NO: 9-16 DATE: 2/11/16 EMERSON CLIMATE TECHNOLOGIES WHOLESALERS -EXECUTIVES -PRODUCT MANAGERS -EMERSON TM TECHNICAL SPECIALISTS -BRANCH PERSONNEL

Similar documents
AE R1 October to 5 Ton ZPS*K6 Copeland Scroll Two-Stage Compressors

Application Guidelines for Glacier K3 Copeland Scroll Refrigeration Compressors

Refrigerant Changeover Guidelines HFC R-404A/R-407A/C/F to R-448A/R-449A. Leading the Industry with Environmentally Responsible Refrigerant Solutions

Copeland Scroll ( HP) ZB*KA and ZF*KA for Refrigeration

KITS COMMON TO HEATING AND COOLING EQUIPMENT 504,652M 03/04. Supersedes 503,249M

Refrigerant changeover guidelines

Table of Contents. Service Procedures. Service Procedures. Measuring Superheat (4) Measuring Subcooling (5) Airflow Calculation (6-8)

September 2016 AE Application Guidelines for Copeland CS**KIE Compressors in Ice Machines AE4-1421

Contour TM Screw Compressors

Next-Gen Uni-Pak 1/2 TO 6 HP MULTI-REFRIGERANT AIR COOLED CONDENSING UNITS

AE Application Guidelines for Refrigeration Copeland Discus Compressors with R-410A

Copeland Scroll Condensing Units for the Food Service Market

Application Guidelines for ZS**KAE Refrigeration Copeland Scroll Compressors HP

PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL With Master Rack Compressor Sequencer

Installation Manual BCS2000/3000

For more Parts Information:

R.A.S.E.R.S System. Installation Guide

F-2000MLF(-C) F-2000MWF(-C) F-2000MRF(-C) F-2000MRF3(-C)

Installation Manual BCS 1000/1500

For an administrative fee of $9.97, you can get an un-locked, printable version of this book.

T2CG/T2HG, T3CG/T3HG, T4CG/T4HG Multi-Zone

Operation and Maintenance Manual

RecoverX Oil-Filled Hermetic Refrigerant Recovery System. Operation and Maintenance Manual

Unit Dimension. Unit Nomenclature DEHUMIDIFIER NOMENCLATURE UNIT VOLTAGE: 2: 240/1/60 5: /3/60 9: 480/3/60 8: 600/3/60

ENGINEERING SPECIFICATIONS

CME1056 Service Parts. Table of Contents

WineZone Ceiling Mount Ductless Split 15

Nominal Circuit Capacities: 9,000 12,000 18,000 & 24,000 Btuh units.

These units are available now from the Distribution Center. For a list of available models, click here.

Hoshizaki America, Inc.

S2HA, T2HA, T3HA, and

INSTALLATION AND OPERATING INSTRUCTIONS

UP TO 17.5 SEER / 13.5 EER / 9.5 HSPF HEAT PUMP ENVIRONMENTALLY BALANCED R- 410A REFRIGERANT 2 THRU 5 TONS SPLIT SYSTEM

WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS

Split system air conditioner

Air Conditioning Operation and Troubleshooting Matt Dunham

Copeland Scroll Outdoor Refrigeration Unit

National Comfort Products 539 Dunksferry Road Bensalem, PA (215) Fax: (215)

Service Step by Step Trouble-Shooting Check-List

Condensing Unit Installation and Operating Instructions

AE R17 November 2016

INSTALLATION GUIDE. 4AC 14* ASA1 SERIES R-410a CONDENSING UNITS R-410A ATTENTION, INSTALLER! ATTENTION, USER!

CS/CD/CP AIR COOLED CONDENSING UNITS (P/N E207120C R2)

DESIGN STANDARDS SECTION 15600

Air-Cooled Condensing Units with Compact Screw Compressors

SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING

Installation Instructions

Application Guidelines for Low Temperature ZF**KAE 1-2.5HP Copeland Scroll Refrigeration Compressors

PS SERIES PARALLEL RACK SYSTEM START UP GUIDE

XC16. IMPORTANT Operating pressures of this R 410A unit are higher than pressures in R 22 units. Always use service equipment rated for R410A.

