Our Ref: CD/FSSD/12/02/03/01 DID: FAX:

Similar documents
Our Ref: SCDF/HAZ/14/03/02/01 DID: FAX: REVIEW ON USE OF HYDROCARBON REFRIGERANT IN SINGAPORE

SCDF A member of the Home Team

The Singapore Fire safety Engineering Guidelines (SFEG)

THE INSTITUTION OF FIRE ENGINEERS

ITUTION OF FIRE ENGINEERS

SEPTEMBER-OCTOBER 2008

FIRE SAFETY AND SHELTER SEMINAR

IFE S AGM President s Address

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

IFE MEMBERS NIGHT ONE DAY SEMINAR ON THE IMPLICATIONS OF RECENT RESEARCH FOR FIRE SAFETY ENGINEERING

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

FIRE TESTING SERVICES FIRE TESTING SER

APPLICATION FOR FIRE CERTIFICATE / FIRE CLEARANCE UNDER THE MAURITIUS FIRE AND RESCUE SERVICE ACT 2013 OFFICE USE ONLY

THE MAURITIUS FIRE AND RESCUE SERVICE ACT. Regulations made by the Minister under sections 18, 19 and 27 of the Mauritius Fire and Rescue Service Act

Maintenance of Fire Systems

Fire Safety In Singapore. Cpt yam yeow kiat

Slight Harm Moderate Harm Extreme Harm Low Trivial Risk Tolerable Risk Moderate Risk Medium Tolerable Risk Moderate Risk Substantial Risk

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

Emergency Evacuation Plan. Tiffany Tower Plot W2 Jumeirah Lakes Towers

NFEC DIALOGUE 2015 COMMON FIRE SAFETY NON-COMPLIANCES AND SCDF ENFORCEMENT ACTIONS

FIRE SAFETY SEMINAR 2009 WORKSHOP DISCUSSION

NFEC FIRE SAFETY SEMINAR 2018

SCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY

Enclosure 4- RISK ASSESSMENT

CITY OF MOUNT GAMBIER BUILDING FIRE SAFETY COMMITTEE

APPENDIX 12 FIRE SAFETY REQUIREMENTS FOR LIQUEFIED PETROLEUM GAS (LPG) CYLINDER INSTALLATIONS

NATIONAL COMPETENCY STANDARD

Element C3.4 Fire Fighting Equipment

- CONSTRUCTION FIRE SAFETY STANDARDS

Ch. 569 FIRE AND SAFETY SERVICES 28 CHAPTER 569. FIRE AND SAFETY SERVICES GENERAL PROVISIONS INTERNAL DISASTER PLAN EVACUATION DRILLS

AFEC FIRE ENGINEERING TEMPLATE FOR CLIENTS INTERNALLY COMPLETED RISK ASSESMENT

Fire Safety Regulations

Singapore Civil Defence Force FIRE SAFETY ISSUES AT SHOPPING OUTLETS AND COMMONLY FOUND NON COMPLIANCES

Winnipeg Fire Department Fire Prevention Branch

CHAPTER 7 MECHANICAL VENTILATION AND SMOKE CONTROL SYSTEMS 7.1 AIR CONDITIONING & MECHANICAL VENTILATION SYSTEMS

FIRE RISK ASSESSMENT NOT KNOWN 15/10/ SOMERTON COURT BROADMOSS DRIVE SIMON ROFFEY

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

MOBILE FOOD VENDING Food Trucks & Trailers

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

Fire Safety Regulations

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

Level 2 Award in Fire Safety (QCF) (SCQF Level 5 in Scotland) Unit 1 title: Fire safety principles

September 1, Sincerely, Mike Montgomery Fire Marshal. M.S. Montgomery Fire Marshal

The Singapore Fire Safety Engineering Guidelines. Nicholas Lee, Senior Consultant Fire Safety & Shelter Department Singapore Civil Defence Force


FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NEW BUILDINGS

COMMON FIRE SAFETY ENFORCEMENT FINDINGS ENFORCEMENT & PROSECUTION BRANCH CENTRAL ENFORCEMENT DEPARTMENT

EMERGENCY RESPONSE PLAN FOR

Department of Physics/Block S11/Science Faculty NATIONAL UNIVERSITY OF SINGAPORE 2 ACTIONS TO BE TAKEN IN THE EVENT OF FIRE DURING OFFICE HOURS

Health, Safety and Wellbeing Management Arrangements. Core I Consider I Complex. Fire Safety. Health, Safety and Wellbeing Service

FORMULATION OF FIRE SAFETY REQUIREMENTS FOR NEW RAILWAY INFRASTRUCTURES

Project: Location: Date Prepared: Last Reviewed:

Active & Passive Fire Protection System. Page 1 Kalidasan S BT IN SSP-OP

- CONSTRUCTION FIRE SAFETY STANDARDS

Following are the systems proposed as per NBC & Local Fire Authority:

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION)

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT HORSEFAIR HOUSE

SOUTH AFRICAN NATIONAL STANDARD

MINISTERIAL ORDER NO.(6) OF 2013 WITH RESPECT TO PROTECTION OF WORKERS FROM THE HAZARDS OF FIRE IN ESTABLISHMENTS AND WORK SITES

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT SPORTS CENTRE

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES

Fire protection documentation. CFPA-E Guideline No 13:2015 F

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

FIRE PROTECTION SYSTEMS IN BURJ KHALIFA. By NAFFCO Fire Protection

Chapter 12 HOT WORK OPERATIONS. Purpose:

SINGAPORE CIVIL DEFENCE FORCE FIRE, AMBULANCE AND ENFORCEMENT STATISTICS TOPIC A FIRE INCIDENT STATISTICS (JAN DEC 2012)

I. INTRODUCTION Codes, Rules, Laws, & Requirements

Family Foster Home Fire Safety Evaluation Checklist Instructions

Management Practices: Fire Protection Impairments November 2015

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

HIGH-RISE RETROFIT ORDINANCES - NO and NO

Blue Whirl Building. General Fire Safety Checklist. conducted for. Location 1029 McLean Ave, Dallas, TX 75211, USA. Visit 20 Sep :08 PM

CITY OF PASADENA FIRE DEPARTMENT

Purpose: To establish procedures for identifying fire hazards and preventing fires. Scope: All Central New Mexico Community College (CNM) Community.

Fire Risk Assessment

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

Fire Safety & Evacuation Procedures

As we operate the hotel, we may want to do some renovation works to improve the service level and guest experience. This will involve application for

Prescriptive Requirement for Smoke Control

IMO. Resolution A.952(23) Adopted on 5 December 2003 (Agenda item 17) GRAPHICAL SYMBOLS FOR SHIPBOARD FIRE CONTROL PLANS

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY)

PROJECT: NITESH PALO Bangalore FIRE SAFETY MEASURES

THE FACTORIES A D OTHER PLACES OF WORK ACT (Cap 514)

ICC Update - Laboratory Issues Code Changes / Proposals / Trends of Interest 10/2005

8.1. Fire and Heritage. The maintenance series. Information sheet. Guidelines on Fire Safety in Heritage Buildings

1970s building housing main school reception and support offices. Well managed buildings with no significant risk of a fire occurring.

Smoke Control Requirements for New Railway Infrastructure. Ir Peter Law

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

IMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE

Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.

Fire protection on chemical manufacturing sites

RISK ENGINEERING GUIDELINE.

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition

Construction Method, Material Selection, Fire Prevention & Building Security System For Project 9a : Board 4 ; For Project 9b : Part 4

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

2012 International Fire Code Significant Changes. IFC Background. Purpose IBC and 2012 NFPA 101 Significant Means of Egress Changes

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Transcription:

