Enactment Date: Rapid Intervention Team and RIT Officer

Similar documents
Rapid Intervention Team

Cumru Township Fire Department 4/27/10 Standard Operating Guidelines Page: 1 of 6 Section 15.07

I. It shall be the responsibility of the department officers to implement this operating guideline.

Outline. Standards of Coverage. ICS Features 2/12/2016 ICS

SUBJECT FIRE OPERATIONS GUIDELINE (F.O.G.) #F510 Issued: 1/2014 Last Revision: 1/2014 Pages: 9 By Order Of: J.S. Thompson, Fire Chief

Structural Firefighting Policy

Wilson County Emergency Management Agency 110 Oak Street Lebanon, Tennessee 37087

COUNTY OF BERGEN DEPARTMENT OF PUBLIC SAFETY LAW AND PUBLIC SAFETY INSTITUTE POLICE, FIRE & EMS ACADEMIES 281 Campgaw Road Mahwah, N.J.

Essentials of Fire Fighting, Fourth Edition Transition Guide. Chapter 1: The History of the Fire Service (Essentials, Chapter 1)

Field Operations Guide (FOG) Effective Date: December 1, 2003 Last Revision Date: November 1, 2015

NFPA. How to Nail. Your First-Due Responsibility. Part 2: What the Standards Recommend

Technician I Kyle Wilson Line of Duty Death April 16, Marsh Overlook Structure Fire Investigative Report

MATRIX TO DETERMINE YOUR PRESENT POSITION IN MEETING N.F.P.A. 1720

BROWNSVILLE VOLUNTEER FIRE DEPARTMENT

VOLUSIA COUNTY FIRE CHIEFS ASSOCIATION MODEL OPERATING GUIDELINE

CHAPTER 1 HIGH RISE INCIDENT COMMAND SYSTEM

Excerpted from NFPA 1403 Standard on Live Fire Training Evolutions

Township Of Jackson, Fire District 3, Station 55 Standard Operating Guidelines FIRE GROUND STRATEGY

TITLE: Offensive and Defensive Operations

Travis County Emergency Services District #1 Standard Operating Guidelines

Travis County Emergency Services District #1 Standard Operating Guidelines

TACTICAL GUIDELINES. To provide guidelines to aid the decision making process for personnel during emergency/nonemergency

1.7 SECTORS, GROUPS AND DIVISIONS

To provide guidelines to aid the decision making process for personnel during emergency/non-emergency incidents.

ATTIC FIRES. Part 2 LIGHT SMOKE SHOWING

ATTIC FIRES. Part 3 HEAVY SMOKE SHOWING

Centers for Regional Excellence. Downriver Fire Authority. Organization Committee Objective. Operations Committee Report 2007

Travis County Emergency Services District #1 Standard Operating Guidelines

Talking about NFPA History of NFPA NFPA Standard 1710: Organization and Deployment of Fire Suppression Operations, EMS

9S / 9E Inspection Worksheets. The fire department should complete the following sheets prior to inspection date

FIREFIGHTER II MANIPULATIVE SKILL OBJECTIVES

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 5 High Rise On Scene Revised

Chapter 17 Test. Directions: Write the correct letter on the blank before each question.

Required Materials For complete material(s) information, refer to

CHAPTER 1 ADMINISTRATION AND ORGANIZATION

Career Fire Fighter Dies While Exiting Residential Basement Fire - New York

NFPA Self Assessment Manual

Public Safety Institute Fire & Rescue Course Fee Catalog

Westbury Fire Department: Hose Company 2 Drill 7/24/14 Thinking Beyond the Obvious or the Norm

Promotional Prep Fire Service Promotional Test Preparation

!!!!! Program Checklist

NATIONAL FIRE PROTECTION ASSOCIATION Fourth Survey of the Needs of the U. S. Fire Service

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

I. INTRODUCTION. A. Purpose: To provide procedures and guidelines for personnel responding to and operating at working structure fire incidents.