National Comfort Products 539 Dunksferry Road Bensalem, PA (215) Fax: (215)

CAUTION. Check Equipment and Job Site. Clearance Requirements. Unpack Unit

HSXA16 WARNING. WARNING R 410A refrigerant can be harmful if it is inhaled. R 410A refrigerant must be used and recovered responsibly.

ENGINEERING SPECIFICATIONS

500 EX Fusion Compressor Series

SECTION 50 - CAB CLIMATE CONTROL

INSTRUCTIONS! DO NOT DISCARD!

SERVICE PARTS MANUAL MODEL-ICE1806 and ICE1807 Version 3 MODEL-ICE2106 and ICE2107 Version 3

Call us today! (800)

User s Information and Installation Instructions

Commercial High-Efficiency Condensing Units

Call us today! (800)

MARVAIR MODPAC TM AIR CONDITIONERS MODELS AVPA EXPLODED VIEW PARTS ID

S1CV/S1HV Single-Zone

Eclipse Technical Training CME686 CME810 CP686 CP886 CP1086

INTRODUCTION. Special Applications of Package Air Conditioners. Instant Cooling Requirement in Wedding Ceremonies

SERVICING PROCEDURE R-410A LEAK TEST EVACUATION CHARGING. Bard Manufacturing Company, Inc. Bryan, Ohio Manual Page 1 of 11

SECTION REFRIGERATION EQUIPMENT. A. Section Includes: Refrigeration equipment for insulated cold storage rooms including necessary accessories.

EarthLinked CC Series Compressor Unit R-410A Quik-Start Instructions

N4H4. Product Specifications 14 SEER HEAT PUMP. ENVIRONMENTALLY SOUND R 410A REFRIGERANT 1½ THRU 5 TONS SPLIT SYSTEM 208 / 230 Volt, 1 phase, 60 Hz

38GHP AIR-COOLED MULTI SPLIT CONDENSING UNITS

HVAC Service Technicians Training Center

HS25 SERVICE UNIT INFORMATION

RDT Refrigeration Book

NM1850 SERVICE PARTS

Hoshizaki America, Inc.

The Essentials Of Working With R-410A

Installation, Start-Up and Service Instructions

Owner s Manual Refrigerated Compressed Air Dryers Models F-200, 250, 300 & F350

Commercial High-Efficiency Condensing Units

Warm Case Troubleshooting Guide 9/18/2014

KM-1600MRF KM-1600MRF3

APPLICATION GUIDELINES FOR COPELAND COMPLIANT SCROLL COMPRESSORS (ZR*1 Models)

power Describe the purpose of lockout/tag-out devices Demonstrate use of lockout/tagout

13ACX. IMPORTANT Operating pressures of this R 410A unit are higher than pressures in R 22 units. Always use service equipment rated for R 410A.

INSTALLATION INSTRUCTIONS

Corp L9 Revised HS27 SERIES UNITS SPECIFICATIONS. Model No. HS HS HS HS27-042

EarthLinked HC Series Compressor Unit R-410A Quik-Start Instructions

Call us today! (800)

Residential Piping and Long Line Guideline

HSXA15 HSXB15. IMPORTANT Operating pressures of this R410A unit are higher than pressures in R22 units. Always use service equipment rated for R410A.

INSTALLATION INSTRUCTIONS

Executive Summary. Number of Low Number of High Number of Faults , Number of OK

Installation 50% Service 20% Components 20% Applied Knowledge 10%

Otherwise, you can continue reading the file on the following pages.

User s Information and Installation Instructions

INSTRUCTIONS! DO NOT DISCARD!

horizontal air discharge outdoor discus condensing unit

TSA WARNING. Service Literature TSA SERIES UNITS. 6, 7.5, 10, 12.5, 15 & 20 ton

Data Aire, Inc. reserves the right to make design changes for the purpose of product improvement or to withdraw any design without notice.

