Emergency Action Plan (EAP) for Coal Combustion Residuals (CCR) Units

Similar documents
2016 Annual Inspection Report

Information for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project

NOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022

November 2, 2015 at 5:15pm City Council Chambers, 3rd Floor, City Hall, 1737 Main Street Columbia, South Carolina 29201

2018 Annual Landfill Inspection Report

EMERGENCY ACTION PLAN

Chesapeake Energy Center. Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323

ORDINANCE NO.:

ENVIRONMENTAL ENGINEERING LAND SURVEYING

Report on Site Selection SR-0188 SR-0176 SR-0319 SR-0819 SR-0818 SR-0817 SR-0816 SR-0576 SR-0813 SR-0225 SR-0293 SR-0811 SR-0810 SR-0865

2018 Annual Landfill Inspection Report

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

Safety Factor Assessment Plant McDonough-Atkinson Ash Pond 3 (AP-3) and Ash Pond 4 (AP-4)

City of Waco Stormwater Management Regulations

.404 acres (approximately 17,600 square feet) Existing Zoning

Presentation Contents

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Draft Official Plan Amendment - The Port Lands

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Exposed Geomembrane Cover Systems for Coal Ash Facilities

Emergency Action Plan for the Fly Ash Dams I and II and Bottom Ash/Reclaim Dikes. Cardinal Operating Company 306 County Road 7E Brilliant, Ohio 43913

January 15, Karen O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL

Draft Rhode Island Stormwater Design and Installation Standards Manual

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

When planning stormwater management facilities, the following principles shall be applied where possible.

CLOSURE PLAN. CFR (b) Fly Ash Reservoir II. Cardinal Plant Brilliant, Ohio. August, 2016

January 8, Sean Fairfield Odell Wind Farm, LLC C/o Algonquin Power Co. 354 Davis Road Oakville, Ontario L6J 2X1 Canada

Selecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill

Johnson County I-69. Corridor Plan DRAFT DRAFT

CLOSURE PLAN. CCR (b) GERS Little Broad Run Landfill. Mountaineer Plant New Haven, West Virginia. October, 2016

Parks and Recreation Committee Agenda for the September 8th, 2014 meeting to be held in the Arena Board Room at 7pm

CHECKLIST FOR PHASE II DRAINAGE REPORT

MONITORING AND EMERGENCY ACTION PLAN FOR THE JOHN E. AMOS BOTTOM ASH POND COMPLEX ID # WINFIELD, PUTNAM COUNTY, WEST VIRGINIA

Information for File # MHK

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

CITY OF SNELLVILLE GREENWAY MASTER PLAN

2.0 PROJECT DESCRIPTION

associated environmental management

Existing Conditions and Environmental Consequences Floodplains

OHIO DEPARTMENT OF NATURAL RESOURCES (ODNR S) STATEWIDE DAM CONSTRUCTION MONITORING PLAN. Presented by: Chad R. Davis, PE

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Appendix E Preliminary Location Hydraulic Study

4.6. Low Impact and Retentive Grading

Attachment A Description of Project

PROPOSED DRAINAGE PATTERNS

Pollutant Removal Benefits

Developing Dam Operations & Maintenance Manuals

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

USF System Campus Master Plan Updates Goals, Objectives and Policies

Non-Metallic Mining Reclamation Checklist

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Technical Manual for Dam Owners Impact of Plants on Earthen Dams FEMA 534

Stormwater Program Coordinator: Title: Office Phone #: Emergency Phone #: Public Notice Coordinator: Title: Office Phone #: Emergency Phone #:

A. Regional Detention Requirements

EMERGENCY ACTION PLAN SURVEILLANCE, WARNING AND EVACUATION BRUNNER ISLAND SES ASH BASIN NO. 6 DAM DEP NUMBER D67-496

EROSION CONTROL Professional Development Training. Sean Crimmins, President Brian Barker, Southeastern Consultant

City of Larkspur. Notice of Mitigated Negative Declaration for the 285

Nova Scotia Fire Dispatch Minimum Standards (2017)

PLANNING AND NATURAL RESOURCES COMMITTEE. Public Access Conceptual Design Alternatives for the Red Barn Area of La Honda Creek Open Space Preserve

Initial Version Revision No. 0 Next Review Date: Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 6

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

CLOSURE PLAN. CCR (b) GERS Landfill Area. Pirkey Power Plant Hallsville, Texas. October, 2016

