These telephone numbers are provided as a general aid to emergency notification. Be advised that additional agencies may be required to be notified.

El Segundo Fire Department. Unified Program (UP) Form CONSOLIDATED CONTINGENCY PLAN I. FACILITY IDENTIFICATION

5.0 CONTINGENCY PLAN. It is necessary to amend the plan if:

HAZARDOUS WASTE CONTINGENCY PLAN

IYRS School of Technology & Trades RCRA CONTINGENCY PLAN Bristol Facility 40 CFR 265 Subpart D 29 CFR Emergency Evacuation

WESTERN CONNECTICUT STATE UNIVERSITY HAZARDOUS WASTE CONTINGENCY PLAN PROCEDURE E-115

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

Evacuation Fire Safety Program

Hazardous Materials Protection and Contingency Plan for Carnegie Mellon University Doha Campus

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

UNIFIED PROGRAM AGENCY (CUPA)

Special Occupancy Requirements

LAKE COUNTY SCHOOL DISTRICT

ANGELO STATE UNIVERSITY HAZARDOUS CHEMICAL STORAGE & SPILL CONTINGENCY PLAN

Environmental Management Procedure (EMP) Tab 1. Subject: EMP Tab 1 Hazardous Materials Storage and Container Management

This plan, its contents, and emergency notification procedures shall be made available to all appropriate university employees.

Board Policy 6819 Fire Safety and Prevention Plan

OXNARD FIRE DEPARTMENT Fire Watch Guidelines

GUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS. High-Hazard

1.2 To ensure the safety of all persons working in or occupying a building where a hot work operation is performed.

CHAPTER 15: FIRE PREVENTION & AWARENESS POLICY

Contingency Plan for Hazardous Materials and Waste Releases

Element 14.7 Fire Prevention and Control 2018

HOT WORK SAFETY PROGRAM:

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

CENTRAL STATE HOSPITAL PLAN SAFE USE HANDLING AND STORAGE OF FLAMMABLE AND COMBUSTIBLE LIQUIDS

Emergency Evacuation Plan South Patterson Building (SPB)

Fire Prevention Plan Program Prepared by: Allied Insurance Brokers, Inc.

SPILL PREVENTION AND RESPONSE PLAN

2010 FIRE CODE OF NEW YORK STATE

Emergency Evacuation Plan. Kettering Labs. School of Engineering

State University of New York College at Oneonta Contingency Plan for Incidents Involving Hazardous Materials and Waste

Today, we re going to talk about emergency action and fire prevention. We hope we never have to face an emergency situation like a fire in our

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

University of Maryland FIRE EVACUATION PLAN Columbus Center POLICE FIRE MEDICAL EMERGENCY - 911

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

Emergency Planning and Preparedness

[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.

OUTLINE FOR FIRE PREVENTION ACTIVITY

Airport Firefighter Recertification Core Competency Task Book

Emergency Action Fire Prevention Plan

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Mount Laurel Fire Department, Office of The Fire Marshal FIRE WATCH NOTIFICATION

SCALES NW EMERGENCY ACTION PLAN

FIRE PREVENTION PLAN EMERGENCY ACTION

X0.01 Emergency Management. Approved: September 27, 2002 Revised: July 15, Next Scheduled Review: July 15, 2014 PROCEDURE STATEMENT

Demolition Permit Application (Please print and complete ENTIRE form)

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services 575 E. Flamingo Road, Ls Vegas, NV (702) FAX (702)

ARTICLE 4-13 ALARM SYSTEMS * Division 1. Generally

WELDING, CUTTING, AND BRAZING SAFETY PROGRAM

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

Subject: Hazardous, Universal, and Non Hazardous Waste Accumulation Site Management

1.0 Basic Principles and Practices of Propane Performance-Based Skills Assessment 2016

Fire Protection. A Health and Safety Guideline for Your Workplace. Introduction. Fire Prevention and Control. Workplace Assessment

1303 Trans Canada Way SE Medicine Hat, AB T1B 3Z9 Phone

Pesticide Emergencies: Contingency Planning 1

FIRE PROTECTION PROGRAM

Flammable Liquid Compliance Program

Flammable Liquids!!!!!

