Antarctic-Unit Cooler/Air Cooler

Similar documents
Directions for use. CPS/XPS - Condensor / Dry cooler

Dry cooler Type XP120

1. Description INSTRUCTION FOR BLAST COOLER TYPE COOL 250. Material

1. Description INSTRUCTION FOR AIR BLAST COOLER TYPE COOL 450

Alfa Laval Arctigo ID

AXUS - SC Short Cased Axial Flow Fans Installation and Maintenance

40LM Hz INSTALLATION, START-UP AND SERVICE INSTRUCTIONS CHILLED WATER FAN COIL UNIT

Blow through unit coolers LEX. Standard coolers for cooling & freezing rooms

Transformer oil coolers BETA & CETA

Fincoil FMP and FMPG. Air coolers and liquid circulated air coolers

Panther Fan Coil Units

BUILT-IN FRIDGE-FREEZER AND BUILT-IN FROST FREE FRIDGE-FREEZER

Installation, Operation and Maintenance Instructions Document Ref:

Installation, Operation and Maintenance Instructions Document Ref:

Copperad. Copperad Fan Convectors (November 2005 onwards) Installation, Operation and Maintenance Instructions To be retained by the user

The ideal cooler at a competitive price KELVION TEC COMMERCIAL AIR COOLER

Installation Instructions

Installation, Operation & Maintenance Instructions Document Ref:

New Industrial Dual Flow Unit Coolers

HEATING & COOLING COIL PRODUCTS

Air cooler VNS Agricultural

SLS 1202 to With or without total heat recovery. u Air Cooled Screw Chillers. 262 to 916 kw. Engineering Data Manual

Installation, Operation, and Maintenance Information

AP-EH500-L/RQA9837. Installation Guide

Table of Contents. Specifications... page 2. Installation... page 3. Customizing... page 4. Reversing door swing... page 5

361 RFD DOORS 2 \ Item # Part # - - Description. Description. Item # Part #

CMA CONDENSING UNITS FOR OUTDOOR INSTALLATION INSTALLATION AND OPERATION MANUAL

Compact CUBIC. Air cooler GSF. Highly efficient compact air cooler Optimal for commercial refrigeration. HFCs 1 55 kw

Technical Guide SUNLINE 2000 DESCRIPTION ACCESSORIES FIELD INSTALLED SPLIT-SYSTEM EVAPORATOR BLOWER K4EU NOMINAL TONS (WORLD 50 HZ)

Ocelot Fan Coil Units

Topvex SR03, SR04, SR06 Compact Air Handling Unit

Air cooler BC50 Blast freezer

WIRING DIAGRAMS AND OTHER RELAVENT LITERATURE WITH THE END USER. access panel Fan speed and on/off switches. Discharge spigot. Fan/motor.

F17W44_MFB_F_EN INSTALLATION INSTRUCTIONS

VANGUARD 245 POST-MIX DISPENSER

Comfort Ceiling Fan Coil System INDULVENT ec. Draught-free ambient air distribution with cooling capacity up to 2600 W

Operating Instructions

Cleaning unit for coolant. :_decftez`_>r_fr] Book No.: V2

INSTALLATION and OPERATION INSTRUCTIONS

TECHNICAL DATA & SERVICE MANUAL

30GH Air-Cooled Liquid Chillers 30GH Nominal cooling capacity kw

Operation & Maintenance Manual

52 CEILING FAN READ AND SAVE THESE INSTRUCTIONS FAN RATING AC 120V.

Scotsman Technical Training. CU50 Cube Ice Machine

INDEX. Granita Machine. Operation a nd Instruction Manual

Goedhart VNS. Air coolers for agricultural applications Cu/Al R404A - CO 2. engineering for a better world. GEA Heat Exchangers

Küba SG commercial

Swaging Machine Type H50-46ECO

INFRARED IP55 HEATER INSTRUCTIONS FOR: MODEL:- QZWP45N 1. SAFETY INSTRUCTIONS

TECHNICAL, OPERATING & INSTALLATION MANUAL TC 15, 33, 52 AIR COOLED PACKAGED WATER CHILLERS

Technical Data ACN Series. Modular Air Cooled Condensers. 68 kw 155 kw. Extra Long Life Epoxy Coated Outdoor Coil. Nominal Cooling Capacity

Topvex SF02-SF12 Air Handling Unit

KITCHEN EXHAUST FAN GLEC-6 INSTALLATION AND MAINTENANCE

SPLIT-SYSTEM EVAPORATOR BLOWERS K2EU060, K4EU090, K3EU120 & K1EU180 5 Thru 15 Nominal Tons DESCRIPTION ACCESSORIES FIELD INSTALLED

