Northern Branch Corridor SDEIS March 2017

Similar documents
15. Wetlands Chapter Overview Introduction

Northern Branch Corridor SDEIS March 2017

Northern Branch Corridor DEIS December 2011

Northern Branch Corridor SDEIS March Table of Contents

4. Land Use and Zoning

6. Consistency with Local Plans

27. Construction Impacts

25. Section 4(f) Evaluation

Right-of-Way Acquisitions and Relocations Technical Memorandum

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

Asbury Chapel Subdivision Sketch Plan

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Appendix E Section 4(f) Evaluation

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Environmental Assessment

BeltLine Corridor Environmental Study

DRAFT MAP AMENDMENT FLU 04-4

Chesapeake Bay Critical Area Conservation Plan

Note: Staff reports can be accessed at Zone: I-3. Tier:

ITS Concept Development Activity Descriptions

Existing Conditions and Environmental Consequences Floodplains

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

WASHINGTON COUNTY OREGON

Review Zone Application for D&R Canal Commission Decision

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

Pedestrian Trails Within Regulated Areas

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

A. INTRODUCTION B. CUMULATIVE EFFECTS ANALYSIS

Information for File # MVP MMJ; Elim Care

Transportation Committee

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Pennsy Greenway Trail

Agenda. Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity ( )

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

SOUTHEAST BERGEN. Constituent Municipalities: Cliffside Park Edgewater Fairview Fort Lee Leonia Palisades Park Ridgefield Ridgefield Park

Description of Preferred Alternative

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

WELCOME TO OPEN HOUSE TWO November 28, 2018

Technical Memorandum 5

East Corridor Final Environmental Impact Statement

THE PLANNING AREA 2.1 PLANNING AREA LOCATION

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017

Staff Report CONDITIONAL USE

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

To: Planning Commission D.. June 3, 2009

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

III. PROJECT DESCRIPTION

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

7.0 SECTION 4(F) EVALUATION

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

SECTION 1 Introduction...1. SECTION 2 Regional Context Criteria for Planning Districts Description of Planning District...

City of Sun Prairie Wetland Buffer Reduction Request

Southwest Fleetwood Enclave

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

Section 3 INVENTORY OF RECREATION LAND AND FACILITIES

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

REQUEST: Conditional Change of Zoning (AG-1, B-1,R-15 to Conditional R-7.5)

The proposed project will impact a large amount of aquatic resources.

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Visual and Aesthetic Resources

UNIVERSITY OF MICHIGAN:

Planning Commission Staff Report June 5, 2008

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Berkshire Regional Planning Commission Clearinghouse Review Report

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

BRADENTON RIVERWALK EXPANSION MASTER PLAN

23. Historic Properties and Resources

PLANNING COMMISSION. Submitted

Venice Pumping Plant Dual Force Main Project Draft EIR

FINAL MITIGATION PLAN to address

Information for File # KDZ

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

3.5. Visual and Aesthetic Qualities

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Written Statement for Keizer Station Area B Amendment. Master Plan Amendment for Keizer Station Area B GENERAL INFORMATION

Floodplain Technical Memorandum

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Draft Environmental Assessment

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

CHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary

Chapter 3 Site Planning and Low Impact Development

PART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.

PARKS AND RECREATION

5.13 RECREATION / OPEN SPACE

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

Transcription:

