The EPN Infrastructure: Status, Monitoring and Plan

Similar documents
EPN Status and Network Management

C. Bruyninx, L. Legrand, F. Roosbeek

Status and Performance of the EUREF Permanent Tracking Network

Twenty Years of EPN: Network Challenges Ahead

EPN CB News. Carine Bruyninx Royal Observatory of Belgium EPN Central Bureau. EUREF AC Workshop Meeting, Bern, Oct , 2015

EPN CB Report. Carine Bruyninx EPN CB. EPN Central Bureau EUREF TWG Meeting, March , Lisbon Royal Observatory of Belgium

The EUREF Permanent Network

GOALS AND ACTIVITIES EUREF TECHNICAL WORKING GROUP OF THE. EUREF 2015 Symposium Leipzig, Germany June 3-5, C. Bruyninx for the EUREF TWG

Network Coordination of the EUREF Permanent Network

EPN Analysis Coordinator Report Heinz Habrich Federal Agency for Cartography and Geodesy

KTIMATOLOGIO S.A. M. Gianniou KTIMATOLOGIO S.A. (Hellenic Cadastre) Geodetic Department.

EUREF-IP from pilot project to operational status

The EUREF Permanent Network : Recent Achievements

Status of the EPN Troposphere Products

EUREF-TWG Project: Monitoring of official national ETRF coordinates on EPN web

The EUREF Permanent Network: Recent Achievements

Real-Time GNSS - EUREF-IP

Today s EPN and its network coordination

EPN DENSIFICATION STATUS REPORT

EPN Analysis Coordinator Report

EPN Reprocessing. Christof Völksen. Bayerische Kommission für die Internationale Erdmessung.

Porsche Classic Vehicle Tracking System FAQs

ISO Coordinate Reference Systems Registry

CURRENT DEVELOPMENTS OF THE LITHUANIAN NATIONAL GEODETIC CONTROL

Permanent Network. EPN Central Bureau EUREF TWG Meeting, May 31, 2005, Vienna, Austria Royal Observatory of Belgium

Friends and Family Test

FCD-wire Contents. List of Figures

EUROPE STARTS WITH YOU!

User manual CLIMATIC 200/400 - Controller. Providing indoor climate comfort

APP Function Introduction

Porsche Classic Vehicle Tracking System FAQs

Z-GROUP 3 Business Units Until end 2011

English version. OPC unified architecture - Part 1: Overview and concepts (IEC/TR :2010)

Type Approvals GARAGE DOOR OPENER RADIO TRANSCEIVER. (EuroHomeLink 2000) Czech Republic CTU R 1194 Cyprus MCW129/95 12/2000 Denmark 98.

Dr. Pete Gábor Vodafone Hungary. NB-IoT (Narrow Band Internet of Things)

Options Specification

PROPOSAL FOR PARTICIPATION TO ESEAS (EUROPEAN SEA-LEVEL SERVICE)

new Italian Permanent Network RDN of GPS stations: the Contribution of the

THE GLOBAL CELLULAR NETWORK DEDICATED TO SMALL MESSAGES FOR THE IOT JACQUES HUSSER CHIEF OPERATING OFFICER

This document is a preview generated by EVS

EC TYPE EXAMINATION (MODULE B) CERTIFICATE (EC-US MRA)

SECTION 12 LANDSCAPE

This document is a preview generated by EVS

CONVENTIONS CONCERNING ELECTRIC AND MAGNETIC CIRCUITS (IEC 60375:2003) IRISH STANDARD I.S. EN 60375:2003. Price Code

COPYRIGHT Danish Standards. NOT FOR COMMERCIAL USE OR REPRODUCTION. DS/EN :1999

Airborne Imagery Potential Role in Monitoring Climate Change

This document is a preview generated by EVS

Tinytag Plus LAN Data Logger with Temperature & Relative Humidity Probe (-25 to +85 C/0 to 100% RH) Standalone. Tinytag Connect

SOUTH AFRICAN NATIONAL STANDARD

Metal Woodprint The natural look

ELECTRICAL AND INSTRUMENTATION LOOP CHECK (IEC 62382:2006 (EQV)) IRISH STANDARD I.S. EN 62382:2007. Price Code

Telematics Services. Vodafone Power to you. Vehicle Security and Remote Management in the palm of your hand. automotive.vodafone.

