SECTION 13 LANDSCAPING & TREE PROTECTION

Similar documents
University of Delaware

Site guidance for working in root protection zones

39 N. B Street San Mateo, California Construction Tree Protection Plan

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

I. DEFINITIONS For the purpose of this policy the following terms, phrases, words and their derivations shall have the meaning given herein.

Vegetation Management

Palmdale Municipal Code (Excerpts) Title 14: ENVIRONMENTAL MANAGEMENT Chapter 14.04: JOSHUA TREE AND NATIVE DESERT VEGETATION PRESERVATION

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

A. Contractor shall provide product data for each type of product indicated.

SECTION TREE AND PLANT PROTECTION

Renovation Program. Renovation Program GENERAL

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

SCHEDULE ONE TO CUSTOMER CONTRACT DOCUMENT STANDARD INSTALLATION CONDITIONS FUEL CONVERSION PRODUCT COMBINATIONS BREAKDOWN HOT WATER REPLACEMENT

Content. 1. Particular Specification for Green Roof System. 2. Drawing. 3. Particular Preambles for Standard Method of Measurement

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

3 Urban Design and the State Highway Network

DATE: June 17, 2013 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ x ]

Section General Tree Preservation Requirements for New Nonresidential and Residential Development

Title: Room-sealed fanned draught flue systems concealed within voids

Historic Heritage Historic Heritage Explanatory Statement Significant Issues Objectives and Policies...

Section 6A 6A Purpose of the Natural Features and Landscapes Provisions

V-5 TREE PROTECTION AND LANDSCAPING REQUIREMENTS

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

This is an optional Unit in the National Certificate in Horticulture at SCQF level 4.

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

5.0 Storm Water Landscape Guidance Introduction

Management Standard: Fire Safety

CropHealth Advising & Research Kelowna, B.C.

Chaska Oaks Preservation Plan September 29, 2017

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

Electrical Safety Policy and Management System

CHESAPEAKE LANDSCAPE ORDINANCE

FIRE SAFETY MANAGEMENT PLAN

Terwillegar Community Garden

3. Landscape and Streetscape

Foreword. Síle de Valera, TD, Minister for Arts, Heritage, Gaeltacht and the Islands

Soft Landscaping. Soft Landscaping. Solutions

High Speed Rail (London- West Midlands)

Parks & Recreation Tree Board - Tree Ordinance Angola, Indiana

UNIVERSITY OF TOLEDO

Protocol between Local Housing Authorities and Fire and Rescue Authorities to improve fire safety

E16: MAINTENANCE OF LANDSCAPED AREAS

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

Significant Tree Register

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE

Waterwise verge best practice guidelines

Article 6 Tree Protection

Tree Removal Procedure

To seek Cabinet approval of the Council s Fire Safety Policy. It is proposed that Cabinet approves the Fire Safety Policy.

NHS Tayside. Fire Safety Policy

Minneapolis College of Art and Design Integrated Pest Management Policy and Plan

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

WMU Tree Care Plan and Policies

ANNEXURE 5 GUIDELINES FOR WORKS IN THE VICINITY OF TREES

Raft Island Right of Way Vegetation and Tree Management Plan

USF System Campus Master Plan Updates Goals, Objectives and Policies

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

June 2017 (Updated 18 January 2018) Fire Safety Policy. Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

DESIGN OF FOOTBRIDGES

CITY OF OVERLAND PARK POSITION DESCRIPTION

OPERATIONAL GUIDELINE. Office of the Fire Commissioner O.G.# Revision #1 TITLE: ISSUING ORDERS Page 1 of 8

The Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows.

ACTIVITY: Trees, Shrubs and Vines ES 10

14 HIGHWAY PLANTING AND IRRIGATION

July 2011 ENVIRONMENTAL MANAGEMENT STRATEGY (EMS) AMENITY BERMS MANAGEMENT PLAN

Visitors to Police Premises Standard Operating Procedure

GUIDELINES FOR FLORIDA FRIENDLY PLANTING,

I539. Smales 2 Precinct

DIVISION 32 EXTERIOR IMPROVEMENTS

Horticulture: Prepare an Area for Landscaping (SCQF level 4)

ARTICLE XIX SCREENING, LANDSCAPING AND TREES

Highland Council Allotment Policy

ECOLOGICAL ADVICE SERVICE

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

This policy may also be used for routine work orders that are Life Safety in nature and cannot be completed within 45-days.

