Equestrian Skills Centre, SE18

Similar documents
Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Longbridge Town Centre Phase 2 Planning Application

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Barvills Solar Farm Environmental Statement Non-Technical Summary

PANSHANGER QUARRY, Hertfordshire

Meridian Water Phase 1 Application

London Road, Derker. Non Technical Summary. Introduction

BREEDON NORTHERN LIMITED

The Place Solar Farm

University Park, Worcester Non Technical Summary December 2011

South Whitehaven, Cumbria EIA

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

NON-TECHNICAL SUMMARY

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

Non-technical summary

Former RAF Sealand Site EIA

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT

Land at Weymouth Gateway Proposed hotel and pub / restaurant Non-technical summary. Premier Inns Ltd February 2011

Grantham Southern Quadrant Link Road Environmental Statement

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Rannoch 132 / 33 kv Substation Extension

Longbridge East : Site Wide and Phase One Development

9 Archaeology & Cultural Heritage

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

Land to the North of Main Road, Wybunbury

Armourers Court, Woolwich

Public Consultation. Land at Monks Farm, North Grove. Welcome

and Netherhall Road and Camp Farm EIA

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND NORTH OF STAFFORD

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

XII IX VIII NON-TECHNICAL SUMMARY OF ENVIRONMENTAL STATEMENT. Redevelopment of the Laverstoke Mill Complex

REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

Small Heath Rail Sidings, Anderton Road, Small Heath, Birmingham, B11 1TG

Welcome to our Public Consultation

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Blackley Mere Developments Limited Blackley Mere Redevelopment

Issue/revision Issue 1 Revision 1 Revision 2. Remarks Draft FINAL. Date January 2009 September Prepared by Project Team Project Team

NON TECHNICAL SUMMARY

Re-location of Rugby Farmers Mart

Plumstead Temporary Railway Sidings and Associated Permanent Works

Application Recommended for Approval Hapton with Park Ward

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

Inert Recycling (UK) Ltd Boxgrove Quarry Restoration Environmental Statement

Peckham Peckham Area Vision Map

1 INTRODUCTION 1.1 INTRODUCTION

This document provides a summary of the ES findings in non-technical language.

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary

NON TECHNICAL SUMMARY

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Environmental Statement (Volume 1) Non Technical Summary

NON - TECHNICAL SUMMARY

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY

Manchester Town Hall Complex Transformation Programme

Strategic Employment Site, on land to the East of the M5, south of Junction 6, west of Pershore Lane. Environmental Statement. Non Technical Summary

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary

Environmental Impact Assessment

Ʊ ± ªº Œª ºª ø ª ª ± ª

NRP North Environmental Statement Non Technical Summary. Norwich Research Park North Environmental Statement Non Technical Summary.

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

LAND WEST OF ST ANDREWS ROAD

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

7 Scoping and Introduction to the Assessments

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015

Welcome to our exhibition

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2)

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

16. Peckham Peckham Area Vision

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

1.6 The application area, which is shown in Figure 1.1 comprises approximately ha

Land to the rear of the Police Station, High Street, Heathfield

Town And Country Planning Act 1990 (As Amended) Town And Country Planning (General Development Procedure) Order 1995

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

TRANSFORMING TUDOR NURSERIES

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

E16: MAINTENANCE OF LANDSCAPED AREAS

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary.

Moat Lane Regeneration Project Environmental Statement

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Florida Farm North. Environmental Statement. Non-Technical Summary. July /04/MW/PN

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd

2014/0590 Reg Date 26/06/2014 Chobham

Transcription:

Equestrian Skills Centre, SE18 Non Technical Summary (Volume 3) Campbell Reith Hill LLP July 2011