Northern Branch Corridor SDEIS March 2017 15. 15.1. Chapter Overview 15.1.1. Introduction This chapter discusses changes to the Preferred Alternative resulting in the potential for project improvements to adversely affect wetlands. Although the SDEIS Preferred Alternative no longer travels into Tenafly, no wetlands were affected in Tenafly under the DEIS Preferred Alternative. Consequently, the change in terminus does not affect the total impact to wetlands. The following revisions specifically required freshwater wetlands assessment: West Side Avenue alignment: the majority of the alignment, as well as a 3,000± square foot substation, represent new development within the Hackensack Meadowlands District (HMD) boundary. 85th Street Viaduct /85 th Street Extension: the viaduct connection from West Side Avenue to the Northern Branch and extension of 85 th Street would acquire and develop wooded acreage in North within the HMD boundary. Relocation of 91 st Street platforms: linear wetland swales would be affected by a shift in platform location. Relocation of Ridgefield platforms: linear wetland swales would be affected by a shift in platform location. Relocation of Leonia parking deck: a parking deck is proposed to be developed within Overpeck Park. Revised design of Englewood Route 4 : the Englewood Route 4 would now incorporate the vehicle base facility (VBF) into the proposed parking deck, and the entire facility would be located on the east side of the Northern Branch. Previously, the VBF was located in North with an option to locate in Englewood, and the Englewood Route 4 and parking area occupied land on both sides of the Northern Branch right-of-way. Comments submitted on the DEIS pertaining to wetlands focused on the availability of wetlands mitigation banks and the need for a detailed wetlands delineation during the FEIS phase. The availability of wetlands mitigation credits was taken into consideration in the development of the SDEIS Preferred Alternative. The SDEIS, like the DEIS, evaluates the conceptual design to assess for the potential for impact and related fatal flaws. 15.1.2. Summary of Findings of the DEIS and the SDEIS Changes to the Preferred Alternative altered the location of three improvements relative to identified wetland areas: 91 st Street s platforms shifted from the south side of 91 st Street to the north, affecting an area of wetlands, and the Ridgefield s platforms shifted south. The West Side Avenue realignment and 85 th Street Extension (including a railroad underpass and grade crossings) would place Northern Branch improvements within the HMD, but the majority of the proposed developments would occur within existing road rights-of-way. Additionally, shifting the alignment to West Side Avenue would eliminate wetland impacts within the freight yard. A small portion of the 85 th Street Extension would be located on undeveloped land; however, this land does not contain any wetlands. Although the new Leonia parking deck would be located within Overpeck Park, the parking facility would be designed to avoid wetlands impacts. Table 15-1 summarizes the permanent impacts to study area wetlands resulting from the implementation of the SDEIS Preferred Alternative. Chapter 15: 15-1

Northern Branch Corridor SDEIS March 2017 Table 15-1: Potential Wetland Acreage Impacts within Study Area Municipality and /Element Wetland Acreage* Location Revised Between the DEIS and SDEIS? Change in Wetland Impact Compared to DEIS North Rail ROW (including structures, 85 th Street Viaduct and 85 th Street 0.81 Yes Yes: less 0.98 acres Extension) West Side Avenue Alignment None Yes No 91 st Street 0.14 acres Yes Yes: additional 0.10 acres Fairview Rail ROW (including structures) 0.02 acres No No Ridgefield Rail ROW (including structures) 0.26 acres No No Ridgefield 0.07 acres Yes Yes: additional 0.07 acres Palisades Park Rail ROW (including structures) 0.24 acres No No Palisades Park None No No Leonia Rail ROW (including structures) 1.03 acres No No Leonia None Yes No Englewood Rail ROW (including structures) 1.10 acres No No Englewood Route 4 and VBF 0.25 acres Yes No Englewood Town Center None Yes No Englewood Hospital and Medical Center TOTAL None Yes No 3.92 acres *= based on preliminary engineering design and subject to change Yes: 0.81 acres less than DEIS Preferred Alternative The SDEIS Preferred Alternative would result in 0.81 acres less wetlands impacts than the DEIS Preferred Alternative to Tenafly. The SDEIS Preferred Alternative therefore represents an improvement (less impacts) as compared to the DEIS. Although the SDEIS Preferred Alternative results in fewer impacted acres, the project would still require approval from the New Jersey Department of Environmental Protection (NJDEP) Freshwater Protection Act (FWPA) to obtain a Freshwater Wetland Individual Permit. Figures 15-1 to 15-6 illustrate the locations of wetlands along the Northern Branch Corridor. Baseline data updates did not indicate any new wetland areas or changes to the boundaries of wetlands analyzed in the DEIS. Chapter 15: 15-2

4 Rd Knickerbocker Englewood Hospital & Medical Center Englewood Town Center Engle St Northern Branch Overview Figure 15-1 Dean St Grand Ave E Palisade Ave Englewood Route 4 80 Fort Lee Rd Leonia 4 9W Half-Mile Study Area Proposed s 46 Palisades Park Ridgefield 93 1 Broad Ave 63 5 67 95 Proposed Alignment HBLR s Light Rail Rivers and Streams Delineated Wetland Areas Municipality 91st Street West Side Ave 1 John Tonnelle Ave F Kennedy Blvd 0 1 2 Miles Source: NJ DEP and US FWS National Inventory 3

Northern Branch 91st Street Figure 15-2 91st St Half-Mile Study Area Proposed Alignment Municipality Westside Ave Area Features Bus Pullout Parking Area Pedestrian Improvement Platform 0 350 700 Feet 83rd St Source: NJ DEP and US FWS National Wetlant Inventory

