Non-Parallel Generation Application

Similar documents
SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES

GPS 140 NEC Requirements for Generators. Professional Development Seminar Series NEC Requirements for Generators

SECTION AUTOMATIC TRANSFER SWITCHES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

FACILITY CONNECTION STANDARD

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

CHAPTER 20 SERVICE EQUIPMENT

Energy Commander Paralleling Switchgear

UFGS (August 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UC700 EMERGENCY TRANSFER SYSTEM SPECIFIER S HANDBOOK. 40 Dale Street West Babylon, NY Ph: Fx:

ENGINE GENERATORS AND ACCESSORIES

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

SECTION GENERATOR PARALLELING CONTROLS

SECTION LOW VOLTAGE LIGHTING CONTROLS

16620 EMERGENCY POWER SYSTEMS

M2500 Engine Controller Installation Manual

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

DOOR MONITORING/DURESS SYSTEM

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

Guide Specification Model CTG Automatic Transfer Switch

AL800ULADA. NAC Power Extender. Installation Guide

DIRECTIVE NO: D-B

AL600ULADA. NAC Power Extender. Installation Guide

MASTER PRESSRE MAINTANENCE CONTROLLER. Models PMCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Booster Power Supply Manual

TT /97. Features INSTALLATION INSTRUCTIONS. Horn. Lamps

Application Note. Using XPoint Wireless Devices with Emergency Lighting. 1 of 16

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

AL802ULADA. NAC Power Extender. Installation Guide. (See Application Guide for additional information) Rev

Elevator Control ES Switch

CONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA

Heatrix Electric Duct Heater HXOB Installation Instructions

Installation Guide for AL800UL-ADA. NAC Power Extender. Rev

SECTION Fire Pumps

Model LTN-3R Outdoor Rated Uninterruptible Power System Single Phase

BULLETIN. Temperature Controls (VAV) (3/11/2010)

EG Controls. SLIMVIEW 120 VOLT FLOAT SERIES DUPLEX PUMP CONTROL PANEL SPECIFICATION for CITY OF E G

User s Manual and Warranty Information ThyssenKrupp Access

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION FIRE ALARM SYSTEM

Powerohm Resistors Digital HRG System

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS

Installation Instructions

DRC12FR DRC12FR347. Dynalite. Install Guide

1. Delete BID FORM in its entirety and replace with the BID FORM attached to this Addendum.

AFCI. RECEPTACLEFAQs. What is an arc fault? What causes arc faults?

Emergency power automatics MS-2. High resistance to shock, vibrations and transients. All output are 2A relay contacts

B. Section Transfer Switches: Automatic transfer switch.

2015 NATURAL GAS EFFICIENCY REBATE APPLICATION

ASCO Series 185 Power Transfer Switches

SECTION 1-1 SAFETY PRECAUTIONS

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

USER MANUAL MODEL READ ALL INSTRUCTIONS BEFORE PROCEEDING. 5-2 Day Programmable Multi-Stage 2 Heat/1 Cool Heat Pump Digital Thermostat

WARNING Important Safety Information

Fire alarm system specification for multiple tenant retail buildings

INSTALLATION, OPERATION AND MAINTENANCE

Step by Step Detailed Procedure Expected Result Observations Verify power off at all loads on emergency power. Verify all loads have power.

Baldor Electric ProSPEC MASTERFORMAT SPECIFICATION 10/26/05

CONTENTS AUTOMATIC TRANSFER SWITCHES

RE-PR3-E-27 3-Phase Panel Mount 27kW

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL

Safety Instrumented Systems The Smart Approach

Commercial Water Source Heat Pump Water Heater Operations and Installation Manual

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

INSTALLATION INSTRUCTIONS FOR 9330F4552 FREE DELIVERY PLENUM KITS

EMERGENCY POWER SYSTEMS

A. This Section includes transfer switches rated 600 V and less, including the following:

USER MANUAL WARNING! CONTENTS MODEL 1 SPECIFICATIONS READ ALL INSTRUCTIONS BEFORE PROCEEDING 2 INSTALLATION

PUMP CONTROL CENTER (PCC)

SUGGESTED SPECIFICATION For Series 300 Manual Transfer Switches (3MTS)

Temporary LPG Heat for Construction Sites Work At Risk and Inspection Information Packet

Management Standard: Fire Safety

PART GENERAL 1.01 SECTION INCLUDES

Commercial Air Source Heat Pump Water Heater Operations and Installation Manual

2019 Landscape Awards

PGR-8800 TECHNICAL FAQ

DAY/TIME Button: Selects hour, minute and day setting.

Laboratory Enclosed Scroll Air Compressor System with Premium NFPA Controls

Operational Overview and Controls Guide

CALTECH Pasadena, CA

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM

Muskogee Public Schools. Lockout/Tagout. Program

ILLUMINATOR EM. CENTRAL LIGHTING INVERTER 1000 VA/W through 2800 VA/W 98% Efficiency!

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016

Project: Customer: Engineer: Pump Manufacturer: Model GPY + GPU. with Automatic Power Transfer Switch

GE Energy Digital Energy. Zenith Energy Commander Paralleling Switchgear

Appendix B9 Geothermal Unit Cause Codes

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems

Tri-Stack Smart System

DAY/TIME Button: Selects hour, minute and day setting.

ELECTRIC FIRE PUMP CONTROLLER

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL

Guide Specifications

Product Specifications Auto Restart Main Power Distribution Panel

SECTION 1-1 SAFETY PRECAUTIONS DOUBLE ARM MIXER CHAPTER 1: SAFETY

National Electrical Code

Burner Management and Combustion Control. Copyright 2014 Rockwell Automation, Inc. All Rights Reserved.

