Rapid Transit Implementation Working Group September 14, 2017

Similar documents
Rapid Transit Implementation Working Group

Appendix B-13: Community Stakeholders Group Meeting Materials and Minutes

RECOMMENDATION. (b) that the Shift Communications Plan, attached hereto as Appendix B, BE RECEIVED;

London s Bus Rapid Transit System

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Shift Rapid Transit Public Participation Meeting May 3, 2017

Burloak Drive Grade Separation

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

St. Clair Avenue West Area Transportation Master Plan

Portage Parkway Environmental Assessment Public Information Centre No. 1

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Mavis Road Class Environmental Assessment

Elfrida Growth Area Study

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Scarborough Waterfront Project

Commissioners Road West Realignment Environmental Assessment

Building the transportation network we need for the future

Dundas Place Flexible Street Public Information Centre

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Kanata Light Rail Transit Planning and Environmental Assessment Study

City of Toronto. Emery Village Transportation Master Plan

APPENDIX L3. Table of Contents. SWP EA Information Sheets

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Alternative Routes Determined

Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill. March 30, 2017

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Alternative Routes. St. Vital to La Verendrye Station - Southern Loop Transmission Corridor. 20 different segments 4 segments common to all routes

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Commissioners Road West Realignment Environmental Assessment

New. Stations. Smart Track I tlo MTDRONIO. Public Information Centre

WELCOME TO OPEN HOUSE # 3

Johnson Street Bridge Public Realm Update

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

An Introduction to the Far North Land Use Strategy

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Relief Line Project Assessment

DESIGN REVIEW PANEL TERMS OF REFERENCE AND PROTOCOL

Appendix E: Evaluation of Network Alternatives - July 2017

Local Growth Planning in North Central Green Line Communities

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

WELCOME TO THE CHOUTEAU GREENWAY EQUITY WORKING GROUP!

Presentation August 20, 2013

METRO Gold Line BRT CBAC Meeting. August 23, 2018

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018

Ashbridges Bay TTC Maintenance and Storage Facility

Building Great Neighbourhoods. Strathcona

Complete Neighbourhood Guidelines Review Tool

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

OTC ENVIRONMENTAL ASSESSMENT WORKSHOP

Public Information Centre #1

City of London Adelaide Street North - Canadian Pacific Railway Grade Separation Class Environmental Assessment Study Report

Creating Complete Roadway Corridors:

ONE RIVER MASTER PLAN ENVIRONMENTAL ASSESSMENT

One River Environmental Assessment. Welcome!

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Proposed St. Vital Transmission Complex

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Appendix G: Environmental Impact Study Report

D2 Subway Project Development. Public Meeting September 12, 2018

Presentation Overview

Master Environmental Servicing Plan & Secondary Plan

Toronto Complete Streets Guidelines

implementation r expression in landscape

Aldershot GO Draft Mobility Hub Concepts. East Plains United Church September 13, :30 8:30 pm

Report to: Development Services Committee Report Date: April 24, 2017

SALISBURY TOMORROW Our Vision

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

EIA process in Malaysia. Approaches and Strategies. Way Forward

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Welcome to the Oakridge Centre Open House

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

3.10 Network Assessment and Business Case

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

GTA West Transportation Corridor EA Study Stage 2. Introductory Community Workshop

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

WELCOME TO OPEN HOUSE TWO November 28, 2018

Glen Road Pedestrian Bridge Environmental Assessment

TABLE OF CONTENTS Page

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

TORONTO COMPLETE STREETS GUIDELINES

The MSII reports for the bridge indicate that the Annual Average Daily Traffic at the bridge is 100. The road can be considered a low volume road.

