Design Services for Wiles Road Broward County Project #104026

Similar documents
Wiles Road from University Drive to Riverside Drive

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road

Cottage Grove Road Reconstruction. City of Madison Engineering

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

City of Burlington Downtown Street Design & Construction Standards

Construction Engineering & Inspection

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Fall 2017 Construction Update

FDOT D4 Complete Streets

Prince William Street Project (Grant Avenue to Wellington Road)

COMPLETE GREEN STREET CHECKLIST

DESIGN CRITERIA PACKAGE

SR 483 Clyde Morris Boulevard FDOT District 5

2040 Long Range Transportation Plan

BRADENTON RIVERWALK EXPANSION MASTER PLAN

2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers

Transportation Alternatives Program (TAP) Experience

2017 General Obligation Bond

TAC/CAC, TPO Project Update February 2016

DEPARTMENT OF PUBLIC WORKS & UTILITIES

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

Building Great Neighbourhoods. Strathcona

PROJECT SHOWING MINUTES

Index to Projects by Project Name

PROJECTS UNDER CONSTRUCTION

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

Three-Question Matrix and Reference Checks RFP Number: R P1 RFP Name: Design Services for Wiles Road from University Drive to Riverside Drive

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

University Park Subdivision Street Assessment Report

DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

Drexel, Barrell & Co.

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

STANDARD DETAILS QUICK REFERENCE

Construction and Landscaping on Public Property

Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014

Pine Island Road Corridor Master Plan

Drexel, Barrell & Co.

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

Agenda. Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity ( )

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

Application for Site Plan Review

John Portman Boulevard Corridor

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

Completing the Vision:

23 EA , , , , , , , LF , , ,596.

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Parapet/Formliner/Fencing

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

TABLE OF CONTENTS. Building Great Neighbourhoods. Working together to make the most out of your neighbourhood.

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

Citizen Information Meeting

2 ALTERNATIVES AND OPTIONS

2018 Woodhill Road Improvements Public Informational Meeting. September 28, :00 pm

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

Capital Projects impacting Odenton Town Center

Welcome & Introductions

ORDINANCE NO

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

County of El Dorado Standard Plans

City of Richmond. Engineering Design Specifications

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

CRA Five Year Capital Improvement Plan. September 2, 2015

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Dogpatch/22nd Street Greening

Route 7 Reconstruction and Widening, Wilton. State Project Nos & 124. Wolf Pit Road to just north of Olmstead Hill Road

Review Zone Application for D&R Canal Commission Decision

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

Importance of townhouse design

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

TENTATIVE MAP CHECKLIST

Sumter County Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 SR 35 in Sumter County

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

HERNANDEZ & SWIFT ASSOCIATES, INC. Engineering & Environmental Services Balihai Court Gulf Breeze, Florida (850)

February 17, Sara Ullman Planner I. Sincerley,

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission

EAST NAPLES SELF STORAGE

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

November 2, 2015 at 5:15pm City Council Chambers, 3rd Floor, City Hall, 1737 Main Street Columbia, South Carolina 29201

WELCOME. Welcome to the Public Open House

COMMERCIAL DESIGN REVIEW APPLICATION

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

Chapter 6. Green Streets

Index to Projects by Project Name

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

Transcription:

Design Services for Wiles Road Broward County Project #104026

ORGANIZATIONAL CHART

THE CGA TEAM Firm Services Key Staff CBE Calvin, Giordano & Associates, Inc. HBC Engineering Company Florida Engineering & Testing, Inc. Roadway, Lighting, Landscape Architecture, Signalization, Drainage and Other Associated Improvements. Utility Coordination and Signing & Pavement Marking Environmental Engineering Support Jenna Martinetti, P.E.; Nicholas Mahon, P.E; David Frodsham, P.E; Eric Czerniejewski, P.E., Env SP; Sandra Lee, AICP CEP, LEED AP BC+D; Michael Conner, RLA; Robert Roush, PE; Steve Watts, PSM; Jon Cooper, P.E. Adebayo Coker, P.E. Mohan V. Thampi, P.E., R.E.M. Mark A. Mesiano, PE Lakdas/Yohalem Engineering, Inc. Structural Engineering Lakdas Nanayakkara, P.E. CBE Radise International, L.C. Geotechnical Engineering Gregory Stelmack, PE Thomas Mullin, PE Aerial Cartographics of America (ACA), Inc. -- CBE CBE CBE Photogrammetry Iarelis Hall, PSM CBE Dickey Consulting, Inc. Public Involvement Sheryl Dickey CBE CGA has a 21% CBE goal for this project.