[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Information for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships)

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

water resource specialists

Severn River Sub-Watershed: BMP 09-Retrofit

SOIL EROSION AND SEDIMENT CONTROL

PUBLIC NOTIFICATION PLAN

Gloucester County PLAN SUBMITTER'S CHECKLIST

Austin Independent School District Police Department Policy and Procedure Manual

24-Hour Emergency Contact: 303-xxx-xxxx

SPILL PREVENTION AND RESPONSE PLAN

Understanding Drainage Options What s Feasible and Legal. February 2019

Austin Independent School District Police Department Policy and Procedure Manual

PHASE III DRAINAGE REPORT

APPENDIX B. Hydrologic and Hydraulic Analysis

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

Figure 1 Cypress Street Study Area Location Map

REQUEST FOR QUALIFICATIONS

CAMDEN COUNTY FIRE COORDINATOR

WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST

NAPA COUNTY PUBLIC WORKS Standards & Specifications

EMERGENCY RESPONSE PROCEDURE Operation, Maintenance, and Surveillance Plan

THE CITY OF DELAWARE, OHIO ILLICIT DISCHARGE DETECTION AND ELIMINATION PLAN

STORM WATER MANAGEMENT SYSTEMS

Appendix E Outfall Identification Standard Operating Procedure

APPENDIX B. SAMPLE EMERGENCY PROCEDURE FORMATAND INSTRUCTIONS

VIA Re: Liner Design Criteria for Existing CCR Surface Impoundments Interstate Power and Light Company (IPL) Prairie Creek Generating Station

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

City of Pittsburg: Billboard Corridor Study

EMERGENCY PREPAREDNESS - POLLUTION INCIDENT RESPONSE PROGRAM

5.0 CONTINGENCY PLAN. It is necessary to amend the plan if:

IYRS School of Technology & Trades RCRA CONTINGENCY PLAN Bristol Facility 40 CFR 265 Subpart D 29 CFR Emergency Evacuation

Information for File # MVP MMJ; Elim Care

Transcription:

Emergency Action Plan (EAP) for Coal Combustion Residuals (CCR) Units J. H. Campbell Facility Prepared for Consumers Energy Company December 2016 Barr Engineering Co. 3005 Boardwalk Street, Suite 100 Ann Arbor, MI 48108

Emergency Action Plan (EAP) for Coal Combustion Residuals (CCR) Units at J. H. Campbell Facility December 2016 Contents Certification... ii 1.0 Introduction... 1 1.1 CCR Units... 1 1.1.1 Pond A... 2 1.1.2 Bottom Ash Ponds 1-2... 2 2.0 Safety Emergency... 3 2.1 Events or Circumstances Which Represent a Safety Emergency... 3 2.2 Detection Procedures... 3 2.3 Delineation of the Downstream Affected Area... 4 3.0 Responsible Persons, Responsibilities, and Notification Procedures... 5 4.0 Annual Exercise Meeting... 6 5.0 Revisions... 7 6.0 References... 8 List of Figures Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 a Figure 5b Site Plan Dam Break Inundation Map Pond A Dam Break Inundation Map Bottom Ash Ponds 1-2 South Dam Break Inundation Map Bottom Ash Ponds 1-2 North Emergency Action Plan Notification Procedure Emergency Action Plan Notification Procedure, Non-Working Periods i

Certification I hereby certify that this emergency action plan complies with the provisions of Title 40 of the Code of Federal Regulations Section 257.73 (40CFR 257.73) and in accordance with standard engineering practice, including consideration of applicable industry standards. Further, I hereby certify this plan was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Michigan. Bethany Kelly PE #: 6201057709 December 21, 2016 Date ii

Acronyms Acronym CEC CCR CFR EAP EPA ICS JHC Description Consumers Energy Company Coal Combustion Residuals Code of Federal Regulations Emergency Action Plan Environmental Protection Agency Incident Command System J. H. Campbell iii