EMERGENCY ACTION PLANS HOW READY ARE YOU?

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST STANDPIPE SYSTEMS

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

B. The Facility Emergency Planners and Alternate Planners will successfully complete the in-house DJJ Fire Prevention course.

Harvard University - OEB Glasshouse Emergency Evacuation Plan

Fire Prevention Plan

HEALTHWEST PROCEDURE. No Prepared by: Effective: February 6, 2008 Revised: June 5, 2017 Environment of Care Committee

University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat,

Flammable and Combustible Liquids Checklist

Introduction. Program Description. Section C.20 University of South Carolina Safety Program Guide FLAMMABLE AND COMBUSTIBLE LIQUIDS

Fire Safety Plan (FSP) Review Checklist 1

Muskogee Public Schools. Lockout/Tagout. Program

Fire Safety Plan (FSP) Review Checklist 1

FIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE FIRE MEDICAL EMERGENCY

FIRE SAFETY AND EVACUATION PLANNING FOR ASSISTED LIVING FACILITIES AND NURSING HOMES

Title: Fire Prevention During Welding, Cutting and Other Hot Work Plan (formerly the Cutting & Welding Policy)

Safety Manual: Emergency Response

Fire Prevention Plan

MIT Emergency Response Guide

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

Fire Prevention Plan Program

Savard Labor & Marine Staffing, Inc. Fire Prevention Program Rev3/14

Chapter 3: Emergency Planning for Laboratories

Welcome to the Keys to a Successful Fire / Life Safety Inspection and Sustained Tenant & Building Safety

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

Thomasville Municipal Code Chapter 12 PUBLIC SAFETY

Fire Safety Plan Information. For Construction and Demolition Sites

Table of Contents. EMERGENCY PROCEDURES Policy 190

Fire Prevention and Protection Plan

Mulch fires, trash can fires, or other fire outside a building should be reported by the following methods:

Winnipeg Fire Department Fire Prevention Branch

Hot Work Policy and Procedures

SUMMARY: Policy Title: Electrical Safety Work Practice Program. Policy Number: UNIV-EHS 430 Policy Approved: January 2014

FIRE SAFETY PLAN FOR CONSTRUCTION, RENOVATION AND DEMOLITION SITES

Los Angeles International Airport Rules and Regulations SECTION 08 FIRE AND SAFETY

State University of New York College at Oneonta Contingency Plan for Incidents Involving Hazardous Materials and Waste

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Hazardous Waste Section Civil Penalty Assessments 2007

Transcription:

July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST DRY CLEANING Address: Permit #: Inspector: Date Inspected: Status: Inspector: Date Inspected: Status: A-Approved, R-Re-inspection Required This Checklist outlines general requirements. Information contained herein applies to typical instances and may not address all circumstances. PERMITS 1. Installation permit 2. Fixed extinguishing system or automatic sprinkler system permit to be obtained by the installer prior to system installation 3. Operations (a separate permit is also required if the dry cleaning business uses perchlorethylene) 4. Hazardous Materials (Range and/or Level) CODE REFERENCES: California Health & Safety Code Title 40 Code of Federal Regulations (C.F.R.) Title 22 California Code of Regulations GENERAL REQUIREMENTS 5. Heating (CFC 1204.2.2). In Type II dry cleaning plants, heating shall be by indirect means using steam, hot water or hot oil only. 6. Bonding and grounding (CFC 1204.2.4). Storage tanks, treatment tanks, filters, pumps, piping, ducts, dry cleaning units, stills, tumblers, drying cabinets and other such equipment, where not inherently electrically conductive, shall be bonded together and grounded. Isolated equipment shall be grounded. SPOTTING AND PRETREATING Page 1 of 7