MECHANICAL INTEGRITY INSPECTIONS OF AIR COOLERS

Beverage Air IMPORTANT

Daikin Direct Expansion (DX) Cooling Coils

OPERATION AND MAINTENANCE INSTRUCTIONS FOR ROOF TOP HEAT PUMPS AND CEILING PLENUMS

EXPLODED VIEWS & PARTS LISTS

Bona Portable DCS Manual and safety instructions

GCG-10. Instruction Manual. G-Series Cooler. Manual is for the following models: GCG-10-N33EB G-10-N33EB UPRIGHT COOLER

30GT FLOTRONIC AIR-COOLED CHILLERS

Installation Operation Maintenance. Ductable water unit FWD FWD-SVX01D-E4

CP-200 S&T. CP Warewash Pump Instruction & Operation Manual Speed & Time , Rev1.0, , Page 1 of 8

Alfa Laval Arctigo IS

MRXBOX95-LH1/LH2. Mechanical Ventilation Unit with Heat Recovery for Loft Mounting Installation and Maintenance. Spigot 4.

STC Series Twin Unit Coolers (E329630_A)

DIRECT DRAW BEER COOLERS Installation, Operation and Maintenance Instructions

INSTALLATION, OPERATION, SERVICE & PARTS SUPPLEMENT for

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

G Series. G Series Air Coils Installation ti Manual ENCASED/UNCASED AIR COILS. Geothermal/Water Source Heat Pumps R-410A Refrigerant 2-5 Ton

in/out connections outer Ø 25 bar (363 psi) 200 kg/h SS '000 (2.12 HP) 300 kg/h CU (661 lb/h) (3.18 HP) 300 kg/h SS (661 lb)

Compact SLIM. Air cooler GASC. Air coolers in a flat design with forced draught fans Optimal for commercial cooling. HFCs, CO 2 0.

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST PLYMOUTH BELVEDERE

RCM-77. Instruction Manual. G-Series Cooler. U.S. Patent No. 8,215,125 RECHARGE COLD MERCHANDISER

OPERATION AND MAINTENANCE INSTRUCTIONS FOR ROOF TOP HEAT PUMPS AND CEILING PLENUMS

INSTALLATION & SERVICE BOOKLET. Juice Machine - Postmix JM 6 JM 7

IMAGE V. Parts and Service Manual

TECHNICAL MANUAL CX(E) SPLIT SYSTEMS. Tel: Fax:

½ Monitored Pneumatic Valves On Series Ported Manifold

L3MGB. THREE DECK MEAT/DELI MERCHANDISERS Medium Temperature Self Serve Display Cases

High Profile Evaporator

SM/SV-Space Master Unit Coolers (E R.0)

DRINKING WATERCOOLER MANUAL. Website:

Owner's Manual. (200 Gallon Lawn Service Skid Sprayer) Technical Specifications. Operation. General Information. Warranty/Parts/Service

52 DorsetTM. Instruction Manual. Basic Function Wall Control System Included. A Kichler Decor ceiling fan

Refrigerator BRFB1920SS BRFB1900FBI BRFB1920FBI

ChicagoTM. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.

OPERATING INSTRUCTIONS

SP-RANGE INSTALLATION AND OPERATING MANUAL PLEASE LEAVE WITH OPERATOR SP12 & SP25 SERIES 4

CHH - Active Chilled Beam. Halton CHH. Active Chilled Beam

CENTRIFUGAL AIR CONDENSERS

BOTTOM MOUNT REFRIGERATORS & FREEZERS Installation, Operation and Maintenance Instructions

SERVICE INSTRUCTION. DYNAMIC COOLING with 0 zone REFRIGERATION. Fridge/freezer with. Publication number

TECHNICAL DATA & SERVICE MANUAL

4A6H5049E1000B 208/230/1/ /8 7/8 7/8 7/8 DURATION 208/230/1/ /230/1/ SPINE FIN 13 LBS., 10 OZ. YES

XB-EFA-8L-BK & XB-EFA-8R-BK

Topvex SR 09, 11, Topvex TR Compact Air Handling Units

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST CHEVROLET NOVA

CENTRIFUGAL FAN IN SCROLL CASING. Helix S-Vent OPERATION MANUAL

Transcription:

6- Installation, Operating & Maintenance Instructions

Declaration by the Manufacturer, Annex II B As defined by the EC Machinery Directive (MD) 98/7/EC, the Low Voltage Directive (LVD) 006/95/EC and the EMC Directive 00/08/EC. Type of machinery Heat Exchangers supplied with direct cranking fans Productdescription Unit Coolers Antarctic, EVFI, EVDL, DDX Air cooled Condensers CPS, CPM, DCP Air Coolers Antarctic, CBFI, CBDL, DDB Dry Coolers XPS, XPM, XP, DXP developed and designed in accordance with the MD 98/7/EC, LVD 006/95/EC and EMC Directive 00/08/EC on the own responsibility of: Company Asarums Industri AB S. Industrivägen - SE 7 50 ASARUM Harmonized Standards: EN ISO 00-:00 EN 6000-6- EN ISO 00-:00 EN 6000-6- EN ISO 857:008 EN 6000-6- EN 600-:006 EN 6000-6- EN ISO 87 The product is not allowed to put in operation until the machine or system, which it is to be incorporated or which it is to be a part of, is in accordance with the Machinery Directive 98/7/EC.The compliance with EMC Directive 00/95/EC is valid if the product is connected directly to the main supply. If the product is integrated in a system or combined with other products (e.g. other controllers) the system manufacturer is responsible for compliance with EMC Directive 00/95/EC for the complete system. Date : 008--0 Signed by : Title: Tord Engberg R&D Manager

INDEX P Summary description Receiving of goods 5 Designation system 6 Installation 7-9 Preventive maintenance 0-

Summary description General description The product is suitable for cold-storage/deep-freeze rooms in commercial plants. The construction provides for close installation on the ceiling, reducing the risk of contamination on the upper surface of the product. The coolers are provided with axial fans. The standard model casing for the NE0,0,5 are manufactured from white enamelled sheet aluminium. NE56 & 6 Industrial models use casing manufactured from plain plastic protected Aluminium plate. Electric heating rods, drain tray elements and fan ring heaters are single phase and rated at 0 V. Important! Avoid unnecessary opening of doors to cold-storage/deep-freeze rooms. Hot air flowing into the room causes icing on the finned coils. Free air circulation within the cold-storage/deep-freeze room is necessary in order to obtain maximum cooling effect. The finned surfaces should be clean and free from dust and ice. 5 6 9 8 0 7 Pos Denomination Pos Denomination Pos Denomination Bracket 5 Cooling coil 9 Terminal box (heating rod) Terminal box (fan) 6 Axial fan 0 Condensate connection Electric heating rod 7 Screws (NE0-5) Drain tray Fan ring heater 8 Drain tray heater Hinge (NE56-6)

Receipt of goods and installation Prior to leaving the factory the product went through a thorough quality control and serviceability. If the product, in spite of this control, should be defective or suffer transport damage, the sales and haulier representative should be contacted immediately.. The product should be transported to and placed in position before removing the straps.. Cut the straps off () and discard the lid of the packing (). NE0/0/5 uses cardboard packing. NE56/6 & NE5 with Air sock use a wooden crate.. NE0/0/5 remove the cardboard () 6 undo the screws () and carefully invert product. NE56/6 & NE5 with Air sock lift up the product onto the enclosed pallet with the intended hoist.. Lift up the product onto the enclosed pallet with the intended hoist. 5. Mount the product using the factory provided brackets (5). Then lower the pallet (packing) with the hoist (8). When the product is packed in wooden a case (7) and provided with supporting frame (6) these should be removed and the enclosed plastic plugs should be replaced in the holes. 5 7 8 5

Designation System Antarctic Tube diam. E= mm Fan diam. in cms Lines of fans # fans per line Coil rows deep Fin pitch code F=.0 / M= 7.0 mm N E 0 F X D P 0 50 CU AL x 5/8 /8-EN+... Product application B =Air Cooler, X = Unit Cooler Product variant D = Draw thru, S = Air sock Fan speed (poles) Poles rpm @50 Hz rpm @60 Hz 00 680 6 900 080 Nominal Motor winding connection P= Single speed, DY= Delta/Star connected Delta YD= Star/Delta connected Star Phase = Single phase = Three phase Voltage 00 = 00 V, 0 = 0 V Frequency 50 = 50 Hz, 60 = 60 Hz # circuits Tube material code Fin material code # sets of connections Inlet conn. size Outlet conn. size Optional extras EN= Coil and drain tray (chilling) EF= Fan ring (recommended for freezing application) ET= Drain tray only EH= Coil and drain tray (freezing) GT= Hot gas defrost only in drain tray ID = Insulated drain tray 6

