Technical Discussion on

Similar documents
Ashirwad Carbonics (India) Private Limited

Application Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES

Gas Plant Training Module 4 TEG Dehydration Systems

STANDARDS FOR VAPOUR EMISSION CONTROL SYSTEMS ( MARPOL reg VI/15 )

THE SIGNIFICANCE OF RELIABLE PRESSURE CONTROL IN OILFIELD BURNER SYSTEMS

Handling Petroleum Products & Static Ignition Hazards Introduction

Above Ground Fuel Tank Requirements

Water Mist Fire Protection Systems for the Protection of Industrial Oil Cookers. 8th March 2016 Dr Tim Nichols CPhys MIFireE

Flammable and Combustible Liquids Checklist

USER S INFORMATION MANUAL Model: HSE 125 N/P, HSE 145 N/P Gas-fired, Condensing Boiler and Instantaneous Water Heater

CRU-S Series Stainless Steel Condensate Recovery Unit

Ontario Fire Code SECTION 5.10 COMBUSTIBLE DUST PRODUCING PROCESSES. Illustrated Commentary. Office of the Ontario Fire Marshal

Flammable and Combustible Liquids

Computer Controller. The Bio-Burner has user regulated settings as well as built-in safety features to protect you and your burner.

DELAYED COKER UNIT (DCU)

Design and Construction Standards SECTION PLUMBING EQUIPMENT

THE INITIATES PLC (TIP)

NILEATOR ATOR. Dyna-Fog ANILE. Cold Fog ULV Aerosol Applicator. Instruction Manual For Operation, Service and Maintenance

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20

Figure 10 or Figure 6

defence Prior to 1947 in the USA, process vent streams The last line of

Reactor-Boiler and Auxiliaries - Course 433 BOILER STEAM AND WATER SYSTEMS

Introduction to Control Technology

Explosion Protection Engineering Principles

Boiler. Fire tube Boiler:

L O S S C O N T R O L

PIPING SYSTEM EQUIPMENTS

Boiler Basics. Design and operation

Knowledge Objectives (2 of 2) Fuel Gas Systems. Skills Objectives. Introduction. Fuel Gas Systems (1 of 6) 12/20/2013

Knock Out Drum Sizing Calculation

Performance and safety features of a 2 x cbm LPG-import terminal built in China

Prevention of Fires and Explosions in Wood Pellet Facilities. Allen Wagoner, FLAMEX, Inc.

Module 3: Liquid Fossil Fuel (Petroleum) Lecture 25: Refinery Equipments

SULPHUR RECOVERY UNIT

SECTION PLUMBING EQUIPMENT

TERRACE AND PATIO HEATER HLB-2400/ 2650 SERIES

Vacuum System Troubleshooting Author: Keith Webb, P.E. Application Engineering Manager

Foam Products ENGLISH

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

MaxiCoking Technology Breakthrough Technology for Improved Existing Delayed Coker Performance

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements.

CORPUS CHRISTI FIRE PREVENTION MOBILE FOOD VENDOR REQUIREMENTS

Burners Flares Incinerators Vapor Combustion

Engineering Pvt. Ltd.

New Power Vented Rheem FVIR Tanks

Cascade Refrigeration System for LPG Subcooling. Related Technical Data and Information for the Case:

Vancouver Airport Fuel Delivery Project. Fire Prevention, Preparedness and Emergency Response

Introduction. Program Description. Section C.20 University of South Carolina Safety Program Guide FLAMMABLE AND COMBUSTIBLE LIQUIDS

1. Know your process. The following guidelines will help you navigate what can be a challenging and time consuming task.

THE INITIATES PLC (TIP) Waste Management & Industrial Cleaning Services

LOPA. DR. AA Process Control and Safety Group

OWNER S MANUAL. Smoky Hill 5pc Gas Firepit Chat Set. Product Code: D71 M25973 UPC Code: Date of Purchase: / /

The Significance of Reliable Pressure Control in Oilfield Burner Systems

Operating instructions

& Fire Extinguisher Training

BURNERS/ FLARES. VAREC BIOGAS 244W Series WASTE GAS BURNER & IGNITION SYSTEM

Selfpriming Centrifugal Pumps. Type HZS/HZSA

Installation and Maintenance Manual Please retain this manual for future reference.

