Oakdale Primary School Expansion Project Appendix A - MEP Schedule of Works

Similar documents
FUME EXTRACT STRATEGY STATEMENT

Oakdale Primary School Expansion Project Appendix C Elec Equipment Schedule

Planning Application for the Aylesbury Estate Regeneration. Plot 18 Reserved Matters Application. Ventilation Statement. Aecom

Eco Active H E A T R E C O V E R Y S Y S T E M S H Y B R I D U N I T. W: T:

SCHEDULE OF RATES SHEET PRELIMINARIES

GARCIA GALUSKA DESOUSA Consulting Engineers

GOLDFIELDS PRIMARY SCHOOL. TENDER SPECIFICATION For ELECTRICAL SERVICES MECHANICAL ENGINEER:

Operating Performance

MEP Syllabus CAREER DEVELOPMENT CENTRE SHRISTI MEP. Trichy-26

NES. What s New June Contents: Detailed Technical guidance. Work section updates. (key points)

Telecity. Table of Contents. Page. Section 3.2

SCHOOL OF ENGINEERING. BSc(HONS) IN QUANTITY SURVEYING & COMMERCIAL MANAGEMENT SEMESTER 1 EXAMINATION 2015/2016 RISK AND VALUE MANAGEMENT

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

Indoor Swimming Pools:

If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option.

Installation Instructions

Appendix B. Facilities Assessment Report

ELECTRICAL AND COMMUNICATION INSTALLATION DESIGN IN AN OFFICE COMPLEX

CPC-150-ABIAB. Important Installation Notes.

The works comprise the complete supply and installation of new Electrical Engineering Services to the site comprising:-

Royal Wolfson Foundation Laboratory Refurbishment Grants Scheme Final Report: University of Glasgow, Prof Lee Cronin

ARCHIVED. Compliance Document for New Zealand Building Code Clause G4 Ventilation Second Edition. Prepared by the Department of Building and Housing

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD.

Fixed Electrical Instillation Inspection

Installation and Servicing Instructions. Alpha FlowSmart

Mini Tender Section 1.1 External Wall Insulation, Mechanical and Electrical Installation

Fire Risk Assessment Borough High Street

ELECTRICAL SAFETY INSPECTION REPORT

Steel, Civil, MEP & Telecommunication Infrastructure Service Providers MEP Profile

Mains Pressure Hot Water from an existing vented copper cylinder... Allows the cold water tank to be removed, freeing loft space.

Verification Methods For New Zealand Building Code Clause G4 Ventilation

ARCHIVED. Compliance Document for New Zealand Building Code Clause G4 Ventilation Third Edition. Prepared by the Department of Building and Housing

Andromeda. Product Manual. Copyright HS Europe Limited Printed in the UK

R E F E R E N C E S. (SUMMARY OF THE MAIN BUILDINGS WHERE COMPANY TERMOSISTEM Ltd. HAS PERFORMED HVAC WORKS IN THE LAST FEW YEARS)

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Assessment Schedule - TS.6

Energy Efficiency Rating

This manual must be kept with the appliance

WHHR Midi & Midi Lite

hxi High Efficiency Heating Only 24hxi hxi High Efficiency Heating Only 30hxi hxi High Efficiency Heating Only 38hxi

Passivhaus. sally godber MEng CEng MIMechE WARM: Low Energy Building Practice. The first 3 in the UK.

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No.

Alpha FlowSmart 25 and 50

Chapter One Commercial Kitchen Fires

CPC-180-ABNAB. 180 litres, 535mm x 1550mm high

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

Primo Hotel. General. Indoor climate units for hotel rooms

PROPOSED NEW BUILDING

Instructions for Robust Fiber Appendix 4 Robust sites and nodes. Ver 1.2

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

ECP OPTICAL FIBRE SPLICING, TESTING AND COMMISSIONING REQUIREMENTS

SECTION 1.02 DETAILED SCOPE OF WORK

INSTALLATION AND SERVICING INSTRUCTIONS

Commercial Kitchen Ventilation Services. Ventilation Systems. Canopies. Ductwork. Gas Interlock Systems

INTEGRA PLUS ABC. 230V~ 50Hz. Stock Ref. N. Installation and Wiring Instructions IPX2

BMS Commissionability Review. October Four Seasons Hotel Park Lane PROJECT:

Roof: sound attenuation Category B. 4.0 DOORS

Annexure - D. Station Interface Matrix Power Supply, S&T, AFC,Lift & Escallators,Rolling stock and Track work. Station Civil and E & M Contractor

Standard Assessment Procedure Instantaneous Waste Water Heat Recovery Systems Design Checklist for 'System A' Installation Configuration