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

codes for the operation of City business; and WHEREAS, the Bonita Springs City Council has determined that it is in

Landscape Maintenance Plan Proposed Childcare Centre Leichhardt Park

SECTION LANDSCAPE ESTABLISHMENT

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ROLE OF THE FIRE PROTECTION ENGINEER IN THE CONSTRUCTION DESIGN PROCESS

Boise Municipal Code. Chapter 9-04 EXCAVATIONS

Appendix H: Easement cross sections

City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods

Construction Specification for Planting

BUSINESS PARK TOWN OF OKOTOKS

FIRE SAFETY AND PREVENTION POLICY

LOT 66 VACANT Ca (4) 3 BICYCLE PARKING SPACES. REFER ARCH. CANOPY ABOVE (SHOWN DASHED) REFER ARCH.

Proposed Ice Skating Rink Impact Assessment & Mitigation Measures

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

APPENDIX B: SAMPLE LETTERS OF SUPPORT

Securities Dealing Policy

STREETSCAPE MANUAL ONLINE TRAINING SESSION 3: Decision-Making

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

Local Rules: Fire Safety

Transcription:

Facilities and Services ANU Building Requirements Manual 2010 SECTION 13 LANDSCAPING & TREE PROTECTION Subject Matter Expert / Owner: George Abraham 13.1 GENERAL...2 13.2 LIAISON...2 13.3 TREE PROTECTION OR REMOVAL...2 13.4 LANDSCAPE PLANTING PLAN AND SOIL SPECIFICATIONS...2 13.5 GRASS TYPES...2 13.6 LANDSCAPE CONSTRUCTION...3 13.7 LANDSCAPE PROTECTION DURING CONSTRUCTION...3 Annex A: Landscape Protection Guidelines Annex B: Unacceptable Practice Version Date Authors Summary of Changes 1.0 5 August 2010 George Abraham Annex B added: Unacceptable Practice 1.1 9 Sept 2010 George Abraham 1.2 9 Sept 2010 Mel Walker 13.3 text added: AS4970: Protection of trees on development sites. TreeNet database updated to ANU Tree database and associated changes. Version 08 Sept 2010 Page 1 of 10

Facilities and Services ANU Building Requirements Manual 2010 13.1 GENERAL Under Review 13.2 LIAISON LANDSCAPING & TREE PROTECTION The appointed Landscape Architect or landscape designer is required to liaise with the Manager, Gardens & Grounds, Facilities & Services on the following matters for all new landscaping proposals and alterations to existing landscape works: Broad landscape guidelines and site specific issues; preliminary plans and concepts; development of landscape details; and for final landscape plan proposals. The Consultant shall liaise through the University s Project Coordinator. 13.3 TREE PROTECTION OR REMOVAL The Landscape Architect, Superintendent or Project Manager, as the case may be, is required to ensure that all trees within the construction site that are to remain are identified and appropriate tree protection measure are undertaken to prevent damage or destruction during construction. The proposed methods for tree protection should be discussed and agreed with the Manager, Gardens & Grounds. The University has a comprehensive survey of trees within the Acton Campus for reference purposes. Development proposals should endeavour to retain existing trees wherever possible and practical to do so. Any trees that require removal shall be identified to the University and prior approval obtained before removal commences. Trees on development sites shall be protected in accordance with the current version of AS4970: Protection of trees on development sites. 13.4 LANDSCAPE PLANTING PLAN AND SOIL SPECIFICATIONS The requirements of the University for the planting plan and soil specifications shall be determined in consultation with the Manager, Gardens & Grounds. Samples of topsoil shall be provided to the University for approval. 13.5 GRASS TYPES Poa labillarderi (Tussock Grass) is no longer approved for use on the ANU campus. Drought conditions and water restrictions have severely reduced the usefulness of this plant. With no supplementary watering this plant becomes a fire risk too quickly and has to be cut back manually and is too labour intensive to be acceptable as a routine maintenance regime. Version 08 Sept 2010 Page 2 of 10

