For the compliance with the resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority.

Similar documents
For compliance with Resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority.

For compliance with Resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority.

For compliance with Resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority.

TYPE APPROVAL CERTIFICATE

EU RO MUTUAL RECOGNITION TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

GUIDE TO APPROVAL OF RETROFIT BALLAST WATER MANAGEMENT SYSTEM INSTALLATIONS

TYPE APPROVAL CERTIFICATE

Issued to DISTRIBUIDORA INTERNACIONAL CARMEN, S.A -DICSA- Zaragoza Zaragoza, Spain

is found to comply with DNV GL rules for classification Ships, offshore units, and high speed and light craft

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

BWTS Installation DNV GL Experience

TYPE APPROVAL CERTIFICATE

Commandant United States Coast Guard

TYPE APPROVAL CERTIFICATE

Shipboard incinerators with capacities up to 4000 kw

Commandant United States Coast Guard

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

DET NORSKE VERITAS TYPE APPROVAL CERTIFICATE

DNVGL-CP-0398 Edition December 2015

TYPE APPROVAL CERTIFICATE

Notified Body No.: 0575

TYPE APPROVAL CERTIFICATE

Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC

Notified Body No.: 0575

Glass fibre rovings - Non-metallic materials

HYUNDAI HEAVY INDUSTRIES CO., LTD.

Terminal lugs for LV power cables with aluminum conductors

DNVGL-CP-0407 Edition February 2016

EC-TYPE EXAMINATION CERTIFICATE (MODULE B)

DNVGL-CP-0402 Edition February 2016

Notified Body No.: 0575 G U A D N L. SJq

MARINE GYRO COMPASS STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

DNVGL-CP-0399 Edition March 2016

RADAR REFLECTOR STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

DNVGL-CP-0401 Edition February 2016

Coatings for protection of FRP structures with heavy rain erosion loads

BWTS installation and beyond UK Chamber of Shipping BWM implementation forum

Notified Body No.: 0098

GROUNDING AVOIDANCE SYSTEM (GAS)

SHOP PRIMERS FOR CORROSION PROTECTION OF STEEL PLATES AND SECTIONS

IMO LIST OF DOCUMENTS ISSUED IN CONNECTION WITH THE FORTY-SEVENTH SESSION OF THE SUB-COMMITTEE ON FIRE PROTECTION AGENDA FOR THE FORTY-SEVENTH SESSION

EC-TYPE EXAMINATION CERTIFICATE (MODULE B)

WÄRTS1LÄ. EC-Declaration of Conformitv. In accordance with the Marine Equipment Directive 2014/90/EU

INFORMATION BULLETIN No. 150

SIMPLIFIED VOYAGE DATA RECORDER (S-VDR)

DASPOS A/S Gammel Klausdalsbrovej Herlev Denmark Tel.: website: DASPOS USA, Inc NE 116th Street, PMB

Circuit Breakers JANUARY The electronic pdf version of this document found through is the officially binding version

SOUND RECEPTION SYSTEM

MOL Group TECHNICAL SPECIFICATION INSTRUMENTATION. List of booklets MGS-M-REF-I-LI. Rev

Valve Manufacturers Association of America

7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3.

Australian Standard. Functional safety Safety instrumented systems for the process industry sector

Indicators for Rudder Angle, Rate of Turn, Propeller Shaft Revolution and Propeller Pitch

EC Type Examination Certificate

Report No. ECL01I Page 1 of 5. Test Report. Centre Testing International Pinbiao(Shanghai) Co., Ltd. Maritime Industry Division

DIRECTIVE NO: D-B

Tasman Sea Control System

SOUTH AFRICAN NATIONAL STANDARD

CLASSIFICATION NOTES. Type Testing Procedure for. Crankcase Oil Mist Detection and Alarm Equipment

MED 96/98/EC QUALITY SYSTEM MODULE D CERTIFICATE

***** 2. Rev.1 is to be uniformly implemented by IACS Members from 1 July 2004.

Part 6 Additional class notations Chapter 2 Propulsion, power generation and auxiliary systems

EC TYPE EXAMINATION (MODULE B) CERTIFICATE (EC-US MRA)

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Part 6 Additional class notations Chapter 6 Additional fire protection for passenger vessels

ISO INTERNATIONAL STANDARD. Fire protection Automatic sprinkler system Part 9: Requirements and test methods for water mist nozzles

Part 2-55: Medical electrical equipment. Particular requirements for the basic safety and essential performance of respiratory gas monitors