PROJECT MANAGER JENNA MARTINETTI, PE Over 13 years of engineering experience Started as a roadway designer Senior PM for roadway, stormwater, water, sewer, land development, and park design projects Experience includes FEMA grants, LAP/JPA and FDOT projects, and County Incentive Grant Projects Advanced Traffic Control Certification

TEAM EXPERIENCE FDOT Pre-qualified MPO/Complete Streets Experience: Community Incentive Grant Program (CIGP) experience Davie Rd Phase 1 College Avenue Nova Drive FDOT LAP projects Davie Rd Ph. 2 Andrews Avenue Tamarac Bike Lanes Broward County Mast Arm Conversion - 35 Intersections Upgraded

PROJECT CHALLENGES Widening reduces/eliminates swales and requires curb & gutter Key elements: Analyze existing profile to confirm 0.3% min. longitudinal slope Overbuild/reconstruct where needed Reduce existing lane widths Install exfiltration trench for water quality Similar Experience: Davie Rd Ph. 1 widened for new travel and bike lane, added curb & gutter, reconstruction and overbuild, modifications to the drainage system

PROJECT CHALLENGES Widening encroaches on existing trees Key elements: Obtain tree survey Review horizontal clearance Coordination with landscape architect for impact to trees, need for root barriers Site triangles for side streets to be verified Similar Experience: Davie Rd Ph. 1 widening required relocation of over 45 large royal palms within the R/W as well as removal, replacement or relocation of other species of trees. Davie Rd Ph. 2 root barriers had to be installed where trees were adjacent to new sidewalk Nova Dr trees within the swales utilized decorative retaining walls.

PROJECT CHALLENGES Widening encroaches on side street and development median noses Key elements: Verify R/W information Minimize impacts Modify where needed Coordinate with the individual condo associations as part of public outreach Verify site triangles for sides streets Similar Experience: Davie Rd Ph. 1 Driveways were modified to accommodate widening impacts and bring to ADA compliance

PROJECT CHALLENGES Widening impacts existing irrigation and existing bus stops Key elements: Specify proper maintenance or repairs to the existing irrigation system, including notes regarding private systems encountered during construction Coordinate with BCT to meet requirements for 8 wide pad Coordinate any future bus stop, shelter or pad upgrades. Similar Experience: Davie Rd Ph. 1 multiple irrigation systems existed requiring replacement. Bid documents included a line item to pay for this. BCT coordination allowed for removing sidewalk from the project to avoid BCT damaging and replacing it months later with the future shelter/pad project.

PROJECT CHALLENGES Lighting location Key elements: Obtain available safety study Review horizontal clearance of existing poles Photometric analysis taking existing trees and new lane into account Coordination with FPL for additional hardening projects Potential for pedestrian scale lighting Similar Experience: Davie Rd Ph. 1 & 2 existing lighting was supplemented by proposed fixtures SR 870/Commercial Blvd areas around the intersections were upgrades to have lighting. Andrews Ave upgrading to LED

PROJECT CHALLENGES Existing conditions at the Coral Springs Nursery Key elements: Coordinate early with City and owner to determine site needs and code requirements Review grades for installation of valley gutter to maintain stormwater on public R/W Similar Experience: Tamarac Bike Lanes community club house parking requires modification due to bike lane widening. Parking is being relocated to a side street as a separate contract.

PROJECT CHALLENGES Grade differential at R/W line Key elements: Review areas where R/W is higher than adjacent private property Review areas where adjacent property is higher. Provide handrail or gravity wall where required Similar Experience: SR 870 gravity wall was required at the R/W line due to adjacent backyards being too low.

PROJECT CHALLENGES Overhead utility lines Key elements: Early coordination with UAO s, particularly FPL Consider constructability, as well as final placement of mast arms and uprights near FPL Similar Experience: SR 870 FPL transmission and distribution surrounded and crossed the intersection. Transmission lines had to be de-energized for the installation of the new mast arms. Utility work schedules were provided as part of the bid documents.

PROJECT CHALLENGES Right Turn Lane Impact Additional R/W not available at existing right turn lanes New turn lanes constructed where R/W available Coordination with Broward County and property owners Drainage District Permitting Sunshine Water Control District North Springs Improvement District Complete Streets/Bike Lane Buffers R/W may not be available through out the corridor to provide the 2 buffer the County prefers Striping buffer can be provided and meet the County s 4 minimum bike lane width

WHY the CGA TEAM? INTEGRATED APPROACH Engage all stakeholders in the planning, design, and construction of the project. Multiple Services in-house allowing for expedited design to meet the project schedule. Experience on similar projects Well defined QA/QC process Clear and efficient communication. EXPERIENCE, PERFORMANCE & SATISFACTION

QUESTIONS?