Developed by CA Matt Paiss, and Bill Brooks, PE

Similar documents
SUMMARY OF CALIFORNIA FIRE MARSHAL SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE. Presented by Bill Brooks, PE Brooks Engineering

Labeling to Article 690 of the National Electrical Code Routing and Protecting PV Cables

Photovoltaic (Solar) Array Installation Guide

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM

Contractor Information Packet. North County Fire Authority. 10 Wembley Drive Daly City, CA (650)

Tyco Electronics Solar Identification Labels

Roof Coatings Manufacturers Association October 18, 2012

Ground Fault Protection Improvement Study

Ground Fault Protection Improvements to Prevent Fires Description of problem and potential solutions Presented by Bill Brooks, PE Principal, Brooks

SECTION ELECTRICAL IDENTIFICATION

San Francisco General Plan Preservation Element: Objectives 7-9. Historic Preservation Commission August 20, 2014

Introducing Solar Identification Labels

PERMIT APPLICATION REQUIREMENTS FOR NON-RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES

HEAT & SMOKE VENT INSPECTION AND MAINTENANCE PACKET

IBC Committee Responsibility Matrix January 2017

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005

Technical Expert to develop grid connection guidelines and standards for the Kingdom of Bahrain

2012 International Fire Code Significant Changes. IFC Background. Purpose IBC and 2012 NFPA 101 Significant Means of Egress Changes

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

NEW ENERGY IN THE BATTERY INFRASTRUCTURE

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

California s Enhancement of Public and Firefighter Safety Through Codes and Standards The New Fire Triangle

Railroad Safety Trail. Recompiled August Project Description. Prepared For: City of San Luis Obispo

Article by: Ark Tsisserev, Principal, Stantec Consulting Ltd.

J-PRO TM Cable Support System

SECTION (16075) - IDENTIFICATION FOR ELECTRICAL SYSTEMS

Oberon s NEC Compliance Statement and Underwriters Laboratories (UL ) Considerations for Oberon Products

IDENTIFICATION FOR ELECTRICAL SYSTEMS July Electrical Systems

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

RISKTOPICS. Photovoltaic systems

CARBON DIOXIDE SYSTEMS FOR BEVERAGE DISPENSING PERMIT REQUIREMENTS

CALIFORNIA OFFICE OF THE STATE FIRE MARSHAL

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

BUILDING PERMIT APPLICATION REQUIREMENTS FOR GROUND MOUNTED PHOTOVOLTAIC SYSTEMS

EXIDE CLEANUP PROJECT Update

CodeNotes. Solar Water Heating Systems Based on the 2018 International Solar Energy Provisions (ISEP ) Introduction OFFICIAL

CALIFORNIA MECHANICAL CODE OVERVIEW OF 2016 UPDATES CHANGES AND RAMIFICATIONS

PERFORMANCE TEST REPORT. Rendered to: Metal Building Manufacturers Association Cleveland, Ohio

Surviving Survivability A User s Guide to Survivable Fire Alarm Circuits Larry D. Rietz, SET 23 May 2018

Oberon s National Electric Code (NEC)Compliance Statement and Underwriters Laboratories (UL ) Considerations for Oberon Products

4/13/2015. Everything a firefighter wants to tell a design professional or building code official, in one hour.

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST

CHAPTER 56 EXPLOSIVES AND FIREWORKS SECTION FIREWORKS 1.4G RETAIL STORAGE, DISPLAY, AND SALE

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

Interfacing Fire Alarm, Sprinkler and Elevator Systems

NEC 2017 Changes and Their Effect Upon the ICT Industry

American Fire Sprinkler Association. An Introduction to the IBC and IFC

GENERAL AREAS OF INSPECTION

F, T, L and W Ratings - What are the Code & Testing Requirements?

NCEHSA Conference. Carbon Monoxide Detector Regulations for Lodging Establishments (S.L )

Fire Alarm, Water Flow Alarm & Signaling Systems

TABLE OF CONTENTS ADOPTED FIRE CODES... 3 AFPD SERVICE AREA... 3 SITE AND DEVELOPMENT SUBMITTAL REQUIREMENTS... 4 PLAN REVIEW FEES...

