LC3000 Level Controller Installation and Maintenance Instructions

Similar documents
LC2200 Level Controller Installation and Maintenance Instructions

Archive. LC2200 Level Controller. 1. Safety information. 2. General product information. 3. Installation. 4. Setting up the controller

LC2610 Level Controller Installation and Maintenance Instructions

PA ma Loop Powered Level Preamplifier

LP30 High Integrity Low Level Alarm Probe Installation and Maintenance Instructions

BC3250. Blowdown Controller

LC1350 Level Controller

UV Flame Supervision System

- to scroll through the menus. - to increase digits when in a menu.

Forced draught gas burner

LFE50. UV Flame Safeguard. Siemens Building Technologies HVAC Products DETACTOGYR. Series 02

LFE50. UV Flame Safeguard. Building Technologies Division DETACTOGYR

Forced draught gas burner

EUROBOX SERIES TYPES CM... SM... MM...

LC2650 Level controller

RE-PR3-E-27 3-Phase Panel Mount 27kW

! WARNING. Before using product, read and understand instructions.

GESTRA Steam Systems NRS English. Installation Instructions Level Switch NRS 1-51

EURO-OIL SERIES TYPES G.. G../. OR.. OR../. F.. FR..

ELECTRONIC FLAME SUPERVISION MULTI-BURNER

C Note! LGI16... Burner Controls. Building Technologies

RTA421. Technical Information. Limit alarm switch Alarm switch and power supply for monitoring current or voltage signals

! WARNING. Before using product, read and understand instructions.

INSTRUCTION MANUAL (English version) Water still

Single Point Freeze Protection Heat Trace Control TRACON MODEL FPT 130 Installation and Operation Manual

Pipe Freeze Protection Control SCFP-CO-F130 Installation and Operation Manual

Flame Safeguards LFE10. Building Technologies HVAC Products

Electronic steam boiler controls

LAE10 LFE10. Use. Series 02

MODEL FPT-130 SINGLE POINT FREEZE PROTECTION HEAT TRACE CONTROL

DEB71. Earth Leakage Monitoring Relay. Benefits. Description

Process Alarm Module RTA 421

GM420. Digital Ground Continuity Relay For AC Systems. Technical Bulletin NAE /

! WARNING. Before using product, read and understand instructions.

Recirculating Chiller RC350G-RC400G RC1400G-RC3000G. Operating Manual

BX444-Mc Gas Detector

MICROFLAT SERIES TYPES C.../U T X

Instructions for the fan motor control system with integrated wiring terminals SILVER C

Flame Safeguards LFE10. Building Technologies HVAC Products

EUROFLAT SERIES TYPES C... S... M...

SLATE. Base Module INSTALLATION INSTRUCTIONS R8001A1001

TH100 Three in One Instant Hot Water Tap

Instruction Manual. Electronic gas and smoke detector GRM

SLATE. Burner Control Module INSTALLATION INSTRUCTIONS R8001B2001

PAC1500Xi PORTABLE APPLIANCE CHECKER

Excellence in Level Measurement

GL-CO-RFG Channel Gas Leak Alarm System

Earth-Rite II PLUS Static Earthing System

MICROtrac MICROPROCESSOR BASED WATER TREATMENT CONTROLLER. Installation and Operation Manual REV. L

MODEL GPT-130 SINGLE POINT HEAT TRACE CONTROL THERMOSTAT

4 Ó â. Contactor RTA421. Contactor with loop power supply for monitoring currentorvoltagesignals. Technical information TI074R/09/en

UV Scanner. Model Specification. Introduction. 854 Instruction Manual

standards: standards:

Q7800H Integrated Burner Control Subpanel

SERIES VAC Microprocessor-Based Intermittent Pilot Ignition Control FEATURES APPLICATIONS SPECIFICATIONS DESCRIPTION

EXTINGUISHING AGENT RELEASE MODULE

LFL Series Burner Flame Safeguard Control

Installing the Cisco ONS FAP-4 Fuse Alarm Panel

EUROBOX SERIES TYPES CM...N SM...N MM...N

SAFETY INFORMATION AND WARNINGS

Eclipse Self-Check UV Scanner

! WARNING. Before using product, read and understand instructions.

Instruction manual. WMCR-2, WMCR-3, WMCR-4 and WMCR-6 Circulator Zone Controllers WMCR-1E and WMCR-4E Expansion Modules

Commissioning password. This page MUST be removed after commissioning and kept in a safe, access controlled location.