1.0 Introduction Consumers Energy Company s (CEC) J. H. Campbell (JHC) facility stores coal combustion residuals (CCR) in surface impoundments which are classified as significant hazard potential units. Therefore, pursuant to the United States Environmental Protection Agency s (EPA) 40 CFR Part 257 (specifically 40CFR 257.73(a)(3)(i)), this facility must prepare and maintain a written Emergency Action Plan (EAP). The purpose of the EAP is to define emergencies related to CCR surface impoundments, define responsible persons, and define notification procedures in the event of an emergency. The EAP must be completed and placed in the facility s operating record no later than April 17, 2017. 40CFR 257.73(a)(3)(i)) requires that the owner or operator of the CCR Unit (EPA 2015) to: A. Define the events or circumstances involving the CCR unit that represent a safety emergency, along with a description of the procedures that will be followed to detect a safety emergency in a timely manner; B. Define responsible persons, their respective responsibilities, and notification procedures in the event of a safety emergency involving the CCR unit; C. Provide contact information of emergency responders; D. Include a map which delineates the downstream area which would be affected in the event of a CCR unit failure and a physical description of the CCR unit; and E. Include provisions for an annual face-to-face meeting or exercise between representatives of the owner or operator of the CCR unit and the local emergency responders. The J. H. Campbell facility is located in West Olive, Michigan (shown on Figure 1). Two of JHC s CCR surface impoundments (CCR units), Pond A and Bottom Ash Ponds 1-2, have been classified as significant hazard potential CCR surface impoundments (Golder, 2016a and Golder, 2016b). The EAP provides CEC with a pre-planned and organized method to identify and implement a response to a safety emergency related to the CCR units. The CCR units are toward the interior of the property which is bordered by the Pigeon River approximately 1,500 feet to the south, Lakeshore Avenue approximately 600 feet to the west and closed or inactive ash disposal areas to the east and north. 1.1 CCR Units The two CCR units with significant hazard potential classifications are bounded by internal and perimeter dikes. The internal and perimeter dikes are used as roadways, therefore being well compacted, and typically constructed with a mixture of bottom ash and sand fill (AECOM, 2009). Perimeter dikes were constructed on native sandy soil. In accordance with 40CFR 257.73(a)(3)(i)(D) and to provide context for failure detection and response actions, these two CCR units are described in more detail in the following sections. 1

1.1.1 Pond A Pond A was completed as part of initial construction of the facility. The pond contains CCR material and water. The northwest corner of Pond A receives continuously flowing water. Effluent water flows through a pipe that penetrates the perimeter dike, discharging into an open channel ditch on the southern side of the perimeter ditch. The outfall structure consists of a 24-inch corrugated metal pipe which outlets into a concrete stilling basin. Visual observations indicate the normal/minimum freeboard is approximately 10 feet (AECOM, 2016). An overflow pipe (to mitigate a potential overtopping scenario) comprised of a 30-inch HDPE pipe inlet is also located at Pond A. Water level within the pond varies with total storage capacity estimated at 250,000 cubic yards (CY) (Golder, 2016). 1.1.2 Bottom Ash Ponds 1-2 Bottom Ash Ponds 1-2 act as temporary impoundments for bottom ash and plant process water. The ponds contain an internal dike which separates the unit into Ponds 1-2 South and Ponds 1-2 North. Overflow/emergency outlets were constructed in 1993. The pond also has an emergency overflow outlet known as the high-high emergency overflow (AECOM, 2009). Water level in the pond varies, with total dam break volume estimated at 63,000 CY for the CCR unit (Golder, 2016b). Annually, as needed, bottom ash is mechanically removed to maintain storage capacity. 2