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

Homepage > Products > Decentralised ventilation systems > Vertical units > Type FSL-V-ZAB/SEK FSL-V-ZAB/SEK

GRP Ducting and Glass Tube Heat Exchanger Installation

Larch house and Lime house review of systems design and implementation

Efficiency Maximiser for Solid Fuel Central Heating

Swegon CASA W130. Ventilation unit with counter-flow plate heat exchanger HOME VENTILATION

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

RADIANT PANELS COMMERCIAL BUILDINGS INNOVATIVE VENTILATION & HEATING

5.5 CD/14 (Warning & Advice Notice)

INSTALLATION DO S AND DON TS

Installation and Servicing Instructions. Alpha GasSaver GS-2

Visitor & Intruder Security Policy

MAXIMISER Semi-Storage Calorifiers

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Standard Assessment Procedure Instantaneous Waste Water Heat Recovery Systems Design Checklist for Configurations A, B & C

RADIANT PANELS COMMERCIAL BUILDINGS INNOVATIVE VENTILATION & HEATING

MODEL ENGINEERING SPECIFICATION

Installation instructions PYROMAT ECO. for contractors PYROMAT ECO GB 8/2012 Dispose after installation.

Installation and Servicing Instructions. Alpha GasSaver GS-1

SECTION HEATING TERMINAL UNITS

about your house Before You Start an Energy-Efficient Retrofit Mechanical Systems

Document Information Cover Sheet

DACC Health Sciences Building Air Handler Assessment/Study

Denco has been producing and installing. equipment specifically designed for the precise. control of air temperature, humidity and quality

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

OVERVIEW and SYSTEM GUIDE. Swegon CASA. Residential ventilation for optimal operating economy and the greatest comfort.

30C, 40C, 50C & 60C open flue gas fired boiler

2006 Washington State Nonresidential Energy Code Compliance Form Washington State Nonresidential Energy Code Compliance Forms Revised July 2007

CBC - Active Chilled Beam. Halton CBC. Active Chilled Beam

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

900 N. Via Piemonte Ontario, CA

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

Newport County Council Bettws High School Electrical Particular Specification and Data Sheets. Contract

SECTION AIR DUCT ACCESSORIES

REPLACEMENT PARTS MANUAL

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150

DOCUMENT TABLE OF CONTENTS

High Performance Building Guide 1

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Annex 4a Common Minimum Technical Competency Requirements for Oil Appliance Installation Work (Domestic)

Walkthrough Inspection Checklist

Transcription:

Oakdale Primary School Expansion Project Appendix A - MEP Schedule of Works HBS-SH-MEP-801 May 2017 For Peterborough City Council ver. author date checked comment P1 KA 19-05-17 TC TENDER ISSUE 1

1. Mechanical Services Schedule of Works (Tender Return) Phase 1 1.01 Preliminaries including design 1.02 Liaise with utility companies and isolate/strip-out existing water and gas supplies to existing Nursery Building to be demolished 1.03 External trench from boiler room to Block N with pre-insulated heating flow/return pipework and mains water supply pipework Design/ Supply/ Install 1.04 Strip-out existing boiler plant 1.05 New boiler plant installation including boilers, flues, pressurisation unit, pumps, hot water cylinder, control panel, pipework and fittings, thermal insulation, control wiring etc. Design/ Supply/ Install 1.06 Heating services including pipework, radiators, insulation, valves, drain cocks, brackets and thermal insulation. Design/ Supply/ Install 1.07 Hot and cold water services including water heaters, pipework, insulation, valves, drain cocks, brackets and thermal insulation. Design/ Supply/ Install 1.08 Above ground drainage Design/ Supply/ Install 1.09 Mechanical ventilation system (extract fans) to cleaner store and server room, including fan units, ductwork etc. Design/ Supply/ Install 1.10 Mechanical ventilation (heat recovery ventilation unit) to pupil toilets, including unit, wiring, control system and commissioning by manufacturer. - Design/ Supply/ Install 1.11 Classroom natural ventilation; attenuated louvres with motorised dampers including controls - Design/ Supply/ Install 1.12 Classroom natural ventilation; window motors including controls - Design/ Supply/ Install 1.13 Test and commissioning of all mechanical and public health services including automatic controls 1.14 Chlorination of hot and cold water services installation 1.15 Water treatment to new and existing heating system 1.16 Provision of O&M Maintenance manuals and record drawings. 1.17 Provision of Installation Drawings 2

1.18 Provision of Record Drawings 1.19 Provision of as-built Part L BRUKL document and Energy Performance Certificate PHASE 1: MECHANICAL TO BE CARRIED FORWARD TO MAIN TENDER SUMMARY 3

