HYDRAULIC OIL COOLER Installation, Operation & Maintenance Guide

Similar documents
HYDRAULIC OIL COOLER. Installation, Operation & Maintenance Guide

REG NO FM BS EN ISO HEADER TANK HEAT EXCHANGER. Installation, Operation & Maintenance Guide

Installation, Operation & Maintenance Guide

REG NO FM BS EN ISO EXHAUST GAS HEAT EXCHANGERS. Installation, Operation & Maintenance Guide

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

Swimming Pool Heat Exchangers

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

Header Tank Heat Exchangers

Installation, Operation and Maintenance Instructions Electric Flow Heater OM009

4 route 147, C.P.33 Coaticook, Qc J1A 2S8

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

Greenstar System Filter

Installation, Operation and Maintenance Instructions ThermaFlex Gasketed Plate Heat Exchanger OM010

Installation and Maintenance Manual Forbes Marshall Tracer Line Trap FMMST63

Steam Trap BK 45 BK 45-U BK 45-LT BK 46

Rycroft Storage & Non-Storage Calorifiers. Installation, Operation & Maintenance Manual

SERVICE MANUAL. For Service & Parts please call APK THERMAL at or SAFETY INSTRUCTION

Installation, Operation and Maintenance Instructions for ThermaFlex Gasketed Plate Heat Exchangers

EN transition from BS 1387 Structural & Conveyance Business

submersible water pumps

LONGONI ENGINEERING SRL

OPERATING AND MAINTENANCE MANUAL FOR VERTICAL IMMERSION HEATED STEAM BOILERS. Technical Control Systems Limited MODELS "VIHS"

General Maintenance and Operating Instructions for Heat Exchangers

ANLAGENBAU HEAT EXCHANGER w w w. a nla g enba u-b oehm er. d e Version 05/2015

Hozelock Ltd. Midpoint Park, Birmingham B76 1AB. England Tel: +44 (0)

Pedestal Range. Installation and user manual. Kiosk. Trafalgar. Tube. Issue 001 September 2017 ENGLISH UK IRL SmithsEP.co.uk

Commercial product range

Installation and Maintenance Manual Forbes Marshall Bucket Trap FMBT50

INSTITUTIONAL QUICK RESPONSE/QREC FLUSH PENDENT SPRINKLER VK410 (K5.6) TECHNICAL DATA

CENTRIFUGAL PUMPS OPERATING INSTRUCTIONS

Panel Radiators. Installation and operating instructions. ThermaRad Classic.

S and SF Inverted Bucket Steam Traps Installation and Maintenance Instructions

Instruction and Maintenance Manual. Spiral Heat Exchanger

WC2 & WC3 Installation & Maintenance Instructions

Friwa Compact. Operating instructions EN

Inverted Bucket Steam Traps

ZIP InLine. Models: ES3, ES4 & ES6. Electronic Instantaneous Water Heaters. ES3, ES4 & ES6 Instructions. V1.09 Page 1 November / 2015

CLEAN WATER PUMP. MODEL No: Hippo4A OPERATION & MAINTENANCE INSTRUCTIONS. Part No:

Self-help Temperature Adjustment

Installation, operating and servicing instructions

Operation and Maintenance Manual Sondex All-Welded Heat Exchangers (SAW)

TITAN FLOW CONTROL, INC.

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

INSTITUTIONAL QUICK RESPONSE FLUSH HORIZONTAL SIDEWALL SPRINKLER VK412 (K5.6) TECHNICAL DATA

Technical information. Remeha P 500. Pressurized boiler. Heat output: kw

Vorton 11/18/36/55 2YEAR. GUARANTEE. Hozelock Ltd. Midpoint Park, Birmingham, B76 1AB. England Tel: +44 (0)

DOMESTIC WATER RECORDS

Instruction Manual. Pharma-line ESE02198-EN Original manual

MODELS N150/300/675/900/1500/2500/2600 INSTALLATION, SERVICING AND MAINTENANCE INSTRUCTIONS

PRODUCT GUIDE. High performance heating system filter Improves energy efficiency Captures magnetic and nonmagnetic.