Relief Line Project Assessment

URBAN DESIGN ACTION PLAN. Community Design and Environmental Services Committee April 20, 2009

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Evaluation Criteria. Detailed Evaluation Criteria

Transcription:

Rapid Transit Implementation Working Group September 14, 2017

BACKGROUND Council approved the Rapid Transit Master Plan and Updated Business Case on July 25, 2017. Approval of the RTMP confirmed the BRT Network and its corridors. The RTMP is wrapping up a 45-day Public Review Period. Feedback we ve received will help to refine the conceptual level designs of the RTMP through the next phase of the study. Ontario s EA Process for infrastructure projects is structured into five technical phases. Phase 1 Phase 2 Needs and Justification Alternative Solutions } Completed with Approval of RTMP Phase 3 Pre-planning for TPAP Phase 4 TPAP & Environmental Project Report Current Project Assignment (TPAP) Phase 5 Implementation Detailed Design & Construction } 1

TODAY S PRESENTATION Shift Rapid Transit Initiative: where we ve been and where are we headed? TPAP What to Expect Review Project Planning Documents for next phase of study These plans provide a roadmap for activities in preparation for and during the time-limited TPAP. Updated Project Management Plan Communications & Consultation Plan The Rapid Transit Corridors EA: Project Management Plan - Updated and Expanded Scope combined with the Shift Communications and Consultation Plan outline the technical analysis and engagement deliverables required to complete the TPAP process. 2

TPAP: What to Expect 3

Transit Project Assessment Process (TPAP) TPAP is a proponent-driven, self-guided assessment process that includes a focused consultation and objection process. Phase 3 TPAP Pre-planning Activities will identify and evaluate design alternatives to develop preferred alternative. This phase includes: conducting public and stakeholder consultation identifying impacts and related mitigation measures additional assessment of impacts to natural, cultural, archaeological and socio-economic environments. updating and completing a range of technical analysis. PIC #5 to obtain feedback from the public to aid in the evaluation of design alternatives The outcome of Phase 3 is a draft Environmental Project Report (EPR) with supporting technical appendices, preliminary engineering design, and a consultation summary. 4

Transit Project Assessment Process (TPAP) The TPAP is a time-limited process intended specifically for transit-related projects with the emphasis on matters of provincial importance and constitutionally protected Aboriginal treaty rights. Phase 4 TPAP and Environmental Project Report (EPR) provides a formal opportunity for stakeholders and the public to comment on the draft EPR This phase includes: Notice of TPAP Commencement to trigger the 120-day TPAP period following review of the Draft EPR by the MOECC. 120-day period formal public consultation including PIC #6. Final EPR documenting consultation and findings of the 120-day period. Notice of EPR Completion to trigger a 30-day formal review period during which objections may be submitted to the MOECC. 35-day period for the Minister to give notice if objection received. The outcome of Phase 4 is a Final Environmental Project Report (EPR) and issuance of a Statement of Completion. 5

Transit Project Assessment Process (TPAP) Adequately addressing Matters of Provincial Importance is key to the successful completion of a transit EA. It is also important to consider Matters of Public Interest to foster community support and mitigate issues during detailed design and construction. 6

TPAP: Matters of Provincial Importance Natural Heritage Hydrogeology Heritage & Archaeology Aboriginal Affairs Park, conservation reserve or protected area Extirpated, endangered, threatened, or species of special concern and their habitat Wetland, woodland, habitat of wildlife or other natural heritage area Area of natural or scientific interest Stream, creek, river or lake containing fish and their habitats Area or region of surface water or groundwater or other important hydrological features Areas that may be impacted by a known or suspected on- or off-site source of contamination such as a spill, a gasoline outlet, an open or closed landfill site, etc. Protected heritage property Built heritage landscapes Archaeological resources and areas of potential archaeological interest Constitutionally protected Aboriginal or treaty rights and areas of concern 7

Updated Project Management Plan 8

Rapid Transit Corridors EA - Project Management Plan Updated & Expanded Scope The Rapid Transit Corridors EA - Project Management Plan has been updated based on the approved Rapid Transit Master Plan (RTMP). The updated Project Management Plan provides a guide to remaining deliverables included in TPAP. This forms the basis for the recommended amendment to consulting fees to complete the EA. The balance of the project scope has been influenced by the following factors: 1. Additional effort necessary to complete Phases 1 and 2 (RTMP) 2. Updated TPAP scope to address approved corridors 3. New & expanded TPAP scope to respond to community interests 9