7. Spotting tables (CFC 1206.3.1). Scouring, brushing or spotting tables on which articles are soaked in solvent shall have a liquid-tight top with a curb on all sides not less than 1 inch (25 mm) high. The top of the table shall be pitched to ensure thorough draining to a 1.5-inch (38 mm) drain connected to an approved container. 8. Ventilation (CFC 1206.3.3). Scrubbing tubs, scouring, brushing or spotting operations shall be located such that solvent vapors are captured and exhausted by the ventilating system. 9. Bonding and grounding (CFC 1206.3.4). Metal scouring, brushing and spotting tables and scrubbing tubs shall be permanently and effectively bonded and grounded. DRY CLEANING SYSTEMS 10. Type II systems (CFC 1207.2). Type II dry cleaning and solvent tank storage rooms shall not be located below grade or above the lowest floor level of the building. 11. Fire-fighting access (CFC 1207.2.1). Type II dry cleaning plants shall be located so that access is provided and maintained from one side for fire-fighting and fire control purposes in accordance with Section 503. 12. Number of means of egress (CFC 1207.2.2). Type II dry cleaning rooms shall have not less than two means of egress doors located at opposite ends of the room, at least one of which shall lead directly to the outside. 13. Spill control and secondary containment (CFC 1207.2.3). Curbs, drains, or other provisions for spill control and secondary containment shall be provided in accordance with Section 2704.2 to collect solvent leakage and fire protection water and direct it to a safe location. FIRE PROTECTION 14. Automatic sprinkler system (CFC 1208.2). 15. Automatic fire-extinguishing systems (CFC 1208.3). Type II dry cleaning units, washerextractors, and drying tumblers in Type II dry cleaning plants shall be provided with an approved automatic fire-extinguishing system installed and maintained in accordance with Chapter 9. Exception: Where approved, a manual steam jet not less than 0.75 inch (19 mm) with a continuously available steam supply at a pressure not less than 15 pounds per square inch gauge (psig) (103 kpa) is allowed to be substituted for the automatic fire-extinguishing system. 16. Portable fire extinguishers (CFC 1208.4). A minimum of two 2-A:10-B:C portable fire extinguishers shall be provided near the doors inside dry cleaning rooms containing Type II, Type III-A and Type III-B dry cleaning systems. DRY CLEANING BUSINESS OPERATION REQUIREMENTS: ACCUMULATION 17. (Title 22, 66262.34.) Hazardous waste may be accumulated onsite in generator accumulation units only in compliance with the applicable time limits specified in Health & Safety Code, 25123.3 (90 days, 180 days, 270 days or 365 days). Page 2 of 7

18. If hazardous waste is accumulated in containers, a generator must comply with Title 22, California Code of Regulations, division 4.5, chapter 15, article 9 (Use and Management of Containers). These requirements include: 19. (Title 22, 66265.176.) Placing containers holding ignitable or reactive wastes at least 15 meters (50 feet) from the facility's property line. 20. (Title 22, 66265.177.) Not placing incompatible waste streams into the same container. 21. (Title 22, 66265.177.) Separating a container holding a hazardous waste that is incompatible with any waste or other materials transferred or stored nearby in other containers, piles, open tanks, or surface impoundments from the other materials or protecting them by means of a dike, berm, wall, or other device. Maintaining all containers so that they are: 22. (Title 22, 66265.171) in good condition; 23. (Title 22, 66265.172) compatible with contents; 24. (Title 22, 66265.173) closed, except when adding or removing hazardous waste; 25. (Title 22, 66265.173) managed to avoid rupture or leaks; 26 (Title 22, 66265.174) inspected weekly; and 27. (Title 22, 66262.34) properly labeled. LABELING/MARKING 28. (Title 22, 66262.34) The date upon which each period of accumulation begins must be clearly marked and visible for inspection on each accumulation unit. 29. (Title 22, 66262.34) Each container must be labeled or clearly marked with the words, "Hazardous Waste." 30. (Title 22, 66262.34) Each container and portable tank in which hazardous waste is accumulated must be labeled with the following information: 31. Composition and physical state of the waste; 32. Statement or statements that call attention to the particular hazardous properties of the waste (e.g. flammable, reactive); and 33. Name and address of the generator. EMERGENCY PROCEDURES/ CONTINGENCY PLANS All generators must comply with these requirements regarding preparedness and prevention: 34. (40 C.F.R. 265.31; Title 22, 66265.31) All operations must minimize the possibility of a fire, explosion or any unplanned release of hazardous waste or hazardous waste constituents to air, soil, or surface water that could threaten human health or the environment. Page 3 of 7