Our Ref: CD/FSSD/12/02/03/01 DID: 68481407 FAX: 68481493 14 Jan 2010 Registrar, Board of Architects (BOA) Registrar, Professional Engineers Board (PEB) President, Singapore Institute of Architects (SIA) President, Institution of Engineers, Singapore (IES) President, Association of Consulting Engineers, Singapore (ACES) Dear Sir/Madam, RESPONSIBILITIES OF REGISTERED INSPECTORS (RIs) FOR ARCHITECTURAL (ARCH) & MECHANICAL & ELECTRICAL (M&E) Some RIs (Arch) and RIs (M&E) have highlighted that the existing scope of responsibilities under Part I and Part II to First Schedule of the Fire Safety (Registered Inspectors) Regulations 1994 could be made more defined for clearer delineation of responsibility between the RIs of the two disciplines. This will further facilitate in knowing their areas of responsibilities and minimize any grey areas on the respective scope of fire works to be inspected by RI (Arch) and RI (M&E). 2 A study group has since been formed to examine and review the scope of fire safety works to be inspected by appropriate registered inspectors. On 20 July 2009 and subsequent meetings, the revised scope of duties of respective RIs was presented and accepted by the FSSD Standing Committee. See Annex A for the revised versions of Part I & II. 3 The Committee also discussed on some related issues that are reflected in Annex B, which serves to clarify some possible areas of doubts. 4 We seek your assistance to convey the contents of this circular to your members. The circular is also made available for viewing in CORENETeinfo:http://www.corenet.gov.sg/einfo and SCDF internet website http://www.scdf.gov.sg. 5 For enquiry or clarification, please contact MAJ Winson Cheung at DID 68481433. 1

Yours faithfully, (Transmitted thru e-mail) Poon Keng Soon Secretary, FSSD Standing Committee for Commissioner Singapore Civil Defence Force cc All members of FSSD Standing Committee President, REDAS President, IFE President, SISV CEO, BCA CEO, URA CEO, HDB CEO, PSA CEO, JTC CE, LTA CE, TUV SUD PSB (Attn: Ms Tan Chiew Wan / Mr Lau Keong Ong) CE, SPRING Singapore (Attn: Mr Kenneth Lim) 2

Annex A SCOPE OF FIRE SAFETY WORKS TO BE INSPECTED BY APPROPRIATE REGISTERED INSPECTORS A registered inspector who (a) is an architect registered under the Architects Act (Cap. 12) or a professional engineer in the civil or structural engineering discipline registered under the Professional Engineers Act (Cap. 253) shall inspect and, unless otherwise provided, test the fire safety works listed in Part I; (b) is a professional engineer in the mechanical or electrical engineering discipline registered under the Professional Engineers Act shall inspect and test the fire safety works listed in Part II; (c) is a fire safety engineer and either an architect registered under the Architects Act or a professional engineer in the civil or structural engineering discipline registered under the Professional Engineers Act shall inspect and, unless otherwise provided, test the fire safety works listed in Part I and that part of the fire safety works using the alternative solution; (d) is a fire safety engineer and a professional engineer in the mechanical or electrical engineering discipline registered under the Professional Engineers Act shall inspect and test the fire safety works listed in Part II and that part of the fire safety works using the alternative solution. PART I (RI Architectural) Means of Escape Determination of exit requirements Means of escape requirements Exit signs and directional signs Provision of exit lightings, emergency lightings (selfcontained light fittings only), and low level photo luminescent signs Structural Fire Precautions: Compartment walls and floors Elements of structure External walls Separating walls Protected shafts and lift shafts Protection of openings Exit staircases Concealed spaces Fire stopping Restriction of flame spread Roofs Materials for construction 3

Site planning and external fire fighting provisions: Provision for external access to building for fire fighting and accessibility of site to fire fighting appliances Access to buildings with rising mains Hydrants Fire Fighting Systems (Provisions Only): Automatic and manual fire alarm systems Dry and wet rising main systems Emergency power supply Fire lifts Fixed automatic fire extinguishing systems Hosereels (include testing for direct Public Utilities Board supply) Mechanical ventilation Natural ventilation openings Sprinkler installations Smoke control systems Other Provisions: Emergency voice communication systems Fire Command Centre Portable Fire Extinguishers Pressurized or non-pressurised storage cylinders, tanks and cylinders with manifold system (testing not required) Any other requirement specified by the Fire Code. Any other requirement specified by other accepted Codes of Practice that have been adopted for the project. Any other endorsements made on the approved building plans. 4