OUTLINE FOR FIRE PREVENTION ACTIVITY

FIRE & LIFE SAFTEY STANDARD

Metasys System Extended Architecture Smoke Control UL 864 UUKL Compliance

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Guardrail and Barrier Systems

Alex Masterton, PE Electrical Engineer Reviewer AHCA Neal Boothe, PE Electrical Engineer/Principal

Agilent Santa Clara CO-3

Obstructions and ESFR Sprinklers Phase 2 FINAL REPORT

Large Family Daycare Guideline

ORDINANCE NO

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD

AD HOC HEALTHCARE COMMITTEE MEANS OF EGRESS WORK GROUP APPROVED CODE CHANGE DRAFTS CODE GROUP B MOE COMMITTEE

Mobile Food Units. A definition of mobile food unit added in OFC Rule 2 is as follows:

*HB0217* H.B. 217 H.B STATE FIRE CODE ACT AMENDMENTS. LEGISLATIVE GENERAL COUNSEL 6 Approved for Filing: C.R. Gilbert :11 PM 6

Rooftop Photovoltaic (PV) Systems Examining the Risks and Researching the Options

U.S. Codes & Standards for Energy Storage Systems. Joe Cain, P.E. Chair, SEIA Codes & Standards Working Group

Revisions for the 2011 National Electrical Code - Part 4

Clark County Department of Building & Fire Prevention 4701 West Russell Road, Las Vegas, NV (702) FAX (702)

INTERNATIONAL FIRE CODE

Fire Flow Requirements Standard

Minutes. NFPA Technical Committee on Fire Code. NFPA First Draft Meeting

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

INSTALLATION OF ACCESS FLOOR SYSTEMS IN GENERAL OFFICE AREA AND COMPUTER ROOM

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC

FIRE PROTECTION ACTION PLAN A Clear Path towards Strengthening Community Fire Protection

Fire Flow Requirements Standard

FIRE APPARATUS ACCESS

New Construction Fire Inspection Process

GARCIA GALUSKA DESOUSA Consulting Engineers

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

Design Guidelines - 1 -

CURRICULUM VITAE Curtis L. Hawk, CFI

Ordinance # 11 AN ORDINANCE ADOPTING THE FIRE PREVENTION CODE OF THE SALINE VALLEY FIRE PROTECTION DISTRICT JEFFERSON COUNTY, MISSOURI

EZ Path System Addressing the Enclosure Integrity Issue Tim Lochner, P.Eng

CERTIFICATION BULLETIN

Dear Concessionaire,

California Fire Code (CFC) Part III contains requirements. Building and Equipment Design Features PART. Chapters 5 through 19

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,

PHOTOLUMINESCENT EXIT SIGNS EVALUATED AND TESTED TO UL924

2.11 Submittal Guidelines for Emergency Evacuation Signs (2016)

Transcription:

Understanding the Cal Fire Solar Photovoltaic Installation Guideline Developed by CA Matt Paiss, and Bill Brooks, PE

Presentation Overview Brief Overview of History of PV Firefighter Issues State Fire Marshal/CalSEIA Guideline Process Specifics of the Guidelines What is not included and why What is included and why National regulation coming in 2012 Questions??

Brief Overview of History of PV Firefighter Issues

History Lesson Firefighter concerns are not new, but the level of awareness has greatly increased recently. In 1998, fire officials in Northern California suggested a variety of very stringent regulations for PV systems. Largely ignored and the issues went away (for a period of time) CalSEIA (California Solar Industries Association) and SMUD (Sacramento Municipal Utilities District) developed training materials for fire fighters in 2006. These training materials raised awareness among fire districts in California and elsewhere. LA Fire Department began strictly enforcing a document that was developed in 1999. They also added new requirements to the document.

