Solar station DKP 6-8 / DKP Installation and Service Manual C

Similar documents
CIRCO 6 Solar Circulation Unit

Installation and operation instructions Solar stations SolarBloC midi Premium DN 20 SolarBloC maxi Premium DN 25

Installation and instruction manual SOLAR STATION

TRIO DT 350/3 DIETRISOL. Solar domestic hot water tanks. Installation instructions. Instructions for use. Technical instructions.

BSC...E - BSP...E - BESC...E

WHE 2.24 / WHE 2.24 FF

Installation, operation and care Wall-mounted electric boiler MP THL nr. - rev 02

Solar heating systems

AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE

MAIN FEATURES ADVANTAGES BENEFITS BOSS TRANSFORMER COMBI HF 110 CHEMICAL AND PHYSICAL FEATURES PACKAGING FEATURES

PRIUX HOME D. High-efficiency double circulating pumps Heating Air conditioning 50 Hz OPERATING RANGE APPLICATIONS BENEFITS

DEVIATING VALVES ART K063

CONNECT SOLAR MR - 7,5m

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

Installation & Operation Manual Models: TSU

Installation, Operating and Servicing Instructions

Crown Boiler Company

HeatMaster. Assembling and installation instructions. 201 Booster. HeatMaster. HeatMaster. 200N (Gas) Booster ENGLISH FRANCAIS NEDERLANDS ESPAÑOL

General System Layout Sketch

Components for solar heating systems

8008 CIRCULATION UNIT FOR SOLAR THERMAL SYSTEMS, FLOW AND RETURN.

HKF 8180 Operating instructions

Powerstock Storage Tank

INSTALLATION MANUAL. Domestic hot water tank for air to water heat pump system EKHTS200A EKHTS260A EKHTSP200AA EKHTSP260AA

USER S MANUAL ATH WH220

AGS 5/5E, AGS 10/10E INSTALLATION AND SERVICING INSTRUCTIONS SOLAR PUMP STATIONS FOR SEALED SOLAR HEATING SYSTEMS AND INDIRECT FED DOMESTIC HOT WATER

Installation, Operating and Servicing Instructions

Enzo Concealed Shower Mixing Valve

Installation and Operation Manual IDRA PLUS DS. Solar Solar storage cylinder. Installation and Operation Manual

VIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l

Enzo Safe Touch Thermostatic Shower EZ10010CP & EZ10014CP

PHRIE / PHIE InvERTER monoblock air To water HEaT PumP medium TEmPERaTuRE

Operating Instructions. Boilermag XL Filter. High Intensity Magnetic Separator

EXTREME 1 Reverse Osmosis System

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Hakki Pilke Raven spare parts manual

MCR 24 MCR 24/28 MI MCR 30/35 MI MCR 34/39 MI

Aquastrom T plus Thermostatic valve with adjustable temperature control range and fixed residual volume flow for circulation pipes

Illustration shows item no Z Original operating manual. Operating manual. BlueMobil eco. Item no: Z-3278

IST 03 C CYLINDER WHPF BM USE AND MAINTENANCE HANDBOOK

Moisture inside the drum is due to final testing.

SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model MICROGENUS PLUS. R EN - Edition 02-01/04/2007

Metering systems 0548EN April 2014

Operating Guide. Termix Compact 28 VX-FI / HWP / HWS. 1.0 Table of Contents. 1.0 Table of Contents

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

- 1- IMPORTANT SAFETY REMINDERS

Installation Instructions

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

HG 675 CX 60 HG 675 CN 60 HG 675 CW 60

LINDOFLAMM thermal engineering.

Installation Guide. Termix Distribution unit. 1.0 Table of Contents. 1.0 Table of Contents

Oblo Basin and Bidet Monobloc Installation and User Guide

Installation Manual STOR C. Solar combination storage cylinder. Installation Manual

METRO BASIN MONO MIXER CHR

LYRA 1000 VVS Installation and Operation Manual LYRA 1000 VVS THERMAL STORE LYRA 1000 VVS

Accumulator tank. 1000, 750 and 500 litres Aqualux Teknik Aqualux UB Aqualux 750 CU

PARTS BOOK. From S/N:

EXTREME HP-1 Reverse Osmosis System

M07. Wunda Premium Manifold. Before you start: Check the contents THE BRAND YOU CAN TRUST