NON-TECHNICAL SUMMARY INTRODUCTION NTS1 The London Borough of Greenwich has submitted a full planning application for the development and refurbishment of the land and buildings at 341 Shooters Hill, Welling, Greenwich ( the site ). NTS2 This document is the non-technical summary (NTS) of the findings of the (ES) that accompanies the planning application. THE SITE NTS3 The site covers an area of 2.587 hectares (ha), comprising 1.4 ha of grazing and 1.187 ha of development and is located within the Shooters Hill ward in the London Borough of Greenwich. The location of the site is shown on Figure NTS1. NTS4 The site was first developed in c.1869, prior to which it had largely remained part of an area of woodland. The present Woodland Farm House was constructed in 1886. The site has undergone a number of changes in development, including an earlier house plus numerous changes in the location of buildings. NTS5 The site currently comprises of car parking, residential accommodation (Woodlands Farm House), an office and ancillary accommodation, various out buildings, cultivated areas and two small fields, one of which is let for grazing donkeys. THE PROPOSED REDEVELOPMENT NTS6 The description of the proposed development as it appears on the planning application is as follows: Formation of new equestrian centre including: Refurbishment of former farmhouse to provide a tack room, reception and offices, kitchen, canteen and seminar rooms and staff accommodation;

Erection of arenas (indoor and outdoor), a horse walker, a therapy centre, stabling including feed room/rug room with attached yard office, hay and straw barns, tractor and 4 x 4 vehicle garage, laboratory and three classroom block, farrier and treatment area, external washdown area and muckheap enclosure; Formation of associated areas for parking and access and provision of new landscaping; and Formation of a horse crossing to Oxleas Woods NTS7 The proposed development is shown in Figure NTS2. NTS8 The construction period of the proposed development is due to last 9 months between November 2011 and July 2012 with completion in August 2012. THE NEED FOR THE REDEVELOPMENT NTS9 The London Borough of Greenwich is one of the five host Boroughs for the London 2012 Olympic and Paralympic Games. The borough will host nine events across three venues, including the Modern Pentathlon and Equestrian events, which will be hosted at Greenwich Park. NTS10 Due to the historic and environmentally important nature of Greenwich Park, its Equestrian event facilities will be temporary in nature and will be removed after the event. However, the Council is committed to achieving a lasting legacy from the Games, benefiting residents from all backgrounds and across a number of areas, including employment, health, training and social inclusion. NTS11 The potential to create an accessible Equestrian Centre which could provide both a physical sporting and educational legacy from the 2012 Games (providing new sporting, community access, learning and employment opportunities) has therefore been identified. ENVIRONMENTAL IMPACT ASSESSMENT NTS12 Under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999 (as amended) an Environmental Impact Assessment (EIA) is required for a development of the scale and nature proposed. EIA is a process for ensuring that the likely significant effects of a new development on its

surrounding environment are fully described and taken into account before that development is allowed to proceed. NTS13 The scope of the EIA was determined through consultation with the London Borough of Greenwich and a number of other consultees (e.g. Natural England and the Environment Agency) and the findings of the EIA are presented in the Environmental Statement (ES). NTS14 The general approach to assessing environmental impacts is to consider the current conditions on and around the site for each environmental issue, and then to compare these with the predicted conditions during the construction and post-construction phases of the development, taking into account local, national and international standards, policies or guidelines of relevance to the proposals. NTS15 In order to assess the potential impacts of the redevelopment and refurbishment of the land and buildings at 341 Shooters Hill on the environment, the sensitivity of existing resources is considered in conjunction with the scale (or magnitude) of the predicted impacts in order to establish the significance of the predicted changes. The significance of impacts are described as being either neutral, minor, moderate or major. Impacts can be adverse or beneficial. NTS16 The following sections set out the findings of the EIA process. The order in which the sections appear matches the order in which they are considered within the ES. ALTERNATIVES CONSIDERED NTS17 A requirement of the EIA Regulations is that an ES should include an outline of the main alternatives studies by the applicant or appellant and an indication of the main reasons for their choice, taking into account the environmental effects. NTS18 A number of alternative sites were considered by London Borough of Greenwich at the feasibility stage, including the abattoir site located to the north of the application site boundary. The abattoir site was not chosen due to the fact that it has a smaller parcel of land for grazing, has the potential to be contaminated due to its former use and lies directly adjacent to an area of ancient woodland. NTS19 Once the site had been chosen, a number of alternative layouts were considered. The finalised scheme was chosen because it offers a number of environmental

