Module 7. Control of Smoke & Highlights of Code Requirements

Similar documents
ICC CODE CORNER 2012 IFC Code & Commentary

MODULE 8. Tying the Systems Together: Emergency Control Functions and Interfaces

Building & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome!

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

SCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY

NFPA 101 Code Update from 2012 Edition to the 2015 Edition

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

ICC CODE CORNER 2012 IFC Code & Commentary

General Principles of Smoke Control

Stairwell Pressurization Systems

REVIEW OF TECHNICAL STANDARDS AND CALCULATION METHODS FOR DIMENSIONING OF SMOKE AND HEAT CONTROL SYSTEMS IN CASE OF FIRE IN UNDERGROUND CAR PARKS

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

Life Safety Damper Installation ASHRAE St Louis Chapter Feb. 9,2015. Peter McDonnell, PE, LEED AP BD+C McClure Engineering

CHAPTER 7 MECHANICAL VENTILATION AND SMOKE CONTROL SYSTEMS 7.1 AIR CONDITIONING & MECHANICAL VENTILATION SYSTEMS

BOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

BUILDING CODE OF THE CITY OF NEW YORK. New York City Department of Buildings 4 June 2007

FIRE/SMOKE BARRIER FUNDAMENTALS

Prescriptive Requirement for Smoke Control

2012 B.C. Building Code Compliance Review (Division B Part 3)

FIRE PROTECTION SYSTEMS

Short Term Accommodations Fire Code Requirements

Taming the Health Care Building Codes NFPA vs. The International and Chicago Building Codes JENSEN & HALSTEAD LTD.

FIRE AND SECURITY CONSULTING SERVICES

Life Safety - Means of Egress/Exits NFPA 101

3/6/2018. Design Tips For Fire and Smoke Barriers. Professional Development Hours (PDH) Certificates. Copyright Materials

NFPA 45 NFPA 211 NFPA 1600

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

DUCT SYSTEMS CHAPTER 6

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

DUCT SYSTEMS CHAPTER 6

Fire Department HEADQUARTERS Cathedral Oaks Road Santa Barbara, CA (805) FAX: (805) CODE SUMMARY

Summary of BBS Proposed Ohio Mechanical Code Rule Changes October 2016

Technical Information

Gravity and Pneumatic Waste and Linen Handling Systems NFPA 82 Inspection Form

2012 International Fire Code Errata (Portions of text and tables not shown are unaffected by the errata)

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

Date: February 22, 2005 Kimbalton DUSEL, Pre-S-2 Submittal CNA0402 PRELIMINARY CODE REVIEW. International Plumbing Code Edition

American Fire Sprinkler Association. An Introduction to the IBC and IFC

Module 9: Ontario Building Code Fire Fighting Provisions

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

CHAPTER 7 ALTERATIONS LEVEL

Fire, Smoke and Control Dampers

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS

NFPA-APSEI Fire & Security 2010

OVERVIEW. Increasing Awareness of Occupant Evacuation in Tall Buildings. Traditional Focus has been on Evacuation From Fire

Life Safety Code Common Discepancies Course# LSC102. EZpdh.com All Rights Reserved

Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS)

PART 2. Basic Code Requirements - Semiconductor & Microelectronic Facilities using HPM s

The Physical Environment Portal: Module 5, LS Leadership

YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS

COMPLIANCE ALTERNATIVES

COMPLIANCE ALTERNATIVES

PROJECT: CIVIC ADDRESS:... PERMIT APPLICATION NO.: DATE:... CRP:. Certified Professional:.

Open to Below: A Discussion of Allowed Floor Openings. Jay A. Ierardi, Ph.D., P.E., LEED AP. Kevin S. Hastings, P.E., LEED AP

2015 MECHANICAL CODE REQUIREMENTS

Smoke Management in High-Rise Structures

PERFORMANCE COMPLIANCE METHODS

WHITE PLAINS SMOKE CONTROL CODE PART 1. GENERAL REQUIREMENTS

Presented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC Web: Lauzon-LSC.com

PERFORMANCE COMPLIANCE METHODS

Osceola County Department of Fire Rescue and Emergency Medical Services

Code Technology Committee Area of Study Balanced Fire Protection Roof Vents

Air Change, Ventilation, and Dehumidification for Multi-family Buildings

DUCT SYSTEMS CHAPTER 6

Indoor Environmental Quality

CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

El Reno Fire Department Fire Alarm Plan Review Worksheet

PERFORMANCE COMPLIANCE METHODS

Smoke Control Design and Activation. CFAA NCA Technical Seminar 2015

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION GUIDELINE RESIDENTIAL CARE FACILITIES 2007 CBC/CFC (R-3.1)

FIRE PROTECTION SYSTEMS

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

FIRE-RESISTANCE-RATED CONSTRUCTION A Primer on IBC Chapter 7

FIRE SAFETY INSPECTION REPORT

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

Top (15) Life Safety Code Deficiencies and Tips for Compliance (10/01/2011 thru 02/22/2012)

ACTIVE FIRE PROTECTION SYSTEMS OVERVIEW. Fire Protection Systems

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

incorporating Guidance to Shafts for Smoke Control A useful guide to practical smoke shaft principals and specifications

First Revision No. 15-NFPA [ Chapter 2 ]

The project scope work is 90% new construction and 10% remodel in Esslinger Hall.

