CALIFORNIA MECHANICAL CODE OVERVIEW OF 2016 UPDATES CHANGES AND RAMIFICATIONS

Similar documents
IMC Significant Changes Summary Tier I

Notable Changes in the Mechanical Codes

Analysis of Changes for the 6 th Edition (2017) Florida Codes

Gil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee

NC Mechanical Code. Land Use and Environmental Service Agency (Code Enforcement) Table of Contents

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

Summary of BBS Proposed Ohio Mechanical Code Rule Changes October 2016

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC

Challenges and Methods of Estimating a Conceptual HVAC Design

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

Land Use and Environmental Service Agency (Code Enforcement) NC Mechanical Code. Table of Contents

8 5.11: Finned-Tube Coils and Heat Exchangers : Humidifiers and Water Spray Systems : Access for Inspection, Cleaning, and Maintenance

Mechanical System Description

Ventilation for New Low-Rise Residential Buildings July 20, 2015

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

1 Exam Prep Florida Building Code-Mechanical Tabs and Highlights

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

UNIFORM MECHANICAL CODE

Contents Chapters 4 & 5 of the 2012 Michigan Mechanical Code CHAPTER 4, MMC: VENTILATION CHAPTER 5, MMC: EXHAUST SYSTEMS

COMcheck Software Version Mechanical Compliance Certificate

2015 & 2012 International Mechanical Code Significant Changes and the PA Uniform Construction Code

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

101 S. George St 116 E Gas Ave York, PA York, PA (717) (717)

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

USEFUL RESOURCES: Applicability. Item o of section 150. Review-Definitions Section 101

b.) Technical Information:

Building Codes, Ventilation Rates, and Certified Performance. Ventilation Track Comfortech 2007 St Louis, MO September 27, 2007

Table of Contents. List of Figures and Tables. Executive Summary: 3 ASHRAE Standard 62.1 Section 6 Analysis 7

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

SEMICONDUCTOR FABRICATION FACILITIES

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

BEST PRACTICE RECOMMENDATIONS

Inspection Checklist Mechanical Final

DUCT SYSTEMS CHAPTER 6

Life Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

Applying VRF? Don t Overlook Standard 15

GreenJet Transfer Fans

Applying VRF? Don t Overlook Standard 15

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

Inspection Checklist Mechanical Rough in

Basic Hood Considerations The design process for a successful kitchen ventilation system starts when the engineering design HVAC team receives

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION)

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

Ammonia Refrigeration RAGAGEP

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

CHAPTER 4 VENTILATION AIR SUPPLY

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering

2012 International Mechanical Code Significant Changes. About the Significant Changes

Trane Performance Climate Changer Air Handlers. An air handler for every need.

Section 42. Lead Paint Risk Factor NONE WATER HEATER STORAGE GAS

REPORT OF THE UMC VENTILATION TASK GROUP

CUMULATIVE ANALYSIS OF UNIFORM MECHANICAL CODE CHANGES to 2003

Land Use and Environmental Service Agency (Code Enforcement) NC Mechanical Code. Table of Contents

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION

PLAN REVIEW SUBMITTAL GUIDE

WORKSHOP VENTILATION- PSYCHROMETRICS-AHU

2015 MECHANICAL CODE REQUIREMENTS

SEMICONDUCTOR FABRICATION FACILITIES

ASHRAE Standard 62 Ventilation Report Technical Assignment #1. Calvert Memorial Hospital Prince Frederick, MD

GASEOUS HYDROGEN SYSTEMS

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

SEMICONDUCTOR FABRICATION FACILITIES

COMcheck Software Version Mechanical Compliance Certificate

Laboratories and Hazardous Materials. Company Overview

2012 INTERNATIONAL FUEL GAS CODE VENTS

HVAC Mandatory Provisions Part II, Page 1

ASHRAE/IESNA Standard

NFPA 96, 2017 REVIEW SUMMARY

2009 IECC Commercial Mechanical Requirements

Craig Wolfe Toxalert International, Inc. Mound, MN

Technical Report Three

OBC INDUSTRIAL CLASSIFICATION OBOA ANNUAL MEETING AND TRAINING SESSIONS LONDON ON OCTOBER 4, 2011

PDH & Professional Training

DUCT SYSTEMS CHAPTER 6

ACKNOWLEDGEMENT. IIAR expresses its deepest appreciation to these authors for their contributions for the betterment of the industry.