2.0 Safety Emergency For purposes of this EAP, a safety emergency would occur if one of the subject CCR units failed or if failure were imminent. While the magnitude or severity of such a safety emergency might vary, the EAP was prepared with conservative assumptions that a catastrophic failure of the CCR units occurred. Therefore, an immediate response according to the EAP is conservative to protect the anticipated affected area. Additional actions after the initial response (cleanup, investigation, repairs, etc.) would be geared toward the actual conditions of the emergency. 2.1 Events or Circumstances Which Represent a Safety Emergency A safety emergency occurs in the event of failure of the CCR unit or if observed conditions represent imminent failure of the CCR unit as determined by a professional engineer in the GE&S Systems Engineering Infrastructure group (an internal CEC group of subject matter experts) in consultation with Qualified Personnel at the facility (Qualified Person as defined in 40CFR 257.53: a person trained to recognize specific appearances of structural weakness and other conditions which are disrupting or have the potential to disrupt the operation or safety of the CCR unit by visual observation). Imminent failure will be determined based on knowledge of the CCR unit construction and the failure modes evaluated in the Potential Failure Mode Analysis performed for the facility (AECOM, 2009). Potential failure modes include a physical dike failure (i.e., or uncontrolled seepage causing internal dike erosion and dike breach) and/or overtopping and erosion of the dike (due to a significant storm event, change in upstream operational conditions, etc.). At Pond A, a third potential failure mode is failure of the outlet pipe installed through the dike. Discharged water could erode the dike material around the pipe creating a circumstance which would breach the dike. Additionally, pipe failure (plugged, partially blocked, or collapsed pipe) could restrict the normal discharge from the pipe, creating a condition which could lead to an overtopping scenario. A final, although unlikely, potential failure mode would be failure induced by uncontrolled earthwork such as excavation at the toe of slope and/or placement of excess load on side slopes or slope crests, such as by heavy equipment activity; either of which may in some circumstances initiate slope failure. 2.2 Detection Procedures The CCR units are periodically inspected for structural and operational conditions by a Qualified Person in adherence with 40CFR 257.83(a)(1) and 257.84(a)(1). Weekly inspections are completed to monitor and document the physical condition of the CCR units. In these inspections, the Qualified Person conducts a visual evaluation for conditions such as vegetation, beaching, bulging, depressions, cracking, erosion rilling and gullies, seepage, sloughing and sliding, or unnatural settlement (CEC, 2015). Observations are reviewed by an employee of the site s Environmental & Technical Support department; if conditions of potential concern are observed they are promptly reported, following which notification and response procedures may be enacted (see Section 3.0). 3

Annual inspections are completed by a qualified Professional Engineer (CEC, 2015). This annual inspection also includes a review of available information, including weekly inspection reports, to understand trends which may be apparent based on changes documented over time. Periodic assessments are also completed as required by the CCR rule. Beyond the visual indicators that are reviewed in weekly inspections, specific items inspected for include but may not be limited to: New and/or uncontrolled slope erosion. Indicators of potential slope movement such as: o o changes in dike alignment changes in dike crest elevation Whirlpool within pond Turbid discharge water CCR unit pond level and freeboard. Indications of seepage through dikes such as: o o soft/saturated toe of slope mid-slope water discharge Uncommon variation in vegetation type and density Any plant personnel may note and report potential concerns, however, some persons on site are required to make regular observations of conditions. Security personnel conduct rounds at least once per shift (three times per day), and the fuel handling supervisor is required to walk through portions of the facility daily. These staff are trained and instructed to identify questionable conditions which are reported to the security command center or Internal Environmental & Technical Support. Finally, members of the public may report a condition or situation indicative of an emergency event to emergency dispatch (911); see Section 3.0. Currently, the CCR units do not have, nor do they require, instrumentation. 2.3 Delineation of the Downstream Affected Area Dam break analyses for the subject CCR units were completed and certified by Golder Associates. Based on the results of a dam break analysis for Pond A (Golder, 2016a), the area which would potentially be affected by a failure (i.e., the potential inundation area) is shown on Figure 2. Based on the results from the dam break analysis for Bottom Ash Ponds 1-2 (Golder, 2016b), the areas which would potentially be affected by two failure scenarios (Ponds 1-2 North and Ponds 1-2 South) are shown on Figures 3 and 4. 4

3.0 Responsible Persons, Responsibilities, and Notification Procedures In adherence with 40CFR 257.73(a)(3)(B), Figures 5a and 5b outlines the approach to responding to a CCR unit safety emergency. Figure 5a details the notification procedures during normal working hours, and Figure 5b presents the notification procedures for non-working hours (i.e., after hours, weekends, and holidays). Responsible persons, their responsibilities, and the notification order are summarized on Figures 5a and 5b to provide a quick-reference document during implementation of the EAP. In the event that a long-term response action is necessary, the Short-term On-Scene Commander will activate needed positions within CEC s Incident Command System (ICS) based upon the needs of the incident. The ICS and related programs are outside the context of this plan and the notification procedures defined herein. Pursuant to 40CFR 257.73(a)(3)(C), Figures 5a and 5b also show emergency responders, including their contact information, who will be contacted in the event of a safety emergency. 5

4.0 Annual Exercise Meeting An annual meeting will be coordinated by site Environmental & Technical Support department personnel and will include CEC representatives and local emergency responders. The CEC representatives and emergency responders included on Figures 5a and 5b will be invited to participate. 6