CENTRIFUGAL PUMPS OPERATING INSTRUCTIONS

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

Installation, Operation and Maintenance Instructions Thermaflow E Plate Heat Exchanger Package OM013

GEM TRAP FITTING & MAINTENANCE INSTRUCTIONS

FSW300 Series Flow Switch

User s Operation Instructions & Important Warranty Information. High-efficiency wall-hung boilers Baxi Avanta Heat Only 15h - 18h - 24h - 30h

CRU 200 and 500 Series Condensate Recovery Unit Installation and Maintenance Instructions

SB Series Brazed Plate Heat Exchanger Installation Manual

USER MANUAL INSTALLATION INSTRUCTIONS WARRANTY REGISTER

M07. Wunda Premium Manifold. Before you start: Check the contents THE BRAND YOU CAN TRUST

Proportioners for Stationary Extinguishing Systems

AXUS - SC Short Cased Axial Flow Fans Installation and Maintenance

ZIP Varipoint III. Installation, Maintenance and User Instructions. Models VP303, VP503 VP803, VP953 direct unvented water heaters. Issued August 2008

Model A Pipe Line Strainer 3, 4, 6, 8 & 10 Inch (DN80, DN100, DN150, DN200 & DN250) 175 psi (12,1 bar) General Description.

Installation and Maintenance Manual

Model/Sprinkler Identification Number JULY, 2011 WARNINGS

Technical Checklist - Plumbing and Heating Fittings - UK Sizes

Target Monobloc Kitchen Mixer Chrome

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Flo~mate Mains Boost Pump Installation & Maintenance Instructions

Installation Guide. Termix Distribution unit. 1.0 Table of Contents. 1.0 Table of Contents

Kinetic. Logic. Astin. THERMOSTATIC INLINE CONTROL SHOWER VALVES Installation & aftercare instructions. Please retain for future reference

Beeline Monobloc Kitchen Mixer Tap

Electronic Instantaneous Water Heaters Models: ES3, ES4 & ES6

Installation and Maintenance

Eliminator TotalGuard Installation Manual

Flomate Mains Boost Pump Installation & Maintenance Instructions

VR60 GLASS FROSTERS INSTALLATION AND OPERATING MANUAL PLEASE LEAVE WITH OPERATOR. VR60 Glass Froster. Series 1

BoilerSupplies.Com. America's Choice For Boiler Room Supplies. Installation, Operation, & Maintenance Instructions For Shell & Tube Heat Exchangers

TECHNICAL NOTICE GH/GHO/GAE V

½ Monitored Pneumatic Valve Patented Technology

Pear Kitchen Sink Tap

EKF. EC kitchen extract fan range. Installation and Wiring Instructions. Stock Ref. N EKF355E1 EKF400E1 EKF450E1 EKF450E3 EKF500E3 EKF560E3

Dovre 700CBW Cast Iron Wood Stove INSTALLATION INSTRUCTIONS 700G/1095

ADVANCE ELECTRIC THERMAL STORE

Installation, Operation and Maintenance Instructions for PlantPac Steam Plate Heat Exchanger Package

Installation and Maintenance

Sargasso Range. Installation manual. Sargasso S. Issue 001 January 2018 ENGLISH UK IRL SmithsEP.co.uk

ORIGINAL INSTRUCTIONS

AIRE. Thermostatic bath shower mixer. Installation and Operating Instructions INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

BK 45 BK 45-U BK 45-LT BK 46

PRESSURE WASHER MODEL NO: JETSTAR 1750 OPERATION & MAINTENANCE INSTRUCTIONS. WARNING Read the instructions before using the machine PART NO:

T550i power shower pump Installation and operating instructions

HTD. High Temperature Non-Cycling Refrigerated Compressed Air Dryers. Operation & Maintenance Manual. MODELS HTD 21 thru HTD 100

