TRCA Field Staking Protocol December 2016

Similar documents
3-2 Environmental Systems

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM

Sustainable Natural Environment Wetlands

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements

APPENDIX 1. Long Range Planning and the Vision for the Future of the Town

TRCA Roles and Responsibilities in Planning and Development

Township of Adjala-Tosorontio Official Plan Review. Natural Heritage

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department

APPENDIX I Presentations

Subject: Identification and Confirmation Procedure for Areas of Natural and Scientific Interest Compiled by Branch Ontario Parks

STREAM BUFFERS

KING CITY COMMUNITY PLAN

APPENDIX F: EXTERNAL APPROVALS

AMENDMENT NO. 41 TO THE OFFICIAL PLAN FOR THE TOWN OF MONO

Natural Heritage areas are characterized by one or more of the following values:

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 5 IMPERVIOUS SURFACES

Great Lakes Conservation Blueprint for Terrestrial Biodiversity on the Canadian Shield

Woodland Conservation and the Master Plan

4. What are the goals of the Kawarthas, Naturally Connected project? 7. What are watersheds and why are they being used as the project boundaries?

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013

MARKHAM. City of. Comprehensive Zoning By-law Project. Task 15: Review & Assessment - Hazardous Lands and Greenway April 20, 2015

Caledon Villas Corp. c/o Mr. John Spina 55 Blue Willow Drive Woodbridge, ON L4L 9E8 May 14, Floodplain Characteristics, Old Church Road

Environment and Sustainability. Environment and Sustainability

11. BALLANTRAE-MUSSELMAN LAKE AND ENVIRONS SECONDARY PLAN

Richmond Hill Official Plan PART II SECONDARY PLANS

Director, Community Planning, Etobicoke York District

THREE-STEP DESIGN PROCESS FOR OPEN SPACE SUBDIVISIONS

Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report

Presentation to Planning Committee, DMM

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

Rule D Wetland and Creek Buffers

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

AMENDMENT NO. 107 TO THE CLARINGTON OFFICIAL PLAN ADOPTED BY CLARINGTON COUNCIL NOVEMBER 1, 2016

July 9, Adèle Labbé Environmental Planner City of Guelph 1 Carden Street Guelph, Ontario N1H 3A1. Dear Ms. Labbé.

TOWN OF SAUGEEN SHORES OFFICIAL PLAN

HURON COMMUNITY PLAN

10.14 ERRATA UPDATE SHEET 3

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Biodiversity Conservation

OFFICIAL PLAN FOR THE TOWN OF NEW TECUMSETH

Section 3 Non-Structural BMPs

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF DECEMBER 10, 2013

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

RECOMMENDED DIRECTIONS REPORT FOR THE TOWN OF RICHMOND HILL

December 11, December 10, 2015

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF DECEMBER 10, 2013

Regional Context Statement

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

THE REGIONAL MUNICIPALITY OF PEEL BY-LAW NUMBER

County of Haliburton. Effective March 14, 2006

APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS CARRBORO DEVELOPMENT GUIDE APPENDIX A

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

Peel Region. Greenbelt Plan Conformity. Plan Review. Background & Approach

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

Feasibility Analysis for Expansion of the Provincial Greenbelt Plan Area into Mississauga

Toronto Complete Streets Guidelines

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

Note: Staff reports can be accessed at Zone: I-3. Tier:

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES

Procedures IV. V. Rural Road Design Option

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

AMENDMENT NO. 38 TO THE CITY OF BARRIE OFFICIAL PLAN SALEM SECONDARY PLAN. June 2014

WASHINGTON COUNTY OREGON

An Introduction to the Far North Land Use Strategy

OFFICIAL PLAN of the TOWN of BRADFORD WEST GWILLIMBURY Adopted February 15, 2000

INTRODUCTION PLANNING HISTORY

Southwest Fleetwood Enclave

SECTION 2 - GENERAL POLICIES

STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF RATHBURN ROAD, FROM DUKE OF YORK BOULEVARD TO SHIPP DRIVE, CITY OF MISSISSAUGA. Submitted to:

