Optimize. Innovate. Deliver. Engineering the Future of Bus Rapid Transit

Similar documents
Metro Orange Line Extension Four Years Early and $61 Million Under Budget

Bus Rapid Transit Route Planning Project

Economic Development and BRT. Cliff Henke Sr. Analyst, Parsons Brinckerhoff John Noel Public Transit Discovery Conference, Addison, IL October 2010

Knoxville Area Transit (KAT) Transit Development Plan Corridor Analysis

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Route 110 Alternatives Analysis

Shift Rapid Transit Public Participation Meeting May 3, 2017

Riverside County Flood Control and Water Conservation District LAKELAND VILLAGE MDP LINE H, STAGE 1

Lesson 6. Corridor Planning

TRANSPORTATION MATTERS. Creating solutions for sustainable and accessible places

South Corridor Rapid Transit Project Public Kick-Off Meeting

Integration of Trees into Roads Policy - the road to success -

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

HIGH-SPEED RAIL PROGRAM UPDATE. Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA

East Corridor Final Environmental Impact Statement

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

METRO Gold Line BRT CMC Meeting

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

S T V. P E R F O R M A N C E M A T T E R S. highways + bridges

Eglinton West LRT Update

Right-of-Way Acquisitions and Relocations Technical Memorandum

Pine Hills Bus Transit Center Community Design Workshop. Presentation April 21, 2018

Dumbarton Transportation Corridor Study. Stakeholder/Public Meetings August 16, 2017

Inglewood Transit Connector Environmental Impact Report Scoping Meeting July 26, 2018

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Mississippi Skyway Preliminary Engineering Report

History: a Grand Urban Boulevard

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011

Lake Oswego to Portland Transit Project. Lessons Learned. John Cullerton Senior Project Manager, URS 2012 APTA/TRB Light Rail Conference

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

FORM 10 ELIGIBLE ASSIGNMENTS OF APPLICANTS

Tier 1 Analysis August 21, North-South Corridor Study

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

COMMUNITY OPEN HOUSE. March 28, 2012

Call to Artists Public Art for Los Angeles Metro Stations

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

EXPANDING THE NETWORK ALEXANDRIA, VIRGINIA

International Blvd. TOD Plan Public Workshop #1

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

METRO Gold Line BRT CBAC Meeting. August 23, 2018

FATAL FLAW ANALYSIS. March 2014 FINAL. DRAFT Febru

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

Oklahoma and Texas Interdependency Along the I-35 Corridor

COUNCIL COMMUNICATION

TRANSIT NEIGHBORHOOD PLANS PROGRAM OVERVIEW

BROOKE PETERSON, AICP Associate Principal

North Somerset Council Local Development Framework

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

BeltLine Corridor Environmental Study

SR 836 Southwest Extension

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Isabel Neighborhood Plan: Alternatives

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

Cotton Belt Regional Rail Corridor Project

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

PROPOSED IMPROVEMENTS

Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition. June 2017

Por favor, levanten la mano si necesita traduccion en espanol Please raise your hand if you need Spanish translation

GAINING LEVERAGE through

Description of Proposed Station Area Planning Project

Reinventing Miner Avenue as a

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

master plan of highways bus rapid transit amendment

City of Orange Trails at Santiago Creek Specific Plan Recirculated Draft EIR Appendix C: Notice of Preparation (NOP) and Comment Letters

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Dumbarton Transportation Corridor Study

FDOT D4 Complete Streets

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement.

Transportation. Strategies for Action

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

TOD IMPLEMENTATION BEST PRACTICE TOOLBOX Leveraging Transit for City Shaping

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Corridor-Level Approaches to Creating Transit-Oriented Districts

A Connected Region for Our Future. Tampa Bay Regional Planning Council

Exclusivel Listing Agent: BRUCE FRAZER Senior Vice President CA Lic:

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

TOD 203 CORRIDOR PLANNING and TOD

The Commissioner of Engineering and Public Works recommends that this report be received for information purposes.

Regional Transportation District

AGENDA ACTION ITEMS INFORMATION ITEMS

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Table W-4...Total Improvement Expenditures by Homeowner Characteristics:

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013

THE COUTURE AT A GLANCE $122 MILLION TOTAL PROJECT COST 44 STORIES / 700,000 SQUARE FEET PUBLIC PLAZAS, PARK & PEDESTRIAN BRIDGES 302 MARKET RATE

Planning Commission Report

South Yonge Street Corridor

TOWN COUNCIL / PLANNING COMMISSION

Table A-4...Professional and Do-It-Yourself Improvement Expenditures by Homeowner Characteristics: 2007

Partnerships in Transportation Transit-oriented Development The Return on Investment

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21

BeltLine Corridor Environmental Study

The Urban Transit Challenge

Transcription:

Optimize. Innovate. Deliver. Engineering the Future of Bus Rapid Transit

Parsons BRT Experience Parsons is a trusted advisor and provider of innovative transit systems across the globe, including express bus systems and bus rapid transit (BRT). We have secured more than $2 billion in FTA New/Smart Starts grants and have put 12 BRT/rail projects into revenue service in the last decade. Our innovative solutions have paved the way for a proven track record of quality and experience in BRT and multimodal corridor planning. From initial conceptual design, feasibility studies, environmental assessments, and alternatives analysis to final design, construction support, and construction/project management, Parsons will work with you to meet your goals to improve mobility. Highlights of our project expertise: Corridor/Operations Planning Station Area Planning/Design Alternatives Analysis Conceptual Design Preliminary Engineering Final Design Environmental Clearance Transit-Oriented Development FTA New/Small Starts Funding Stakeholder Coordination/ Public Outreach Construction Management/Support Cleveland, OH, Euclid Ave. BRT Denver SH119 BRT Entrance to Aspen BRT LA Metro N. Hollywood to Pasadena BRT LA Metro Vermont Avenue BRT Las Vegas Maryland Parkway BRT Las Vegas, NV, Resort Corridor BRT Miami Beach Connector BRT Oakland, CA, East Bay BRT Omnitrans BRT Design Guidelines Ontario, CA, West Valley Connector BRT Reno, NV, Virginia Street BRT Richmond, VA, Broad Street BRT San Antonio Fredericksburg Road BRT San Antonio Zarzamora Street BRT San Bernardino, CA, E Street BRT San Francisco, CA,Van Ness Ave BRT San José, CA, El Camino Real BRT York Region, Viva Quick Start BRT FTA Project Management Oversight