Facilities and Services ANU Building Requirements Manual 2010 Other more suitable grasses available that require virtually no maintenance and pose a negligible fire threat are preferred, for approval by the Manager Gardens and Grounds. 13.6 LANDSCAPE CONSTRUCTION The University may decide to use their internal grounds maintenance resources for certain parts of the construction of new landscape works or alterations to existing. Such scope of works should be agreed with the Manager, Gardens & Grounds prior to tendering the works. 13.7 LANDSCAPE PROTECTION DURING CONSTRUCTION The University requires the Head Contractor or Project Manager to take responsibility for the protection of existing landscapes from construction-related activities and construction personnel vehicle parking. Parking arrangements that are agreed with the University shall be clearly documented and construction personnel made aware of the University s requirements. Adequate provision of temporary barriers or control measures shall be documented and approved by the University. Annex A Landscape Protection Guidelines Annex B: Unacceptable Practice Version 08 Sept 2010 Page 3 of 10

Annex A THE AUSTRALIAN NATIONAL UNIVERSITY FACILITIES & SERVICES LANDSCAPE PROTECTION GUIDELINES 4

LANDSCAPE PROTECTION GUIDELINES FOR THE AUSTRALIAN NATIONAL UNIVERSITY CAMPUS 1. AIMS OF THE GUIDELINES The most significant characteristic of the Acton campus of The Australian National University is the landscape a mix of native and exotic plantings, with the Sullivans Creek waterway reinforcing this natural environment. Over the last ten years there has been a significant amount of new buildings and other work on the campus that has sometimes impacted negatively on the quality of the landscape. Procedures have been developed with the aim of protecting the landscape, but damage continues to occur. The purpose of this document is to clearly articulate the aims, methods and procedures to protect the landscape during any works that have the potential to cause damage, and to identify the respective responsibilities of University staff and external consultants and contractors in these processes. These guidelines are applicable to the whole landscape of the campus, includes lawns, planting beds, native grassland, etc.. However, because of their visual significance, their age, and the time it may take for damage to them to become apparent, it is damage to trees that is of most concern, and towards which these guidelines are largely directed. The major causes of damage to trees are vehicles and machinery (directly by damage to trunks and branches, or indirectly by soil compaction in the root zone) and new service reticulation (particularly through trenching within root zones). These guidelines seek to minimise such damage by: Surveying and classifying all trees on campus, to provide a database for informed advice and action. Making reference to this database a precondition for all work on the campus that has the potential to damage trees. Requiring the responsible project officer, consultant, or contractor to seek the appropriate approvals before carrying out any such work on the campus. Financial penalties may be enforced in cases of non-compliance with these policies, as set out in Section 7 below. However the emphasis is on prevention of landscape damage, through following correct procedures, rather than on penalties after the damage has occurred. In addition to financial penalties, contractors and consultants who consistently fail to comply with these policies will not be considered for future work at the University. 2. DEFINITIONS For the purposes of this document, the following definitions are used: Arborist a specialist in the care and cultivation of trees. Note that the ANU has a dedicated Arborist who is to be involved in all matters pertaining to trees. Drip line The area of ground directly below the outer edges of the canopy. Root zone The space within the soil occupied by the root system of a tree. Unless otherwise defined by the ANU Arborist, the root zone will be assumed to be equivalent, in plan, with the Tree Protection Zone. Significant tree A tree that has been categorised as Exceptional, High or Medium quality (see definitions in section 3). Tree canopy The space that is occupied by the branches and leaves. Tree Protection Zone A defined area of ground where no activity is to be undertaken. Unless defined otherwise by the ANU Arborist, this zone will comprise a circular area, with its centre the trunk of the tree, and its outer edge two metres further out from the Drip Line. 3. ACCESS TO THE TREE SURVEY DATABASE Page 5 of 10