Secure Your Way of Life. Now Compa ble With. Climax Home Portal Platform. Enable a Connected Future

This document is a preview generated by EVS

Manage Alert Rules & Teams

NF EN V2/AC2 DÉCEMBRE Normes en ligne. Pour : CERN. Client : Commande : N T. le : 10/04/2018 à 17:39

The national standards bodies of:

This document is a preview generated by EVS

For more information on Tarkett go to

The ISIA Minimum Standard

ocbridge Plus SPECIFICATION 3. COMPONENTS Wireless sensors receiver, battery СR2032, manual, instalation CD.

English version. Alarm systems - Intrusion and hold-up systems - Part 2-7-1: Intrusion detectors - Glass break detectors (acoustic)

[ [ ADMIN PANEL USER GUIDE

RAE Systems Systems. User Presentation. October Protection Through Detection

This document is a preview generated by EVS

1. Functions of GPS locator ETLOC-30S 3

it500 Internet Thermostat INSTALLER MANUAL

This document is a preview generated by EVS

Metal Woodprint The natural look

ÅF GROUP Q Jonas Wiström, CEO Stefan Johansson, CFO

ENVINET Environmental Radiation Detection

Lone Worker Duress Security Hazard Zone Remote Area Health Care DURESS & SAFETY TECHNOLOGIES I N T E R N A T I O N A L

AERO 20 AERO ENGLISH - Operating Instructions

Certificate of constancy of performance,

Floriculture. A world wide business and international challenges.??-??-2012, Nico de Groot

Competence Center in Electric Heating. February 2017

Lesson 11 Internet Connected Environment (Weather, Air Pollution and Forest Fire) Monitoring

Contents. +0 % VS 2016 On page 1 you will find the key indicators at a glance : chains in the country: 2016 and 2017 sales, number of stores,,

Installation and User Instructions

This document is a preview generated by EVS

This document is a preview generated by EVS

DRAFT EUROPEAN STANDARD pren NORME EUROPÉENNE EUROPÄISCHE NORM October English version

This document is a preview generated by EVS

SVENSK STANDARD SS-EN ISO :2007. Motståndssvetsning Mätning av svetsström Del 4: Kalibreringssystem (ISO :2005)

Keeping European Consumers safe Rapid Alert System for dangerous non-food products 2014

This document is a preview generated by EVS

PERFORM. PLUG. PLAY. BEST-IN-CLASS SENSING SOLUTIONS.

LABORATORY GLASSWARE - GRADUATED MEASURING CYLINDERS (ISO 4788:2005) IRISH STANDARD I.S. EN ISO 4788:2005. Price Code

Sýnishorn Health care services - Quality management systems - Requirements based on EN ISO 9001:2015

EU Urban Mobility Policy. Isabelle Maës European Commission

OnGuard 7.2 Resolved Issues

OnGuard 7.1 Resolved Issues

Annex 4. ESPON-INTERACT Thematic Study on Cross Border Cooperation. Additional figures and maps

Leading manufacturer of high-end ball valves and pneumatic actuators. Over 60 years experience with industrial applications

StolenVehicle Tracking

This document is a preview generated by EVS

CEN/TC 256 Overview. Presentation to ISCC January C Cork Chair CEN/TC CEN all rights reserved

Foreword. A completely revised report for quicker and easier access to key information

International Customer Edition Date: June 2014

Centaur TM II Cube Slave Alarm Signalling Equipment INSTALLATION GUIDE

Transcription:

The EPN Infrastructure: Status, Monitoring and Plan C. Bruyninx, Q. Baire, J. Legrand, W. Aerts EPN Central Bureau Royal Observatory of Belgium

OUTLINE EPN Tracking Network Update of EPN Guidelines New@EPN CB Summary and Future Plans

EUREF PERMANENT NETWORK 243 GNSS tracking stations 6 Data Centres 17 Analysis Centres Special purpose data centres: Hourly data (GOP) High rate data centre (BKG) Historical data centre (ROB/EPN CB)

Since May 2009: 21 new EPN stations 1 station removed from network (SNEC, Czech Repubic) EPN TRACKING NETWORK