improvements over the alternative layout options, including: less intensive development within Metropolitan Open Land (MOL); lower landscape, townscape and visual impact; less habitat requiring removal (including trees) and less traffic generation. KEY ENVIRONMENTAL EFFECTS OF THE REDEVELOPMENT NTS20 The following sections provide a summary of the key environmental effects of the scheme during the construction and post-construction (operational) phases. These are considered in the order in which they appear in the ES. Reference should be made to Volume 1 of the ES for a thorough consideration of impacts. NTS21 Construction works will be undertaken in accordance with an agreed Construction Environmental Management Plan (CEMP) aimed at reducing the environmental effects of the scheme during the construction phase as far as practicable (i.e. in line with best practice guidance etc.). The CEMP will be submitted prior to the start on construction works and can be secured by way of a suitably worded planning condition. NTS22 Post-construction effects have been minimised as far as practicable through an iterative design process whereby potential constraints have been identified early in the overall design process and taken into account in the development of the scheme. TRANSPORTATION (VOLUME 1, CHAPTER 5) NTS23 Existing conditions have been established through the use of traffic counts on Shooters Hill Road. Impacts have been predicted based on the recorded number of trips to developments of a similar size and nature (TRICS database). NTS24 During the construction phase, it is predicted that up to 25 Heavy Goods Vehicle (HGV) trips will be required per week to import and export materials from the site. This number of trips represents less that 0.5% of the daily traffic flow along Shooters Hill Road and no roads or junctions in the vicinity of the site will be operating beyond their design capacity. Impacts are therefore considered to be neutral significance. NTS25 Upon completion in 2012, the development is predicted to result in approximately 107 additional vehicle movements on a typical weekday (0.5% increase) and 152 additional movements on a weekend day (0.9% increase). This is within the daily

variation in traffic along Shooters Hill Road and will not result in roads or junctions operating above their design capacity. Impacts are therefore considered to be neutral significance. NTS26 A Travel Plan has been submitted alongside the application which aims to reduce the number of journeys required to the site by private car. NOISE AND VIBRATION (VOLUME 1, CHAPTER 6) NTS27 Existing conditions have been established through noise surveys within the site boundary. NTS28 Noise and vibration during static construction works is considered to be an short term, adverse impact of minor significance. Impacts will be mitigated through the use of best practice techniques on site and through the limitation of working hours to between 08:00 and 18:00 Mondays to Fridays and between 09:00 and 14:00 on Saturdays. Noise from construction traffic is considered to be an impact of minor significance. NTS29 During the post-construction phase it is predicted that the increase in noise associated with road traffic and fixed plant will be imperceptible over existing conditions (< 3 db(a)) and this is considered to be an impact of neutral significance. AIR QUALITY (VOLUME 1, CHAPTER 7) NTS30 Background air quality in the vicinity of the site has been established through reference to local monitoring stations and the focus of the assessment has been on nitrogen dioxide and particulate matter. NTS31 Construction dust will be minimised as a result of the implementation of best practice techniques during construction. Adverse impacts are therefore considered to be short-term and of minor significance. NTS32 Emissions during the operational stage of the proposed development in terms of services and heating of buildings are not expected to be significant and have not, therefore, been assessed in any detail within this assessment. Emissions from postconstruction traffic are considered to be of neutral significance as the development is predicted to result in very low volumes of additional traffic, as discussed previously.

LANDSCAPE, TOWNSCAPE AND VISUAL (VOLUME 1, CHAPTER 8) NTS33 Existing conditions have been established by walkover surveys of the site and the local area to establish key viewpoints and landscape and townscape character areas. A total of seven key viewpoints and six character areas were identified. Impacts have been assessed through knowledge of the proposed construction works and the layout, height, massing and design of the proposed blocks. NTS34 Construction works will inevitably affect the visual amenity of the local area due to the use of site hoardings, plant and machinery and cranes etc. Adverse impacts are considered to vary between neutral and moderate significance during the nine month construction period. NTS35 Impacts on views from chosen locations and landscape and townscape character after redevelopment will vary between neutral significance and minor adverse significance. Landscape planting comprising native species of trees and plants is proposed to mitigate the visual impacts of the development. SOIL CONDITIONS, GROUNDWATER AND CONTAMINATION (VOLUME 1, CHAPTER 9) NTS36 Existing conditions on the site have been established through an intrusive site investigation and through reference to publicly available data. The results of the testing have shown no elevated concentrations of contaminants across the site areas investigated. NTS37 During construction works, the use of appropriate Health and Safety practices and the use of personal protective equipment will effectively mitigate the potential risks of workers coming into contact with contamination. An unexploded ordnance risk assessment will also be carried out prior to construction to ensure that risks are suitably mitigated. Impacts on construction workers are therefore considered to be of neutral significance. NTS38 Impacts on end users are considered to be of neutral significance as any hotspots of contamination found on the site will be remediated to suitable for use standards.