35. (40 C.F.R. section 265.32; Title 22, 66265.32) A generator's site must be equipped with the following: 36. Internal communication or alarm system to provide immediate instruction to personnel; 37. A telephone, two-way radio, or similar device, capable of summoning emergency assistance from local police departments, fire departments, or state or local emergency response teams; 38. Portable fire extinguishers, fire control equipment, spill containment equipment and decontamination equipment; (40 C.F.R. section 265.33, Title 22, 66265.33) All communications and alarm systems, fire protection equipment, spill control equipment and decontamination equipment, where required, must be tested and maintained as necessary to ensure its proper operation in time of emergency. 39. (40 C.F.R. section 265.34, Title 22, 66265.34.) Whenever hazardous waste is being handled, all personnel involved in the operation must have immediate access to an internal alarm or emergency communication device, either directly or through visual voice contact with another employee. 40. (40 C.F.R. section 265.34, Title 22, 66265.34) If only one employee is on the premises while the facility is operating, he/she must have immediate access to a device, such as a telephone (immediately available at the scene of operation) or a hand-held two-way radio, capable of summoning external emergency assistance. 41. (40 C.F.R. section 265.35, Title 22, 66265.35) The generator must maintain aisle space to allow the unobstructed movement of personnel, fire protection equipment, spill control equipment and decontamination equipment to any area of operation in an emergency. GENERATION OF LESS THAN 27 GALLONS/MONTH 42. (40 C.F.R. section 262.34(d)(5)) Generators that generate less than 27 gallons/month of hazardous waste must comply with the following requirements: 43. (40 C.F.R. section 262.34(d)(5)(i)) At all times there must be at least one employee either on the premises or on call (i.e., available to respond to an emergency by reaching the facility within a short period of time) with the responsibility for coordinating all emergency response measures. This employee is the emergency coordinator. 44. (40 C.F.R. section 262.34(d) (5)(ii)) Post the following information next to the telephone: The name and telephone number of the emergency coordinator; The location of fire extinguishers and spill control material, and, if present, fire alarm; and The telephone number of the fire department, unless the facility has a direct alarm. 45. (40 C.F.R. section 262.34(d)(5)(iv)) The emergency coordinator or his/her designee must respond to any emergencies that arise. In the event of a: Fire, call the fire department or attempt to extinguish it using a fire extinguisher; Spill, contain the flow of hazardous waste to the extent possible, and as soon as is practicable, clean up the hazardous waste and any contaminated materials or soil; Page 4 of 7

Fire, explosion, or other release that could threaten human health outside the facility or when the generator has knowledge that a spill has reached surface water, the generator must immediately notify the National Response Center (using their 24-hour toll free number 800/424-8802). GENERATION OF 27 GALLONS/MONTH OR MORE 46. Each generator that generates 27 gallons/month or more of hazardous waste per month must comply with the requirements as follows: 47. (Title 22, 66265.51) The generator must prepare and retain a written contingency plan and emergency procedures for dealing with emergencies. The contingency plan shall be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water. 48. (Title 22, 66265.51) The provisions of the plan must be carried out immediately whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents that could threaten human health or the environment. The contents of a contingency plan can be found in Title 22, 66265.52. 49. (Title 22, 66265.55) At all times there must be at least one employee, either on the premises or on call (i.e., available to respond to an emergency by reaching the site within a short period of time), with the responsibility for coordinating all emergency response measures. In addition, this person must have the authority to commit resources needed to carry out the contingency plan. TRAINING 50. (40 C.F.R. section 262.34(d)(5)(iii)) Generators that generate less than 27 gallons/month of hazardous waste must ensure that all employees are thoroughly familiar with proper waste handling and emergency procedures, relevant to their responsibilities during normal facility operations and emergencies. 51. (Title 22, 66265.16) Generators that generate 27 gallons or more per month of hazardous waste must comply with the requirements of Title 22, 66265.16. These requirements include: 52. Personnel must successfully complete a program of classroom instruction or on-the-job training that teaches them to perform their duties in a way that ensures the generator's compliance with the regulatory requirements. 53. This program must be directed by a person trained in hazardous waste management procedures, and must include instruction that teaches personnel hazardous waste management procedures (including contingency plan implementation) relevant to the positions in which they are employed. 54. At a minimum, the training program must be designed to ensure that personnel are able to respond effectively to emergencies by familiarizing them with emergency procedures, emergency equipment and emergency systems, including other applicable requirements. 55. Personnel must successfully complete the program within six months after employment or assignment to the facility. Personnel must not work in unsupervised positions until they have completed the training requirements referenced above. They must also take part in an annual review of the initial training. Page 5 of 7