The LA PV Installation Guidelines The LA Guidelines began to be more strictly enforced in the spring of 2007 after the fire department updated the document. Previous guidelines were only used for commercial PV systems now being applied to residential. Main concerns related to language referring to: 1) 4 perimeter around arrays 2) 50 x50 maximum array sizes 3) Reference to quick-release mounting hardware

How the State Guideline Process Started Many installation permits began being held up due to concerns over compliance with LA guidelines. Solar industry began voicing concerns to CalSEIA and the state fire marshal about delays. State Fire Marshal convened first meeting on August 17, 2007 approximately 20 participants roughly half fire officials and half solar representatives.

Fire Service Contributors Vickie Sakamoto, CAL FIRE OSFM Kevin Reinertson, CAL FIRE OSFM Matthew Gatewood, Los Angeles Fire Department Denise Enea and Marshall Hird, Woodside Fire Department Jim Hone, Santa Monica Fire Department Kent Miller, Port of Stockton Ken Kwong and Elizabeth Brueck, Sacramento Fire Department Lisa Beaver, SMUD Ron Keefer, Menlo Park Fire Department Tim Ippolito, Roseville Fire Department Wes Kitchel, Santa Rosa Fire Department Scott Poster, County of Los Angeles Fire Department Ed Hadfield, Coronado Fire Department William Bigariani, San Francisco Fire Department

Solar and other Contributors CalSEIA Sue Kateley, CalSEIA Gary Gerber, Sun Light & Power Edgar Becerra, Sharp Solar Colin Murchie, SunEdison John Hostetter, REC Solar, Inc. Mark Mrohs, Kurt Johnson, Gary Neate, Dylan Anderson, and Carl Lenox, SunPower Peter Rive, SolarCity Kirk Uhler and Carl Woods, SolarPower, Inc. Additional Participants Bill Brooks, Brooks Engineering John Taeker, Underwriters Laboratories

Introduction to Fire Marshal Guidelines (4/22/08 FINAL DRAFT) This guideline was developed with safety as the principal objective. The solar photovoltaic industry has been presented with certain limitations in roof installations due to firefighting suppression techniques. The intent of this guideline is to provide the solar photovoltaic industry with information that will allow it to design, build, and install solar photovoltaic systems in a manner that meets the objectives of both the solar photovoltaic industry and the Fire Service.

1.0 MARKING (IFC 605.11.1) Marking is needed to provide emergency responders with appropriate warning and guidance with respect to isolating the solar electric system. This can facilitate identifying energized electrical lines that connect the solar modules to the inverter, as these should not be cut when venting for smoke removal. Materials used for marking should be weather resistant. Use UL 969 as standard to weather rating (UL listing of markings is not required). Vinyl signs would need to meet UL969 requirements while plastic and metal engraved signs do not need to meet the UL standard.

Examples of Plastic Engraved and Vinyl Signs

1.1 Main Service Disconnect (IFC 605.11.1.3) For residential applications, the marking may be placed within the main service disconnect. If the main service disconnect is operable with the service panel closed, then the marking should be placed on the outside cover. For commercial application, the marking should be placed adjacent to the main service disconnect in a location clearly visible from the location where the lever is operated. Adhesive fastened signs may be acceptable if properly adhered. Jurisdictions that require mechanical fastened signs may necessitate mounting signs adjacent to equipment.

Summary of Fire Marshal Guidelines MARKING (IFC 605.11.1 and 605.11.1.4) Main Service Disconnect CAUTION: SOLAR ELECTRIC SYSTEM dc conduit, raceways, enclosures, cable assemblies, and junction boxes. Every 10, at every turn, above/below penetrations, and all dc combiner and junction boxes. CAUTION SOLAR CIRCUIT

Sign Requirements MARKING CONTENT: CAUTION SOLAR CIRCUIT (NEC and IFC uses Warning: Photovoltaic Power Source) RED BACKGROUND, WHITE LETTERING, MINIMUM 3/8 LETTER HEIGHT, ALL CAPITAL LETTERS, ARIAL OR SIMILAR FONT, NON BOLD, REFLECTIVE, WEATHER RESISTANT MATERIAL (durable adhesive materials meet this requirement)

2.0 ACCESS, PATHWAYS AND SMOKE VENTILATION (IFC 605.11.3) Section 2.0 relates to fire departments that engage in vertical ventilation operations. Some departments are beginning to limit vertical ventilation for lightweight construction. Other buildings already have automatic roof vents making roof access unnecessary. Metal and concrete decked buildings are rarely trenched, so access to vents and skylights is all that may be necessary.