Updated Project Management Plan 1. Additional effort necessary to complete Phases 1 and 2 (RTMP) Based on feedback received during the RTMP, it was necessary to take the review of various solutions through to a level of detail beyond that of a typical master plan. Multiple network alternatives were assessed using the Business Case framework. About 10km of additional conceptual design was development beyond the approved 24km network to support consideration of alternative routes. Numerous illustrative renderings were created. Several additional Community and Stakeholder meetings were held in Spring 2017. Examination of alternative routes triggered input from technical specialists related to natural & cultural heritage, land use, structural and geotechnical engineering and others. While, this enhanced level of detail was needed to reach a decision on the BRT Network, it did use up budget allocated to complete the TPAP phases of the EA. 10

Updated Project Management Plan 2. Updated TPAP scope to address approved corridors The final approved BRT corridors include elements that trigger further analysis through TPAP that were not accounted for in the previous scope. 9 focus areas defined in the RTMP will be examined in greater detail. Additional effort is required for structural engineering, architecture, utilities and other technical aspects to develop and evaluate alternative designs. In some cases, multiple design options will be drafted to illustrate and evaluate a preferred design. The Cultural Heritage Screening Report corridor-level assessment scope increased with on the number of properties directly or indirectly impacted by the project. Air quality review is now included. Procurement analysis by Infrastructure Ontario is now included. Review of the technical and consultation tasks necessary to complete TPAP based on the approved RTMP. 11

Evaluating Design Options 12

Added Technical Effort STRUCTURES: Queens Ave bridge Wellington Street bridge over the Thames Western Road over Medway Creek University Drive bridge Highbury Ave over the CP corridor Wellington Street underpass at CN Rail Western Road pedestrian tunnel Rail/Rivers/Roads/Tunnels Other existing retaining walls 13

Added Technical Effort STATION ARCHITECTURE: Shelter and platform design and amenities: real-time information, wayfinding, fare payment Develop station design concept to meet City s design standards and design codes Source: Raysonha WardenVIVA6.jpg 14

Cultural Heritage The Cultural Heritage Screening Report (CHSR) scope has expanded to capture additional properties identified as being directly or indirectly impacted by the project and needing specific analysis regarding impacts and mitigation. Natural Heritage Environmental Impact Study scope was defined with input from EEPAC in Spring 2017. Air Quality Impact Assessment Noise and Vibration Impact Assessment 15

Updated Project Management Plan 3. New & Expanded TPAP scope to respond to community interests In response to the many concerns raised by Londoners, additional and expanded tasks have been included within the Project Management Plan. Recommended enhancements to TPAP include: Expanded meetings and consultation; More detailed traffic modelling and ITS review; Stage 2 archeological assessment; Additional streetscape design; Local transit integration; Review of parking, access and curbside activities; Business impact assessment of Wellington Street; Safety audit, and Peer Review. These enhancements to TPAP are important to addressing the community s interests and aspects of this work will be required to support detailed design once the project advances to implementation. 16

Expanded Consultation TPAP scope accounts for enhanced consultation with additional meetings with technical agencies; community stakeholders; municipal advisory committees; and the Rapid Transit Working Group. Four consensus building workshops are proposed with City staff on key project topics. A public design charrette proposed to involve the public select project elements such as station architecture, urban design and public art. The Communications Plan provides more detail on engagement strategies for TPAP. 17

Traffic and ITS Detailed analysis of all signalized intersections will be completed in Synchro. VISSIM modelling is proposed for the area of Richmond Street and its surrounding neighbourhoods to assist in quantifying potential diversion to local streets. Using the VISSIM software will also produce visualizations suitable for public presentation. Alternative design concepts include consideration of a preferred strategy for the implementation of Intelligent Transportation Systems (ITS). 18

Local Transit Service Integration Rapid Transit does not replace the current LTC bus system. Local transit service will work together with Rapid Transit. To address public concerns regarding the integration of local transit and rapid transit TPAP scope will: build on the previous Rapid Transit Integration Framework to revisit the recommended 2035 LTC network with BRT in place; and integrate infrastructure requirements along the BRT corridors to support local bus service, as appropriate. 19