A digital survey of all trees on the Acton campus currently exists, each tree has been rated according to the following categories: Exceptional trees These are the most significant and valuable trees on the campus because of their age, rarity, prominence within the landscape etc. Except in exceptional circumstances, no activity involving disturbance of the Tree Protection Zone of these trees will be allowed, other than that carried out by Gardens & Grounds staff, or contractors under their immediate supervision. In exceptional circumstances, application may be made for a specific Works Approval for such activity, from the National Capital Authority. High Quality Trees These comprise the bulk of mature, healthy trees on the campus. Any work within the Tree Protection Zone of high quality trees will require the specific approval of the ANU Arborist or other University officer designated by the Manager, Gardens & Grounds. Medium Quality Trees This class covers trees that tend to be immature, senescent or suppressed. Whilst every effort should be made to minimise damage to such trees, their value to the landscape is less than that of the other two classes. The level of protection to be accorded to such trees will be at the discretion of the ANU Arborist or designated University Officer. Poor Quality trees trees that have been placed in this category have generally been scheduled for removal therefore it is not mandatory to protect such trees. Confirmation of this fact should be sought from the university Arborist or designated University officer. Thus it will be seen that, although the values of trees on the ANU campus varies, in all cases where work may impact on the Tree Protection Zone of a tree (irrespective of its particular classification), the ANU Arborist, or designated University Officer, is to be consulted before any work commences. Information pertaining to the location, species, and category of trees on the ANU Acton campus is stored on the Tree Survey database. Access to this database is through the Drawing Office/Plan Registry or the ANU Arborist. Note: The criteria by which trees are categorised is detailed in the University's Tree Management Plan. 4. PROCEDURES FOR OBTAINING CLEARANCES The earlier that the issue of landscape protection is raised in any project whether the project be a new building, building extension or an underground service the more easily will the requirements for such landscape protection be integrated into the program and budget of that project. Therefore the emphasis is always to be on early rather than late investigation of this issue. Examples include: For a new building project in feasibility and planning phase, the consultants, under the direction of the University Architect, are to consider the impact on the existing environment of the proposal, in the same way as they would underground services to be relocated, adequacy of existing services, etc.. They will thus be required to check the proposed building footprint and service easements against the ANU Tree database, and if necessary seek advice from the ANU Arborist. For a building already under construction, where it has become apparent that work will be required within the drip line of a significant tree (and this work was not identified in the course of previous approvals) specific application will need to be made to the ANU Arborist for clearance. For new sub-surface services reticulation, the relevant ANU officer or the contractor will confirm any impact on significant trees at the planning stage, and the contractor will obtain relevant clearances from the ANU Arborist before work commences on site. Note: It is a mandatory requirement to obtain a clearance to excavate prior to undertaking any activity that will disturb the landscape on the property of The Australian National University. This clearance procedure requires individuals to gain permission from all relevant authorities (both internal and external) prior to undertaking work. A clearance form can be downloaded from http://www.anu.edu.au/facilities/policies/permission_to_excavate.html or a hard copy can be obtained from the Drawing Office/Plan Registry. Page 6 of 10

