrades; plumbing fixture replacements Classroom, gym, hallway, and mobile unit carpet, kiln hood, and dimming system installations; cafeteria floor repairs; door hardware/keying, and primary transformer replacements; security camera and DVR to digital IP system, fire alarm notification system, exterior lighting, mechanical system, and plumbing upgrades 88

Homestead Elementary School 7451 South Homestead Parkway Centennial, Colorado 80112 Year Opened 1977 Current Square Footage 51,358 Site Acreage 8.81 homestead.cherrycreekschools.org $ 500,000 Innovation $1,402,920 Asphalt work; fire protection system, mechanical system, and plumbing upgrades 1990 Stage addition; administrative area, cafeteria, art room, and media center renovations; HVAC system replacement; additional parking lot creation 1999 HVAC system replacement General and special education classroom, corridor, kitchen, music room, gym, cafeteria, library, computer lab, art room, student restroom and administrative office remodeling; flooring upgrades; fire alarm system, lighting and ceiling replacements; asphalt playground repair; rotomilling and installation of new topping to existing asphalt drives and parking lots; landscape and irrigation work Security camera and DVR to digital IP system, exterior lighting, gate valve, gym dimming system, and gym sound upgrades; mechanical system and domestic expansion tank replacements 89

Independence Elementary School 4700 South Memphis Street Aurora, Colorado 80015 Year Opened 1976 Current Square Footage 54,635 Site Acreage 7.01 independence.cherrycreekschools.org $ 500,000 Innovation $1,569,165 Fire protection system, mechanical system, plumbing, and playground upgrades; roof replacement 1990 Classroom additions; interior building renovation 1999 HVAC system replacement Entry drainage and ceiling repairs; flooring, electrical distribution system, door/door hardware upgrades; fire alarm system replacement Security camera and DVR to digital IP system and exterior lighting upgrades; gate valve, exhaust fan, door hardware/keying, playground equipment, and retaining wall replacements; kiln hood installation; door glazing/framing at southwest ground level 90

Indian Ridge Elementary School 16501 East Progress Drive Aurora, Colorado 80015 Year Opened 1985 Current Square Footage 57,373 Site Acreage 14.35 indianridge.cherrycreekschools.org $2,272,500 Asphalt and concrete work; mechanical system and plumbing upgrades 1995 Building addition and renovation 2003 HVAC system replacement Lighting system and temperature control system upgrades; back-up generator and air distribution system replacements Security camera and DVR to digital IP system, exterior lighting, fire alarm notification system, gym sound, gym dimming system, gate valve and water fountain upgrades; window/caulking and door hardware/keying replacements; classroom and building exterior painting; kiln hood installation; restroom floor repairs 91