San Joaquin County Office of Education Career & Technical Education Fire Fighter Technology CBEDS#: 5833

FL Specific Training for DOD Firefighter Equivalency

INTERIOR FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL

DCN: ENGINE COMPANY OPERATIONS CHAPTER 4 March 15, 1997 FIRE SCENE OPERATIONS

House Fire IAP. Staffing Assumptions

Operational Guideline

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

NFPA Who we are and how we can help you

TRAINING AND EDUCATION PAYMENT POLICY FOR TESTING

ADVANCED EXTERIOR FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL

WELCOME TO ROSEVILLE UNIVERSITY

1 Pre-Burn Plan Mandatory. 2 Pre-Burn Inspection Mandatory. 3 Pre-Burn Briefing Mandatory. 4 Instructor In Charge Mandatory

Carbon Monoxide Poisoning

KAMLOOPS FIRE RESCUE OPERATIONAL GUIDELINE. Eff. October 1 st, To ensure understanding of scene locations and designations

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

3330 N Clayton. C - Side Date: 11/18/2017 Time: 21:48 Incident Number: Address: 3330 N Clayton

Assignment Sheet Apply the NIMS-ICS Model to an Emergency Scene

SMALL TOOL REPLACEMENT PLAN

Death in the line of duty...


2013 Compliance Report RCW 52.33

ESF 4. Fire Fighting

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM

Development and Use of Interdivisional Box Alarm Cards

Additional Materials: Instructor s PowerPoint, Question Files

FIREFIGHTER II: FIRE DEPARTMENT COMMUNICATIONS COMMUNICATIONS: SKILL SHEET #2 Define and Demonstrate Fire Department Radio Procedure

EAST CLACKAMAS COUNTY S.O.G. S

FEMS Board Executive Committee Agenda 3/2/2015

CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS

EASTERN ARIZONA COLLEGE Fire Department Operations II

DEPARTMENTAL GUIDELINES CHAPTER 6 TACTICAL OPERATIONS

Instructor Guide. Title: Tactical Approach to Chimney Fires. Time Required: 2 hours. Materials: PowerPoint presentation AV equipment

The 2012 Fire Suppression Rating Schedule (FSRS)

Based on NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition.

INCIPIENT FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL

FIRE FIGHTER I APPLICATION PENNSYLVANIA VOLUNTARY FIRE SERVICE CERTIFICATION PROGRAM NFPA Edition

The Technical Committee on Fire Service Training

Newfoundland and Labrador Association of Fire Services PMA Conference St John s April 23,

Career Fire Fighter Dies in Wind Driven Residential Structure Fire Virginia Revised June 10, 2008 to clarify Recommendation #2

Prerequisite/Co-requisite: Pass the reading and writing portions of COMPASS or other accepted testing instrument.

Contra Costa County Fire District Station # 69. Battalion 7. November Your station responded to 129 Emergency Calls. Response breakdown

31 March Submitted to: Commissioner of Public Safety Steven M. Pare. Assistant Chief of the Department Scott Mello

A Career Captain and a Part-time Fire Fighter Die in a Residential Floor Collapse Ohio

FIREFIGHTER 1 COMPETENCY EVALUATION

OPERATIONAL GUIDELINES FIRE/RESCUE MANUAL

Elko County Human Resources Employment Opportunity Announcement

Program of Instruction Course Syllabus

Rescues individuals in danger from fire, vehicle accidents, industrial accidents and other situation requiring extraction.

Truro Police Department. Fire Emergencies. Policy Number: OPS-9.02 Effective Date: June 1, 2000 REFERENCE:

"Quality Professional Services Delivered with Compassion"

Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Edition

ADDISON COUNTY FIREFIGHTERS ASSOCIATION MUTUAL AID SYSTEM STANDARD OPERATING GUIDELINES

Lassen Community College Course Outline

Promotional Prep Fire Service Promotional Test Preparation 301 Claremont Ave. Suite 5 Montclair, NJ (201) or promotionalprep.

Whitestown Fire Department Standard Operating Procedure

Standardized Curriculum Form Ontario, Canada

Transcription:

Section 1: Scope Section 2: Team Requirements Section 3: Establishment of RIT Section 4: Reporting to the Scene Section 5: Scene Size-Up Section 6: Primary RIT Tasks Section 7: RIT Activation Procedures Section 8: (RITO) Assignment Section 9: RITO Qualifications Section 10: Deactivation of RIT Form 1: RIT Tool Assignment Card Form 2: MAYDAY Card Form 3: Worksheet Definitions The following abbreviations that will be seen within this policy are as follows. IDLH Immediately Dangerous to Life and Health. ISO Incident Safety Officer. RIT Rapid Intervention Team. RITO Rapid Intervention Team Chief or Officer (An individual of any rank) assigned to manage the RIT Sector of the fire ground operation. IC Incident Commander PAR Personnel Accountability Report IMS Incident Management System Section 1- Scope While operating at emergency incident scenes, firefighters experience one of the highest occupational injury risks. To minimize emergency scene risk, Division 20 establishes a Rapid Intervention Team (RIT) within the Incident Management System (IMS). This policy meets the scope and intent of NFPA 1561, 1997 ed. 4-1.8. This policy establishes a means to effectively assist firefighters suddenly threatened by a dangerous situation, to initiate an immediate rescue effort in response to a MAYDAY call, report of a lost or missing firefighter, or to other emergency reports. This policy encompasses all emergency environments including those considered an IDLH atmosphere. Special response teams may require their team s procedures to override this RIT policy. The Incident Commander must assure, regardless of the type of incident, that a RIT is in-place and appropriately equipped to rescue any firefighters in distress. Section 2- Team Requirements Rapid Intervention Teams (RIT): Consists of four or more firefighters. 1 company officer and a minimum 3 additional members. Shall have full protective equipment including SCBA with PASS device. Portable radio with remote speaker microphone and ALL required fireground frequencies. Personal 40 webbing bag with carabineer, personal flashlight should also be considered as equipment for each member. 1

Section 3- Establishment of RIT Incident Command shall establish the RIT whenever emergency personnel are expected to operate under hazardous conditions that are deemed IDLH. RIT structure should be flexible based on the incident s size and operational complexity. After careful scene risk evaluation, the Incident Commander shall provide one or more rapid intervention teams commensurate with the risk levels. A. Prior to a MABAS level Box Alarm, RIT shall be either: On-scene personnel designated and dedicated as RIT. (Remember 2 in / 2 out) Additional company requested as RIT on confirmed working fire. B. As the incident escalates to either a MABAS Box Alarm level, in size, or complexity, the RIT shall be dedicated, on-scene personnel. Departments may either pre-designate a specific RIT company on their box alarm cards or assign RIT to the first available company. C. A formal RIT may take the place of, or include members from, the initial response company (2 In / 2 Out) that may have been established before RIT arrival. Section 4- Reporting On the Scene Companies pre-designated or assigned to the RIT function will bypass staging and report directly to the Incident Commander. Apparatus should position so as to not interfere with other fireground operations. Incident Command must be made aware that the RIT apparatus will not be available for other tactical assignments (the entire company will be expected to perform RIT). The RIT shall report to the Incident Commander with the following minimum equipment: RECOMMENDED EQUIPMENT 1. Set of irons (flat head axe & halogen bar) 10. Portable Saw 2. Sledge hammer or maul 11. Oxygen and EMS Jump Bag 3. Search rope (200 length) 12. Stokes Basket 4. Hand lights (1 per firefighter) 13. Thermal Imaging Camera 5. Ground Ladder (28 recommended) 14. Salvage tarp for equipment staging area 6. Portable radio w/ ALL required frequencies 7. Complete SCBA w/ Face piece 8. 4 Spare SCBA Cylinders 9. 8 & 10 Pike Poles Structure size-up will dictate additional equipment that may be needed. RIT shall stage all equipment on a ladder or a stokes basket in an area most readily accessible for potential rescues. RIT equipment should remain mobile at all times for rapid deployment. RIT members are responsible for carrying individually assigned equipment as recommended in Division 20 training programs and individual department policy. 2