5. LANDSCAPE PROTECTION PLAN When instructed to by the ANU Arborist or relevant University officer, the consultant, Manager or contractor will, through consultation with the ANU Gardens & Grounds staff, prepare a Landscape Protection Plan (LPP). The LPP is then to be signed off by the ANU Arborist or designated University officer. The scope of this Plan will vary according to the nature of the project. Indicative formats for LPPs for projects of different sizes are appended to this document. Generally the LPP will take the form of a site plan marked up with notes relating to the various landscape protection issues. Amongst the issues that may need to be addressed in the LPP are: Site features: Site features requiring particular protection include underground irrigation, lawn areas and/or significant trees and sensitive landscape sites. The Gardeners Section will identify such features within proximity of the project. Such features may need to be protected by fencing, and the Superintendent will be responsible for ensuring that these protected areas are not entered or used for any purpose associated with the project. Site access: This is to be agreed on the basis of minimizing landscape damage while providing convenient access. Where boom gates are installed, they will be used to regulate each entry/exit to the site. Where heavy or special vehicle access is required (cranes, trucks, etc.) suitable damage minimization measures are to be undertaken (eg. timber boards positioned in wheel traverse areas over soft landscape). Contractor vehicle parking: Contractor vehicles are subject to ANU parking regulations unless the Manager, Parking Administration, has approved other arrangements. Where parking in areas other than official carparks is unavoidable, a special area will be fenced off and designated Construction Parking Only. Where this area encompasses soft landscape features, strategies to minimise damage/compaction will be practiced. Storage of Materials: All building materials will be stored in a manner that does not compromise the safety of the public or impact negatively on the landscape. It is strictly prohibited to use garden or shrub beds to store materials (or waste). Stored materials are not to be placed on garden or shrub beds. Where turf areas and/or an area on a pedestrian route have to be used as storage areas, the area will be fenced off and reinstated following completion of the project. An agreed access route will be identified and the subsequent documentation passed to the contractor Rubbish Skips: Rubbish skips will be positioned in a manner that does not compromise the safety of the public or impact negatively on the landscape. It is strictly prohibited to use garden or shrub beds to place rubbish skips. Where turf areas and/or an area on a pedestrian route have to be used to place rubbish skips, the area will be fenced off and reinstated following completion of the project. Because of the enormous amount of potential damage that may be caused by waste removal trucks, it is crucial that rubbish skips be placed in a location where they may be emptied without the need for the truck to traverse any soft landscape. An agreed access route will be identified and the subsequent documentation passed to the contractor. Individual Tree Protection: See Section 6 below. Landscape reinstatement: On completion of the project, the landscape is to be reinstated to the satisfaction of the designated Gardens & Grounds staff. 6. INDIVIDUAL TREE PROTECTION The following procedures for protecting individual trees will form part of the Landscape Protection Plan for any project impacting on a significant tree. In addition, even where a LPP is not required, these procedures are to be followed whenever activity is taking place within the drip line of any tree deemed worthy of retention. In order to protect significant trees, the following procedures are to be followed: 1. Identifying a Tree Protection Zone: Where there is the likelihood of a project impacting on existing trees, the consultant, contractor or project officer obtain information from the ANU Tree database to ascertain if any significant trees will be affected. If this is the case, the ANU Arborist is to be contacted to provide advice on appropriate tree protection. The size and shape of a particular Page 7 of 10