VIESMANN. Service instructions VITOCELL 300-B VITOCELL 300-V. for contractors

Operating Instructions. Boilermag XL Filter. High Intensity Magnetic Separator

SUBMERSIBLE DIRTY WATER PUMP

Performa 24 Eco HE. User Guide and Important Warranty Information. Condensing Combination Boiler

Thermostatic Concealed Shower Valve

Inta City Concealed Shower Mixing Valve CT80010CP

Transcription:

REG NO FM 38224 BS EN ISO 9001-2008 HYDRAULIC OIL COOLER Installation, Operation & Maintenance Guide

Foreword Dear Customer, BOWMAN has been manufacturing high quality hydraulic oil coolers for over 60 years. Your BOWMAN Stockist/dealer will be happy to provide you with advice and practical assistance. Please read these instructions fully and carefully. Keep the Installation, Operation & Maintenance Guide for future reference to ensure the long lasting performance from your new Hydraulic Oil Cooler. Copies of the Hydraulic Oil Cooler brochure are available in other languages from: French German http://www.ejbowman.co.uk/downloads.htm Italian Spanish All rights reserved E.J. Bowman (Birmingham) Ltd, reserve the right to change specification and technical alteration without prior notice. No part of this guide may be reproduced or transmitted in any form or by any means including reproduction or recording without written permission from E.J. Bowman (Birmingham) Ltd. 2

H Y D R A U L I C O I L C O O L E R Installation, Operation & Maintenance Guide Contents Foreword 2 1. S A F E T Y 1.1 Hazards when handling the heat exchanger 4 1.2 Approved use 4 1.3 Potential hazards 4 2. I N S T A L L A T I O N 2.1 Transport / storage 5 2.2 Fitting 5 2.3 Connecting the heat exchanger 6 2.4 Notes on zinc anodes 7 3. O P E R A T I O N 8 4. C O M M I S S I O N I N G 8 5. M A I N T E N A N C E / R E P A I R 5.1 Winter shut-down in areas exposed to frost 9 5.2 General maintenance 9 5.3 Cleaning 9 5.4 End cover bolt tightening sequence 10 6. P O T E N T I A L S E R V I C E I S S U E S 6.1 Tube failures 10 6.2 Fault finding 11 7. W A R R A N T Y 11 8. S P A R E P A R T S 11 9. C E M A R K I N G 12 E.J.Bowman (Birmingham) Ltd Chester Street Birmingham B6 4AP United Kingdom Tel: +44 (0)121 359 5401 Fax: +44 (0)121 359 7495 Email: info@ejbowman.co.uk website: www.ejbowman.co.uk 3

1 Safety 1.1 Hazards when handling the heat exchanger BOWMAN Hydraulic Oil Coolers are constructed to current practice and recognised safety standards. Hazards may still arise from operation, such as: - Injury of the operator or - Third parties or - Damage to the heat exchanger or - Damage to property and equipment Any person involved with the installation, commissioning, operation, maintenance or repair of the heat exchanger must be: - Physically and mentally capable of performing such work - Appropriately qualified. - Comply completely with the installation instructions The heat exchanger must only be used for its intended purpose. In the event of breakdowns which may compromise safety a suitably qualified person must always be contacted. 1.2 Approved use BOWMAN Hydraulic Oil Coolers are only approved for cooling hydraulic oil. Any other use unless specified by BOWMAN is not approved. BOWMAN declines all liability for damage associated or arising from such use. The maximum permissible operating pressure must not exceed: Oil (primary side) : 20 bar max. Water (secondary side) : 16 bar max. Applies to EC-RK three pass threaded connections only for other versions please contact BOWMAN for guidance. The maximum permissible operating temperature must not exceed: Oil (primary side) : 120 Deg.C Cooling Water (secondary side) : 110 Deg.C Variants with higher temperature and pressure ratings are available. Please contact the Sales for further details. 4