Open Vented Condensing Boilers

Motor Controller AC Semiconductor Motor Controller Type RSBS23..A2V.2C24

7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management

S and SF Inverted Bucket Steam Traps Installation and Maintenance Instructions

Operation and use. Functions and characteristics

EasiHeat Mechanical Installation and Commissioning Instructions

FIRE ALARM CONTROL EQUIPMENT. Addendum October 2006 Instructions for new style EN54-4 Power supply unit module

Ultracom cxi. Instructions for Use. High Efficiency Condensing System Boilers. To b e l e f t w i t h t h e u s e r.

INSTRUCTION MANUAL. E2xB05 & E2xB10 Xenon Beacons For use in Hazardous Locations

www. ElectricalPartManuals. com GADD MKIII Ground Fault Indication System Instruction Manual Ground Fault Protection

POINTEK CLS 100 OINTEK CLS 100 CAPACITANCE LIQUIDS/SOLIDS. Instruction Manual March 2001

MBCE-110/230UV Flame Sensor Module

Prem1er EVACS16. Installation Manual VOICE ALARM CONTROL PANEL 4 16 ZONES

Distinction. D4000 & D4000/EURO Water Still. Assembly and Operating Instructions. 1 Issue 2

CRU-S Series Stainless Steel Condensate Recovery Unit

Eclipse 90 UV Scanner Model A Version 1

CARVER CASCADE 2 & CASCADE 2 GE CARAVAN WATER HEATER INSTALLATION INSTRUCTIONS LEAVE THESE INSTRUCTIONS WITH THE USER

Dual Point General Purpose Heat Trace Control TRACON MODEL GPT 230 Installation and Operation Manual

LGA... Gas Burner Controls. Siemens Building Technologies HVAC Products

Duct and Rough Service Carbon Monoxide Sensor

MAINTENANCE AND SERVICE GUIDE

M15051) INSTRUCTION MANUAL

INFRARED IP55 HEATER INSTRUCTIONS FOR: MODEL:- QZWP45N 1. SAFETY INSTRUCTIONS

Satchwell. DC1100 Energy Controller SELF CONFIGURING OPTIMISER/COMPENSATOR WITH BOILER SEQUENCE AND HWS CONTROL FEATURES

INSTALLATION AND OPERATING INSTRUCTIONS R-3F2-LXX

MHG201 Gas Hob Manual for Installation, Use and Maintenance

! The Caution Symbol (exclamation point) alerts you to a "CAUTION", a safety or

4 & 8-POINT ANNUNCIATORS Instruction Manual

7PG17 - XR Intertripping, Interposing, Supervision and Special Purpose Relays. Answers for Infrastructure & Cities.

50A Integrated Furnace Control

Soft Starter AC Semiconductor Motor Controller Type RSBS23..A2V.2C24..

SECTION AUTOMATIC TRANSFER SWITCHES

Instruction Manual SCD24. Read this document prior to installation. Contents

HVG620 & HVG720 Gas Hob Manual for Installation, Use and Maintenance

Operating instructions Safety-monitoring module SRB 302X3. 1 About this document

Cat. N. Cat. N (s) 1. DESCRIPTION - USE 3. OVERALL DIMENSIONS. Technology : 4. PREPARATION - CONNECTION 2. PRODUCT RANGE

Transcription:

4025550/12 IM-P402-36 AB Issue 12 LC3000 Level Controller Installation and Maintenance Instructions 1. General safety information LC3000 NORM ALARM TEST 2. General product information 3. Installation 4. Setting up the controller 5. Wiring diagrams 6. Commissioning 7. Maintenance 8. Fault finding IM-P402-36 Printed in the AB UK Issue 12 Copyright 2004 1