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

Alternative Routes. St. Vital to La Verendrye Station - Southern Loop Transmission Corridor. 20 different segments 4 segments common to all routes

Florida Forever Conservation Needs Assessment Overview Maps

Master Environmental Servicing Plan & Secondary Plan

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

3 Development Process 3.1 Stage One page Stage Two page Stage Three page CENTRAL PICKERING DEVELOPMENT PLAN

Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017

I611. Swanson North Precinct

Rapid Transit Implementation Working Group September 14, 2017

Mr. David Trotman

Chapter 5: Natural Resources and Environment

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION

HAZARD MITIGATION GOALS AND OBJECTIVES

Phase I Ecological Network Report Terms of Reference

TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

Goleta Community Plan Update

The lands identified as Residential Areas on Schedule A1, Urban Structure, represent the areas that provide for stable residential communities.

Weston Conservation Commission

AMENDMENT NO. 2 TO THE TRENT HILLS OFFICIAL PLAN

6Natural. Environment Development Permit Guidelines

Chapter 3 Site Planning and Low Impact Development

1 Introduction. Chapter. In this chapter:

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

IMPLEMENTATION STRATEGY: GOAL 1: TO SUSTAIN A HEALTHY NATIVE PRAIRIE GRAZING RESOURCE

Riparian Buffer on the Bushkill Creek. Policies

OFFICIAL PLAN CITY OF THUNDER BAY OFFICIAL PLAN A

Transcription:

Page 1 of 6 TRCA Field Staking Protocol December 2016 This Protocol describes TRCA staff s current practice for field staking the physical top of bank, the physical toe of slope, and the limit of existing natural features or areas. It also includes administrative procedures to be undertaken by the proponent and TRCA staff prior to and after the staking exercise. Typically, staking takes place as part of the planning process (under the Planning Act) or the section 28 Conservation Authorities Act permitting process (TRCA s Ontario Regulation 166/06). This technical guideline supports the Natural System policies of The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority (LCP), and supports TRCA s partner municipalities in defining their natural heritage systems. Defined terms in this Protocol are italicized. Where there are overriding provincial technical guidelines for delineating boundaries of natural heritage features, such as on the Oak Ridges Moraine (e.g., stake from tree trunk), these shall take precedent over TRCA protocols for the same. As a matter of safety and practicality, field staking may not be possible or advisable at times due to excessive cold, heat, wind, thunderstorms, snow accumulation or icy conditions. Staking is One Step in Defining the Natural System It is important to note that field staking is only part of the process for establishing the boundaries of the Natural System and that the top of bank or features staked may not be the greatest constraint applicable to a site. The Natural System is comprised of water resources, natural features and areas, natural hazards and potential natural cover and/or buffers (LCP, section 7.3.1). Not all of these components of the Natural System have boundaries that are staked through an on-site field exercise. Elements of the Natural System that are typically not staked include: watercourses headwater drainage features fish habitat wildlife habitat habitat of endangered and threatened species species of concern potential natural cover/enhancement or restoration areas buffers/vegetation protection zones long term stable top of bank stable toe of slope regulatory flood plain meander belt Rather, these features, areas and hazard limits are identified and delineated through technical studies. Elements of the Natural System that typically are staked include: physical top of bank of a valley corridor; physical toe of slope of a valley corridor; wetlands; woodlands; and contiguous vegetation that intersects with, a wetland, woodland or valley corridor or stream corridor, such as a shrub thicket.