Purpose of Section 2.0 Access and spacing requirements should be observed in order to: Ensure access to the roof Provide pathways to specific areas of the roof Provide for smoke ventilation opportunities area Provide emergency egress from the roof

Exceptions to Section 2.0 Local jurisdictions may create exceptions to this requirement where access, pathway or ventilation requirements are reduced due to: Proximity and type of adjacent exposures Alternative access opportunities (as from adjoining roofs) Ground level access to the roof area in question

Exceptions to Section 2.0 (cont.) Adequate ventilation opportunities beneath solar array (as with significantly elevated or widely spaced arrays) Adequate ventilation opportunities afforded by module set back from other rooftop equipment (shading or structural constraints may leave significant areas open for ventilation near HVAC equipment, for example.) Automatic ventilation device. New technology, methods, or other innovations that ensure adequate fire department access, pathways and ventilation opportunities.

Roof Ventilation Residential Roof Layouts Ventilation (IFC 605.11.3.2.4) 3 space along ridge of roof Ridge setback based on enough room to make 2 wide ventilation cut. ASCE 7, Minimum Design Loads for Buildings, requires this setback in high wind locations (e.g. eastern seaboard) No rooftop disconnect requirement. (see appendix) Each roof face treated independently. PV array and wiring is off limits to fire fighters.

Roof Access Residential Hip Roof Layouts (IFC 605.11.3.2.1) Single hip needs one 3 pathway on array faces. Pathway should be along a structurally strong location such as a load bearing wall. IFC adds a statement that ladder locations cannot be in front of windows or doors and cannot conflict with tree limbs, wires, or signs.

Full Hip

Cross Gable Roof

Roof Access Residential with Single Ridge (IFC 605.11.3.2.2) Single ridge needs two 3 pathways on array faces along edge of load bearing exterior wall.

Full Gable

Roof Access Residential Hips and Valleys (IFC 605.11.3.2.3) 1.5 space on either side of a hip or valley. PV array can go to the center of the hip or valley if the hip or valley is of equal length on adjacent faces and no modules are on the adjacent face.

Cross Gable with Valley

Access Commercial (IFC 605.11.3.3.1) Commercial flat roof with no roof dimension more than 250 feet 4 space around perimeter wall. Commercial flat roof with a roof dimension more than 250 feet 6 space around perimeter wall. No rooftop disconnect requirement for fire fighters.

Pathways and Ventilation Commercial (IFC 605.11.3.3.2 & 605.11.3.3.3) Minimum 4 pathway on center access of building in both directions. A 4 access to skylights, roof hatches, and fire standpipes shall be provided to the perimeter wall. Commercial rooftop arrays shall be no greater than 150 by 150 feet in distance in either axis. Array off limits to fire fighters.

Commercial < 250

Commercial > 250

Commercial > 250 Vent openings every 20

LOCATION OF DC CONDUCTORS (IFC 605.11.2) Conduit, wiring systems, and raceways for photovoltaic circuits should be located as close as possible to the ridge or hip or valley and from the hip or valley as directly as possible to an outside wall to reduce trip hazards and maximize ventilation opportunities. The DC combiner boxes are to be located such that conduit runs are minimized in the pathways between arrays.

LOCATION OF DC CONDUCTORS (IFC 605.11.2) To limit the hazard of cutting live conduit in venting operations, DC wiring should be run in metallic conduit or raceways when located within enclosed spaces in a building and should be run, to the maximum extent possible, along the bottom of load-bearing members. Intent is to stay away from common ventilation locations near ridge. Staying under load-bearing members minimizes likelihood of saws cutting wiring system.

Commercial Systems: Difficult Access Example

Craig Allyn Rose Photography Emergencyphoto.com CONCLUSION