sbx Green Line San Bernardino, CA Roles: Alternatives Analysis, Environmental Assessment/Reporting, Preliminary Engineering, Final Design, Construction Support Parsons completed all work on the 15.7-mile sbx Green Line BRT project, which included activities from planning to final design, and a $75M FTA Small Starts grant. Parsons also provided engineering services during the construction of the project s 5.4 miles of center-running, exclusive BRT lanes; 10.3 miles of mixed-flow lanes; 23 stations with level boarding platforms; and four park-and-ride facilities. The project is one of only five BRT projects in the U.S. that have received a Bronze rating. The project also won a regional award for excellence in transportation planning. West Valley Connector BRT Corridor Los Angeles and San Bernardino Counties Roles: Alternatives Analysis, Environmental Assessment, Preliminary Engineering, Final Design Parsons is responsible for environmental clearance, preliminary engineering, and final design plans for the 35-mile-long corridor through Pomona, Montclair, Ontario, Rancho Cucamonga, and Fontana. The project includes 3.5 miles of exclusive, center-running BRT lanes; 31.5 miles of side-running, mixed-flow lanes; and 50 stations. Parsons is assisting in the development of a $75M FTA Small Starts grant. SH 119 BRT Corridor Boulder to Longmont, CO Roles: Environmental Clearance, Preliminary Engineering, Analyses (Alternatives, Transit and Traffic Operations, Financial, Transit- Oriented Development) Parsons is responsible for alternatives analysis, environmental clearance, and preliminary engineering for the 20-mile-long corridor between Boulder and Longmont, as well as extensive stakeholder and public involvement. The project includes consideration of dedicated BRT lanes, buson-shoulder operations, BRT operations in managed express/toll lanes, transit signal priority, and enhanced stations.

VIVA Quick Start York Region, Canada Roles: Lead Civil Design, Planning, Outreach Parsons served on a series of projects for the York region of Ontario. Viva Quick Start s network established the use of buses operating in mixed-flow traffic with queue-jump enhancements and dedicated stop locations over 100 km of main roads. Enterprise/Simcoe Prominade Boulevard was the first development, which included 0.83 km of dedicated rapidway with customized stations. The vivanext H3 project brought the first rapidway to a main road, including 6.4 km of east- and westbound rapidways and associated stations, utilities, and landscaping. Las Vegas Resort Corridor BRT Las Vegas, NV Roles: Feasibility Study, Alternatives Analysis Parsons conducted a feasibility study and an alternatives analysis for the 33-mile corridor from Las Vegas to Henderson with connections to McCarran International Airport. The work focused on travel-demand/ridership forecasts, capital and operating estimates, traffic analysis, and station simulations. Multiple alignment and station options were considered, and BRT was selected as the preferred technology. Based on the feasibility study, the RTC implemented the 10-mile Resort Corridor BRT service that connects with downtown Las Vegas. The project is one of only five BRT projects in the U.S. that have received a Bronze rating. Euclid (HealthLine) Corridor BRT Cleveland, OH Roles: Project Management Oversight Parsons oversaw the 7-mile development of 36 stations, right-hand and left-hand high platforms for level boarding and roll-on/rolloff wheelchair access, and 21 articulated diesel-electric hybrid vehicles. The vehicles are equipped with bridge plate wheelchair ramps and precision mechanical docking arms to minimize the vehicle-to-platform gap at stations. Parsons also developed realistic staffing plans, utilities management, and construction safety, as well as risk assessment and mitigation plans.

PRIMO Transit Centers and Stations San Antonio, TX Roles: Architectural Design and, Civil; Structural; and Mechanical, Electrical, and Plumbing Engineering Services The project involved architectural/engineering design services for VIA s first bus rapid transit line in San Antonio, including the South Texas Medical Center Transit Center, 16 in-line bus rapid transit stations, and associated improvements. Several sustainable designs were implemented, including energy-efficient mechanical system, drought-resistant landscaping, and retention ponds for stormwater. In addition, aesthetic elements and lighted canopies resulted in this award-winning project and subsequent assignments with this client. East Bay Bus Rapid Transit Oakland, CA Roles: Environmental Assessment, Preliminary Engineering, Final Design, Design Support during Construction Services Parsons converted one traffic lane in each direction to dedicated bus use for a 9.5-mile corridor between downtown Oakland and San Leandro, in Alameda County. The project includes exclusive transit lanes, more than 40 new traffic signals and the modification of 75 existing signals, transit signal priority (TSP) at all signalized intersections,and 34 new passenger stations with level boarding, all of which will improve reliability and reduce travel time. Metro Orange Line San Fernando Valley, CA Roles: Engineering Support Services Parsons was part of the multidisciplinary team that produced a major investment study (MIS) evaluating seven fixed-guideway transit alternatives for construction within a former railroad right-of-way in the San Fernando Valley. Project tasks include the analysis of the 14-mile corridor, the development of urban design/conceptual engineering plans and station concepts, as well as an assessment of the construction methods of the BRT project.

Copyright 2017 Parsons Corporation. All Rights Reserved. parsons.com