Page 2 of 6 Staking for each of these elements is described in turn below. Physical Top-of-Bank of a Valley Corridor The physical top-of-bank is that point where there is a break in slope or grade which distinguishes the valley corridor landform from its surrounding landscape. The staking of this feature is the responsibility of TRCA planning staff, who may consult with TRCA technical staff as desired. The physical top of bank is based on TRCA staff s professional judgment and can generally be described as the first main point of inflection or start of downward valley slope as observed from the adjacent tableland and does not include plateaus within the valley corridor with secondary points of inflection. *Delineation of the physical top of bank is based on existing conditions at the time of staking. Staking takes place from the top of the valley slope looking down, rather than from on the valley slope looking up. The top of valley bank to be staked should be consistent with the elevation trend of the valley, both upstream and downstream of the subject site. A trending elevation may be visible while standing on site; staff may also use digital elevation modeling tools (e.g., LIDAR) to help confirm the elevation trend for a corridor and the location of the top of bank on the subject property. For rolling hills-type of topography, such as is common to the Oak Ridges Moraine, again, the top of bank is delineated based on the elevation trend of the valley on site and up and downstream of the site. There may be small knolls on the tableland adjacent to top of bank, which should not be included. Ideally, the greater extent of the physical top of bank and the dripline of contiguous vegetation is staked as one line that defines the entire feature. However, for some sites, other staking options may be appropriate. For example: staking of two separate lines to delineate physical top of bank and the dripline of contiguous vegetation independently; or staking of a single combination line that identifies the key defining element (the greater of) along the staked line (i.e., with each stake labeled as either physical top of bank or dripline) The preferred option will be determined based on location, scale, municipal planning policies and protocols etc., and should be established prior to scheduling the site staking. For large sites, a single line will be preferred. Where the dripline of contiguous vegetation is located well beyond the top of bank, staking of the top of bank is not appropriate. Similarly, where the dripline is located below the top of bank, dripline staking is typically considered unnecessary. Physical Toe-of-Slope of a Valley Corridor Staking the toe-of-slope is not a common occurrence given that new development is not permitted within valley corridors. However, in special circumstances, such as historically urbanized valley corridors, staking toe-of-slope may be necessary. The physical toe-of-slope is defined as that point where there is a break in slope or grade which distinguishes the bottom of the valley corridor slope from the valley floor. The staking of this feature is the responsibility of TRCA planning staff, who may consult with TRCA technical staff as desired. The physical toe of slope is based on TRCA staff s professional judgment and can generally be described as the first main point of inflection or start of the upward valley slope as observed from the adjacent valley floor. *Delineation of the physical toe of slope is based on existing conditions at the time of staking. Staking takes place from the toe of the valley slope looking up, rather than from on the valley slope looking down. Ideally, the greater extent of the physical toe of slope and the dripline of contiguous vegetation is staked as one line that defines the entire feature. However, for some sites other staking options may be appropriate. For example: staking of two separate lines to delineate physical toe of slope and the dripline of contiguous vegetation independently; or

Page 3 of 6 staking of a single combination line that identifies the key defining element (the greater of) along the staked line (i.e., with each stake labeled as either physical toe of slope or dripline) The preferred option will be determined based on location, scale, municipal planning policies and protocols etc., and should be established prior to scheduling the site staking. For large sites, a single line will be preferred. Where the dripline is located well beyond the toe of slope, staking of the toe of slope is not appropriate. Similarly, where the dripline is located above the toe of slope, dripline staking is typically considered unnecessary. Wetlands, Woodlands and Contiguous Vegetation within Stream Corridors Stream corridors do not have a physical top of bank and so their limits are typically defined from the greater of the following: regulatory flood plain, the meander belt, and any natural features or areas adjacent to the watercourse. While flood plains and meander belts cannot be staked, the natural features or areas associated with a stream corridor can be. Features such as woodlands and wetlands are considered contiguous to the stream corridor if the boundary of the vegetation units intersects with the meander belt or flood plain based on integrated mapping of these elements. The field staking exercise should be completed once the limits of the regulatory flood plain and/or meander belt have been established and preliminary assessment (via photos, site reconnaissance) identifies the presence of contiguous vegetation. Where a stream corridor has no regulatory flood plain or meander belt, but does contain a watercourse, the dripline of any woodland or wetland vegetation or the dripline of any contiguous vegetation that is coincident with the edge of the watercourse could be staked. Transitional Corridors (Valley to Stream or Stream to Valley Corridor landforms) Often found within the headwaters of TRCA watersheds, some corridors transition from valley corridor with a definable top of bank, into stream corridors with no definable top of bank. Such corridors may transition in this way more than once and back again. Where the corridor is a valley with a definable top of bank, the procedures under the above section on physical top-of-bank of valley corridors are used. For those sections of the corridor containing no definable top of bank, features such as wetlands, woodlands and contiguous vegetation may be staked (see above). In this way, a single corridor may be staked in some sections as a valley corridor and in other sections treated as a stream corridor. Wetlands and ANSIs Where a site includes or is immediately adjacent to an area designated as a Provincially Significant Wetland (PSW) or an Area of Natural and Scientific Interest Life Science (ANSI), staking of the wetland or feature boundary must be completed by Ministry of Natural Resources and Forestry (MNRF) staff. Staking of wetlands, other than identified PSWs, may be undertaken by TRCA staff with or without consultation with MNRF, however, TRCA staff may defer any or all wetland staking exercises to MNRF. Delineation of wetland boundaries is based on the criteria and procedures outlined in the MNRF Manual for Wetland Evaluation Southern Edition. Wetland boundaries are usually areas of gradual ecological change (i.e., transition areas). A wetland boundary is established where 50 percent of the plant community consists of upland plant species. This is based on the percentage of area cover by upland plant species, not to the number of different upland plant species. Topography and soil data may also be used to identify where the wetland boundary will be established. For sites with unevaluated wetlands, especially where multiple wetland units are present on and off site, consultation with MNRF may be recommended or required to confirm or delineate individual wetland units that may form part of a larger wetland complex. Wetlands can be staked whether or not they are located within other features to be staked, such as below top of bank or within a woodland. The dripline of any contiguous vegetation to the wetland is also staked. This may be staked as two lines, one for the wetland boundary and one for the dripline of contiguous vegetation.