Phase 2 2.01 Preliminaries including design 2.02 Heating services including pipework, radiators, insulation, valves, drain cocks, brackets and thermal insulation. Design/ Supply/ Install 2.03 Hot and cold water services including water heaters, pipework, insulation, valves, drain cocks, brackets and thermal insulation. Design/ Supply/ Install 2.04 Above ground drainage Design/ Supply/ Install 2.05 Mechanical ventilation systems (extract fans) to cleaner stores, showers, toilets including fan units, ductwork etc. Design/ Supply/ Install 2.06 Test and commissioning of all mechanical and public health services including automatic controls 2.07 Chlorination of hot and cold water services installation 2.08 Water treatment to heating system 2.09 Provision of O&M Maintenance manuals and record drawings. 2.10 Provision of Installation Drawings 2.11 Provision of Record Drawings PHASE 2: MECHANICAL TO BE CARRIED FORWARD TO MAIN TENDER SUMMARY 4

Phase 3 3.01 Preliminaries including design 3.02 Heating services including pipework, radiators, insulation, valves, drain cocks, brackets and thermal insulation. Design/ Supply/ Install 3.03 Diversion and lowering of existing incoming gas and water services as required where new car parking surface is formed. Liaise with utility companies as required. 3.04 Hot and cold water services including water heaters, pipework, insulation, valves, drain cocks, brackets and thermal insulation. Design/ Supply/ Install 3.05 Above ground drainage Design/ Supply/ Install 3.06 Mechanical ventilation systems (extract fans) to cleaner stores, showers, toilets including fan units, ductwork etc. Design/ Supply/ Install 3.07 Test and commissioning of all mechanical and public health services including automatic controls 3.08 Chlorination of hot and cold water services installation 3.09 Water treatment to new and existing heating system 3.10 Provision of O&M Maintenance manuals and record drawings. 3.11 Provision of Installation Drawings 3.12 Provision of Record Drawings PHASE 3: MECHANICAL TO BE CARRIED FORWARD TO MAIN TENDER SUMMARY 5

2. Electrical Services Schedule of Works (Tender Return) Enabling phase E.01 Preliminaries including design E.02 Employ the services of Serco to divert existing fibre by City wide fibre into new server locationref: SWB WO0000001902379 Oakdale Primary School City Fibre Move E.03 Design, supply and install all power, lighting requirements into new server room. (currently part of bin store) E.04 Design, supply and install relocated existing data cabinet from ICT suite or provide new 42 u data cabinet and terminate existing data cables into new patch panels (see item 6.11) E.05 Liaise with utility companies and isolate/strip-out existing electricity and telecoms supplies to existing Nursery Building to be demolished E.06 Strip out and remove all electrical services from Nursery prior to demolition as required by demolition contractor. Phase 1 4.01 Preliminaries including design 4.02 Design, Supply and install new MCCB in existing 6 way panel. 4.03 Design, Supply and install new LV Sub mains to new TP&N dist board. route, duct, containment to new dist board. 4.04 Design, Supply and install new MCB Distribution Board in new classroom block, DB-H 4.05 New Primary Containment/ Design / Supply / Install 4.06 Fire Stopping/ Design / Supply / Install 4.07 Secondary Containment / Design / Supply / Install 6

4.08 Small Power/ Design / Supply / Install 4.09 Internal Lighting Circuits and Controls/ Design / Supply / Install 4.10 Internal Lighting / Design / Supply / Install 4.11 Emergency lighting / Design / Supply / Install 4.12 External Lighting Circuits and Controls/ Design / Supply / Install 4.13 External Lighting Supply and Installation on building / Design / Supply / Install 4.14 Earthing and Bonding 4.15 Fire Detection System / Design / Supply / Install / Commission / Include link to existing main panel.(temp) 4.16 Security Alarm System / Design / Supply / Install / Commission/ Include link to existing main panel.(temp) 4.17 Class change bell system linked to school existing / Design / Supply / Install. 4.18 New lightning protection system linked to existing / Design / Supply / Install. 4.19 Mechanical Services Supplies and Containment wire ways for Mech supplies, accessories and cabling, final connection at source, supplied and installed by others / Design / Supply / Install. 4.20 Verification / testing & certification of systems 4.21 Provision of O&M Documentation and Record drawings 4.22 Provision of installation drawings ENABLING PHASE AND PHASE 1: ELECTRICAL TO BE CARRIED FORWARD TO MAIN TENDER SUMMARY 7