Overview of Hazardous Locations as They Relate to Solenoid Valves

A-8-01 Typical questions and answers on the boiler specifications on tender and boiler contract documents

GASEOUS HYDROGEN SYSTEMS

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

FUEL. Fire & Flammable Liquids Properties. Flammable & Combustible Liquid Safety. Safety. Practice. Laws: OSHA & NFPA. Safety.

HeatExchangerSpares.com Ltd HRS Heat Exchangers Ltd HRS Hevac Ltd HRS Hevac Engineering Ltd HRS International Ltd HRS Investments Ltd

FIREPLACE SIZES FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VACINITY OF THIS OR ANY OTHER APPLIANCE.

Feed Interruption Three separate incidents within Marathon petroleum. p Garyville 2005, 05 Coker Unit - Feed interruption/furnace tripped caused by wa

INSTALLATION AND OPERATION MANUAL GAS SKILLETS MODELS: GTS-30 GTS-40

There are two devices used together for heating crude oil in petroleum refinery as in figure (1), and these devices are:

Process Hazard Analysis Facility Siting Checklist

Model No: Little Devil II (inc ss)

Centrifugal Pumps with Shaft Sealing and Priming Stage Type HZS / HZSA

WATER HEATERS / BOILERS GSB8-E. Gas-Fired Steam Boiler PRODUCT SPECIFICATIONS. AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh GSB E

Fire protection on chemical manufacturing sites

BASIC BOILERS NAME :- DATE :-

INTRODUCTION TO DUSTS AND THEIR EXPLOSIVE PROPERTIES

Fire is No Accident Fire is No Accident It can be prevented.

Arrangements of cold exchangers or cold accumulators in cryogenic separation or liquefaction plants.

VF/VG700 Jumbo. Construction Heater. Installation and Maintenance Manual

Stillwater Area Community Services Center Inc.

GSB8. CONSERVATOR Gas-Fired Steam Boiler. AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh GSB S MODEL NUMBER IDENTIFICATION FEATURES

Rambo CAST IRON RING BURNERS OPERATING INSTRUCTIONS. C40LP 3 Ring Burner C50LP 4 Ring Burner

SUPER HIGH EFFICIENCY WATER HEATERS SUPPLEMENT TO INSTRUCTION MANUAL P/N (Replaces pg. 2 in instruction manual.) CONGRATULATIONS!

Contents. xiii. 4. PHYSICAL PROPERTIES OF HYDROCARBONS General Alkene Series... 28

With CV Technology products and care, you ll be better protected from dust explosions.

Fall Boiler Start-up, Fuel System Tips to keep you Safe

UV Scanner. Model Specification. Introduction. 854 Instruction Manual

Fire Prevention Plan

Construction Heat CH-02 (up to 400,000 BTU) Record of Training Curriculum Document

GAS CHROMATOGRAPHY PURDUE UNIVERSITY INSTRUMENT VAN PROJECT. DEMYSTIFICATION ACTIVITY FOR THE GAS CHROMATOGRAPH (Revised: ) INTRODUCTION

User s Manual & Safety Instructions Read Carefully Before Use

6. Within an internal combustion engine, the can-shaped component that moves up and down the cylinder

User s Information Manual

Installation Instructions Horizon Natural Draft Electronic Ignition Gas Fireplaces

CHAPTER 15: FIRE PREVENTION & AWARENESS POLICY

"HC" AIRFLO. In-duct firing line burner

SMART BIO ETHANOL ELECTRONIC BURNER

Cast Line Heaters The Benefits of This Space Saving Electric Heater

Oil burners fuel unit with solenoid valve

Fully-automatic Gas tankless Water Heater USER'S MANUAL FOR MODEL EZ-101 ISO9001 certified

Transcription:

Technical Discussion on Closed drain system Knock Out Drum system Common venting system Water Seal Drum Remote Ignition system Flare system By D DAS

Need of CD, KOD,Water Seal Drum,Remote Ignition system and flare If we observe deeply the function of these systems, the main purpose comes at same roof that is SAFETY In process industry the undesired substances which are hazardous should be dispatched safely and which can not be dispatched should feed to flare system observing envormental situation.