1. General safety information Your attention is drawn to the relevant Supplementary Safety Information sheet supplied with the product as well as to any National or local regulations. Safe operation of the product depends on it being properly installed, commissioned and maintained by a qualified person in compliance with the operating instructions. It is essential to comply with general installation and safety instructions for pipeline and plant construction, as well as to make proper use of tools and safety equipment. The product is designed and constructed to withstand the forces encountered during normal use. Use of the product for any other purpose, or failure to install the product in accordance with these Installation and Maintenance Instructions, could cause damage to the product, will invalidate the marking, and may cause injury or fatality to personnel. Additional Safety Notes: Level control and level limiting products in steam boilers Products / systems must be selected, installed, operated, and tested in accordance with: - Local or National standards and regulations. - Guidance Notes, (Health and Safety Executive PM5 in the UK). - The requirements of Approvals Authorities. - Boiler Inspection Bodies. - Boiler manufacturer s specifications. Two independent low water limiting systems must be installed on steam boilers. Level probes must be installed in separate protection tubes/ chambers, with sufficient clearance between the tips, and earth. Each probe must be connected to an independent controller. The alarm relays must isolate the boiler heat supply at low alarm status. A high water alarm may be part of the water level control, or a separate system. An independent high water alarm system must be fitted if it is considered a safety requirement. If the high water alarm is a limiter, the relays must interrupt and lockout the energy supply at high water status. All boiler water limiters require regular functional testing. The level probe and controller is only part of the safety system. To complete the system, additional circuitry (wiring, relays, alarm bell/lamp etc.) is required. Circuitry must be designed and wired to 'fail-safe'. A suitable water treatment regime must be used to ensure continuous safe and correct operation of the control and limiter systems. Consult the above authorities and a competent water treatment company. Warning Isolate the mains supply before unplugging the controller since hazardous voltages will be exposed on the controller base. This product complies with the requirements of Electromagnetic Compatibility Directive 89 /336 /EEC by meeting the standards of: - BS EN 50081-1 (Emissions) and - BS EN 61000-6-2 (Immunity). The following conditions should be avoided as they may create interference above the limits specified in BS EN 61000-6-2 if: - The product or its wiring is located near a radio transmitter. - Excessive electrical noise occurs on the mains supply. Power line protectors (ac) should be installed if mains supply noise is likely. Protectors can combine filtering, suppression, surge and spike arrestors. - Cellular telephones and mobile radios may cause interference if used within approximately 1 metre (39") of the product or its wiring. The actual separation distance necessary will vary according to the surroundings of the installation and the power of the transmitter. If this product is not used in the manner specified by this IMI, then the protection provided may be impaired. 2 IM-P402-36 AB Issue 12

2. General product information The Spirax Sarco LC3000 is an advanced level controller with built in cyclic self-testing facilities. It is designed for use with high or low level, self-monitoring, high integrity level probes to provide water level alarms in steam and hot water boilers. The LC3000 is a dual voltage unit (UL /FM version 120 V only) with LED indication of the following conditions:- Green Normal Level correct Red Level alarm Boiler water low/high An automatic cyclic test of the probe, probe cable and controller is carried out every few seconds by internally simulating a fault in the probe. A test button is fitted so that a full test of the probe, controller, and associated circuits can be carried out. Provision is made for the wiring of a remote test button if required. In most countries, steam boilers operating with limited supervision require two self-monitoring level probes and controllers to provide two independent low level alarms. A high level alarm is also advised, and is compulsory in some countries. Minimum conductivity (when used with an LP30 probe) 30 µs/cm or 30 ppm Maximum ambient temperature 55 C (131 F) Minimum ambient temperature 0 C (32 F) Pollution degree 2 Overvoltage catagory II Indoor use only Altitude up to 2 000 m (6 561.5 ft) Humidity Maximum relative humidity 80% for temperatures up to 31 C (87.8 F) decreasing linearly to 50% relative humidity at 40 C (104 F). Protection rating IP40 Mains supply voltage 230 V setting (not available with UL /FM version) 198 V - 264 V 115 V setting (120 V UL /FM version) 99 V - 132 V Frequency 50-60 Hz Fuse type 20 mm cartridge, 100 ma anti-surge (T). For the UL/FM version, replacement fuses must be UL recognised to maintain the integrity of the approval. Maximum power consumption 6 VA Maximum cable length (controller to probe) 50 m (164 ft) Terminal torque rating 1 N m (9 lbf in) Clamping screw LC3000 NORM ALARM TEST Green (Normal) Red (Alarm) Test button Fig. 1 Clamping screw IM-P402-36 AB Issue 12 3