Transcription:

NO: 9-16 DATE: 2/11/16 TO: EMERSON CLIMATE TECHNOLOGIES WHOLESALERS -EXECUTIVES -PRODUCT MANAGERS -EMERSON TM TECHNICAL SPECIALISTS -BRANCH PERSONNEL SUBJECT: Procedure for Changing CS Compressor to Copeland ZS Scroll Compressor for Select Condensing Units. This Change out is NOT recommended for Ice Machine Applications. Emerson is recommending as possible replacements of CS27/33 welded compressor models with ZSKA Scroll models for Condensing Units. Instructions for compressor change out are listed below. Copeland replacement Scroll compressor models for units with CS33 & CS27 Hermetic reciprocating compressor Original Copeland Compressor Model (Hermetic) CS27K6E-PFV Replacement Copeland Compressor Model * ZS29KAE-PFV Unit/Compressor Voltages 230/1/60 * ZS compressor requires 88-106/330 Volt start capacitor (Optional) 60/MFD/440 Volt run capacitor CS27K6E-TF5 ZS29KAE-TF5 230/3/60 CS27K6E-TFD ZS29KAE-TFD 460/3/60 CS33K6E-PFV ** ZS33KAE-PFV 230/1/60 ** ZS compressor requires 88-106/330 Volt start capacitor (Optional) 80/MFD/440 Volt run capacitor CS33K6E-TF5 ZS33KAE-TF5 230/3/60 CS33K6E-TFD ZS33KAE-TFD 460/3/60 1

Capacity (Btu/hr) EER Scroll v. Recip Performance Comparison 20 F Evap 70000 20 60000 50000 40000 30000 Scroll - ZS33K Capacity Recip - CS33K Capacity 20/120 Rating Point Recip EER Scroll EER 21% Delta 18 16 14 12 10 8 20000 6 10000 4 2 0 140 130 120 110 105 100 95 90 80 70 Condensing Temperature ( F) Parts required in addition to compressor to make the conversion: 0 Crankcase heater part# 918-0043-00/07 (supplied by Copeland wholesaler) Voltage dependent. Molded power plug part# 529-0060-24 (supplied by Copeland wholesaler). Compressor mounting kit part# 527-0116-00 (Supplied by Copeland wholesaler). One 3 pole, 40 amp contactor with appropriate coil voltage to match system. o Note: Only 2 poles will be utilized on a single phase compressor units. 7/8 and 1/2 tubing along with various fittings such as elbows and couplings. A minimum of 6% silver alloy should be used. Liquid line drier. For single phase low voltage or brownout concerns. o A Potential relay and start capacitor may be applied to the scroll compressor (See figure 1). o Part numbers are: ZS Model Start Capacitor Run Capacitor Relay ZS33KAE-PFV 914-0036-03 914-0037-38 040-0166-37 ZS29KAE-PFV 914-0036-03 914-0037-22 940-0001-79 2

The mounting footprint on these Hermetic and Scroll compressors are identical. The refrigeration piping is substantially different and will vary by individual unit depending on installed options. Because of this, there will be additional cut & fit field piping required during installation of the ZS compressor. Connection points are very different. Be sure to evaluate Scroll compressor orientation before installation. CS Welded Hermetic Compressor Height 14.60 ZS Scroll Compressor Height 16.54 3