Vivadens. Wall-hung gas condensing boilers MCR 24/28 BIC. User Guide B

R146C. Adjustable magnetic dirt separator. Versions and product codes. Datasheet 0840EN 10/2018

High-efficiency circulating pumps Heating Air conditioning 50 Hz

INISOL EASYLIFE. SOLAR COLLECTORS, TANKS AND SYSTEMS for domestic installations

ZENA PLUS EASYLIFE WALL-HUNG GAS BOILERS

Remeha. Fuel oil/gas boilers P 320. Installation and Service Manual

DIRTMAG dirt separator with magnet, adjustable for vertical or horizontal pipe

RADIANT PANEL SYSTEM CONTROL QUICK GUIDE

Telo Shower Mixing Valve TL10016CP

APPLICATIONS. For the accelerated circulation of hot water in heating circuits with duty point optimisation

4FLOOR-STANDING GAS CONDENSING BOILERS

Commissioning a Solar Thermal Installation

VIESMANN. Installation and service instructions. Solar-Divicon SR. Safety instructions. Application. for contractors. Part no and

Condair Esco. Steam humidification system INSTALLATION INSTRUCTIONS EN 1310

INSTRUCTIONS REHAU PRO-BALANCE MIXING MODULE

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

EXTREME 2 Reverse Osmosis System

Spectrum TM. Installation, Service & Operation Manual O FLO. SoftH 2. Water Softener. Table of Contents

Operating instructions

Cold water HD 9/18-4 ST

T E C H C A L EBS-1 T High technology heating

Beautifully Traditional

VAILLANT SPARE PART CATALOGUE

DTG Eco / V130

STREBEL S-CB + Cascade Kits

HR Powder Feed Hopper

VIESMANN. Installation instructions VITOCELL 300-V/W. for contractors. Vitocell 300-V/W Type EVIA-A

Installation Manual. Conergy TS Open and Closed Systems.

Installation, commissioning and servicing instructions

VERTINOX. AISI 316 stainless steel accumulators with one or two heat exchangers, fixed or removable type

Lago SD3. Differential Controller with Speed Control. Operating and Installation Instructions

AD XT. Air Dryer Service Manual. Innovation with Integrity. Version 003 NMR

Instruction Manual. Automatic fuel oil de-aerator SMART-FLO 3/K B100 COMPATIBLE

Thermostatic Concealed Shower Valve

Pump assembly Instruction manual

Installation, operation and maintenance. Accumulator tank. Acc-tank 500 CU. Acc-tank 500 UB ver: Supersedes:

EXTREME 4 Reverse Osmosis System

Flat Plate Solar Collector

HIGH POWER. VICTRIX PRO 2 ErP. High power, wall-hung condensation boiler

PARTS BOOK. From S/N:

Brazed heat exchanger XB

Transcription:

EN Solar station DKP 6-8 / DKP 9-20 Installation and Service Manual 300014274-001-C

Contents 1 Introduction.............................................................................3 1.1 Used symbols...........................................................................................3 1.2 General................................................................................................3 1.3 Electrical compliance.....................................................................................3 2 Safety instructions and recommendations....................................................3 3 Technical description.....................................................................4 3.1 General description......................................................................................4 3.2 Technical characteristics..................................................................................4 3.3 Pump unit..............................................................................................4 3.3.1 Accelerator pump..................................................................................4 3.3.2 Airstop/degasser..................................................................................5 3.3.3 Antithermosiphon valve.............................................................................5 4 Installation..............................................................................6 4.1 Fitting the vent device (Airstop) to the solar heat exchanger inlet...................................................6 4.2 Fitting the pumping unit to the solar heat exchanger outlet........................................................6 4.3 Fitting to the solar station, steps to be followed:.................................................................7 4.4 Connecting the pipe circuit to the solar station..................................................................8 4.5 Assembling the pipes.....................................................................................8 4.6 Hydraulic connections....................................................................................9 4.6.1 Wall connection kit for expansion vessel................................................................9 4.6.2 Dimensioning the expansion vessel....................................................................9 4.7 Electrical connection.....................................................................................10 5 Commissioning.........................................................................10 6 Spare parts - DKP 6-8 / DKP 9-20...........................................................11 2 DKP 6-8 / DKP 9-20 06/07/09-300014274-001-C