WARNING: Isolate the mains supply before unplugging the controller since hazardous voltages will be exposed on the controller base. To unplug the controller from its base, undo the two retaining screws and pull the controller straight forwards. Rocking the controller in the vertical plane will ease removal. The controller must be installed in a suitable industrial control panel or fireproof enclosure to provide impact and environmental protection (pollution degree 2). Spirax Sarco can provide suitable metal or plastic enclosures (for standard controller only). The controller may be mounted on a 'top hat' DIN rail using the clip provided or the clip can be removed and the controller base screwed directly to a chassis plate. Caution: Allow 15 mm spacing between multiple units for air circulation. The controller is for installation category II (overvoltage category) and must be installed in accordance with IEC 60364 or equivalent. For the US and Canadian markets the controller must be wired in accordance with the National and Local Electrical Code (NEC) or Canadian Electrical Code (CEC). The controller and all connected circuits must have a common isolation system which meets the relevant requirements of IEC 60947-1 and IEC 60947-3 or equivalent. This must be positioned close to the controller and clearly identified as the disconnect device. A quick blow 3A external fuse must be fitted in all phases of the controller and relay supply. The relays must be on the same phase as the controller supply. See notes on wiring diagram. Cabling should be installed in accordance with BS 6739 - Instrumentation in Process Control Systems: Installation design and practice or local equivalent. Note: Screened high temperature, 4 core, 1 mm 2 (18-16 AWG) cable is required for the probe wiring. For the UL/ FM version, NEC class I wiring with a minimum temperature rating of 75 C (167 F) must be used. If the cable is to be exposed to a higher temperature, then a suitable temperature rating will need to be selected. For the standard version a suitable cable is Pirelli FP200 or Delta Crompton Firetuf OHLS. The same type of cable may be used for the mains wiring. Connect the screens as shown in the wiring diagrams (Section 5). If the product is not used in the manner specified in this IMI, then the protection provided may be impared. Relay rating table: Version Relay load type Rating Standard 3. Installation Resistive at 250 Vac Inductive at 250 Vac 2.5 A 1 A UL /FM version Pilot duty at 120 Vac only 1 A 4 IM-P402-36 AB Issue 12

4. Setting up the controller The controller is supplied with the mains selection switch set to 230 V for the standard version (UL/ FM version 120 V only - The supply voltage is not selectable). To change the mains supply voltage: - Loosen the two cover clamping screws. - Unplug the controller from its base. - Remove the rear cover panel. - Slide out the printed circuit board assembly. - Move the voltage selection switch to 115 V. - Replace the printed circuit board assembly. - Replace the rear cover panel. - Plug the controller into the base. - Tighten the cover screws. Transformer Transformer 230 230 Fig. 2 20 mm fuse 100 ma anti-surge (T) Slide switch left for 115 V supply IM-P402-36 AB Issue 12 5

5. Wiring diagrams 5.1 Screen connection An earth current loop is created if a wire or screen is connected between two earth points, which are at different potential (voltage). Spirax Sarco boiler controls do not have an internal connection to earth. The controller is connected to earth via the LP30/ LP31. The screen and the earth wire are only connected at one end of the system, i.e. at: the LP30/ LP31 earth terminal. Note: The LP30 /LP31 earth terminal is a functional earth rather than a protective earth. A protective earth provides protection from electric shock under a single fault condition. This product has double insulation and therefore does not require a protective earth. A functional earth is used in order for the product to operate. In this application, the earth (tank / boiler shell) is used as the common of the probe. It also provides a sink/drain for any electrical interference. Ensure that the screen is connected to terminal 12 of the LC3000 and to the earth terminal of the LP30/ LP31. The LC3000 (terminal 12) is only earthed via the LP30/LP31. CAUTION: Do not connect terminal 12 of the controller to an earth. To do so may induce an earth current loop, which may reduce the performance or damage the product. 5.2 Wiring diagram notes The controller should normally be powered through the boiler panel control fuse, so that terminal 1 is live whenever the boiler plant is switched on. An optional test button may be wired in as shown. This is useful if the controller is installed in a locked enclosure and it is required to simulate a low or high water level condition for test purposes. All relays are shown in the power off position. The terminals are suitable for two 1.5 mm 2 or 16 AWG cables (maximum). LP30 and LP31 UL /FM probes only The LP30 and LP31 UL /FM probes are supplied with four 18 AWG, 12" long colour coded flying leads. These are to be cut to length and connected to a suitable metal terminal box. A length of flexible metal conduit is required between the probe and the terminal box to provide environmental protection and easy electrical connection. The cable socket is provided with a ½" NPT conduit adaptor for this purpose. See LP30 and LP31 IMI for further details. 6 IM-P402-36 AB Issue 12

L N Live supply from burner circuit N Burner circuit broken at alarm Fuse 3 A maximum Fuse 3 A maximum * Fit link as shown Alarm lamp or bell Screen * LC3000 controller 1 2 3 4 5 6 7 8 9 10 Select mains voltage internally Normal Alarm Normal Relay 1 Relay 2 11 12 Do not connect terminal 12 to any other earth Optional external test button Red Yellow LP30 connector Internal link Comparator tip 3 2 1 Internal resistor This terminal is internally connected to the probe body and earth. Ensure resistance from probe body to pipework /boiler shell is less than 1 W. Low alarm tip Fig. 3 See Page 8, Figures 4, 5 and 6 for other probe wiring details. IM-P402-36 AB Issue 12 7