21 NEW EPN STATIONS 4-CHAR ID LOCATION FUNCTION CALIB FROM AXPV Aix En Provence, F rance GLO Type 28/03/2010 CAEN Caen, F rance GLO Type 28/03/2010 CEBR Cebre ros, Spain RT GLO Type 11/04/2010 CFRM Frydek Mistek, Czech Republic RT Type 21/03/2010 CLIB Liberec, Czech Republ ic RT Type 21/03/2010 CPAR Pardubice, Czech Republic RT Type 21/03/2010 CRAK Rakovnik, Czech Republic RT Type 21/03/2010 CREI Creil, F rance GLO Type 28/03/2010 CTAB Tabor, Czech Republic RT Type 21/03/2010 GARI Porto Ga ribal di, Italy GLO Type 08/11/2009 KRA1 Krakow, Pol and RT GLO Type 21/03/2010 LIL2 Lille, France GLO Type 28/03/2010 MAN2 Le Mans, France GLO Type 28/03/2010 MDOR Saint-Didier-au-Mont-d'Or, France GLO Type 28/03/2010 PAT0 Patras, Greece GLO Type 14/06/2009 SCOA Ciboure, France RT GLO Type 28/03/2010 SMLA Smila, Ukraine GLO Type 01/11/2009 SMNE Saint-Mande, F rance GLO Type 28/03/2010 TERC Angra do Heroismo, Portugal RT GLO Type 03/01/2010 TLMF Toulouse, Fra nce GLO Type 28/03/2010 VEN1 Venezia, Ita ly RT GLO Type 13/12/2009

EVOLUTION OF EPN TRACKING NETWORK

21 NEW EPN STATIONS 4-CHAR ID LOCATION FUNCTION CALIB FROM AXPV Aix En Provence, F rance GLO Type 28/03/2010 CAEN Caen, F rance GLO Type 28/03/2010 CEBR Cebre ros, Spain RT GLO Type 11/04/2010 CFRM Frydek Mistek, Czech Republic RT Type 21/03/2010 CLIB Liberec, Czech Republ ic RT Type 21/03/2010 CPAR Pardubice, Czech Republic RT Type 21/03/2010 CRAK Rakovnik, Czech Republic RT Type 21/03/2010 CREI Creil, F rance GLO Type 28/03/2010 CTAB Tabor, Czech Republic RT Type 21/03/2010 GARI Porto Ga ribal di, Italy GLO Type 08/11/2009 KRA1 Krakow, Pol and RT GLO Type 21/03/2010 LIL2 Lille, France GLO Type 28/03/2010 MAN2 Le Mans, France GLO Type 28/03/2010 MDOR Saint-Didier-au-Mont-d'Or, France GLO Type 28/03/2010 PAT0 Patras, Greece GLO Type 14/06/2009 SCOA Ciboure, France RT GLO Type 28/03/2010 SMLA Smila, Ukraine GLO Type 01/11/2009 SMNE Saint-Mande, F rance GLO Type 28/03/2010 TERC Angra do Heroismo, Portugal RT GLO Type 03/01/2010 TLMF Toulouse, Fra nce GLO Type 28/03/2010 VEN1 Venezia, Ita ly RT GLO Type 13/12/2009

EPN ANTENNA CALIBRATIONS Dec. 2006 Indiv. abs. calib. 5 % True abs.calib 64 % 69% Abs. calib. from field 14 % No abs. calib. 17 % June 2010 Indiv. abs. calib 14 % True abs. calib 70 % 84% Abs. calib. from field 7% No abs. calib. 9%

OUTLINE EPN Tracking Network Update of EPN Guidelines New@EPN CB Summary and Future Plans

EPN STATION GUIDELINES Aproved by EUREF TWG on March 8, 2010 Data flow & format Network topology Long-term stability Satellite tracking

EPN STATION GUIDELINES Data Flow & Format Minimal requirement: Hourly data submission All daily and hourly data delivery within 10 min. Real-time data: Stream GLONASS data Stream GPS and GLONASS ephemerides

EPN STATION GUIDELINES Network topology More than 300 km wrt existing EPN station OK Less than 300 km wrt existing EPN station Merrit of a station to EPN will be judged by EPN Coordination Group prior to starting quality checks Added-value to EPN: data flow, satellite systems, colocations, etc with respect to surrounding sites Provided extensive information in commitment letter!

EPN STATION GUIDELINES Long-term stability Antenna change only when malfunctioning Failure of existing antenna GPS-only antenna does not perform well after installation of multi-gnss receiver Only radomes directly connected to the antenna are allowed (calibration) If antenna change is necessary, install multi-gnss antenna (even if receiver is not yet multi- GNSS) - recommendation

EPN ANTENNA REPLACEMENTS 42 antenna replacements (including new stations) (16 with radome!) GPS GPS/GLONASS GPS/GLONASS/GALILEO 1 AOA/M_T 11 LEIAT504GG 4 LEIAR25 1 ASH700936E 1 NOV702GG 2 LEIAR25.R3 1 ASH701945B_M 2 TPSCR.3G 5 LEIAT504 1 TRM59800.00 4 TRM29659.00 9 TRM55971.00 12 12 18