1 Introduction 1.1 Used symbols Caution danger Risk of injury and damage to equipment. Attention must be paid to the warnings on safety of persons and equipment. Specific information Information must be kept in mind to maintain comfort. Reference Refer to another manual or other pages in this instruction manual. 1.2 General The manufacturer is not liable for any improper use of the appliance or failure to maintain or install the unit correctly (the user shall take care to ensure that the system is installed by a qualified fitter). For a proper operating of the boiler, follow carefully the instructions. Keep these instructions in a safe place close to the appliance. 1.3 Electrical compliance This product complies to the requirements to the European Directives and following standards: - 2006/95/EC Low Voltage Directive Reference Standard: EN 60.335.1. - 2004/108/EC Electromagnetic Compatibility Directive Reference Standards: EN 50.081.1 / EN 50.082.1 / EN 55.014. 2 Safety instructions and recommendations Any operation on the installation must be performed by a qualified technician respecting professional regulations and in accordance with this document. Service the appliance regularly to ensure that it operates correctly. To take advantage of the guarantee, no modifications must be made to the appliance. 06/07/09-300014274-001-C DKP 6-8 / DKP 9-20 3

3 Technical description 3.1 General description The solar station includes a safety valve, an expansion vessel connection and a filling device. 3.2 Technical characteristics Solar station Height (with insulation) 630 mm Width (with insulation) 200 mm Depth 190 mm Maximum operating pressure 6 bar Maximum operating temperature 120 C (on occasion 180 C) Safety devices Safety valve 6 bar Connection kit for expansion vessel current Retaining / signalling components Spherical liner valve Mk3/4 Antithermosiphon valve Resistance 200 mm water columns Execution Mod. PPS can be fitted Maximum operating temperature 180 C Sealing material VILTON/EPDL O-ring 180 C AFM 34 gaskets 200 C Insulation Material EPP 3.3 Pump unit 3.3.1 Accelerator pump High manometric pump: ST 20/6 - ST 20/9 Power exchanged 4 DKP 6-8 / DKP 9-20 06/07/09-300014274-001-C

3.3.2 Airstop/degasser The solar station is fitted with a permanent degassing device (Airstop) on the flow pipes. The circulator conveys any air bubbles present to the Airstop system. The air contained in the heatexchanging medium is collected in the degasser. The degasser must be vented from time to time (several times after commissioning, then after one week followed by a further check after one month). For optimum efficiency, the solar installation must be vented using the degasser every six months. After venting, the installation operating pressure must be reset. 3.3.3 Antithermosiphon valve The check valve is included in the ball valve on the red thermometer and it is characterized by an opening pressure of 200 mm water column. 1. To fill, vent and rinse the installation, the antithermosiphon valves must be open. To open them, use a 14 mm openended spanner and open the valves half way. The ball in the valve lifts the check valve (45 ). 2. When the installation is operating, the ball valves must be fully open. The antithermosiphon valve operates when the stop cock is in the open position. 06/07/09-300014274-001-C DKP 6-8 / DKP 9-20 5

4 Installation 4.1 Fitting the vent device (Airstop) to the solar heat exchanger inlet Screw the vent device to the top solar connection. First place the gasket in the coupling nut. 4.2 Fitting the pumping unit to the solar heat exchanger outlet Hold the pumping unit in place with the insulation housing on the tank and screw it onto the bottom solar connection. First place the gasket in the coupling nut. M001698-A 6 DKP 6-8 / DKP 9-20 06/07/09-300014274-001-C

4.3 Fitting to the solar station, steps to be followed: 1. Attach the control system to the mounting base frame provided. 6. Remove the part of the casing in plexiglass from the front insulation housing. Fit the front insulation housing without plexiglass but with control system to the solar station. The control system is now fitted and can be set from the front. 7. Drill a hole 8 in the side cover and feed through the DHW sensor. 8. Fitting the DHW sensor. 9. Refit the cover.. 9 8 M001701-A 2. Secure the control system on the mounting base frame to the station, above the pump. D001003-B 10. Connect the connector delivered with the solar station to the circulator. M001702-A 3. Fit the wiring between the pump and the control system. 4. Connect the tank sensors and the solar collectors. 5. Make the 230 V connection (qualified personnel only). Electrical connections, cf. commissioning the Diemasol A control system. 06/07/09-300014274-001-C DKP 6-8 / DKP 9-20 7