Technical Assignment 1

SEMICONDUCTOR FABRICATION FACILITIES

Mechanical Compliance Certificate

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Appendix 13. Categories of Cooling and Heating systems

ICC CODE CORNER 2015 International Fire Code

August 15, 2013 Page 1 of 19

A. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters.

Life Safety Dampers Selection and Application Manual

DUCT SYSTEMS CHAPTER 6

UMC 2012 ( ): Item # 38

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop

Part I Extraction Process Equipment

900 N. Via Piemonte Ontario, CA

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March

GENERAL BASIC INSTALLATION INSTRUCTIONS DIRECT FIRED HOT WATER BOILERS PARKER BOILER CO.

Adv. 8.4 Guidelines for Biosafety Cabinets Rev

Ventilation. ASHRAE 62.2 COMPLIANCE How do we get there? Bruce Hagen ND Dept. of Commerce.

COMcheck Software Version Review Mechanical Compliance Certificate

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

UNIFORM MECHANICAL CODE SIGNIFICANT CHANGE COMPARISON STUDY

Indirect Gas-Fired Make-Up Air

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,

Transcription:

CALIFORNIA MECHANICAL CODE OVERVIEW OF 2016 UPDATES CHANGES AND RAMIFICATIONS Presented to: Presented by: Sargon Ishaya, PE www.pragmaticprofessionalengineers.com

Introduction Today s Agenda Overview Review changes in the California Mechanical Code (CMC) between 2013 and 2016 versions Point out where there are discrepancies between the CMC and the California Energy Code (what is incorrectly called Title 24 in our industry) What is not included in today s presentation Reviewing changes in other parts of Title 24 (California Plumbing, Electrical, Fire, Building, etc. Codes) Comprehensive delineation of changes only major changes and design ramifications will be presented

Introduction Today s Agenda Natural ventilation Ventilation airflow requirements (full and part load) Air classifications and recirculation Exhaust termination locations Filter MERV ratings Product Conveying Duct and Fire Dampers Minimum exhaust duct design velocities Product Conveying Duct Supports Grease duct thicknesses and leakage testing Type II grease exhaust hood terminations

Introduction Agenda (continued) Boilers and low-water cutoff alternative Regulations regarding relief valve discharge piping Refrigerant leak calculation and vapor alarms Outdoor refrigeration room constraints on intake air Refrigeration piping and shafts Automated controls for cycles of concentration Hydronic piping and flushing Scope of expansion tanks Hydronic pipe joining methods defined Hydronic system controls constraints Process piping materials

Introduction Title 24 Background Title 24 is made up of 12 parts listed below and all parts are Title 24 1. California Building Standards Administrative Code 2. California Building Code (comes in two volumes) 3. California Electrical Code 4. California Mechanical Code 5. California Plumbing Code 6. California Energy Code (this is commonly called Title 24 in our industry) 7. California Elevator Safety Construction Code 8. California Historical Building Code 9. California Fire Code 10. California Existing Building Code 11. California Green Building Standards Code 12. California Reference Standards Code Title 24 is the law in California If you do not conform to an industry standard like ASHRAE, but follow Title 24, then you can be sued. If you do not conform to Title 24 in favor of an industry standard or other practice, then you can go to jail and be sued.