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

Chapter Nursing Homes

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts

SECTION 907 FIRE ALARM AND DETECTION SYSTEMS

SEMICONDUCTOR FABRICATION FACILITIES

COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE

2007 CBC & CFC Residential Care Facility Requirements (24 hour care only)

Table EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE

Considerations in the Design of Smoke Management Systems for Atriums

HVAC Equipment Access Equipment Location

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)

Western Firex. Heat & Smoke Ventilator. EAGLE series Natural Ventilation

Fire & Life Safety Code Compliance. Common Safety Deficiencies and Tips for Compliance for Long Term Care and Skilled Nursing Facilities

Loss Prevention Standards

FIRE SAFETY INSPECTION REPORT

Unit 2 Fire Safety (Zone 1)

Transcription:

Module 7 Control of Smoke & Highlights of Code Requirements 1

Module 7 Overview This module will cover: 1. The requirements of smoke control in the Ohio Building Code Section 909 2. The differences between active and passive systems 3. The components of a smoke control system 4. The requirements of smoke and heat vents per Section 910 OBC. 5. The differences between the mechanical and manual activation of smoke exhaust systems 2

Smoke Control Systems An engineered system that includes all methods that can be used singly or in combination to modify smoke movement Two types: Passive Active NFPA Standards 92B-09: Standard for Smoke Management Systems in Malls, Atria, and Large Spaces 3

Smoke Control Systems: Passive Any portion of a building or structure that provides protection from smoke without any type of system activation or movement. Use compartmentalization, reservoirs or other methods to control smoke to a predetermined habitable level Utilized when active control systems are not feasible and/or to help them function Relies on the natural buoyancy of the smoke and the stack effect to allow the smoke to exit the building. 4

Smoke Control Systems: Passive High Bay/ High Ceilings Act as a reservoir to contain smoke Natural ventilation The flow of air or gases created by the difference in the pressures or gas densities between the outside and inside of a vent, room, or space. Open exterior balcony or vestibule with opening 16 sq. ft. in area facing an open area that is at least 20 ft. in width. 5

Smoke Control Systems: Passive Operable or break-out windows Manually controlled Fusible Link Operated Vent A fusible link holds open springloaded fire-rated damper The link is designed to melt at a certain temperature When it melts the damper slams shut. Operable window 6

Smoke Control Systems: Active A system that uses moving mechanical or electrical parts to achieve a smoke control goal. Also known as mechanical Preferred method of smoke control 7

Smoke Control Systems: Active Exhaust Air removed from a space or power system and not reused. Pulls smoke from space Utilizes: Automatic detection Exhaust fans Make up air Colt International Ltd 8

Smoke Control Systems: Active Pressurization Uses wall and floor assemblies with pressure difference Fans create the pressure difference Default design method in the IBC Indiana University of Pennsylvania 9

Smoke Control Systems: Active Airflow Large airflows from adjacent compartments to fire compartment Difficult to achieve Typically utilizes air-moving device Most commonly used to stop smoke movement through open doorways and corridors 10

Smoke Control Systems: Components Figure 702.1(11) SMOKE BARRIER Smoke barrier A continuous membrane, or a membrane with discontinuities created by protected openings, where such membrane is designed and constructed to restrict the movement of smoke. Smoke zone: The smoke control zone in which the fire is located. NFPA Standards 92B-09: Standard for Smoke Management Systems in Malls, Atria, and Large Spaces International Building Code Commentary 11

Smoke Control Systems: Components Control panel Intended to communicate with fire fighters Installed in approved location adjacent to fire alarm panel KMC Controls, Inc. 12

Smoke Control Systems: Components Power supply The system is supplied with two sources of power Primary power shall be from the normal building power systems. Secondary power shall be from an approved standby source complying with Chapter 27 of the Building Code. 13

Smoke Control Systems: Components Smoke detector A device that detects visible or invisible particles of combustion issue a signal to a fire alarm control panel as part of a fire alarm system Wikimedia Commons 14

Smoke Control Systems: Components Fans A blower or exhauster assembly comprising blades or runners and housings or casings. Examples Pressurization Exhaust Colt Group Ltd/ 15

Smoke Control Systems: Components Ducts Pipes, tubes, or other enclosures used for the purpose of pneumatically conveying materials Examples Exhaust Supply LifeSafety Magazine 16

Smoke Control Systems: Components Make-up air inlets Controlled air vents that allow for fresh, draft-free make-up air to enter a building. Make-up air is provided for exhaust systems Replaces the air that is removed Luxury Metals LLC 17

Smoke Control Systems: Components Smoke Dampers A device within an air distribution system to control the movement of smoke Closes upon actuation of a listed smoke detector or detectors Wikimedia Commons 18