NTS39 Impacts to surface waters and groundwater are considered to be impacts of neutral significance during both construction and post-construction phases as the site does not lie in close proximity to any surface watercourses and overlies a Non-aquifer (London Clay). WATER RESOURCES AND FLOOD RISK (VOLUME 1, CHAPTER 10) NTS40 Baseline conditions have been established through reference to publicly available data (e.g. Environment Agency floodplain maps) and sewer records obtained from Thames Water. NTS41 Construction works have the potential to result in increased sediment run-off into drainage systems and accidental spillages of fuels and oils. Potential impacts will be mitigated through the use of best practice measures contained within the CEMP. Impacts are therefore considered to be of neutral significance. NTS42 The application site is located within an area of low flood risk (Flood Zone 1). The closest extent of extreme flooding, where there is a 1 in 1000 (0.1%) or greater chance of flooding occurring each year, is located over 1 km from the application site, where the level is at least 30 metres lower than proposed site levels. NTS43 Post-construction, surface water will be managed through sustainable drainage devices (SuDS) which allow water to enter the ground as would occur on a Greenfield site. Drainage from car parking areas, which has the potential to contain contaminants will pass through petrol interceptors prior to discharge. Foul water will be connected to the existing main running along Shooters Hill Road. Impacts are considered to be of neutral significance. ECOLOGY (VOLUME 1, CHAPTER 11) NTS44 Existing conditions of the site have been established through a range of site surveys (e.g. habitat surveys, bat surveys, reptile surveys) and through reference to publicly available data and protected species records. NTS45 Construction works will result in the permanent loss of 0.90 hectares and temporary loss of 0.40 hectares of habitats within the site boundary. This will be mitigated through the creation of new habitats (e.g. a sedum green roof), the installation of ecological features (e.g. bird and bat boxes, stag beetle log piles) and long-term

management of retained habitats to maximise biodiversity. Impacts are considered to be adverse and of minor significance. NTS46 The Equestrian Skills Centre will also result in an increase in the use of the Oxleas Woodland for horse riding, with relatively low level horse use between March and July. Impacts are considered to be adverse, long-term and of neutral minor significance and will be mitigated by using specific routes within the woodland and monitoring the level of horse use. The results of the monitoring will be used to inform future management of the woodland. ARCHAEOLOGY (VOLUME 1, CHAPTER 12) NTS47 Baseline conditions have been established through a desk-based archaeological assessment and through reference to publicly available data. NTS48 The site is not known to contain any archaeological deposits, although the southern portion of the site does lie within an Area of High Archaeological Potential. It is proposed that archaeological trial trenching is undertaken prior to construction works which will mitigate the potential impacts on hitherto unknown deposits. This approach will reduce the significance of potential impacts from minor moderate to neutral minor. NTS49 No Listed Buildings or Conservation Areas will be directly impacted as a result of the proposed development, nor will the settings of such features will not be affected during the post-construction phase. Impacts are therefore considered to be of neutral significance. SOCIO-ECONOMIC EFFECTS (VOLUME 1, CHAPTER 13) NTS50 Existing conditions were established through a desk-based assessment of publicly available sources including Census data, information provided by the Office of National Statistics and the British Equestrian Federation. NTS51 During construction, the development has the potential to create up to 63 jobs over a period of approximately 9 months. Given the relatively high levels of unemployment within the London Borough of Greenwich (10.5%), this is considered to be a shortterm beneficial impact of minor significance.