Introduction Slide Formatting When a code section is changed from 2013 The 2013 text that changes in 2016 will appear in bold, italic font like this The 2016 verbiage that modifies the language will then follow the 2013 text In some cases, the ramifications of the change will be shown in a diagram or a sample situation on a job When a code section is new in 2016 A summary will be provided about the new section In some cases, the ramifications of the change will be shown in a diagram or a sample situation on a job

Natural Ventilation Constraints 2013 CMC Sizes of openings follow ASHRAE 62.1 Openings must be permanently open unless ventilated space is also served by a mechanical ventilation system Distance of space served to opening = 20-feet 2016 CMC (402.2.1) Distance of space served to opening is a function of ceiling height as well as if there are opposite or corner walls that contain openings In general this relaxes the natural ventilation constraints allowing for more areas to be naturally ventilated

Natural Ventilation Example A San Francisco office floor has a mechanical ventilation system, no ceilings (16-feet to deck) as well as operable windows The mechanical ventilation system is not conditioned and in winter mornings this results in cold complaints One solution is to shut down the mechanical ventilation system on cold mornings and let the occupants open operable windows for ventilation How much of the floor space can a natural ventilation option serve under the 2013 and 2016 distance-to-operable window constraints?

Natural Ventilation 2013 criteria There are no dampers on the ventilation ducts; therefore, the mechanical ventilation system must operate for the areas that are not shaded

Natural Ventilation 2016 criteria The NON-shaded areas are open to natural ventilation per the 2016 CMC - what is effectively the entire floor

Natural Ventilation CMC Problem Recall that the CMC is part 4 of Title 24 and the California Energy Code is part 6 of Title 24 It turns out that part 6 of Title 24 is more stringent than part 4 If code is law and code has discrepancies, which part should be followed? It could be argued that the more stringent code must be followed It could also be argued that part 6 doesn t address multiple walls with openings, so part 4 can be used The CMC could be used as a basis for engineering, but the project manager should approve the risk

Mechanical Ventilation Airflow 2013 CMC (403.2.1) Lists the equation from ASHRAE 62.1 as the criteria for outdoor airflow to a zone V bz = R p P z + R a A z V bz = outdoor airflow to zone R p = outdoor airflow rate per person basis (cfm/person) P z = largest number of people expected in zone during typical usage R a = outdoor airflow rate per area basis (cfm/ft 2 ) A z = floor area of zone 2016 CMC (403.2.1) P z = number of people typically expected in zone In general, this decreases the required outdoor air rate

Mechanical Ventilation Airflow Sample A conference room on a floor has a table with chairs around it in addition to chairs placed along the wall in the architectural floor plans

Mechanical Ventilation Airflow Sample Based on the 2013 code, the ventilation rate would need to base the number of people in the zone on the number of chairs shown in the space (23) Following the 2016 code, the engineer would have flexibility to base the number of people in the zone on the quantity of chairs only around the table (18)

Mechanical Ventilation CMC Problem Recall that the CMC is part 4 of Title 24 and the California Energy Code is part 6 of Title 24 It turns out that part 6 of Title 24 is more stringent than part 4 (part 4 was updated, but not part 6) If code is law and code has discrepancies, which part should be followed? Part 6, the California Energy Code, specifically shows the discrepancies with part 4 and stipulates that the more stringent code must be followed The CMC could be used to argue a mistake, but it should not be used as a basis for engineering

Air classifications and recirculation 2016 CMC (403.9) classified airstreams that now match 2013 ASHRAE 62.1 Class 1 Air can be recirculated anywhere Class 2 Air can be recirculated to: The same room Other Class 2 or 3 rooms with similar pollutants Any Class 4 room Toilet rooms To any space only through a heat recovery device as long as the recirculated air is less than 10% of the total outdoor air

Air classifications and recirculation Class 3 Air can be recirculated to: The same room To any space only through a heat recovery device as long as the recirculated air is less than 5% of the total outdoor air Class 4 air cannot be recirculated Energy recovery device: Note how the heat wheel pockets will encapsulate some exhaust air as the wheel turns and redistribute it to the supply air.