Transcription:

Non-Parallel Generation Application Use for: Connection of Electric Generation between the Ameren Illinois Utilities (AIU) Distribution System and a Generator that will operate with an: Open Transition (Category 1) or Synchronized Closed Transition (Category 2) Please mail the completed application to: AIU Business and Solutions Center Attn: Customer Generation Team 300 Liberty Street Peoria, IL 61602

Customer Information Name: Mailing Address: City: State: Zip Code: Service/Street Address (if different from above): City: State: Zip Code: Daytime Phone: Evening Phone: Fax: E-Mail: Company Account No. (from Utility Bill): Installation Information/Hardware and Installation Compliance Person or Company Installing: Contractor s License No. (if applicable): Approximate Installation Date: Mailing Address: City: State: Zip Code: Daytime Phone: Evening Phone: Fax: E-Mail: Person or Agency Who Will Inspect/Certify Installation:

Customer s Generator & Transfer Switch System Information Manufacturer Nameplate AC Power Rating: kw and Voltage: V. System Type: (describe) Service/Street Address: Transfer Switch Equipment Manufacturer: Transfer Switch Equipment Model No.: Are System Plans & Specifications Attached? Yes No Existing Electrical Service Capacity: Amperes Voltage: Volts Service Character: Single Phase Three Phase Location of Lockable Visible Open/Main Disconnect Device (describe): Type of Connection Customer is proposing to connect generation that falls under the following category: Category 1 Open Transition Category 2 Synchronized Closed Transition of Less than 0.1 Seconds Signature I hereby certify that, to the best of my knowledge, all the information provided on this Generator Connection Request Form is true and correct. After the installation and testing of the and upon proper submission or resubmission of the documentation required by Ameren, I agree to operate the in compliance with the attached Terms and Conditions. Customer Signature: Date: Printed Name:

Terms and Conditions for Connection 1) All UL, NEC and building code requirements shall be followed. 2) A visible disconnect between the Ameren system and the is required for the safety and protection of Ameren personnel. The visible open disconnect device shall be accessible to Ameren personnel at all times. 3.1) An open transition between the Ameren system and customer (s) can be achieved with an integral transfer switch with mechanical interlocking provisions; a pair of Kirk key-interlocked disconnect switches or circuit breakers; or a pair of circuit breakers with electrical interlocking provisions, provided that the interlocking scheme is backed up with hard-wired protection directly from the breaker auxiliary contacts. 3.1.1) If the open transition between sources is being achieved via automatic transfer means, then the following shall apply: Voltage-sensing capability or other means for detecting the loss and recovery of the Ameren source shall be required. A manual bypass (i.e. auto disable) feature is not required, but it is highly recommended. 3.2) A closed transition between sources can be achieved with an Integral automatic transfer switch set, solid blade disconnects or circuit breakers, then the following shall apply: 3.2.1) The duration of synchronized closed transition between the sources should be less than 100 milliseconds during startup and shutdown of the unit. 3.2.2) Synchronizing capability shall be required in order to safely tie the sources together. 3.2.3) A provision for a transfer failure scheme; which will cause the opening of one of the sources within two (2.0) seconds of the start of the paralleling condition. 3.2.4) An undervoltage protection provision shall be required which prevents a closed transition transfer in the event that the Ameren source is not present. 3.2.5) A manual bypass (i.e. auto disable) feature is not required, but it is highly recommended.

3.3) Ameren defines a programmable logic controller (PLC) as any solid-state microprocessor-based controller that needs to be programmed by the user with the logic necessary for it to supervise and execute the control functions for which it is being utilized. If a PLC is used the following shall apply: 3.3.1) A backup control scheme independent of the PLC shall be provided to prevent the extended paralleling operation. 3.3.2) The PLC and backup control logic shall be enabled when the transfer scheme is placed in automatic operation and disabled when the transfer scheme is placed in manual operation. 3.3.3) The automatic transfer switch shall be supervised by the status of the disconnect switch, circuit breaker or bypass switch controls so that if any of these switches is manually tripped, the PLC control will disable automatic transfer. 3.3.4) The PLC shall not lose power at any time as a direct result of automatic transfer switching operations. 4) Ameren does not require that the transfer equipment be capable of switching or disconnecting the grounded circuit conductor (neutral). 5) Signage shall be provided in the immediate vicinity of Ameren s revenue meter indicating that; Backup Generation Present Lockable Main Service Disconnect Available for Isolation. Similarly, provide signage at the disconnect device itself; Lockable Main Service Disconnect for Isolation from Generator. The sign shall have minimum dimensions of 5 x 7, be permanently secured with bolts, and shall be both waterproof and ultraviolet resistant. 6) Generator owner/operator must agree not to operate the in parallel with Ameren s electric system other than as indicated in this agreement. 7) A one-line diagram is required showing the electrical location of the Ameren source as well as that of the, the transfer switch, and if applicable, the visible open disconnect device inside the customer facility. Attached are a few examples of customer equipment placement. 8) A start-up and commissioning test procedure is required. Ameren and the customer shall agree on this procedure as well as on the date and time of the testing. Ameren personnel will attend (if desired by Ameren) and take any operational or safety precautions deemed necessary.

Examples of placement of customer equipment service meter accessible visible main disconnect Main panel transfer sw service meter visible disconnect accessible Main panel transfer sw service meter visible disconnect accessible Main panel transfer sw load