4.4 Connecting the pipe circuit to the solar station Recommendation: connect the flow and the return according to the instructions in the illustration. If need be, it is nonetheless possible to modify the return by turning the valve block from left to right. After completing the solar circuit, filling it and checking the pressure, it is possible to fit the front housing to the station. 4.5 Assembling the pipes If connecting by brazing: - Strong brazing on joints to be brazed without scouring agent/ paint stripper. - Remove the rubber gasket before brazing. - Put the gasket back in place after brazing. The arrow on the pump must be pointing towards the roof ridge. Make the connections using clamping ring screw connections. With small systems, use De Dietrich propylene glycol containers to recover fluid under the safety valve discharge pipe. 8 DKP 6-8 / DKP 9-20 06/07/09-300014274-001-C

4.6 Hydraulic connections 4.6.1 Wall connection kit for expansion vessel The connection kit includes a 0.5 metre long stainless steel hose with nuts for pipe unions and flat gaskets for both sides as well as an arm and a screw connection supporting the expansion vessel. The connecting hose is arranged in such a way as to be able to fit the expansion vessel to the wall, beside the hot water tank. If the appliance is not installed against a wall, the installer must fit an extension (copper pipe) connecting the expansion vessel or connect the expansion vessel to the conduit coming out of the top of the hot water tank. If, due to lack of space, the arm cannot be mounted as such, it can be used as a floor-standing support. In this case, the opened expansion vessel is fitted in the horizontal position. 4.6.2 Dimensioning the expansion vessel The volume of the expansion vessel depends above all on the volume likely to be vapourised when the installation is switched off. For this reason, the expansion vessel must be chosen according to the number of collectors. When the number of collectors is high, parallel expansion vessels can be fitted. PRO PRO C POWER Collecto r surface Number of panels Total length of the pipe A/R < 30m A/R >30m Volume of the expansion vessel m 2 ø ext. (mm) ø ext. (mm) litres 5 15/18 15/18 18 10 15/18 15/18 25 15 15/18 18 35 20 15/18 18 50 5 15/18 15/18 25 10 15/18 15/18 35 15 15/18 15/18 50 20 15/18 15/18 50 4 18 18 50 5 18 18 50 6 18 18 60 7 18 18 70 8 18 18 80 Expansion vessel capacity: Pre-inflation and pressure in the installation must be adapted to the configuration of the installation. Package no. Volume of the expansion vessel EG 82 25 EG 83 40 EG 84 60 06/07/09-300014274-001-C DKP 6-8 / DKP 9-20 9

4.7 Electrical connection Make the 230 V connection (qualified personnel only). Electrical connections, cf. commissioning the Diemasol A control system. 5 Commissioning See: Domestic hot water tank manual. 10 DKP 6-8 / DKP 9-20 06/07/09-300014274-001-C

6 Spare parts - DKP 6-8 / DKP 9-20 To order a spare part, quote the reference number next to the part required. 06/07/09-300014274-002-C 9 A000646A Ref. Reference Description 2 300003219 Insulation for DKP 6-8 solar station 3 300003220 Part in plexiglass 4 300003213 R 3/4 connection cross 5 300003214 3/4 double nipple 6 300011786 Rp 3/4 return valve with antithermosiphon valve 7 300019797 Circulator ST20/6-130 - DKP 6-8 7 97930832 Circulator ST20/9-3 - DKP 9-20 8 97930834 Flow valve 9 300003211 Elbow R 3/4 10 97930830 Drain cock 11 300004141 Bleeder valve stopper 3/8" (after 06/2007) 12 300011783 Degasser M/M 3/4" (after 06/2007) 12 97930831 Air vent R 3/4 (before 06/2007) 13 300003215 Safety device holder 14 300003216 Solid plug R 3/4 15 300003218 Manometer connection point 16 97930836 0-6 bar manometer Ref. Reference Description 17 97930837 6-bar safety valve 18 200002765 Sachet of gaskets for DKP 6-8 solar station 19 300008115 23x3 O-ring 06/07/09-300014274-001-C DKP 6-8 / DKP 9-20 11

Copyright All technical and technological information contained in these technical instructions, as well as any drawings and technical descriptions supplied, remain our property and shall not be multiplied without our prior consent in writing. Subject to alterations. 06/07/09