Marine Solutions. Honeywell s Solution for LNG Vessels

INTERNATIONAL STANDARD

MGN 453 (M) Maritime and Coastguard Agency Logo MARINE GUIDANCE NOTE

Design & Use of Ground Based Pumps Guidance Document

CCTV Camera Systems and Project Engineering

PQS Independent type-testing protocol

TYPE TESTING PROCEDURE FOR CRANKCASE EXPLOSION RELIEF VALVES JULY 2016

Presentation to the Ballast Water Collaborative Duluth, Minnesota August 2 & 3, Prepared by:

Sergey Gribanov Head of Technical Service, Germany

FINAL ATEX REPORT ON EQUIPMENT FOR USE IN POTENTIALLY EXPLOSIVE ATMOSPHERES FOR GOLDEN PROMISE EQUIPMENT INC. FLOW MONITOR, GPE3000 SERIES,

PHARMACEUTICAL INDUSTRY CLEANING SYSTEMS

Omniguard 4: Features

M-20 Oil Mist Concentration Detection and Alarm Device

API MANUAL OF PETROLEUM MEASUREMENT STANDARDS

EC TYPE EXAMINATION CERTIFICATE

Functional Safety: the Next Edition of IEC 61511

BS EN : 2001 & IEC :2000

All icon products are. Easy to use: with an intuitive glass touch-screen, wipe-clean graphic user interface with multi-language options.

INSTRUCTIONS FOR SAFE OPERATIONS LM3000 EXPLOSION PROOF LASER DISTANCE METER

APRIL 2010 ELECTRICAL EQUIPMENT STANDARD FOR CERTIFICATION DET NORSKE VERITAS. No. 2.9 Type Approval Programme No

INTRODUCTION. Our diverse range of world-class Specialty Insulated Wires and Cablesinclude: LV Cables -

USCG-EU MRA EC TYPE EXAMINATION (MODULE B) CERTIFICATE

SECTION Free/Available Chlorine Analysis System

SOUTH AFRICAN NATIONAL STANDARD

Report No EC. 1 Windsor Dials, Windsor, Berkshire, UK. SL4 1RS ATEX CERTIFICATION REPORT. Electronstandart-pribor

Size and rating wise typical Third Party Inspection certificates for the models of Valves

Transcription:

Certificate No: TP00000ZS This is to certify: That the Ballast Water Management System with type designation(s) Ecochlor Ballast Water Management System Issued to Ecochlor, Inc. Maynard M, United States is found to comply with Resolution MEPC.174(58) Resolution MEPC.169(57) DNV GL class programme DNVGL-CP-0209 Type approval Ballast water management systems DNV GL rules for classification Ships pplication : This is to certify that the Ballast Water Management System listed above has been examined and tested in accordance with the requirements of the specifications contained in Guidelines contained in Resolution MEPC.174(58) and DNV GL Rules stated above. This Certificate is valid only for the Ballast Water Management System referred to above. For the compliance with the resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime uthority. Product(s) approved by this certificate is/are accepted for installation on all vessels classed by DNV GL, unless otherwise instructed by relevant Maritime dministrations. Operating media: Issued at Høvik on 2017-10-24 This Certificate is valid until 2022-10-23. DNV GL local station: New York pproval Engineer: Ingrid Sigvaldsen for DNV GL Dag Sæle-Nilsen Head of Section This Certificate is subject to terms and conditions overleaf. ny significant change in design or construction may render this Certificate invalid. The validity date relates to the Type pproval Certificate and not to the approval of equipment/systems installed. Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 1 of 6 DNV GL 2014. DNV GL and the Horizon Graphic are trademarks of DNV GL S.