5.0 Revisions CEC has a program to periodically review and amend emergency planning documents. The EAP will be included in this program and reviewed, at a minimum, every five years. The current EAP, i.e. the reviewed or revised EAP, will be placed in the facility s operating record as required by 257.105(f)(6). 7

6.0 References AECOM, 2009. Potential Failure Mode Analysis (PFMA) Report for J. H. Campbell Generating Facility. AECOM Project No. 60100985. November 24, 2009. Consumers Energy Company, 2015. General Administrative Procedures G-A-601 Coal Combustion Residuals Periodic Inspections, Revision 1.0. Approval Date: October 5, 2015. Implementation Date: October 19, 2015. Consumers Energy Company, 2010. Coal Ash Landfill Site Specific Surveillance and Monitoring Plan for JH Campbell Facility. November, 2010. EPA (Environmental Protection Agency), 2015. Disposal of Coal Combustion Residuals from Electric Utilities; Final Rule. 40 CFR Part 257. Effective Date October 19, 2015. Golder Associates, Inc., 2016a. Pond A Hazard Potential Classification Assessment Report for J. H. Campbell Generating Facility. Golder Project No. 1654923. October 14, 2016. Golder Associates, Inc., 2016b. Bottom Ash Pond 1-2 Hazard Potential Classification Assessment Report for J. H. Campbell Generating Facility. Golder Project No. 1654923. October 14, 2016. 8

Figures

Croswel l St sh or e Hiawatha Dr ke Dr Oli ve Sho re Av e La Croswel l St Port Sheldon Township, MI Ottawa County $ Bottom Ash Pond 1-2S $ $ $ M arg ar et Av e Bottom Ash Pond 1-2N "High-high" Emergency Overflow Pond A (active) Barr Footer: ArcGIS 10.4, 2016-10-19 13:12 File: I:\Projects\22\70\1037\Maps\Reports\Figure1_SitePlan_JHCampbellFacility.mxd User: Mac2 Lake Michigan Pond A Outlet Aerial Source: 2014 USDA NAIP ;! N 0 400 Pigeon Lake 800 Feet SITE PLAN JH Campbell Facility Consumers Energy Company FIGURE 1 Pig e Riv on er

KEY MAP Wisconsin Michigan Michigan LEGEND Inflow Boundary Condition (Dam Breach) Outlet Boundary Condition (Lake Level) Existing Culvert 2D Grid Extents Waterbody Maximum Inundation Depth (ft) High : 3 Illinois Indiana Ohio Low : 0 Pond A 0 500 1,000 2,000 Feet NOTE(S) 1. RESULTS FROM TUFLOW 2D HYDRAULIC MODEL. REFERENCE(S) 1. BATHYMETRY IN LAKE MICHIGAN AND PIGEON LAKE ESTIMATED. 2. SERVICE LAYER CREDITS: SOURCE: ESRI, DIGITALGLOBE, GEOEYE, I-CUBED, EARTHSTAR GEOGRAPHICS, CNES/AIRBUS DS, USDA, USGS, AEX, GETMAPPING, AEROGRID, IGN, IGP, SWISSTOPO, AND THE GIS USER COMMUNITY ESRI, HERE, DELORME, MAPMYINDIA, OPENSTREETMAP CONTRIBUTORS, AND THE GIS USER COMMUNITY 3. COORDINATE SYSTEM: NAD 1983 STATEPLANE MICHIGAN SOUTH FIPS 2113 FEET INTL, DATUM: NORTH AMERICAN 1983 CLIENT CONSUMERS ENERGY PROJECT J.H. CAMPBELL GENERATING COMPLEX CCR HAZARD POTENTIAL CLASSIFICATION ASSESSMENT TITLE DAM BREAK INUNDATION MAP BOTTOM ASH POND A CONSULTANT YYYY-MM-DD DESIGNED PREPARED REVIEWED 2016-09-22 TH TH SJS APPROVED SJS PROJECT NO. REV. FIGURE 1654923 E 2 FIGURE 2