Page 4 of 6 Woodlands The dripline of woody vegetation is used to stake the limit of a woodland. Where a woodland forms part of a larger natural feature that includes a wetland, the greater limit of the two features is staked, which may include contiguous vegetation to the wetland or woodland. Gaps in woodland of more than 20 metres between crown edges signify two separate woodlands, whereas gaps of 20 metres or less between crown edges constitutes one contiguous woodland (MNRF, 2010). Hedgerows Where linear terrestrial features/hedgerows are encountered, they are captured within the staking typically to the limit of the first break in canopy. Where there is no canopy break, the inclusion or exclusion of this element should be determined on the basis of study to determine existing or potential ecological function. Ecological Quality Whether vegetation being staked is native, non-native and/or invasive, the quality of existing natural cover does not inform or otherwise affect the staking exercise in the field. TRCA staking of the physical top of bank and natural features and areas is only one step in defining the Natural System. Additional studies may be required to determine areas of potential natural cover/enhancement/restoration areas or buffers/minimum vegetation protection zones; this includes assessing the need for additional lands or actions to maintain, to restore, or to improve Natural System functions. During these evaluations, issues of ecological function, quality, sensitivity, etc. can be assessed to inform future management options to ensure that a net ecological gain can be achieved. Feature Removals Staff will not stake a feature that has been wilfully damaged or destroyed; rather, a violation process under the applicable legislation may be initiated. Further, TRCA staff will rely on the following policy from LCP 7.4.2.1, which states, It is the policy of TRCA: g) To not support a boundary adjustment to recognize any component of the Natural System that has been altered, damaged, or destroyed by unauthorized activities; such activities will require replacement or rehabilitation of the feature(s) and its functions. Disputes Any disagreement with a staked line on behalf of the proponent may be noted in minutes or in follow up correspondence. Any requests for or changes to the limits as staked must be supported by additional technical studies (i.e., EIS or similar) prepared by qualified professionals and in accordance with the applicable provincial, municipal or TRCA standards.