Ballast Water Management System Supplier Ecochlor Inc. Type and model designation Ecochlor BWMS Series 75, Ecochlor BWMS Series 100, Ecochlor BWMS Series 150, Ecochlor BWMS Series 200, Ecochlor BWMS Series 250, Ecochlor BWMS Series 300. Place of production: ProFlow Inc. 303 State St., North Haven, CT 06473, US and FluidTech Environmental & Equipment Technology Co., Ltd., 1st Floor, Block 2, Henglu Modern Industrial Park, 166 Min Dong Road, Pudong New rea, 201209 Shanghai, P. R. China. Equipment assembly drawings The Ballast Water Management System (BWMS) shall be installed in accordance with one of the piping and instrumentation listed below. Description Title Drawing no. Rev. Treatment system P&ID Main Filtration system P&ID Two Filter (Shared) Main Filtratration system P&ID Two Filter (Each) Main Filtration System P&ID Single Filter (Each) Main Filtration System P&ID Single Filter Zone 0 Main Filtration System P&ID Two Filter (Shared) ES04075H01 ES04100H01 ES04150H01 ES04200H01 ES04250H01 ES04300H01 ES04075H02 to ES04300H02 ES04075H12 to ES04300H12 ES04075H22 to ES04300H22 ES04075H32 to ES04300H32 ET04075H42 to ET04300H42 Motive Water Filter P&ID ES04800H05 Wiring Diagram Filtration System Electrical Details Package Revision ES05400H02-H22 Wiring Treatment system Electrical Details Package Revision ES05400H32-H61 Wiring ft Peak system Electrical Details Package Revision ES05400H63-H77 Wiring Zone 0 Main Filtration System Electrical Details Package Revision ET05400H01-H55 Product description The Ecochlor Ballast Water Management System description is given in Operation Maintenance & Safety Manual (OMSM), Ecochlor standard vessel (ES) and Operation Maintenance & Safety Manual (OMSM) Ecochlor tanker vessel (ET) approved by DNV GL. Treatment sequence: Ballast water uptake: Filtration and chemical disinfection H G G H G H J C C B Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 2 of 6

Ballast water discharge: Manual verification of chlorine dioxide (ClO 2) levels in ballast water to be discharged. Discharge is allowed when the maximum concentration is 0.20 mg/l. pplication/limitation TRC (m 3 /h) ClO 2 consentration (mg/l) Model during uptake Ecochlor BWMS Series 75 <500 4.25 Ecochlor BWMS Series 100 <1300 4.25 Ecochlor BWMS Series 150 <3500 4.25 Ecochlor BWMS Series 200 <6900 4.25 Ecochlor BWMS Series 250 <12200 4.25 Ecochlor BWMS Series 300 <16200 4.25 Minimum capacity is 50 m 3 /h for all models. Temperature is not a limiting condition for this system. The system is accepted for a salinity above 1 PSU. Minimum holding time is 24 hours. Holding time is dependent on time to reach maximum allowable discharge concentration. Manual in-tank sampling regime is depending on the holding time times; 24-48 hrs; 48-72hrs or >72hrs. Filter The filter type BS-Series manufactured by Filtersafe is a screen filter with a 40μm wire mesh. Filter(s) shall be installed with a TRC that corresponds to the ballast flow capacity. The filter require a minimum inlet operational pressure of 1.6 bar. Backwash shall initiate when a differential pressure across the filter is 0.4 bar. Model TRC (m 3 /h) Model TRC (m 3 /h) BS025 50 BS201-T 550 BS031 75 BS300 750 BS050 125 BS300-T 850 BS061 150 BS400 1000 BS061-T 180 BS400 -T 1200 BS070 180 BS603 1500 BS100 250 BS603-T 1650 BS100-T 275 BS804 2000 BS101 250 BS804-T 2250 BS101-T 275 BS1004 2500 BS150 375 BS1004-T 2750 BS150-T 410 BS1204 3000 BS151 375 BS1204-T 3300 BS151-T 410 BS1206 3000 Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 3 of 6

BS200 500 BS1206-T 3300 BS200-T 550 BS1406 3420 BS201 500 BS1406-T 3762 Installation- and operational specifications for the different components Flow Meter The type approved system must be installed with a flow meter on filter outlet. If the flow meter is installed on filter inlet, an additional filter flush flow meter is installed. Chemical storage and piping For safety arrangement for chemical storage and piping DNV GL rules Pt. 6, Ch.7 applies. Further details are given in DNV GL report no 262.1-019159-J-83, rev. 0. Control and monitoring equipment Monitoring equipment to be installed; gas detectors inside ClO 2 generator installation space, flow meters for precursor chemicals, motive water and ClO 2 piping, pressure transmittors monitoring vacuum conditions for mixing chamber and leakage detectors in secondary containments and ClO 2 generator. ny indication of leakage shall trigger alarm and shutdown. The gas sensors are arranged with independent shutdown functionality. The control and monitoring devices are to be energized and remain active while the system is switched OFF, in case of leakage during longer voyages. The type approved system includes the following control units and sensors: Name Manufacturer Model Treatment system control panel Ecochlor CP-1 CP-1ExZ1 Main ballast filter control panel Ecochlor CP-2 CP-2EXZ1 CP-2ExZ0 CP-4 Remote HMI panel Ecochlor CP-3 Mixing chamber Nalco 6052111 Metering pump IWKI IX-C060TCF-TF01 ClO 2 Gas detector Dräger 37 ClO 2 sensor Optek F26 Handheld ClO 2 measuring Palintest Photometer 7500 instrument Handheld ClO 2 measuring Palintest ChlordioXense instrument PLC program Ecochlor ES0400 V13_SP1 170401 ll changes in software are to be recorded as long as the system is in use onboard. The records of all changes are to be forwarded to DNV GL for evaluation and approval. Major changes to the software are Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 4 of 6