EPN STATION GUIDELINES Long-term stability (cont.) For sites with different stable monuments: If GPS multi-gnss, then install multi-gnss on new monument Propose new multi-gnss site to EPN Keep old monument as long as possible in EPN

EPN STATION GUIDELINES Satellite tracking Track L5 and multiple GNSS (at least GPS) PRN01, first Block II-F launched May 27 Unhealthy satellites!! EUREF mail 5160 (May 25, 2010)

TRACKING OF UNHEALTHY SATELLITES Unhealthy satellites (PRN01) Tracked Not tracked

GLONASS TRACKING BISK/VACO: neg. freq. channels ASHTECH Z-12 (equipment problem) OSJE: reports mixed RINEX, but delivers only GPS (TRIMBLE NETR5) NAY1, OSLS, STAS,TRDS, TRO1, VARS: GPS+GLONASS equipment, but GPS-only RINEX SPT0:

GLONASS TRACKING Melbourne-Wubbena combination: noise + cycle slips ONSA: Normal tracking JPS E_GGD (2.6.1 Jan, 10, 2008) AOAD/M_B

GLONASS TRACKING Melbourne-Wubbena combination: noise + cycle slips SPT0: Tracking problem JPS E_GGD (2.6.1 Jan, 10, 2008) AOAD/M_T

GLONASS TRACKING BISK/VACO: neg. freq. channels ASHTECH Z-12 (equipment problem) OSJE: reports mixed RINEX, but delivers only GPS (TRIMBLE NETR5) NAY1, OSLS, STAS,TRDS, TRO1, VARS: GPS+GLONASS equipment, but GPS-only RINEX SPT0: Tracking of L2 on GLONASS R09 only emmiting L1

Tracking L2 on R09 Which only emmits L1 GLONASS TRACKING

GLONASS TRACKING BISK/VACO: neg. freq. channels ASHTECH Z-12 (equipment problem) OSJE: reports mixed RINEX, but delivers only GPS (TRIMBLE NETR5) NAY1, OSLS, STAS,TRDS, TRO1, VARS: GPS+GLONASS equipment (), but GPS-only RINEX SPT0: Tracking of L2 on GLONASS R09 only emmiting L1 + others with reduced GLONASS tracking on some satellites

EPN STATION GUIDELINES Satellite tracking L2C (civil code on L2, C2 in RINEX 2.11) Block IIR-M (7 sat.) L2 carrier phase: L2(C) - L2(P) = ¼ cycle RINEX : C2, P2

C2 not tracked C2 tracked TRACKING OF C2

EPN STATION GUIDELINES Satellite tracking No code smoothing (often default activated) Format: RINEX V2.11

OUTLINE EPN Tracking Network Update of EPN guidelines New@EPN CB Summary

NEW FORMATS WEB-PAGE

NEW INTERACTIVE SITE MAP

NEW INTERACTIVE SITE LIST

NEW INTERACTIVE SITE LIST

ON-LINE SITE LOG SUBMISSION Operational since July 2, 2009 Create a new site log Upload a site log from the local disk or from the EPN CB Update the site log Save the site log on the local disk or in the EPN CB data base (all in IGS/EPN site log format)

ON-LINE SITE LOG SUBMISSION

ON-LINE SITE LOG SUBMISSION RECOMMENDATIONS: Read the instructions, guidelines and FAQ's Do not upload the site log from disk, but from the EPN CB data base instead and then update it on-line. This will guarantee that no information (e.g. due to bad formatting) will be lost during the upload. Enter in the OC form the contact(s) responsible for the site log submission First submit the site log (successfully) to the EPN CB before sending a EUREF mail related to the site log modification Complete a maximum of information, even missing fields giving only a warning message Send new pictures related to hardware changes

ON-LINE ETRS89 ITRS TRANSFORMATION Operational since Nov. 23, 2009

ON-LINE ETRS89 ITRS TRANSFORMATION Operational since Nov. 23, 2009

OUTLINE EPN Tracking Network Update of EPN Guidelines New@EPN CB Summary & Future Plans

SUMMARY & FUTURE PLANS 243 EPN stations, 53% GPS+GLONASS Update EPN guidelines: C2 tracking not allowed Tracking of unhealthy satellites is mandatory New at EPN CB: interactive site map & list, on-line ETRS89/ITRS transformation Future: On-line of site pictures management system Query-based data retrieval