PART II (RI Mechanical & Electrical) Means of Escape Exit lightings, emergency lightings and low level photo luminescent signs Site planning and external fire fighting provision - Private hydrants (testing only) Fire Fighting Systems (Verification & Testing): Automatic and manual fire alarm systems Dry and wet rising main systems Emergency power supply Emergency voice communication systems Fire lifts Fixed automatic fire extinguishing systems Hosereels (pump feed) Integrated fire fighting and protection systems testing under both fire alarm activation and power failure condition Sprinkler installations Mechanical ventilation and smoke control systems Mechanical ventilation/air-conditioning systems, including dampers and fire resisting construction of ductworks Pressurisation systems Smoke control systems (both mechanical and venting systems) Other Provisions: Emergency voice communication systems Pressurized or non-pressurised storage cylinders, tanks and cylinders with manifold systems (testing only) Any other requirement specified by the Fire Code. Any other requirement specified by other accepted Codes of Practice that have been adopted for the project. Any other endorsements made on the approved building plans. 5

Annex B FSSD STANDING COMMITTEE 4/2009 HELD ON 20 JULY 2009 & SUBSEQUENT MEETINGS S DECISIONS ON IDENTIFIED GREY AREAS UNDER THE SCOPE OF RESPONSIBILITIES FOR RI (ARCH) AND RI (M&E) The Provision Of The Fire Alarm System: RI (Arch) will ensure the provision by checking that the manual call-point is provided in accordance with the Fire Code. RI (M&E) will then conduct the system testing to detect any missing components and any non-compliances of the fire alarm system. For the case of a show flat, where there is no fire protection and mechanical ventilation plans involve, the QP (Arch) making the fire safety plan submission is to make clear that he is covering the M&E portion. Given the understanding that QP (Arch) is undertaking the M&E portion, this means that QP (Arch) is overseeing that the M&E portion is of compliance to the relevant Codes of Practices. Similarly, the RI (Arch) inspecting the project will see that both Architectural and M&E aspects are in compliance to the relevant Codes of Practices. The Provision Of The Emergency Lighting: RI (Arch) will check on the provision of the emergency lighting while the RI (M&E) will verify the conformance of the system details, which include the final performance, adequate siting, spacing, luminous level and testing of the associated components. In the case of self contained emergency lighting, the RI (Arch) may conduct the testing; ie that is no need to engage the RI (M&E). The Provision Of The Wet Riser System: For wet riser system, the RI (Arch) shall see that the wet riser is provided for in accordance to the Fire Code. RI (Arch) shall also check on the sufficient area of wet riser s coverage and appropriate location of breeching inlets, risers and landing valves. The RI (M&E) will check and verify for full compliance with the Fire Code and the relevant Code of Practice and to conduct test for the entire system. 6

The Provision Of The Dry Riser And Hosereel: For dry riser, the RI (A) will check on detailed components and features of the system to see that dry riser is provided in accordance to Fire Code. The RI (M&E) will carry out the testing for dry riser. For hosereel, RI (A) will check on the adequate area of coverage, carry out testing of hose reel if it is direct from PUB as stated under Part 1 of first schedule. The RI (M&E) will carry out the testing of hose reels if they are pump fed. The Provision Of The Staircase Pressurization: RI (Arch) shall see that staircase pressurisation systems are provided by way of that the inlet grilles are present at site, proper MV shafts are provided. RI (M&E) will carry out the testing of the entire system. During the testing, RI (M&E) will check for full compliance of the detailed components and compliance with relevant codes of practice. The Provision Of The LPG Manifold System: RI (A) shall check on the location of manifold system, safety distance from any ignition source, compliance of openings to the installation to comply with the LPG guidelines under the Fire Code. RI (M&E) will check for full compliance of the system and its components. During the testing, RI (M&E) will detect missing components and non-compliance items of the system such as location of vaporizers, leakages, conditions of pipings etc. 7