Air classification ramifications 2016 CMC (Table 402.1) airstream classifications have some conspicuous ramifications like: Cafes, kitchens, and dining areas are Class 2, so in an office building they have to be once-through or isolated on a dedicated HVAC system Art classrooms, wood/metal shops, and educational labs are all Class 2. Do they have similar pollutants? Engineering advice: Stipulate the assumed air classes in a Basis of Design Have the manufacturer of heat recovery equipment publish the recirculation rates in submittals

Exhaust Terminations 2013 CMC No mention of bird screens 504.5 Environmental Air Ducts 3-feet from property lines or building openings No mention of minimum distance to forced air inlets 2016 CMC 502.1 All exhaust openings except clothes dryer vents shall be covered with a corrosion resistant screen See code section for dimensional constraints of screens 502.2.1 Environmental Air Ducts 3-feet from property lines or building openings 10-feet from forced air inlets

Filtration Constraints 2013 CMC No mention of mandated filtration in standard buildings E 603.3 Appendix E is for recommended sustainable practices Filtration value stipulated at MERV 13 in this section 2016 CMC 503.3 All return airstreams must be filtered with a minimum of MERV 8 filters Note that MERV 13 is preferred because it captures most particle matter that is detrimental to human health with minimal pressure drop increase

Product Conveying Duct and Fire Dampers 2013 CMC No mention of restrictions on dampers in exhaust Most building inspectors referred to an NFPA standard that prevents dampers in fume hood exhaust ducts 2016 CMC 505.2 now stipulates (via NFPA) Fire dampers are not allowed when the toxic hazard is greater than the fire hazard No product-conveying duct can pass through a fire wall Ramifications All product conveying ducts must be isolated in separate shafts or fire-wrapped The risk analysis about fire vs. toxic hazard is moot

Product Conveying Duct Velocities 2013 CMC No mention of welding exhaust Fine light dust minimum velocity =2,000-fpm Dry dust minimum velocity = 2,500-fpm 2016 CMC Table 505.4 Added welding fume minimum velocity = 2,000-fpm Fine light dust minimum velocity increased to 2,500-fpm Dry dust minimum velocity increased to 3,000-fpm Provides more detailed examples of product conveyed material in the table

Product Conveying Garage Exhaust 2015 UMC Illustrated Training Manual 502.2.2 Garage ventilation systems in parking garages should be regarded as ducts conveying flammable vapors. 2016 CMC As a variance, a calculation showing the concentration of flammables in the exhaust airstream is below 25% of the lower explosive limit (LEL) to avoid sprinklers and other constraints dealing with flammable exhaust Even at below 25% of the LEL, the duct is still productconveying which constrains it s terminations as compared to environmental air duct terminations

Product Conveying Duct Supports 2013 CMC 506.5.1 Duct supports designed for weight of duct half-filled with material Sprinklered duct supports weight is duct half-filled with water 2016 CMC Table 506.5.1 Duct supports designed for weight of duct half-filled with material What would this mean for workshops with sawdust exhaust? Sprinklered duct supports weight is duct with water expected (allows for less than half-filled weight if drains will remove enough water to prevent that)

Grease Duct Gage and Testing 2013 CMC 510.5 Thickness 0.054-inches carbon steel or 0.043-inches stainless steel States 16 MSG for carbon steel or 18 MSG for stainless No mention of leakage testing 2016 CMC Table 510.5 Thickness 0.060-inches carbon steel or 0.048-inches stainless steel States 16 MSG for carbon steel or 18 MSG for stainless 510.5.6 stipulates leakage testing on non-listed grease duct systems per ASHRAE 154 before concealing Ramification use a listed grease duct system

Type II Grease Exhaust Terminations 2013 CMC No mention of Type II grease exhaust terminations 2016 CMC 510.10 Rooftop terminations 10-feet from property lines Directed away from the roof surface Horizontal terminations 10-feet from Property lines Operable openings Grade level No terminations permitted to be directed onto a public walkway

Boiler Low Water Cutoff Alternative 2013 CMC 904.5 Low water cutoff protection required on boilers No mention of an alternative to low water cutoff 2016 CMC 904.5 Low water cutoff protection required on boilers As an alternative, flow sensing can be used to shut down boiler Check boiler submittal to confirm that either type of protection is factory-installed