1.3 Potential hazards Ensure the maximum permissible operating pressure on the primary or secondary side of the heat exchanger is not exceeded. The heat exchanger or surrounding equipment may be damaged. NB: before the oil cooler is disconnected it must be allowed to cool sufficiently and be depressurized to prevent injury. The supply and returns to the heat exchanger should be isolated to minimise fluid loss. 2 Installation 2.1 Transport / storage The heat exchanger must be fully drained down prior to transportation. Once drained and fully dry, the heat exchanger must only be stored indoors within a non aggressive atmosphere. The connections should be capped to avoid ingress of dirt and contaminants. 2.2 Fitting Before fitting, the heat exchanger should be checked for visible signs of damage. The oil cooler can be positioned horizontally or vertically and should be connected in counterflow so that the fluids flow in opposite directions, as shown below: Multiple units can be connected in parallel: 5

Or in series: A filter with a maximum permeability of 2.5mm should be used prior to the inlet of each circuit of the oil cooler. Nothing should be welded to any part of the oil cooler. Each unit has threaded holes on its underside to facilitate mounting. 2.3 Connecting the heat exchanger Shut off all drainage valves in the flow and return pipes of the primary and secondary circuits. When fitting the heat exchanger into the pipe work care must be taken to ensure that no debris has been introduced into the primary or secondary circuit of the heat exchanger. Unsupported lengths of pipework should be avoided so as not to subject the heat exchanger to excessive loads. Water side pipework diameter should not reduce to less than the connection size within a distance of 1m from the oil cooler. Measures should be taken to isolate the oil cooler from excessive vibration. Taper fittings are not recommended as these can split the shell and end cover castings if over tightened. The correct length of fitting should be used as too long a fitting will damage the tubestack. Pipework materials must be compatible with the oil cooler materials. Stainless steel sea water pipes and fittings should not be used adjacent to the heat exchanger. If the sea water supply is taken from the ships main, ensure that the recommended flow rate cannot be exceeded. This will normally mean that an orifice plate must be fitted in the pipe work at least 1m before the cooler with the orifice size calculated to ensure that the maximum sea water flow rate cannot be exceeded. If these precautions are not taken, it is possible that the sea water flow rate through the cooler may be several times the recommended maximum which will lead to rapid failure. For our oil coolers, the maximum permitted sea water flow rates are as follows: EC range 50 l/min. GK range 300 l/min. FC range 80 l/min. JK range 400 l/min. FG range 110 l/min. PK range 650 l/min. GL range 200 l/min. RK range 900 l/min. 6

No oil cooler manufacturer can guarantee that his products will have an indefinite life and for this reason, we suggest that the cooling system is designed to minimise any damage caused by a leaking oil cooler. This can be achieved as follows: 1. The oil pressure should be higher than the sea water pressure, so that in the event of a leak occurring, the oil will not be contaminated. 2. When the hydraulic system is not being used, the coolers should be isolated from sea water pressure. 3. The sea water outlet pipe from the cooler should have a free run to waste. 4. Stainless steel sea water pipes and fittings should not be used adjacent to the oil cooler. Three Pass Bowman Heat Exchangers Oil cooler Max. sea water flow Orifice diameter in mm for max. sea water flow series l/min 1 bar 2 bar 3 bar 4 bar 5 bar 6 bar 7 bar 8 bar 9 bar EC 50 11 9.5 8.5 8 7.5 7.2 6.8 6.7 6.5 6.3 FC 80 14 12 11 10.0 9.5 9 8.7 8.4 8.2 8 FG 110 17 14 13 12 11 10 10 9.8 9.6 9.3 GL 200 23 19 17 16 15 14 14 13 13 13 GK 300 28 23 21 19 18 17 17 6 16 15 JK 400 32 27 24 22 21 20 20 19 18 18 PK 650 41 34 31 28 27 26 25 24 23 23 10 bar 2.4 Notes on zinc anodes The use of zinc anodes in heat exchangers has been employed for some years, generally by manufacturers using admiralty brass tube or its variants. The purpose of the zinc anode, or zinc pencil as it is sometimes called, is to prevent dezincification of the brass alloy tubes. As such zinc anode acts sacrificially in favour of the tube. There are a number of American and European manufacturers that use these anodes in their products. Bowman, do not fit zinc anodes as the tubes used in the construction of our coolers are of copper nickel alloy and as such do not require a zinc anode. It is possible that if this anode is fitted it can actually destroy the copper oxide film built up by the tube as a natural defence which can allow the tube material to be attacked. It is usual with the copper nickel alloys to use an iron anode which allows an iron oxide film to build up inside the tube which breaks down as a sacrificial element reducing the possibility of corrosion to the heat exchanger. In Bowman designs it is not practical to fit iron anodes as their size has to be very generous. Therefore as an alternative a piece of black iron pipework can be placed before the heat exchanger which in itself acts as sacrificial element protecting the cooler. The Royal Navy has often used this technique and when the black iron pipework corrodes, it is simply replace with a fresh piece. We do know that some manufacturers of heat exchangers, mostly those providing copies of the better known products, often fit zinc anodes incorrectly with copper nickel alloys in error. 7