protection zone will vary according to individual tree species and the site. The zone will be determined by an Arborist as per the Australian standard - Protection of trees on development sites prior to commencing the project and will remain in place until project completion. 2. Pruning: Prior to establishing a tree protection zone, trees to be protected will be pruned focusing on removal of dead or broken branches. The purpose of this activity is primarily safety, but it serves as a monitor for any damage that may occur during construction. The ANU Arborist will instigate this activity and the cost born by the Grounds department. Construction contractors are prohibited from undertaking any additional pruning as this activity, if not performed properly, can be harmful to the tree. 3. Establishing the Tree Protection Zone: The following measures will be taken to protect the tree (long term projects only): o Fencing Secure posts with 1.8m high Chain link or equivalent sturdy fencing to be erected, maintained and removed by the contractor to the outer edges of the protection zone. o Trunk protection 1.8m high palings strapped to the trunk o Mulching 100mm of composted mulch cover over the ground within the tree protection zone in order to retain soil moisture and encourage microbial activity. o Irrigation natural moisture levels should be maintained. Ideally an automated drip irrigation system should be installed. o Drainage the natural drainage patterns around the root zone should not be altered. o Signage (to be supplied and erected by the Grounds Section) as follows: Tree Protection zone No vehicle movement No storage of building materials No washing of equipment Contact name and number for enquires 4. Activities Within the Tree Protection Zone: Undertaking any activity inside the tree protection zone is considered a serious breach of these guidelines. If during the course of a project, it becomes unavoidable for activities to take place inside the protection zone, then consent should first be gained from the ANU Arborist. Such activities may include the erection of scaffolding, vehicle movement, trenching or excavation. The ANU arborist will determine whether it is appropriate to undertake that activity and advise of the most appropriate way to undertake such activities or suggest possible alternatives. Pruning of branches and/or roots may be required; if so these activities should be undertaken under the direction of an Arborist. 5. Trenching and Excavation: When trenching or excavation is to be undertaken within the root zone of any tree, roots will be severed cleanly rather than torn with a backhoe or other excavation equipment. All roots are to be exposed first and then cut cleanly with a sharp saw or loppers. Exposed roots are to be kept moist and covered with hessian for the duration of the exposure. Where roots with a diameter larger than 50mm are encountered excavation should be undertaken by hand and such roots tunnelled under. 6. Vehicle and Pedestrian Movements: Continuous vehicle and pedestrian movement can be particularly damaging to trees, causing soil compaction and subsequent death of roots. A thick layer of mulch or recycled crushed concrete spread over the soil to a depth of 150 200mm is mandatory in order to reduce the effects of soil compaction within the root zone of any tree. 7. Monitoring and Reporting: Regular monitoring is necessary for long-term projects. A monthly site inspection will be conducted to ensure that protection measures are being adhered to. Following this inspection a report will be generated and kept on file. This report will be used to issue warnings or to pursue claims for compensation for damaged trees. Such inspections will to be conducted by the ANU Arborist. 8. Soil Injections: If deemed necessary by the ANU Arborist a soil injection treatment will be applied to the root zone of any tree that has been adversely effected by a project. The soil injection treatment is a combination of water, nutrients and other agents that promote root growth. At the cost of the project an arborist will administer this treatment. 7. FINANCIAL SANCTIONS Failure to follow the above policies may result in a financial penalty being applied to the relevant contractor or consultant. It should be noted that these penalties relate to non-compliance with University policies, rather than proven landscape damage. (This approach has been selected because of the Page 8 of 10

difficulty in assigning value to landscape damage, and the fact that such damage may not become apparent for some considerable time after the work has occurred.) However the monies recoverable through this process will be used by the Gardens & Grounds Department for remedial landscape work. Where the contractor or consultant can be shown to have failed to follow the procedures set out in this document, regardless of whether landscape damage has occurred as a result of the work for which they are responsible, The Australian National University may deduct an amount up to $10,000 from monies otherwise owing from the ANU to that contractor or consultant. In addition, in cases of work near trees of particular high value, the ANU Arborist or other University Officer may require a bond to be lodged with the University by the contractor or consultant to cover any remedial or other work that may be required after completion of the contract. The value of the bond will reflect the value of the tree of landscape feature potentially effected by the work, and will be determined on a case by case basis by the University Arborist. 8. POINT OF CONTACT Should any individual experience difficulties in interpreting or implementing these guidelines that person should not hesitate to contact a representative of the ANU Gardens & Grounds Department. Generally, the contact officer will be the ANU Arborist, Melinda Walker, on 02 6125 8969. 9. SUMMARY OF PROCEDURES TO BE FOLLOWED The following is a summary of procedures to be followed by any consultant or contractor working on the ANU campus. Failure to do so may result in penalties being levied, as detailed at Section 7. 1. At the earliest practicable stage in the planning of any project which will potentially impact on the landscape (including trees, shrubs, lawns etc.) be it a new building, a building extension, new services reticulation, or other the responsible consultant or contractor is to access the TreeNet database to ascertain the implications of the project for the existing landscape. 2. Having made these investigations, if it becomes apparent that the project will impact on the landscape then they are contact the ANU Arborist to seek advice. 3. When directed by the ANU Arborist, the contractor or consultant will prepare a Landscape Protection Plan as set out at Section 5. This Plan is to be approved by the ANU Arborist prior to any work commencing on site. 4. Regardless of any other requirements of the ANU Arborist, the consultant or contractor is to abide by the procedures set out in Section 6: Individual Tree Protection wherever any work is taking place within the Tree Protection Zone of a significant tree, unless specifically exempted by the ANU Arborist. Page 9 of 10

Unacceptable Practice Annex B Root system substantially damaged by construction of adjacent brickwall Page 10 of 10