While the remaining crew assembles required equipment, the RIT company officer will meet face-to-face with, and get a briefing from, the Incident Commander. The briefing will consist of the following information: What is the action plan (offensive or defensive) What has occurred during the attack (significant events) Operating crew locations Other resources responding View of tactical worksheet Review available preplan information Section 5 Scene Size Up The RIT is expected to perform initial and on-going structure assessments to determine possible RIT need due to firefighters in distress. Based on information received from the Incident Commander, the RIT will determine structure access points for rapid entry/exit and other firefighter survival keys. Scene size-up may be conducted by the RIT as a team or with members staged at the immediate access point while others perform the size-up. If the crew splits up to perform size-up, both crews SHALL maintain radio contact with the Incident Commander and each other. RIT structure size-up will be based on firefighter survival; on what may cause firefighters to be trapped, lost or become missing inside the structure, and how RIT can facilitate their escape. Structure size-up may include, but not be limited to, the following: (See RIT checklist) a. Size-up structure, complete 360 degree walk around when possible. b. Highest priority: Identify and remove any hazards that will block or slow firefighter building evacuation. Open or cause to be opened any exit that is locked, blocked or non-existent. c. Building dimensions. d. Building occupancy. e. Building construction type. f. Placement of windows, doors and fire escapes. g. Potential danger from high-security devices. h. Fireground tactics being used. i. Other operations. j. Interviews of those who may have been in the effected area. After completing the size-up, report to the IC any information that may dictate a change in operations. The RIT team should then stage at a primary entry point or other point determined by RIT size-up. Section 6 - Primary RIT Task 1. When assigned, RIT shall be responsible for the following primary tasks. 2. Respond to any report of firefighter(s) in distress (MAYDAY CALL). 3. Assess the need and call for placement of ground ladders. 4. Assemble minimum required equipment at primary entry point. 5. Monitor radio and maintain contact with IC. 6. Assess where firefighters are working in structure and any special tasks assigned. 7. Assure that tools assigned to RIT are appropriate to situation. 8. Receive situation status from Operations Sector or other sectors during deployment. 3

As part of the scene size-up, RIT may complete the following tasks if this does not take them away from the primary tasks and as long as these tasks support the incident s strategy. These tasks will not include situations requiring direct entry into the IDLH environment or using their SCBA. Task assignments should take into account that the RIT should not be allowed to fatigue unless needed for rescue. Secure utilities Perform horizontal ventilation Open rear of structure in accordance with primary task function Unblock other areas of egress in operational areas. If RIT deploys into an IDLH environment or as a result of a MAYDAY or other firefighter emergency, another back-up RIT must be immediately assigned, the alarm level escalated at least one level, and include an additional EMS response. Section 7 - RIT Activation Procedure RIT will be activated at any time a firefighter(s) are reported to be in distress, missing or unaccounted for. Upon receipt of any of these conditions, the RIT will deploy with appropriate tools and equipment for the situation. RIT will deploy to the location where the firefighter(s) are in distress or the last known location of the firefighter(s). RIT will operate on Fireground Red (153.830) and communicate with the ISO (if established) and communicate directly to the stricken firefighter(s). All other companies on the fireground will hold their positions and switch radios to Fireground White (154.280) and await instructions from IC. An immediate PAR will be initiated within each company Personnel will not evacuate or abandon their position unless conditions or orders from IC require If RIT is deployed, another team of equal size and equipment shall be assigned, staged and ready for deployment. RIT will continue to operate in a rescue mode until firefighter(s) are located, assessed, evacuated from structure, and transferred to medical care. The decision to switch to a recovery mode will only be made by the Incident Commander (IC). Section 8 - Assignment MABAS Division 20 recognizes a assignment as an essential function during MABAS alarm incidents. MABAS Division 20 will assign a at all box alarm or higher incidents. Duties of the include: The (RITO) will coordinate and act as RIT radio contact. This will enable the RIT to deliver rescue efforts without pausing to communicate on the radio. The RITO will be available to call for additional resources and to provide information to the Incident Command (IC) of needed. The RITO will work and communicate frequently with the Incident Safety Officer (ISO) in exchanging incident progress and safety concerns. These sectors will work independently of each other. 4

Additional on-scene RIT teams are designated as Assist Team #1, #2, and so forth. This position will essentially serve as a safety officer for and with the RIT and will take steps necessary to insure the safety of the RIT while operating in the IDLH. RITO should utilize whatever means to insure sector safety including: Use of Thermal Imaging equipment Ordering of additional resources or changing fireground tactics to support RIT operation Ordering the withdrawal or prohibiting entry into environments judged to hostile for crews to operate Section 9 - Qualifications MABAS Division 20 establishes the following RITO position requirements. It is recommended that departments establish these same requirements as minimums for internal personnel. 1. Fire Officer Designation within sponsoring department and Fire Officer 1 certification. 2. Rapid Intervention Training. 3. Knowledge in building construction. 4. Knowledge in roles/responsibilities of the RIT, IMS and deployment of RIT. 5. MABAS Division 20 policies and procedures for RIT, Fireground Safety. Section 10 - Deactivation of RIT RIT may be deactivated: After incident stabilization and when there are no existing IDLH atmospheres. After consensus is reached between the ISO, RITO. The IC will make the final determination and announce to all companies working on fireground that RIT has been deactivated. After deactivation, RIT may be reassigned to other normal company tasks. 5