Broad Ave Hendricks Cswy Northern Branch Ridgefield Figure 15-3 1 Half-Mile Study Area Proposed Alignment Municipality Area Features Bus Pullout Parking Area Pedestrian Improvement Platform 0 90 180 Feet Source: NJ DEP and US FWS National Wetlant Inventory

Northern Branch Leonia Figure 15-4 Half-Mile Study Area Proposed Alignment Municipality Area Features Bus Pullout Parking Area Pedestrian Improvement Platform Fort Lee Rd 93Grand Ave 0 440 880 Feet Source: NJ DEP and US FWS National Wetlant Inventory

4 Northern Branch Englewood Route 4 Figure 15-5 Half-Mile Study Area Proposed Alignment Municipality Dean St Area Features Parking Area Pedestrian Improvement Platform VBF 0 175 350 Feet Source: NJ DEP and US FWS National Wetlant Inventory

Northern Branch Corridor SDEIS March 2017 15.2. Methodology Information on wetlands and drainage in the Northern Branch Corridor study area was obtained from field verification conducted during the DEIS phase and existing digital mapping from the NJDEP Division of Land Use Regulation and U.S. Fish and Wildlife Service National Wetland Inventory GIS datasets. DEIS phase field verification investigated the area adjacent to the rail corridor, regardless of the potential for development of the DEIS Preferred Alternative and remains the most accurate mapping of wetland constraints in the study area. SDEIS Preferred Alternative improvements that were located beyond the limits of the area investigated and delineated during the DEIS were assessed using NJDEP land use and land cover (LULC) data by watershed to indicate the likely presence of wetlands. Improvements were also analyzed on an aerial basemap to indicate whether the land potentially affected by project development was already disturbed or built. The reanalysis also sought to confirm the existing jurisdictional boundaries relating to wetlands regulations. NJDEP assumes authority to regulate freshwater wetlands and streams in most of New Jersey. US Army Corps of Engineers (USACE) retains authority over certain designated areas and tidal waters of the United States. In the Northern Branch Corridor study area, USACE jurisdiction is limited to the HMD. The HMD boundary did not change between the DEIS and SDEIS phase. To estimate wetland disturbance, it was assumed that any existing wetlands within 25 feet of the centerline of the alignment would be impacted during construction activities. These wetland areas were then calculated to determine the approximate area of permanent impact, if any, due to the proposed project. Permanently impacted areas along the right-of-way were assumed to be filled as a result of construction activities, representing the loss of the identified acreage. Right-of-way improvements include improvements to the rail bed. platform development, although occurring within the rightof-way, was counted separately as station impacts, and reflects the approximate acreage permanently incorporated into paved and concrete areas serving the station, including platforms and parking areas. No areas were double-counted. 15.3. Environmental Review 15.3.1. Existing Conditions Wetland areas mapped in the DEIS are consistent with those found in the SDEIS. The southern and western portions of the study area are within the HMD and are under the jurisdiction of the USACE. The Northern Branch railroad alignment serves as the western boundary of the HMD from North to its intersection with Hendricks Causeway in Ridgefield. North of Hendricks Causeway, as well as south of Hendricks Causeway and east of the Northern Branch, all wetlands are under the jurisdiction of NJDEP. not directly connected to existing waterbodies (Bellman s Creek, Wolf Creek, Overpeck Creek, etc.) are typically linear drainage swales dominated by invasive species including phragmites. These linear areas were delineated as part of the analysis performed for the DEIS. Re-evaluation performed as part of SDEIS revisions to the Preferred Alternative indicated no change in the delineated boundaries. 15.3.2. Potential Impacts and Mitigation 15.3.2.1. No Build Alternative There are no changes to the impacts associated with the No Build Alternative as compared with the DEIS. Chapter 15: 15-8