Boiler Relief Discharge Piping Regulations 2013 CMC 1006.1 Piping to within 18-inches of receptacle Very little mention of other restrictions 2016 CMC 1005.2 Piping discharge between 6-inches to 24-inches of receptacle Many other restrictions added regarding pipe and sizing Ramification change standard detail(s) to list all requirements of 1005.2 relief valve discharge piping

Refrigerant Calculations and Alarms 2013 CMC Chapter 11 Very little mention of how to calculate concentration limits 1107.4 only one alarm is required at lesser of 50% of IDLH and 25% of LFL 2016 CMC 1104.2 - Calculation methodology and exceptions are more clearly defined (many taken from ASHRAE 15) 1106.4 requires two alarms for Group A1 or B1 First alarm at lesser of 50% of IDLH and 25% of LFL Second alarm at lesser of vapor detector s upper limit and 25% of LFL

Refrigerant Room Natural Ventilation 2013 CMC No restrictions on outdoor refrigeration rooms Many engineers, including me, used covered chiller pads with one or two exposed sides to obviate the need for refrigeration room alarms and exhaust 2016 CMC 1107.3 Calculation methodology is now included to prove that natural ventilation of outdoor refrigeration rooms is adequate It s not enough to simply expose the chiller area to the outdoors

Refrigerant Piping and Shafts 2013 CMC 1110.0 Materials for piping have general regulations No mention of refrigerant pipe shafts 2016 CMC 1109.1 More defined regulations on materials 1109.3 There are several exceptions, but refrigerant piping shall not penetrate floors, ceilings, or roofs and this may require a refrigerant pipe shaft. Ramifications VRV system piping in multi-story buildings may have to be run in vertical or horizontal shafts

Cycles of Concentration Controls 2016 CMC 1122.2 Cycles of concentration have to be monitored and modulate the bleed rate of evaporative coolers In Part 6, California Energy Code, this is only required above 150-tons, but there is no size exception in Part 4 This is going to lead to better water conservation Ramifications Most cooling tower vendors have dedicated control packages that can accomplish this and they should quote this, at least as an alternate, in any pricing Change standard equipment schedules to include this control strategy as part of the notes

Hydronic Piping and Flushing 2016 CMC 1205.3 Hydronic piping systems have to be flushed prior to use with water or a cleaning solution Ramifications To avoid plan check comments, change standard piping material schedules to include this item on all plans with hydronic piping systems

Expansion Tanks Requirement 2013 CMC 1005.1 Hot-water heating systems require expansion tanks No mention of expansion tanks required for process cooling or chilled water systems 2016 CMC 1209.1 All hydronic piping systems must have expansion tanks Ramifications Even a small, isolated process cooling water system would need an expansion tank which has material, installation, and startup costs Engineers, remember that it is the project manager who should know about and accept the risk of ignoring this

Hydronic Piping Specifications 2013 CMC 1201.3.3 Joints and piping are loosely referred to No mention of specific materials and joining methods 2016 CMC 1211.2 and following sections Similar to the 2013 Plumbing Code, most piping materials and joining methods have been added as part of code Ramifications Generating specifications for a job becomes easier because code now includes means and methods for furnishing and installing hydronic piping

Hydronic System Control Specifications 2016 CMC 1213 Many of these requirements are intuitive and common among engineering designs. 1213.1 is a good example: 1213.1 Water Temperature Controls. A heat source or system of commonly connected heat sources shall be protected by a water-temperature-activated operating control to stop heat output of the heat source where the system water reaches a pre-set operating temperature. 1214.1 makes balancing a requirement. Many heating systems do not need balancing, but it s required now. Ramifications Review the different control requirements and add applicable notes to general details If heating hot water systems were not balanced before, then it s time to start balancing them to comply with code

Process Piping Materials 2013 CMC 1406.1 Piping must be metallic unless there is a compatibility issue 2016 CMC 1406.1 Piping material must be compatible and robust enough to handle pressure and temperature (no mention of metallic) Ramifications If the city will allow it, run piping in the most economical material and joining method required for the system

Closing/Questions Questions Thank you for listening! Sargon Ishaya, PE www.pragmaticprofessionalengineers.com