Page 5 of 6 Administrative Procedures for Field Staking Prior to a staking being scheduled, the landowner must submit a request for a staking to TRCA, which includes an acknowledgement of the conditions outlined below. 1. The landowner and/or his or her agent, the landowner s Ontario Land Surveyor (OLS), municipal staff (to be invited by the landowner) and TRCA planning and technical staff will meet on site. It is the responsibility of the landowner to arrange for an OLS to be present, with a sufficient number of wood stakes, flagging tape and any other measures necessary for field staking. A topographic map of the subject property and the surrounding area is also helpful but not mandatory. 2. TRCA staff, in consultation with municipal staff, will stake the limits of the natural features or areas and/or physical top-of-bank. TRCA staff may identify locations where additional technical assessments may be required (see Staking Protocol above). 3. TRCA staff will issue a staking letter to the landowner and/or his or her agent, confirming the staking. The letter outlines the following: The staking is valid for 5 years; The proponent must submit a stamped survey of the staked feature(s) and/or top-of-bank, provided by the accredited OLS, to TRCA within 6 months of the staking; Should substantial differences be identified between the location of feature(s) and/or top-of-bank on the survey and the feature(s) and/or top-of-bank on the ground, or should the survey appear to be inconsistent with the illustrated locations, a new staking will be required; Additional study requirements to be completed to assist in the determination of development limits. 4. The proponent will submit the survey (on base topographic mapping) to TRCA, which must include the following information: staked natural heritage feature(s) and/or physical top-of-bank (location of stakes to be identified); date of staking; names of TRCA staff who participated in staking; OLS stamp. Note: Both a hard copy and a digital version (as a PDF, not CAD) of the survey are requested. 5. The proponent will submit additional technical studies prepared and stamped by qualified professionals, if required (e.g. geotechnical study, flood study, ecological evaluation). 6. The proponent will submit one drawing illustrating all natural hazard and/or natural heritage components, as applicable: staked physical top-of-bank; staked physical toe-of-slope; long-term stable slope, as determined through study; long-term stable toe, as determined through study; regulatory flood plain limit, as determined through study; staked limit of natural features or areas, as determined on site; Requisite areas of potential natural cover and/or buffers (from the greatest extent of all hazards and features) as determined by applicable policy. The above should be overlaid on a recent colour air photo.

Page 6 of 6 Definitions Dripline the furthest lateral extent of branches or leaves of woody plants. Wetland the identification and boundary determination of a wetland will be established following criteria and procedures outlined in the MNR Manual for Wetland Evaluation Southern Edition. Also see Planning Act and Conservation Authorities Act definitions in the Living City Policies. Woody vegetation (trees and shrubs) - perennial plants differing from perennial herbs in their presentation of persistent and woody stem(s) o Trees woody plants (stems) of species that are able to reach unassisted a height of 4.5 metres (ORMCP Technical Paper) o Shrubs a shrub is a perennial plant differing from a perennial herb in its persistent and woody stem(s), and less definitely from a tree in its lower stature and the general absence of a well-defined main stem (Natural Resources Canada). Shrubs rarely achieve a height greater than 10 metres (Farrar, 1995). Woodland treed areas that provide environmental and economic benefits to both the private landowner and the general public, such as erosion prevention, hydrological and nutrient cycling, provision of clean air and the long-term storage of carbon, provision of wildlife habitat, outdoor recreational opportunities, and the sustainable harvest of a wide range of woodland products. Woodlands include treed areas, woodlots or forested areas and vary in their level of significance at the local, regional, and provincial levels. (Provincial Policy Statement, 2014) Contiguous Vegetation refers to when the dripline of woody vegetation intersects with a wetland, a woodland or a valley corridor or stream corridor. Valley Corridor see definition for River or Stream Valleys (confined/apparent) in The Living City Policies. Stream Corridor see definition for River or Stream Valleys (unconfined/non-apparent) in The Living City Policies. References Farrar, J.L. 1995. Trees in Canada. Fitzhenry & Whiteside Limited and the Canadian Forest Service, Natural Resources Canada. 502 pp. Natural Resources Canada. Glossary of Forest Resources. http://cfs.nrcan.gc.ca/terms. Accessed February 2015 Oak Ridges Moraine Conservation Plan Technical Paper 7 Identification and Protection of Significant Woodlands Ontario Ministry of Natural Resources. March 2010. Natural Heritage Reference Manual for Natural Heritage Policies of the Provincial Policy Statement. Second Edition. Toronto: Queen s Printer for Ontario. 248 pp. The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority, November 2014