Streetscape Design Design concepts: Transit Villages Corridor streetscape Downtown streetscape Station landscaping Development of concept designs for lighting, benches, waste receptacles, kiosks, newspaper boxes and banners Identification of possible public art locations and installations 20

Archaeology A Stage 1 Archaeological Assessment was completed as part of the RTMP submission. Based on the approved RT corridors, additional Stage 1 Archaeological Assessment will be required for the new corridor areas. A Stage 2 Archaeological Assessment is recommended for the selected areas identified in the original Stage 1 Assessment as part of an enhanced TPAP scope. 21

Other Recommended Studies Independent Safety Audit An independent road safety audit of the preliminary engineering design is recommended to respond concerns heard through consultation. Expert Peer Review Host a one-day event inviting professionals involved in similar BRT projects across Canada to London to view the work completed and gather suggestions and feedback. Review of Parking, Access and Curbside Activities A review of on-street parking, access, and curbside activities will be conducted for the full 24-km network counting driveways, delivery locations and on-street parking spots, documenting City input on snow clearing, waste removal, and other City maintenance activities and reviewing utilities in the curb lane roadside. Business Impact Assessment of Wellington Street; Conduct field review of the SoHo area to inventory and categorize businesses along Wellington Street from Horton Street to South Street (approx. 1km), similar to the review completed for the Downtown and Richmond Street in spring 2017. 22

Communications & Consultation Plan 23

Communications Plan The Shift Communications and Consultation Plan was designed to guide transparent, inclusive, and proactive engagement and consultation with stakeholders across our community. Through this plan, our goals are to: build trust and accountability for the Shift Rapid Transit process; give stakeholders an opportunity to provide insight to shape RT corridor design and implementation; gather insight that can help minimize and mitigate project impacts; improve understanding of project timeline: where we are in the process, and how far we have to go before implementation; and promote the project as encompassing the entire transit system, in which BRT and local service form an integrated network. 24

Communications Plan The Consultation Plan follows the key principles of: 1 2 3 4 TRANSPARENCY by providing regular updates and project news through various platforms and tools. INCLUSIVITY through communication strategies designed to reflect the needs of diverse interests, contexts and functions within the city. RESPONSIVENESS with a commitment from the Shift Project Team to being responsive and accessible to all interested parties. CLARITY through the use plain language where possible to promote understanding among stakeholders. 5 RESPECT by maintaining a positive tone that respects the diversity of opinions throughout our community and promotes productive participation. 25

Stakeholders General Public representing members of the community who are not part of a specific stakeholder group and include a diverse range of interests within the city. Transit Riders - London s current transit ridership is not as easily organized into a formal stakeholder group, so the project will look to a variety of consultation activities to reach this diverse segment of our community. Aboriginal (First Nations) Communities are an important stakeholder group for Shift consultation and the project considers constitutionally protected Aboriginal rights and the City s duty to Consult. Community Stakeholder Group (CSG) comprises representatives from major institutions and shopping malls within the project area. Municipal Advisory Group (MAG) comprises representatives from existing City Municipal Advisory Committees. Technical Agencies Group (TAG) comprises representatives from the many technical agencies and utilities involved in Shift. Interest Groups include local neighbourhood/tenant/student associations, non-profit community organizations, and business associations. 26

Consultation by Stage Similar to the Project Management Plan, the Communications Plan covers Phases 3 and 4 of the EA process to the completion of TPAP 27

Phase 5 - Implementation The Statement of TPAP Completion and the end of Phase 4 marks the completion of this Communications Plan. A follow-up evaluation and report will prepared for TPAP communication activities. Phase 5 is not part of this assignment. The final phase of the EA process, Implementation, includes development of contract drawings and tender documents, construction, operations and monitoring. A new Communications Plan will be developed for Phase 5, which will include strategies for public engagement and stakeholder relations with a focus on providing frequent information and updates to the public throughout construction. 28

Summary The following reports were developed based on the BRT Network approved in the Rapid Transit Master Plan: Rapid Transit Corridors EA Project Management Plan: Updated and Expanded Scope & Shift Communications and Consultation Plan The recommended scope of work addresses both matters of provincial importance and due diligence for planning and design matters that address local public interests. 29