Status of AGATA detectors. deliveries customer acceptance tests neutron damage maintenance, annealing,

Similar documents
AGATA: Advanced Gamma Tracking Array, Project Status

Status of the ENSAR2 JRA PSeGe

Highlights of Germanium Detector technology

RISING. Stopped beam design status. 29 th September 2005

EDELWEISS-III dark matter search: first results and future

Cryogenic Autofill for AGATA. I. Kojouharov GSI, Darmstadt

R&D of GEM detector high rate for CBM Experiment at FAIR Muon Chamber R&D in India

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

The Majorana Demonstrator Update and Detector Technologies

Analogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement

dewar or an electrically powered cooler. The sensitive detector surfaces are thus protected from moisture and condensable contaminants.

Status Report about the TPC Detector and Module at CEPC

R&D Fast and lightweight EIC integrated tracking system Barrel MicroMegas & Forward Triple-GEM

Mastertitelformat bearbeiten Super-FRS Status

Food Control Plans or National Programmes Cold Hold Records 2019

Technician Tools CAN/ULC-S CAN/ULC-S537-13

GERDA Phase II Detectors and Acceptance Tests

Countywide Recycling and Disposal Facility Weekly Progress Report 08/22/08

Acknowledgement: Ralph Prahl, Prahl & Associates, contributed critical review and analysis

Kurt J. Lesker in the Cryogenic Community. Dr. Glynn Dyson Cryogenics Cluster Day 19 th September 2014

Strategies for Summer Utility Savings. Residential Environmental Program Series May 15, 2013

BEST-IN-CLASS PERFORMANCE 2015 Q3 SAME-STORE

Modifications and Improvements to the NPDGamma Liquid Hydrogen Target System and Safety

Germanium Detector Research at MPP

Laboratory Evaluation of Hybrid and Advanced Water Heaters: Performance Overview in Hot Humid Climate

India's First B2B Sourcing Guide for the Electronics Industry. Media Information

Monthly Report for January 2016

Data driven insights from the nation s deepest ever customer energy research

First results and developments of the multi-cell SDD for Elettra and SESAME XAFS beam lines

Cork County Energy Agency

2010 Fire Log Fire Log. Annual Fire Safety Report

MEASURED PERFORMANCE DATA FOR

arxiv: v1 [physics.ins-det] 2 Oct 2013

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017

Abstract. Cuvinte cheie: caisa, radacina, profil de sol Keywords: apricot, root, cavity. 1. Introduction

Bench Top Production Hydroponic Production

PROPER WASTE DISPOSAL

Biosolids Dewatering, Monitoring, and Disposal Programs

North American Technical Services

arxiv: v1 [physics.ins-det] 14 Apr 2014

A Triple GEM Detector for the central Region of Muon Station 1

System Using Exhaust Heat from Residential GHPs

FCC COMPLIANCE REPORT. SHENZHEN STARWELL TECHNOLOGY CO., Ltd. AC/DC ADAPTER

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT Resolution Plan for GI-AP1000-IH-01 Internal Fire Safety Case Substantiation.

The RPII s radon road shows. Hugh Synnott Scientific Officer Radon Advice Section

DRX Retrofit. Northern Cluster Business Partner Meeting 9th-11th September 2014 Castricum, Amsterdam

Micromegas detectors for the upgrade of the ATLAS Muon Spectrometer

multi-purpose detector to search for Higgs and new physics

NON-DESTRUCTIVE 2-D BEAM PROFILE MONITOR USING GAS SHEET IN J-PARC LINAC -overview & hardware construction-

ND280 Construction Status Report

XEUS mirror calibration:

ENERGY CONSUMPTION OF HOUSES AND LIFESTYLE IN COLD CLIMATIC AREA OF JAPAN

Asparagus Response to Water and Nitrogen

The Optical Scattering Calibration System at SNO+ IOP 2015

ISIS Design Division Electrical Engineering. S Birch. September 2012.

CERTIFICATE. EN tested QAL 1 certified TUV approved Annual inspection. The certificate is valid until: 19July2017. Köln, 17 August2012

X-Ray Protection Program

The influence of vegetation and climate on clay earthwork slopes. Dr Joel Smethurst Faculty of Engineering and the Environment

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,

National Grid Residential Active Demand Reduction Demonstration Project. MA EEAC Demand Reduction Sub-Committee February 23, 2017

WLAC Facilities Committee Meeting. September 18, 2017

GEn Proton Recoil Polarimeter Components

60+ NEED-TO-KNOW APPLIANCE MAINTENANCE TIPS

URBAN DESIGN LONDON TRAINING PROGRAMME UDL are pleased to present our programme for April 2013 to March 2014.