KEY MAP Wisconsin Michigan Michigan LEGEND Inflow Boundary Condition (Dam Breach) Outlet Boundary Condition (Lake Level) Existing Culvert 2D Grid Extents Waterbody Maximum Inundation Depth (ft) High : 3 Illinois Indiana Ohio Low : 0 Bottom Ash Pond 1-2 North Bottom Ash Pond 1-2 South 0 500 1,000 2,000 Feet NOTE(S) 1. RESULTS FROM TUFLOW 2D HYDRAULIC MODEL. REFERENCE(S) 1. BATHYMETRY IN LAKE MICHIGAN AND PIGEON LAKE ESTIMATED. 2. SERVICE LAYER CREDITS: SOURCE: ESRI, DIGITALGLOBE, GEOEYE, I-CUBED, EARTHSTAR GEOGRAPHICS, CNES/AIRBUS DS, USDA, USGS, AEX, GETMAPPING, AEROGRID, IGN, IGP, SWISSTOPO, AND THE GIS USER COMMUNITY ESRI, HERE, DELORME, MAPMYINDIA, OPENSTREETMAP CONTRIBUTORS, AND THE GIS USER COMMUNITY 3. COORDINATE SYSTEM: NAD 1983 STATEPLANE MICHIGAN SOUTH FIPS 2113 FEET INTL, DATUM: NORTH AMERICAN 1983 CLIENT CONSUMERS ENERGY PROJECT J.H. CAMPBELL GENERATING COMPLEX CCR HAZARD POTENTIAL CLASSIFICATION ASSESSMENT TITLE DAM BREAK INUNDATION MAP BOTTOM ASH PONDS 1-2 SOUTH CONSULTANT YYYY-MM-DD DESIGNED PREPARED REVIEWED 2016-09-22 TH TH SJS APPROVED SJS PROJECT NO. REV. FIGURE 1654923 E 3 FIGURE 3

KEY MAP Wisconsin Michigan Michigan LEGEND Inflow Boundary Condition (Dam Breach) Outlet Boundary Condition (Lake Level) Existing Culvert 2D Grid Extents Waterbody Maximum Inundation Depth (ft) High : 3 Illinois Indiana Ohio Low : 0 Bottom Ash Pond 1-2 North Bottom Ash Pond 1-2 South 0 500 1,000 2,000 Feet NOTE(S) 1. RESULTS FROM TUFLOW 2D HYDRAULIC MODEL. REFERENCE(S) 1. BATHYMETRY IN LAKE MICHIGAN AND PIGEON LAKE ESTIMATED. 2. SERVICE LAYER CREDITS: SOURCE: ESRI, DIGITALGLOBE, GEOEYE, I-CUBED, EARTHSTAR GEOGRAPHICS, CNES/AIRBUS DS, USDA, USGS, AEX, GETMAPPING, AEROGRID, IGN, IGP, SWISSTOPO, AND THE GIS USER COMMUNITY ESRI, HERE, DELORME, MAPMYINDIA, OPENSTREETMAP CONTRIBUTORS, AND THE GIS USER COMMUNITY 3. COORDINATE SYSTEM: NAD 1983 STATEPLANE MICHIGAN SOUTH FIPS 2113 FEET INTL, DATUM: NORTH AMERICAN 1983 CLIENT CONSUMERS ENERGY PROJECT J.H. CAMPBELL GENERATING COMPLEX CCR HAZARD POTENTIAL CLASSIFICATION ASSESSMENT TITLE DAM BREAK INUNDATION MAP BOTTOM ASH PONDS 1-2 NORTH CONSULTANT YYYY-MM-DD DESIGNED PREPARED REVIEWED 2016-09-22 TH TH SJS APPROVED SJS PROJECT NO. REV. FIGURE 1654923 E 2 FIGURE 4