Detail showing wiring of the LP31 for high alarm Screen 9 10 11 12 Red Yellow LC3000 1 2 3 LP31connector Fig. 4 Internal link High alarm tip * * Internal resistor Ensure resistance from probe body to pipework/boiler shell is less than 1 W. Detail showing wiring of UL/ FM LP30 and LP31 Screen 9 Screen 9 10 10 11 11 12 LC3000 Terminal box 12 LC3000 Terminal box Red 3 2 1 Internal link Comparator tip Yellow Low alarm tip LP30 connector Internal resistor Ensure resistance from probe body to pipework /boiler shell is less than 1 W. Fig. 5 Fig. 6 Red 1 2 3 Internal link High alarm tip Yellow LP31 connector * *Internal resistor Ensure resistance from probe body to pipework/ boiler shell is less than 1 W. 8 IM-P402-36 AB Issue 12

6. Commissioning With the water level normal the green LED should be on and the boiler panel should indicate normal water level. The green LED will briefly extinguish every few seconds showing that the automatic cyclic test is being carried out. To carry out a manual test:- 1. With the water level normal, press and hold the test button until the green (normal) LED extinguishes and the red (alarm) LED lights (approximately 5-6 seconds). The boiler panel should signal alarm. 2. Release the test button. After a short delay, the green LED will light and the red LED will extinguish, showing that the internal checking circuits have been verified. The boiler panel will return to normal. If there is an external lockout circuit in the boiler panel this will need to be reset. 3. If the optional external test button has been connected, press and hold it until the same test sequence occurs. (approximately 5-6 seconds). 4. Lower the boiler water level to below the low alarm level (low alarm), or raise the water level to above the high alarm level (high alarm). The green LED will extinguish and the red LED will light. The boiler panel will go to alarm. 5. Alter the water level to normal. The controller relays will re-energise and allow the burner to fire (after resetting any lockout). No special servicing or maintenance of the controller is necessary. Clean and inspect the LP30/ LP31 annually. Boiler water level controls and alarms require regular testing and inspection. For specific testing instructions for the Spirax Sarco systems please see separate literature. LP30 Clean and inspect the LP30 assembly annually, particularly the threaded contact surfaces between the tip extension and the probe central electrode. More regular cleaning is advised where the quality of boiler water might cause a build-up of insulative scale or oxide on the probe. Spare parts 7. Maintenance Spare fuses Stock number 4033380 Set of 3 IM-P402-36 AB Issue 12 9

8. Fault finding Most faults which come to light during commissioning are caused by incorrect wiring, installation or setting up. If there are problems the following points should be checked:- Diagnosis table Symptom Probable diagnosis Probable diagnosis LP30 LP31 Probe cable to low Probe cable to high alarm alarm tip open circuit. tip (terminals 1 or 2) shorted to earth. Comparator tip Probe cable to probe Red LED on continuously shorted to earth. terminal 3 open circuit. Earth open circuit. Earth open circuit. Probe wires crossed. Probe wires crossed. Low alarm tip shorted to comparator tip. Probe cable to low alarm Probe cable to high alarm tip shorted to earth. tip open circuit (Probe Red and green LED s terminals 1 or 2). both on continuously Probe wires crossed. Probe wires crossed. Comparator tip open circuit. Green LED flashes quickly on Controller self-checking circuitry has simulated a fault at the start-up, then red LED lights moment it was switched on, but is working normally. for about 12 seconds. Green No fault is present. LED then flashes at normal speed (every 4 seconds). Check: Mains on LED not lit: - No live supply. - Neutral not connected. - Controller internal fuse blown. Controller internal fuse blown: - Check the mains supply voltage is lower than 264 V, and that the ambient temperature inside the control panel is less than 55 C (131 F). If either of these limits has been exceeded, it is possible that the controller internal thermal fuse has blown, and that the controller will need to be replaced. - Ensure that the probe supply voltage is approximately 2-2.5 Vac between terminals 10 and 12 of the controller, or terminals 1 and earth of the probe. 10 IM-P402-36 AB Issue 12

IM-P402-36 AB Issue 12 11

12 IM-P402-36 AB Issue 12