4 th EU Summit on the Future Internet

Depleted Uranium Waste Assay at AWE. T.J. Miller AWE, Aldermaston, Reading, Berkshire, England, RG7 4PR UK

2) This manual covers Fire and General Alarm systems. The differences are described in the appropriate sections.

Mission 份有限公司 wwwom 先锋科技股份有限公司 www Working with our customers we identify, design and deliver low light detection solutions which solve customer probl

Programme overview Peter Bakker. Introduction & Separation. Tea Break Harry Koorstra. Mail. Short Break 15.35

ROCKAWAY BOARDWALK Community Board 14 Parks Committee Meeting June 4, 2014

COS Monthly Status Review

Tysons-Old Meadow Road Bike/Ped Improvements

INSTALLATION MANUAL LIST OF SECTIONS LIST OF FIGURES LIST OF TABLES SECTION I: SAFETY UIM-C-0214

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Kingfisher AGM. 17 June 2010

Aging measurements on triple-gem detectors operated with CF 4 based gas mixtures

City of San Francisco Department of Emergency Management Auxiliary Communications Service

The DM-Ice Test Detector. Detector Concept Mechanical Assembly Vessel Options Logistics Considerations Schedule

Measurement system for detection of Radon in building

List of events. December UCLG World Council. January Policy Committee. February Location : Hangzhou. Location : Brussels

REVIEW ON CONDENSER AIR LEAK TEST

Instrumental technique (MCP detectors) - Kamalesh ( )

Flowering Behaviour of Helichrysum obconicum DC.

Carmel Bud Failure. HAL Project AL Dr Prue McMichael Dr Kate Delaporte ABA & Trial Co-operators

ELEMENT SIX NEWS. Kevin Oliver Business Development Manager NoRDHia August Making Diamond Work for You

Better Buildings By Design 2013 Building the Renewable Energy Ready Home Solar Thermal Lessons Learned and Results

Grain Handling, Drying and Storage Management

List of events. September October November Meeting of Secretaries General and Directors. Location : Brussels. Location : Brussels

Whirlpool Cabrio Washer Service Manual

Forecasting gas demand for heating in Belgium

AM-806. Waste/Door Radiation Monitor OPERATIONS MANUAL

Antoine Drouart DSM/DAPNIA/SPhN. Köln, 5 th of December,

SuperCDMS SNOLAB: Road to 100 mm Germanium Detectors

INSTALLATION, OPERATION

Certificate: _01 / 22 March 2013

ICS Integrated Cryocooling System

MÖBIUS Recycler. Condensing Liquid Nitrogen HPGe Detector Cooling System

SAFETY CARTRIDGE. An innovative rupture disc solution to eliminate leaks and installation errors, and increase safety.

National Grid Residential & C&I Active Demand Reduction Demonstration Projects. MA EEAC March 15, 2017

Detector Configurations for the MAJORANA Demonstrator

Transcription:

Status of AGATA detectors deliveries customer acceptance tests neutron damage maintenance, annealing, AGATA week @ Lyon, 22-26 November, 2010

AGATA crystals - overview 21 detectors were delivered: A001,A002,A003,A004,A005,A006,A007,A008 B001,B002,B003,B004,B005,B006 C001,C002,C003,C004,C005,C006,C007 6 detectors are broken: A007,B004,B006 A005,C004,C006,(S003) 1 detector A008 CAT pending 14 detectors accepted and functional: Usage of the available detectors in AGATA Triple Cluster: A001, A003, A002, A006, A004 B002, B003, B005, B001, C002, C005, C003, C001, C007 ATC1 ATC2 ATC3 ATC4 ATC5

AGATA crystals - evolution 24 21 deliveries accepted AGATA crystal pool number of detector 18 15 12 9 Triples at LNL 6 3 0 janv. 05 janv. 06 janv. 07 janv. 08 janv. 09 janv. 10 janv. 11

Crystals & delays 1825 1460 Time between arrival and report CAT pending Time between report and new delivery Crystal not returned yet 1095 730 365 0 A001 A002 A003 A004 A005 A006 A007 A008 B001 B002 B003 B004 B005 B006 C001 C002 C003 C004 C005 C006 C007 mean delay [days] Remark: - Delay by shipment to Turkey taken out - Only time for repair and CAT is considered, the time crystals were in use is taken out