to be approved before installed in the computer. Based on the modification, a Certification of pplication Functions may be required for the particular vessel. Information regarding the selected components shall be part of the documentation related to the specific installation, either by a reference to valid type approval certificate or technical documentation. Explosion proof version The Ecochlor chemical system is not designed for installation in a hazardous area. The Ecochlor filter EX model meets the requirements for use in hazardous area s zone 1 and zone 0 in accordance with DNV GL rules Pt.4 Ch.8 Sec.11. Only the equipment listed in Ecochlor BWTS Zone 1 and Zone 0 Electrical Components List, Table 2 and marked as to be installed in Zone 0 Hazardous may be installed in this area. Ex-certification is not covered by this certificate. Installation in hazardous area are to be approved in each case according to the Rules and Ex-certification/ Special Condition for Safe Use listed in valid Excertificate issued by a notified/recognized Certification Body Documents approval The following documentation is to be submitted for approval in each case. Piping: Piping and Instrumentation Diagram (P&ID) of the ballast system including the treatment system installation Control and instrumentation: Power supply arrangement Interface description specifying external signals including alarms for failure Description confirming the arrangement of alarms for bypass of the BWMS system (as part of Ballast Water Management Plan) List of EX equipment according to Pt. 4, Ch. 8, Sec. 11 if the system is to be installed in hazardous zone. Type pproval documentation Test Quality ssurance Plan, Ecochlor BWTS Series 75, Model ES-400S-1.0,, 8 pril 2015, Rev.0 Final Land-based Ballast Water Management Report ccording to USCG Final Rule, Ecochlor BWTS Series 75, Model ES-400S-1.0, 17 March 2017, Rev.0. Final Shipboard Ballast Water Management Report ccording to USCG Final Rule, Ecochlor BWTS Series 75, Model ES-400S-1.0, 5 Oct. 2016, Rev.0. Operation Maintenance & Safety Manual (OMSM), Ecochlor standard vessel (ES), 21 Jun2017/Rev.B Operation Maintenance & Safety Manual (OMSM) Ecochlor tanker vessel (ET), 21 Jun2017/Rev.B OMSM ES ppendix Package OMSM ET ppendix Package ES Installation Specification, 26Mar2017/Rev. ET Installation Specification, 26Mar2017/Rev. B Test Report for Ballast Water Treatment Systems (BWTS), report no. R-15756-1, October 17 2016 Information for pproval of Scaled Treatment Systems, Series 100 to Series 300, 08Mar2017, Rev.4 Ecochlor Commissioning, 22 June 2017, Rev.C Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 5 of 6

Tests carried out Land-based testing in accordance with Resolution MEPC.174 (58) witnessed by DNV GL Shipboard testing in accordance with Resolution MEPC.174 (58) witnessed by DNV GL Factory cceptance Test of the control and automation system witnessed by DNV GL Environmental testing in accordance with Environmental test specification for instrumentation and automation equipment, DNV GL CG-0339 and Resolution MEPC.174 (58) Marking of product For traceability of this Type pproval, each treatment system is to be marked with: Manufacturer s name or trade mark Type designation Serial number Periodical assessment DNV GL s surveyor is to be given permission to perform Periodical ssessments at any time during the validity of this certificate and at least every second year. The arrangement is to be in accordance with procedure described in DNV GL-CP-0338 Section 4. The scope of periodical assessment includes: Ensure that type approved documentation is available Inspection of factory samples, selected at random from the production line (where practicable) Review of production and inspection routines, including test records from product sample tests and control routines Ensuring that systems, software versions, components and/or materials used comply with type approved documents and/or referenced system, software, component and material specifications Review of possible changes in design of systems, software versions, components, materials and/or performance, and make sure that such changes do not affect the type approval given Ensuring traceability between manufacturer s product type marking and the type approval certificate Copy of type approval certificate copy of this type approval certificate should be carried onboard a vessel fitted with this ballast water management system at all times. n annex containing the summary reports of the test results of landbased and shipboard tests should be available for inspection onboard the vessel. Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 6 of 6