Conversion process for CS Welded Hermetic compressor to ZS Scroll compressor: *All work to be complete by a qualified HVAC/HVAR technician following refrigeration best practices and safe guidelines 1. Disconnect power from the condensing unit. 2. Remove condensing unit s panels for full access to the compressor and open the electrical panel. 3. Connect gauge set hoses to both high and low side valves ports and open. 4. Connect gauge set hose to reclaimer then reclaim system refrigerant until gauge pressures all read 0 PSI. 5. While reclaiming refrigerant, start disconnecting the wiring from the compressor, the compressor contactor, and all electrical between contactor and compressor. 6. Un-braze the discharge line and suction lines from the existing CS compressor. 7. Remove the rubber mounting grommets. 8. Remove the CS compressor and place to the side. 9. Install the new mounting feet onto the new ZS compressor and place on the base in a manner that the suction line is in close proximity to the suction connection on the ZS compressor. 10. Utilizing the 7/8 and 1/2 piping and components along with tubing benders, etc. braze in the suction and discharge lines. The pressure switch connection points may need to be moved and new Schrader valves installed. 11. With hoses still connected to suction and discharge valves, connect your vacuum pump and begin the evacuation process. Evacuate to 500 microns. 12. While evacuating, install the new compressor contactor, wiring, capacitors, and relay. For single phase units follow the wiring diagrams shown at the end of this document (Figure 1 for Brownout, Figure 3 for Standard Scroll), (230 and 460 three phase diagrams are the same). 13. The crankcase heater is a belly band style with only two leads. Connect heater leads back to L1 and L2 on the line side of the compressor contactor. 4

14. When 500 microns has been achieved, turn off pump and close valves. Let it stand for at least 30 minutes to make sure vacuum is maintained. A leak can be suspected due to rise in gauge pressure. At that point, pressurize system with dry nitrogen and a small amount of refrigerant and perform a leak test before proceeding to next steps. 15. Break the vacuum with as much of the original equipment recommended refrigerant charge as possible by charging liquid into the receiver valve. It is sometimes possible to get it all in but if not, finish the charging when running through the low side of the system. 16. The RLA of the ZS is slightly higher than that of the CS on most models which will impact the MCA/MOPD per the table below. This chart covers both the ZS29 AND ZS33 scroll compressors. Unit Electrical Specifications with Replacement ZS Scroll Compressor Original Reciprocating Compressor New Scroll Compressor RLA Original (CS) New (ZS) CS27K6E-PFV ZS29KAE-PFV 21.5 23.4 CA27K6E-TF5 ZS29KAE-TF5 13.7 18.4 CS27K6E-TFD ZS29KAE-TFD 7.6 8.4 CS33K6E-PFV ZS33KAE-PFV 27.6 23 CS33K6E-TF5 ZS33KAE-TF5 16.8 20 CS33K6E-TFD ZS33KAE-TFD 8.8 9 *Using this chart you will need to confirm that the existing wire and breaker sizes supplying power to the condensing unit are correct to comply with all state & local codes. 5

17. Contractor must determine MCA and MOPD Values 18. When all electrical is confirmed to be correct, turn on power. With pressure in the system the low pressure switch should be closed and the compressor contactor should engage. Remember that three phase Scroll compressors can run backwards, so confirm that suction and discharge pressures do not equalize! If pressures equalize, remove power from unit, reverse two of the electrical leads to the compressor at the contactor then restart system normally. 19. After charging is complete, check for a 20 F superheat at the compressor. It will be normal to have high superheat, high suction/discharge pressures and high amperage draws on initial startup of a warm box but when the box is within 5 F of desired temperature, 20 F superheat should be achieved. If not, adjust the expansion valve. Check for restrictions across filter driers, solenoids, piping, dirty coils, or any other abnormalities. 20. Remove refrigeration gages and securely re-install all service valve port caps. 21. Re-install all of the condensing unit panels and front screen. 22. Clean up all debris. For further details on the application of Copeland Scroll compressors please refer to, MB2012CC-31. Additional product performance and electrical information can be accessed online at EmersonClimate.com. Log in or register for Online Product Information. For additional questions, please contact your Emerson Climate Technologies Sales Manager or Application Engineer. The contents of this publication are presented for informational purposes only and are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. Emerson Climate Technologies, Inc. and/or its affiliates (collectively "Emerson"), as applicable, reserve the right to modify the design or specifications of such products at any time without notice. Emerson does not assume responsibility for the selection, use or maintenance of any product. Responsibility for proper selection, use and maintenance of any Emerson product remains solely with the purchaser or end user. 6

Single Phase Compressor with Start Capacitor and Potential Relay Standard Scroll Single Phase Compressor without start capacitor 7