Crystals & Failures 01/01/2006 01/01/2007 01/01/2008 01/01/2009 01/01/2010 01/01/2011 time B001- segments out of specs A001 hole trapping A002 leakage current A003 leakage current C003 leakage current B004 missing segment A004 segments out of specs B001- leakage current A005 leakage current B005 - leakage current B001 leakage current B006 leakage current after CAT C003 leakage current A007 microphony in segments B004 leakage current C003 microphony in segments S003 leakage current after CAT C004 leakage current after CAT C006 leakage current after CAT A005 leakage current after CAT

AGATA detector deliveries CANBERRA, Announced Deliveries, 29 April 2010 A008 Jun 2010 Germany A007 July 2010 Italy B004 July 2010 Turkey warranty B006 Jun 2010 Italy warranty C003 July 2010 UK warranty B007 July 2010 Germany B008 Aug 2010 Germany C008 Aug 2010 UK A009 Oct 2010 UK B009 Dec2010 UK Last Deliveries A008 25. August 2010 Germany C003 5. July 2010 UK warranty - seven detectors behind schedule. - missing B-type detector. - Future Delivery A009 December 2010 UK

Status acceptance tests A008 @ Liverpool

The detector lab in Saclay Team involved: Marie-Delphine Salsac, Marc Karolak and Mariam Kebbiri Work done in 2010: Acceptance test of C007 and C003 i r f u Travelling to Cologne to learn how to mount and repair a triplet Work to be done in 2011: Continue the acceptance tests of crystals Mount and test triplets or multiplets saclay Maybe repair the unworking triplets

Status future Cluster detectors ATC5: A005 and C007 mounted, waiting for B-crystal, at IKP ATC6 at IKP, ATC7, ATC8 at CTT Summary of ordered cryostats and end caps 5 ATC s from demonstrator, 3 ATC s (2 Italy, 1 Germany) ready for detectors 1 AdoubleC (UK) 1 double end cap (Saclay) 1 double end cap (GSI)

Det. 1B - Shape of the 1332 kev line A B C D E F CC /150 Talk by B. Bruyneel

Neutron damage of AGATA clusters Segment energy resolution values of ATC1 ATC4 White: April 2010 Green: July 2010, after 3 high-rate experiments (3 weeks of beam at 30-80 khz singles) Worsening more severe on the forward crystals Segments are the most affected, cores almost unchanged

1B April 2010 CC SG The 1332 kev peak as a function of crystal depth (z) for interactions at r=15mm

The 1332 kev peak as a function of crystal depth (z) for interactions at r=15mm Position of the hits derived from the GRID search PSA 1B July 2010 CC SG

Segments, 1B(C002), r=20 mm Position dependent neutron damage correction works!

Maintenance of AGATA clusters at LNL Scheduled Maintenance at Legnaro 13. 23. September ATC2 replacement of wires in cold part, repair of one missing segment cable ATC3 increased temperature Unscheduled Maintenance after 23. September ATC1 ATC4 First annealing of AGATA capsules!

Annealing of AGATA clusters at LNL AGATA needs an annealing station C003 broken after annealing

Transport of ATC(1), ATC(4) to IKP, Cologne Dismounting of crystals: A001, B002, C002, A005, B001 and C001 @ Legnaro Broken capsule C003 of ATC(3) replaced by C001 of ATC(4) Ongoing repair campaign at IKP, Cologne M.-D. Salsac, M. Karolak, M. Kebbiri (CEA, Saclay) Marc Norman, Tom Stainos (University of Liverpool) D. Lersch, H. Hess, A. Wiens, B. Birkenbach (Cologne)

1. Annealing of crystals Annealing of crystals A001, B002, C002, B001 Increased annealing time: 5h @ 102 C

2. Exchange of cold PCB New PCB Old PCB

3. Leak-Test of ATC-Cryostats ATC(4): vacuum o.k. ATC(1): broken vacuum feed throughs replacement, new flanges

4. Annealing of ATC-cryostats heat power 20W Max. temp. 110 C for several days

5.Reassembly of crystals, cold and warm electronics

6.Final test of detectors Example ATC5 -energy resolution at 1.3 MeV of detector A and C All segment signals of ATC1, ATC4, ATC5 o.k. Some cores need improvement Transport of detectors to LNL beginning of December