Plant Personnel Observes emergency condition Public Observation of potential emergency condition Security Personnel Observes emergency condition Emergency Dispatch (911) Environmental & Technical Support Environmental personnel determines if failure has already occurred (517.788.2980) Has Failure Occurred? No Yes GE&S Systems Engineering - Infrastructure Technical expert makes imminent failure determination in consultation with qualified personnel at the facility (517.206.8282) Is Failure Imminent? No Maintenance or Repair Procedures No emergency response necessary 1. Emergency Dispatch (911) Yes Emergency Responder Notifications 2. National Response Center (NRC) (800.424.8802) 3. Michigan Pollution Emergency Alert System (PEAS) (800.292.4706) 4. MDEQ Grand Rapids District Office NPDES Permit MI0001422 (616.356.0500) 5. US EPA Region V Spill Phone (312.353.2318) JHC Plant Control Room Operator Receives notification and engages plant environmental manager (616.738.3425) Security Command Center Operator Receives call from security personnel and notifies plant control room of emergency condition (616.738.3210) Environmental & Technical Support (517.788.2980) Makes or coordinates notification calls to external (first priority) and internal contacts (in the numbered, priority order, as shown). The caller should collect the following information and provide it to the notified parties: -The release is coal combustion residual material from the facility s coal ash surface impoundment (provide CCR unit identification, if known) -Location of the breach and magnitude of the discharge (if known) -If the release is ongoing or if the potential for additional released material is unlikely -The affected or anticipated to be affected water bodies Internal Notifications 6. Short-term On-Scene Commander JHC Shift Supervisor who is the leader of Emergency Response Actions and initiates Incident Command System (ICS) if necessary (616.836.9917) 7. Plant Control Room Operator Coordinates response impacts to generating units (616.738.3425) 8. JHC Superintendent Backup to Short-term On-Scene Commander (616.738.3425 ask to be transferred to on-call superintendent) 9. Site Business Manager Supports allocation and procurement of response resources, notifies Plant Manager (989.239.8120) 10. Environmental & Technical Support Provides technical support and makes additional environmental contacts as appropriate (517.788.2980) 11. Environmental Services Coordination of cleanup contractors and disposal (517.788.2083) 12. JHC Environmental Lead Provides environmental technical assistance and assists with any potential environmental restoration (616.738.3467) 13. Site Security Lead Coordinates site security with corporate security (616.738.3210) WORKING HOURS 6. Ottawa County Local Emergency Planning Committee (616.738.4000) 14. Public Affairs Coordinates communications to public (231.798.0184) Figure 5a EMERGENCY ACTION PLAN NOTIFICATION PROCEDURE Pond A and Ponds 1-2 J. H. Campbell Facility West Olive, MI

Plant Personnel Observes emergency condition Public Observation of potential emergency condition Security Personnel Observes emergency condition On Call Shift Supervisor Determines if failure has already occurred (616.836.9917) Has Failure Occurred? No Yes GE&S Systems Engineering - Infrastructure Technical expert makes imminent failure determination in consultation with qualified personnel at the facility (517.206.8282) Is Failure Imminent? No Maintenance or Repair Procedures No emergency response necessary 1. Emergency Dispatch (911) Yes Emergency Responder Notifications 2. National Response Center (NRC) (800.424.8802) 3. Michigan Pollution Emergency Alert System (PEAS) (800.292.4706) 4. MDEQ Grand Rapids District Office NPDES Permit MI0001422 (616.356.0500) 5. US EPA Region V Spill Phone (312.353.2318) Emergency Dispatch (911) JHC Plant Control Room Operator Receives notification and engages plant environmental manager (616.738.3425) Security Command Center Operator Receives call from security personnel and notifies plant control room of emergency condition (616.738.3210) On Call Shift Supervisor or their Designee (616.836.9917) Makes or coordinates notification calls to external (first priority) and internal contacts (in the numbered, priority order, as shown). The caller should collect the following information and provide it to the notified parties: -The release is coal combustion residual material from the facility s coal ash surface impoundment (provide CCR unit identification, if known) -Location of the breach and magnitude of the discharge (if known) -If the release is ongoing or if the potential for additional released material is unlikely -The affected or anticipated to be affected water bodies Internal Notifications 6. Short-term On-Scene Commander JHC Shift Supervisor who is the leader of Emergency Response Actions and initiates Incident Command System (ICS) if necessary (616.836.9917) 7. Plant Control Room Operator Coordinates response impacts to generating units (616.738.3425) 8. JHC Superintendent Backup to Short-term On-Scene Commander (616.738.3425 ask to be transferred to on-call superintendent) 9. Site Business Manager Supports allocation and procurement of response resources, notifies Plant Manager (989.239.8120) 10. Environmental & Technical Support Provides technical support and makes additional environmental contacts as appropriate (517.788.2980) 11. Environmental Services Coordination of cleanup contractors and disposal (517.788.2083) 12. JHC Environmental Lead Provides environmental technical assistance and assists with any potential environmental restoration (616.738.3467) 13. Site Security Lead Coordinates site security with corporate security (616.738.3210) NON-WORKING HOURS 6. Ottawa County Local Emergency Planning Committee (616.738.4000) 14. Public Affairs Coordinates communications to public (231.798.0184) Figure 5b EMERGENCY ACTION PLAN NOTIFICATION PROCEDURE NON-WORKING PERIODS Pond A and Ponds 1-2 J. H. Campbell Facility West Olive, MI