3 Operation The oil cooler should be pressurized on the oil (shell) side such that it is at a higher pressure than the water (tube) side. This will ensure that if a leak occurs it will be detected by a reduction in the oil level and the oil will not be contaminated. A differential pressure of 2 bar would be sufficient. It is essential that the following instructions are followed to prevent corrosion/erosion of the heat exchanger: a) Always maintain the water ph to within correct levels. The ideal water ph should be kept within 7.4 to 7.6. On no account should it fall below 7.2 or above 7.8. b) Maximum fluid velocity through the oil cooler of 2m/s for sea water (ideal sea water flow rates are detailed on page 7) or 3m/s for fresh water must not be exceeded. If in doubt contact BOWMAN for guidance. For shipboard installations an information sheet with orifice plate sizes is available. c) Minimum water velocity of 1m/s should be used. d) Ensure compliance with water quality and maximum permissible pressure requirements. e) Air must be adequately vented from both circuits. f) Stagnant water should not be allowed to accumulate in the oil cooler. If it is not in use for any period of time the water should be drained off. 4 Commissioning Commissioning of the heat exchanger should not be undertaken until such time that this document has been fully read and understood. The primary and secondary circuits of the heat exchanger must be fully closed prior to commissioning. Adequate provision should be made to ensure that correct operating/service equipment along with personal protection (PPE) in accordance with current standards/legislation is utilised prior to the commencement of any working. Cooling water should be introduced to the oil cooler prior to the gradual introduction of hot oil. Both circuits should be vented initially and again when operating temperatures and pressures are reached. The system should be checked for leaks. 5 Maintenance / Repair 5.1 Winter shutdown in areas exposed to frost Care should be taken to prevent frost damage from a winter shutdown in conditions exposed to frost. We recommend fully draining down the heat exchanger or removing the heat exchanger completely from the installation throughout the duration of the shutdown period. 8

5.2 General maintenance While the unit is in operation, weekly inspection of the heat exchanger and its connections should be maintained for leaks and externally visible damage. BOWMAN recommend that the tubestack should be cleaned and inspected annually and the o rings should be renewed at this time. Removal of the screws around the periphery of each end cover will allow the end covers and seals to be removed. The tubestack can then be withdrawn from either end of the body. 5.3 Cleaning Any cleaning solutions used must be compatible with the oil cooler materials. This should be confirmed with the chemical s supplier before use. The chemical solution can be circulated through the heat exchanger or the unit can be disassembled and the tubestack submerged in a container filled with cleaning fluid. If necessary the fluid should be neutralized after cleaning and the unit should be flushed with fresh water and dried. Small diameter rods and brushes for tube cleaning are available from companies such as Easy Products www.easyproductsltd.com Replacement O rings should be fitted and the end cover bolts should be initially be hand tightened then tightened in the sequence and to the torque figures below: Oil Cooler Series Bolt Size Torque (Nm) Oil Cooler Series Bolt Size Torque (Nm) EC M6 8 GK M12 54 FC M8 22 JK M16 95 FG M8 22 PK M16 130 GL M10 37 RK M16 130 5.4 End cover bolt tightening sequence End covers must be refitted in the correct orientation to ensure correct performance. 9