Installation The installation instructions below should be read together with the brochure, which contains the technical description. Location of coolers It is very important to locate the product according to the minimum dimensions below to avoid any air circulation issues plus ensure maintenance access. N.B. Remember to remove the protective plastic from all products prior to starting. A min 500 mm A+ 00 mm min 0,6 C G C + G C Air direction 7

Installation The installations should only be carried out by authorised personnel according to national standards. Connection of fan NE0 is via fixed cables connecting directly to single-phase 0 V circuit breaker(s). NE0/5/56/6 are connected as follow.. Undo the screws () with a screw driver and remove the cap (). Cable is connected through fitting () on the lower side of the cover. Connect according to electric instructions in the cap. I Setting of overload protection The diagram to the right, shows the setting of overload at different room temperatures. Standard motor current data rated at -0 C.,0 0,9 E.g. at a room temperature of 0 C the overload should be set to 0,9 x I rating data 0,8 0 0 +0 0 0 C NE with Air sock motor current rated at 0 C. Connection of electric heating Turn the screws () anticlockwise one turn, ( on the short side and on the long side) and remove the end cover. Insert the cable through the upper edge on the long side and connect the electric heating to the terminal box. 8

Installation Pipework installation of a DX unit cooler The product should be charged with the quantity and type of refrigerant stated by the installation engineer. The connection pipework is located at one end of the product and accessed by opening the end cover as described on page 8. Expansion valve is connected on pipe (). Suction gas line is connected on pipe (). Suction pressure tapping (). UT 6 Pipework installation of air cooler The product should be filled with the quantity and appropriate brine stated by the installation engineer. The connection pipework is located at one end of the product and accessed by opening the end cover as described on page 8. An air vent is placed on the high point of the collecting manifold (). The supply pipework is connected to pipe (5). Return pipework is connected to pipe (6). IN 5 Connection of drain tray Connection of condensate drain (7) to the drain tray (8) is via a threaded connection of a size specified in the technical brochure. Connection of Air sock The Air sock (9) is mounted on to the fan spigot with a retaining clip (0). Refer to the technical brochure for the applicable dimensions. 9 0 8 7 9

Preventive maintenance Caution! Ensure that the power supply has been isolated Changing Fan NE0 Disconnect the cable from the fan at the circuit breaker. NE0/5/56/6 Disconnect the electric connections in the distribution box on the fan. Undo the bolts () ( pcs) including washers and unfasten the fan (). NE with Air sock. Disconnect the electric connection in the distribution box on the fan. Dismantle the Air sock. Undo the bolts () (6-8 pcs) including washers and unfasten the fan (). Fan set-up Insert the screws loosely, including the washers, into the two upper holes (). Centre the fan and fasten the screws at the bottom. N.B. Ensure the fan-shaped washer () is between washer (5) and fan grille. Electric defrosting Electric heating rods, drain tray elements & fan ring heaters are single-phase 0 V and connected to the terminal box on the side of the cooler according to separate wiring diagram. The electric rods are made of stainless material SS. Change of electric heating rod Disconnect the electric cables from the distribution box. Then undo the lock 5 5 5 washer () and pull out the heating rod (5). Assemble the heating rod in reverse order. Change of fan heating coil Disconnect the electric cables from the distribution box. Then undo the plate (6), which hold the heating coil. Assemble in reverse order. Standstill During long stoppage periods, the fans must be run at least once a month. The fans should be run until the motor(s) have reached operating temperature i.e. for approximately 5 minutes. Change of drain tray heating elements Disconnect the electric cables from the distribution box. Then undo the plates (7) which hold the heating elements. Assemble the heating element in reverse order. 7 6 0

Preventive maintenance Caution! Ensure that the power supply has been isolated. Cleaning of cooling coil. Disconnect the drain pipe from the drain tray connection (). Caution! Always use protective gloves when cleaning or working with the finned surface.. NE0/0/5 Undo the screws (), and lower the drain tray. NE56/6 loosen the screws in the shackle lock () and remove the shackles, then lower the drain tray ().. NE56/6 Dismantle the inner drain tray by removeing the star screws (5). Then lower the inner tray on the hinges provided.. Clean the inner & outer drain trays and the cooling coil with water and a nonaggressive detergent that does not corrode aluminium or copper. Ensure that the drain pipe is not clogged. Rinse and leave to dry. Assembly of inner & outer drain trays. Secure the inner drain tray with the star screws (5).. NE56/6 Reposition the outer tray and insert and fasten the shackle locks. NE0/0/5 Re-fit screws and fasten.. Reconnect the drain pipe (). 5

009-0-0