Phase 2 5.01 Preliminaries including design 5.02 Strip out existing electrical installation ahead of demolition/refurbishment. 5.03 Design, Supply and install new MCCB in existing 6 way panel. 5.04 Design, Supply and install new LV Sub mains, route, duct / containment to new dist board. 5.05 Design, Supply and install new MCB Distribution Boards, DB-A, DB-B, DB-C including sub metering. 5.06 New Primary Containment/ Design / Supply / Install 5.07 Fire Stopping/ Design / Supply / Install 5.08 Secondary Containment / Design / Supply / Install 5.09 Small Power/ Design / Supply / Install 5.10 Data cabinet in nursery and cat5e data cabling including terminations / Design / Supply / Install (inc patch panels & RJ45 double front plates) 5.11 From main Data cabinet provide data cabling including terminations to all non-nursery areas / Design / Supply / Install (inc patch panels & RJ45 double frontplates) 5.12 Design, Supply and install data fibre link between main school data cabinet and data cabinet in store room of nursery. 5.13 Internal Lighting Circuits and Controls/ Design / Supply / Install 5.14 Internal Lighting / Design / Supply / Install 5.15 Emergency lighting / Design / Supply / Install 5.16 External Lighting Circuits and Controls/ Design / Supply / Install 8

5.17 External Lighting Supply and Installation on building / Design / Supply / Install 5.18 Earthing and Bonding 5.19 Fire Detection System / Design / Supply / Install / Commission / Include link to existing main panel. 5.20 Security Alarm System / Design / Supply / Install / Commission / Include link to existing main panel. 5.21 Class change bell system linked to school existing / Design / Supply / Install. 5.22 Access control system to / Design / Supply / Install / Commission 5.23 Mechanical Services Supplies and Containment wire ways for Mech supplies, accessories and cabling, final connection at source, supplied and installed by others / Design / Supply / Install. 5.24 Telecommunications & Data / Design / Supply / Install / Commission 5.25 New lightning protection system linked to existing / Design / Supply / Install. 5.26 Verification / testing & certification of systems 5.27 Provision of O&M Documentation and Record drawings 5.28 Provision of installation drawings PHASE 2: ELECTRICAL TO BE CARRIED FORWARD TO MAIN TENDER SUMMARY 9

Phase 3 6.01 Preliminaries including design 6.02 Design/and arrange the diversion and lowering of incoming telecoms and electrical services as required where new car parking spaces is formed and were widened apron is formed. Liaise with utility companies as required. 6.03 Strip out existing electrical installation ahead of demolition/refurbishment. 6.04 Design, Supply and install new 8 way MCCB to replace existing located in main intake 6.05 Design, Supply and install new LV Sub mains from new MCCB board to sub boards 6.06 Design, Supply and install new MCB Distribution Boards DB-D,DB-E,DB-F & DB-G 6.07 New Primary Containment/ Design / Supply / Install 6.08 Fire Stopping/ Design / Supply / Install 6.09 Secondary Containment / Design / Supply / Install 6.10 Small Power/ Design / Supply / Install 6.11 Design, supply and install new 42 u data cabinet and terminate existing data cables into new patch panels. (remove existing cabinet) 6.12 From main Data cabinet provide data cabling including terminations / Design / Supply / Install (inc patch panels & RJ45 double frontplates) 6.13 Internal Lighting Circuits and Controls/ Design / Supply / Install 6.14 Internal Lighting / Design / Supply / Install 6.15 Emergency lighting / Design / Supply / Install 10

6.16 External Lighting Circuits and Controls/ Design / Supply / Install 6.17 External Lighting Supply and Installation on building / Design / Supply / Install 6.18 Earthing and Bonding 6.19 Fire Detection System / Design / Supply / Install / Commission / Include new main panel. 6.20 Terminate fire alarm cables from phase 1 & 2 into new fire alarm panel / Design / Supply / Install / 6.21 Security Alarm System & new panel / Design / Supply / Install / Commission 6.22 Terminate intruder alarm cables from phase 1 & 2 into new intruder alarm panel. / Design / Supply / Install / 6.23 Class change bell system linked to school existing / Design / Supply / Install. 6.24 Mechanical Services Supplies and Containment wire ways for Mech supplies, accessories and cabling, final connection at source, supplied and installed by others / Design / Supply / Install. 6.25-op1 Relocation of Telecommunications system & BT lines / into new office meeting room & BT lines / Design / Supply / Install / Commission 6.25-op2 Relocation of Telecommunications system & BT lines / into new server room & BT lines / Design / Supply / Install / Commission 6.26 Verification / testing & certification of systems 6.27 Provision of O&M Documentation and Record drawings 6.28 Provision of installation drawings PHASE 3: ELECTRICAL TO BE CARRIED FORWARD TO MAIN TENDER SUMMARY 11