(Title 22, 66265.16) The following documents and records must be maintained at the facility: 57. The job title for each position related to hazardous waste management, and the name of the employee filling each job. 58. A written job description for each position related to hazardous waste management, including the requisite skill, education or other qualifications and duties of employees assigned to each position. 59. A written description of the type and amount of both introductory and continuing training that will be given to each person filling each of these positions. 60. Records that document that the training or job experience required has been given to, and completed by, facility personnel. 61. Training records on current personnel must be kept until closure of the site. Training records on former employees must be kept for at least three years from the date the employee last worked at the site. Personnel training records may accompany personnel transferred within the same company. SHIPMENT 62. When shipping hazardous waste totaling more than 50 pounds/5 gallons off the premises a generator must: 63. (Title 22, 66262.12) Use only transporters, and transfer, treatment, storage and disposal facilities that are registered or permitted by DTSC and have obtained an ID number; 64. (Title 22, 66262.32) Comply with Department of Transportation (DOT) requirements for packaging, labeling and marking and ensure that the transport vehicle is correctly placarded; 65. (Title 22, 66262.20 and Title 22, 66262.21) Use a California Hazardous Waste Manifest, DTSC Form 8022A, unless the receiving state requires otherwise. A manifest is the paperwork that accompanies hazardous waste from the point of generation to the point of ultimate treatment, storage or disposal. Manifests may be ordered from the Department of General Services, P. O. Box 1015, North Highlands, CA, 95660. For general manifest questions, call DTSC's GISS at 1-800- 618-6942.; 66. (Title 22, 66262.23) Complete the generator and waste sections and sign the manifest certification according to the instructions included in the Appendix to Chapter 12 of Division 4.5, Title 22, California Code of Regulations; 67. (Title 22, 66262.23) Obtain the handwritten signature of the initial transporter and date of acceptance on the manifest; 68. (Title 22, 66262.23) Retain two copies of the manifest, in accordance with Title 22, 66262.40(a); 69. (Title 22, 66262.40) Keep the generator copy of each manifest for three years or until the signed copy is returned by the designated facility (See below*). This signed copy must be retained for at least three years from the date the waste was accepted by the initial transporter; 70. (Title 22, 66262.23) Ensure that if shipping hazardous waste to an out of state non-permitted TSD, that the TSD signs and returns the final copy of the manifest to the generator, who is then responsible for sending the signed copy to DTSC; Page 6 of 7

71. (Title 22, 66262.23) Submit the appropriate copy of each manifest used to DTSC, within thirty (30) days of each shipment; 72. (Health & Safety Code, section 25160) If a manifest from another state is used to ship hazardous waste to that state, then submit a legible copy of the manifest used to DTSC within thirty (30) days of each shipment; 73. (Title 22, 66262.20) Ship waste only to facilities authorized to accept the waste type; 74. Contact the transporter and/or the owner or operator of the designated facility to determine the status of the hazardous waste if the generator has not received a copy of the manifest signed by the operator of the designated facility within 35 days of the date the waste was accepted by the initial transporter; and 75. (Title 22, 66262.42) *File an Exception Report with DTSC if a copy of the manifest signed by the facility operator is not received within 45 days of the date the waste was accepted by the initial transporter. The time to file an exception report is 60 days for generators of less than 27 gallons/per month and who meet other specified requirements. (Health & Safety Code, section 25123.3 (h)(2)). These reports must be retained for a period of three years. BIENNIAL REPORT (Title 22, 66262.41 and Title 22, 66262.40) Submitting a biennial report is required for a generator who ships any hazardous waste to a transfer, treatment, storage or disposal facility within the United States. The report is due by March 1 of each even-numbered year and covers the previous year of hazardous waste activity. Copies must be retained for three years. For more information regarding biennial reports, call the Biennial Report Hotline at (916) 322-2880. Page 7 of 7