FLARE SYSTEM PIPING Network Of LPG Recovery Plant 16 mid steel line Gas out to flare Burn Pit area n Upset Gas from plant Gas in 16 SRV out nrv KOD Water in Scrubbers CD Water drain From storage Water Seal Drum Fuel line to flare Air in Ignition Switch board Spark point Burn Pit area LCV Liquid pump To tank farm Horton sphere Common venting CD Closed Drain KOD Knock Out Drum SRV Safety Relief Valve. LCV Level control valve Water

Closed drain Closed drain means to drain liquids on closing condition from closed vessel not to be drained openly,the liquid which is undesired and separated on process. In our plant Closed Drain vessel is provided to collect liquid hydrocarbon ( as condensate) which leaves scrubbers such as Inlet gas suction scrubber (PV- 16.01),Booster compressor suction scrubber (PV-16.02), Regen gas scrubber (PV- 16.05) and Inlet filter separator( FC-12.01) through Level Control Valve or By passed valve and meet a common 3 line to CD and collected Liquid in CD is dispatched by pumping to central tank farm through 2.75 line. The top of closed drain vessel (gas vapour) enters to the top of Knock Out Drum, More over If Liquid of CD becomes beyond high level it overflows to the KOD through a non returned valve.the high level may arise if liquid is not transferred properly and timely. To get Indication of liquid level, Level Gauge Glass and Level switches are provided. Specification of CD :- radius= 0.62992mtr,height= 1.9304mtr, volume=2.4067m 3 material :- carbon steel

Knocked out drum The top of KOD is a common line 16 of plant which is connected with Pressure Safety Valves and Pilot Operated Safety Relief valve s vent ports. Released Gas from PSV and POSRV during plant upset enters into KOD via this common line and moves to wards flare through water Seal Drum. To get Indication of liquid level, Level Gauge Glass and Level switch are provided. There are two types of KOD such as horizontal and vertical. it is also known as vapor-liquid separator and flash drum. For high liquid separation and much volume gas, horizontal KOD is used. In our plant we are using horizontal KOD, It separates vapour from liquid, so that Liquid in the vent stream can not extinguish the flame or cause irregular combustion and smoking. At bottom of KOD a 2 line from LPG storage tank is provided with NRV to drain liquid and vapor. More over it is used to drain vapor of ethylmercaptan after injecting mercaptan in to LPG storage vessel which we use regularly. KOD bottom liquid which is deposited at over flow of closed drain vessel transferred to central tank farm as same procedure as of CD.

Water Seal Drums In petroleum refineries, petrochemical and chemical plants, elevated flares are the ultimate safety device. They are used to safely dispose of excess process gas that is generated from time to time by minor and occasionally major plant upsets. A water seal drum is mounted in the main flare gas line The gas line from KOD at first enters into water, Gas leaves water with bubbles to the top of the seal drum and moves to wards flare tips. A make up water level is maintained at seal drum and it over flows through drain pipes. The water seal s function is to prevent the entry of air and the development of an explosive mixture in the main plant piping.

Common Venting Line In common venting line Horton Sphere s Pressure Safety Valve s vent ports are commonly connected to a line which moves to flare through another Water Seal Drum as shown in figure. If pressure released through PSV of Horton Sphere the gas will move to flare point by this line.

Flare System In flare system the flare is ignited with remote ignition system. In remote ignition an electrical Spark plug,reliable Insulated electrical wire, step up transformer and air- gas combustible mixer are used. When Air and Gas are allowed to mix at pressure 0.6kg/cm 2 & 0.3kg/cm 2 respectively and assumed that the mixer is combustible and this mixer passes through a High Tension Electrical Plug chamber,one end of the plug is connected with step up side of transformer and other end to the body. The transformer is placed in the ignition panel. When we pushed on Ignition switch which is connected to step in of the transformer which develops 06KV from 230 volt AC, a spark is generated which we can see through the mirror of plug chamber and this spark ignites the combustible mixer and it is taken to burn pit area with the help of ½ line. Parallel to the ignition line another 3/4 pilot line is laid to the burn pit area which tip is kept near to ignition line, when fuel is available in the line we see flame after igniting the combustible mixer, The Common Venting Line and The Flare Line from water seal drums are laid to the burn pit area and tips are kept near by fuel and ignition line. Water seal drums should over flows before igniting the flare.

THE END Thank You