Northern Branch Corridor SDEIS March 2017 15.3.2.2. Preferred Alternative Following is a description of the revisions to the Preferred Alternative and their potential for affecting wetlands within the study area, followed by a description of the mitigation that is applicable to all of the impacted areas. West Side Avenue Alignment The alignment along West Side Avenue is within the HMD and under USACE jurisdiction; however, the proposed alignment occurs within existing paved areas. No wetlands would be affected as a result of this revision to the Preferred Alternative (refer to Figure 15-2). However, as a result of shifting the alignment to West Side Avenue instead of within the existing right-of-way, the impacts to wetlands were reduced by almost an acre. 85 th Street Viaduct/85 th Street Extension The 85 th Street Viaduct and 85 th Street Extension would acquire and develop wooded acreage within the parcel occupied by the North Municipal Pool. The land to be acquired is within the HMD. A linear wetland swale is present in the portion of the property to be developed. The estimated impact would be less than 0.01 acres. This acreage is included in the rail right-of-way impact estimate shown in Table 15-1. 91 st Street The platforms for 91 st Street would be relocated to the north side of the 91 st Street intersection within the Northern Branch railroad right of way. Both the inbound and outbound platforms would be located within previously-delineated wetland swales. Approximately 0.14 acres of linear freshwater wetlands would be permanently impacted to accommodate the new station platforms. The station site is located both in USACE jurisdiction and NJDEP jurisdiction as the HMD boundary is coterminous with the Northern Branch railroad centerline. The western platform, affecting 0.09 acres of wetlands, is subject to USACE mitigation. The eastern platform, affecting 0.05 acres of wetlands, is within NJDEP jurisdiction (refer to Figure 15-3). Ridgefield Ridgefield platforms were previously located within 100 feet of the Hendricks Causeway overpass. Due to the eastern curve in the Northern Branch alignment, project engineers noted that the service plan would be better met by moving the platforms south. This arrangement enables the light rail vehicles to enter the curve while in motion instead of starting from a station stop on a curve. The southern shift affects one linear wetland swale on the east side of the Northern Branch within NJDEP jurisdiction. Total permanent impact to wetlands resulting from this adjustment in station configuration is 0.07 acres (refer to Figure 15-4). Leonia Leonia platforms are proposed to be located within the existing Northern Branch right-of-way, south of Fort Lee Road. This is a new location for the platforms, but the relocation does not affect any mapped or previously-delineated wetlands. The four-story parking deck and pedestrian walkway to the platforms are proposed to be located within the Leonia South Area of Overpeck Park, on land currently developed with an abandoned paved basketball court and restroom facility. were delineated immediately north of the proposed parking deck site, but the facility would be designed to avoid impact to the wetland resource. The bus pull-outs proposed for Fort Lee Road are located at the roadway edge and would not affect wetlands (refer to Figure 15-5). Englewood Route 4 /VBF The proposed Englewood Route 4 and proposed VBF are located adjacent to previouslydelineated freshwater linear wetland drainage swales parallel to platforms located on the east and west Chapter 15: 15-9

Northern Branch Corridor SDEIS March 2017 sides of the existing right-of-way (refer to Figure 15-6). The combined VBF and parking deck would occupy the same footprint as the Englewood VBF described in the DEIS and right-of-way impacts would not change. No difference in wetlands impacts occurs under the SDEIS Preferred Alternative as compared to the DEIS Preferred Alternative. Mitigation Mitigation measures for SDEIS impacts are the same as those described for DEIS impacts. NJ TRANSIT s preferred means of mitigation of permanent impacts would be to acquire wetland mitigation credits within an NJDEP-approved Wetland Mitigation Bank. This method is typically preferred by the USACE due to its ability to create high-quality wetland areas of sufficient size to provide habitat for wetland fauna. This mitigation method would address all wetlands impacts, regardless of location or associated project element. The purchase of credits would require an agreement between NJDEP and USACE, but is typically a 2:1 ratio. Two options include the Kane Tract and the MRI-3 Wetland Mitigation Bank. The Kane Tract, administered by the Meadowlands Conservation Trust Organization, is located in. The Kane Tract is a 587-acre property located in the Borough of Carlstadt and Township of South Hackensack,. This wetlands mitigation bank is located approximately 1.25 miles west of the project alignment in the HMD and is within the same Hackensack Pascack Watershed Management Area 5 as the project corridor and the potentially impacted areas. The MRI-3 Mitigation Bank, operated by Evergreen Environmental, is a site of approximately 51 acres and is also located in the Borough of Carlstadt and Township of South Hackensack,, along the banks of the Hackensack River in the Hackensack Meadowlands. The bank site is bordered on the west by Bashes Creek and is drained by Moonachie Creek to the east. 15.4. Summary of Potential Environmental Effects of the DEIS and the SDEIS The SDEIS Preferred Alternative results in a total of 3.92 acres of wetlands impacts associated with the development of project elements. The project elements that changed between the DEIS and SDEIS did not result in a substantial increase in wetland acreage impacts; to the contrary, the new configuration of project elements in the SDEIS resulted in fewer impacts. None of the wetlands affected by the new or relocated elements are high-quality habitat areas; all are isolated drainage swales of minimal quality. Mitigation is anticipated to occur in the form of the purchase of mitigation credits from an approved wetlands mitigation bank, regardless of the jurisdiction of the acreage affected. Chapter 15: 15-10