6 Potential Service Issues 6.1 Tube failures The majority of problems facing a heat exchanger are those of corrosion or erosion on the water side. Three common types of failure are: a) Impingement attack (or corrosion/erosion) This is caused by water containing air bubbles flowing at high speed through the tubes. The impingement of rapidly moving water may lead to a breakdown of the protective copper oxide film built up by the tube thus allowing corrosion/erosion. This is worse with water containing sand or grit. The effect of these conditions would be pockmarking and pinholing of the tubes. b) Oxide corrosion This is caused by water containing organic matter such as that found in polluted estuaries. Usually this water produces hydrogen sulphide, which is very corrosive and can cause failure of the tubes, particularly if excessive water flows are used c) Pitting This problem is caused by very aggressive sea water in the tubes, especially in partially filled coolers where the sea water is stagnant. Low sea water flow rates can create a high temperature rise on the sea water side. Under these conditions deposits may build or settle in the tube, allowing pitting corrosion to take place under the deposits. This is only a brief introduction to corrosion problems. The subject is complex and the purpose of these notes is to outline in very general terms what may occur under extreme conditions. 6.2 Fault finding Symptoms Possible Causes Remedy Increase in temperature on shell side or excessive pressure loss Pressure loss is as expected, but the temperature of the oil rises Oil leaking into the cooling water circuit or vice versa Inadequate performance Oil sludging, tube scaling or build up of both resulting in an insulating film covering the tubes Film, scale or restrictions on the inside of the tubes Split or perforated tubes Flow rates too low Unit connected in parallel flow The complete heat exchanger should be thoroughly cleaned The complete heat exchanger should be thoroughly cleaned Tubes should be blocked with hard wooden plugs as a temporary measure & the tubestack replaced asap Check flow rates & increase if necessary Reconnect in counterflow as per section 2.2 10

7 Warranty All BOWMAN Hydraulic Oil Coolers are guaranteed against manufacturing and material defects for a period of twelve months from the date of delivery. BOWMAN should be contacted immediately if a unit is received damaged. No attempt should be made to repair a faulty unit as this will invalidate the warranty. For full warranty terms, please see the BOWMAN Conditions of Sale. A copy of which is available on request or via download from the website: www.ejbowman.co.uk 8 Spare Parts A comprehensive stock of spare parts is always available. Details are given in the Hydraulic Oil Coolers brochure which can be downloaded from: http://www.ejbowman.co.uk/products/hydraulicoilcoolers.htm Please contact our sales department for price and availability or nearest stockist. 9 CE Marking Documentation Heat exchangers are covered by the Pressure Equipment Directive 97/23/EC which is mandatory for all EU member states.. This manual is part of the compliance and points out all essential safety requirements to be observed. BOWMAN Hydraulic Oil Coolers fall within the Sound Engineering Practice category of the Pressure Equipment Directive 97/23/EC and as such cannot be CE marked. 11

Scan the QR Code below to your phone for a direct link to our Hydraulic Oil Cooler webpage: - Bowman products can also be found in the following industries: - CHP Power Generation Engine Test House Cooling Marine Cooling Swimming Pool Heating Fishing Industry Cooling The product range includes: - Aquatic Heat Exchangers Calorifiers Exhaust Gas Heat Exchangers Plate Type Heat Exchangers Shell & Tube Oil Coolers Stainless Steel Heat Exchangers Swimming Pool Heat Exchangers 12