Smoke and Heat Vents Openings in the roof which are intended to vent the heat and smoke developed by a fire inside the building NFPA Standards: 204: Standard for Smoke and Heat Venting for information only, not listed in chapter 35 OBC Smye Holland Associates Limited 19

Unit-type vents Small openings on a structure s roof, equipped with a metal frame and housing and manual or automatic hinged dampers, which are opened in case of fire. Using mechanical openings Using gravity openings 20

Unit-type vents Using mechanical openings A small openings on a structure s roof, equipped with a metal frame and housing and automatic hinged dampers, which are opened in case of fire. Spring lift Pneumatic lift Electric motor-driven lift National Domelight Company 21

Unit-type vents Using mechanical openings: Spring Tension is maintained on a fusible link with the use of a heavy duty spring. High temperatures melt the fusible link Santa Barbara County Fire Dept 22

Unit-type vents Using mechanical openings: Pneumatic Lift uses a pressurized air system to open the vent automatically with a loss, or activation, of air pressure Babcock-Davis 23

Unit-type vents Using mechanical openings: Electric motor-driven lift equipped with electrical links that trigger the vent opening when connected to a remote smoke or fire alarm. FAKRO 24

Smoke and Heat Vents: Unit-type vents Using gravity openings: Plastic shrink-out panels Constructed of plastic which shrinks in the presence of heat drop-out panel HPAC Engineering 25

Mechanically-powered venting systems Consists of fixed, motor-driven fans that can be mounted on the roofs Rely on mechanical extraction of smoke through fans. Energy Vanguard's 26

Glass roof and continuous gravity vents Ordinary glass roof vents Vents in glass roofs Continuous gravity vents (ridge vents) Installed at the peak of a sloped roof which allows smoke to escape a building's attic. 27

Mechanical smoke- exhaust systems A dedicated or shared-duty fan system designed and suitable for the removal of heat and smoke. May be an acceptable alternative to smoke and heat vents. Colt International Licensing Ltd 28

Manually-activated smoke exhaust systems Operated by the fire department Are an acceptable alternate to smoke and heat vents 29

Why are smoke control systems are required? To improve conditions in common areas to facilitate safe escape for occupants when a fire occurs To enable the fire to be fought in its early stages 30

When are smoke control systems required? 1. Determine the location of the top floor above ground floor level 2. The nature of occupancy 3. Location of the building above the fire service access level, then a fire fighting core(s) is required. 31

Codes and Standards: OBC 404.5 Smoke Control- Atriums 402.10 Smoke Control- Covered malls and other mall buildings Wikimedia Commons 32

Codes and Standards: OBC 1028.6.2.1 Smoke Control- Means of egress 410.3.7.2 Smoke Control- Stages 403.5.4 Smoke Control- High Rise Buildings 33

Codes and Standards: OBC 405.5 Smoke Control- Underground Buildings 415.7.5.3 Smoke Control- Groups H-3 and H-4 909.4 Analysis 34

Codes and Standards: OBC 909.6 Pressurization Methods 909.7 Airflow Design Method 909.8 Exhaust Method 909.19 System Acceptance 35

Codes and Standards: OBC 909.8 Exhaust Method 909.19 System Acceptance 909.18.8 Special Inspection for smoke control Wikimedia Commons 36

Codes and Standards: OBC 1704.16 Special Inspection for Smoke Control 910.2 Smoke and heat vents- Where required 910.3 Design and installation 37

Codes and Standards: OBC 910.3.2 Vent operation 910.3.2.2 Sprinklered buildings 910.3.2.3 Nonsprinklered buildings 910.3.3 Vent dimensions Wikimedia Commons 38

Codes and Standards: OBC 910.3.5 Draft curtains 910.4 Mechanical smoke exhaust 910.5 Manually activated smoke exhaust system 1016.3 Group F-1 and S-1 increase maximum travel distance 39

Codes and Standards: OFC Chapter 23: High-Piled Combustible Storage High piled storage in excess of 12 feet requires specific consideration, including fire protection design features and smoke and heat vents in order to be adequately protected. Not all high-piled storage will require the use of smoke and heat vents and draft curtains. If properly sprinklered, draft curtains aren t required. Fairfax County Va. 40

Code and Standards: NFPA 92B: Smoke Management Systems in Malls, Atria, and Large Spaces This standard provides methodologies for estimating the location of smoke within a large-volume space due to a fire either in the large-volume space or in an adjacent space. 41

Lessons learned in Module 7 1. There are two types of smoke control systems, passive and active. 2. Smoke control systems must be supplied with two sources of power. 3. Smoke control systems are designed to improve conditions in common areas, to facilitate safe escape for occupants when a fire occurs, and to enable the fire to be fought in its early stages 4. Unit type vents are small openings on a structure s roof, equipped with a metal frame and housing and manual or automatic hinged dampers, which are opened in case of fire. 5. Chapter 23 of the Ohio Fire Code regulates high piled combustible storage. 42