NTS52 Once complete, the development is anticipated to generate 10 full time jobs (administrators, lecturers etc.) and five part-time jobs. In addition, the development is also likely to generate an additional 5 indirect jobs as a result of additional goods and services demand. Impacts are considered to be long term, beneficial and of minor moderate significance. NTS53 The development would also result in greater participation in equestrian activities, with an estimated 600 1000 unique visitors (on school visits, training days etc.) using the facility per year. This is considered to be a long term beneficial impact of minor moderate significance. CLIMATE CHANGE: ADAPTATION AND MITIGATION (VOLUME 1, CHAPTER 14) NTS54 Despite the intensification of land uses on the site, the proposed development is predicted to result in carbon emissions of 40,760 kg per year, a reduction in overall emissions over the current usage of 18,540 kg per year (31.2%). This is considered to be a long term beneficial impact of neutral minor significance. FURTHER INFORMATION NTS55 The full ES and other planning application documents may be inspected at the following locations: Greenwich Council Crown Building 48 Woolwich New Road SE18 6HQ NTS56 Electronic copies and paper copies of the ES may be obtained at 15.00 and 115.00 respectively by contacting: Campbell Reith Hill LLP Somerset House 47 49 London Road Redhill Surrey RH1 1LU

Tel: 01737-784500 Fax: 01737-784501 NTS57 Comments on the planning application and ES should be addressed to Jessica Lai, Principal Planner, at Greenwich Borough Council. Alternative formats NTS58 The text size used in this document has been chosen to cut down on the quantity of paper required in its production. A large text version of this document is available from CampbellReith upon request.

Legend Site Boundary 1:15000@A4 Equestrian Skills Centre for London Borough of Greenwich Council CampbellReith OS Copyright: Crown copyright. All rights reserved. Licence number 100020027 Job Number: 10726 Date: 16/06/2011 Drawn by: SC Checked by: RJ Drg No: GIS002 Status/Revision: A File location: O:\10500-10749\10726 - Equestrian Skills Centre\Workspaces (pdf in Outputs) Revision History: A, First Issue, 16/06/11, SC CampbellReith 2011 NTS1: Site Location Plan Contains Ordnance Survey data Crown copyright and database right 2011 LONDON 020 7340 1700 MANCHESTER 0161 819 3060 REDHILL 01737 784 500 BIRMINGHAM 01675 467 484 BRISTOL 0117 916 1066 www.campbellreith.com

A B LEG END New security fencing provided from olympic games. Exact size and type TBC. Mechanical Horse FENCING Jump Storage New 1800 high closeboard fencing to replace existing. New 1200 high pallisade fencing to replace existing. New 1200 high post and rail fence. EXTERNAL HARD SURFACES 60 x 20m Indoor arena and viewing platform LEG END Concrete surface to main yard areas Resin bonded aggregate to parking and access road Porous paving to entrance and pedestrian areas x 69.50 Stable 10 Outdoor all weather arena - 20 x 40m. Stable 11 Stable 12 Stable 13 Stable 14 Stable 15 Stable 16 Stable 17 Stable 18 Stable 19 Stable 20 1:10 Horse Ramp to Grazing x 69.25 American Stabling for 20 Horses Stable 9 x 68.50 Muck Heap Stable 7 Stable 6 Stable 5 Stable 4 Stable 3 Stable 2 Stable 1 Rug Room Yard Office Feed Room 16No secure cycle spaces Waiting Area New Horse Crossing x 68.50 Hay Barn 10 x12m Wash Down x 68.75 x 68.75 x 70.25 x 70.80 PLANNING ISSUE 1:10 Horse Ramp to Grazing C x 69.00 x 69.25 x 69.00 x 69.25 x 69.25 C x 69.00 Parking/Access x 69.25 70.65 x Stable 1 Stable 2 Stable 3 Stable 4 Dis Rev Date Description Name x 69.50 C Horse walker (4-6 Horses) Stock/Solarium Treadmill Hydrotherapy Farrier and Treatment Area x 70.00 St St Weighbridge x 67.00 Stable 8 1:20 ramp Swimming Pool Plant Plant Isolation Stable 1 Isolation Stable 2 Dis F x 70.75 x 70.50 R x 70.00 Isolation Storage x 70.25 R R x 70.50 M CLIENT Lecture Room London Borough of Greenwich Classroom 2 Wet Laboratory Classroom 1 Storage Storage Storage Coach Drop Off x 70.00 Storage Car Parking Area PROJECT Equestrian Skills Centre TITLE Figure NTS2 Proposed Site Layout B DATE A APR 2011 DRAWING No. SCALE 1:200 @A1 DRAWN NP 633 109 PL02 F