FIRE STROBE 2000 INSTALLATION INSTRUCTIONS

Similar documents
SP-1000X. Panic Device Power Controller Installation Guide. Rev

RPSMLR2 RPSMLR2BB. Panic Device Power Controller Installation Guide LISTED. Rev

Booster Power Supply Manual

Public Safety DAS Annunciator Panel

PTE0705 Electric Fence Monitor

AL800ULADA. NAC Power Extender. Installation Guide

Installation Instructions. PS902 Power Supply. These instructions cover the following parts: PS902 Power Supply Specifi cations:

PSN-1000 & PSN 1000(E) Installation Manual

LED Driver Module. These instructions contain procedures to follow in order to avoid personal injury and damage to equipment.

AL600ULADA. NAC Power Extender. Installation Guide

AL802ULADA. NAC Power Extender. Installation Guide. (See Application Guide for additional information) Rev

Installation Guide for models:

MBCE-110/230FR Flame Sensor Module

FIREFORCE 8 NOTIFICATION APPLIANCE CIRCUIT EXPANDER INSTALLATION & OPERATION MANUAL

TECHNICAL DATA. Humidity: 85% Relative Humidity (non-condensing) at 90 F (32 C) maximum.

Models NFPA 1221-A, NFPA 1221-B Public Safety DAS Annunciator Panel. Revision E 61117

Installation Guide for models:

MD12-1 Vehicle Loop Detector

MVP-D-TEK Vehicle Loop Detector 9 Volts DC to 240 Volts AC. Operating Instructions

Installation Guide for AL800UL-ADA. NAC Power Extender. Rev

STATUS ALARM ALARM HISTORY POWER HISTORY RESET

Series. Access Power Controllers. Installation Guide

Open-area Smoke Imaging Detection (OSID)

F PC and AO OUTPUT BOARDS INSTRUCTION MANUAL. Blue-White. Industries, Ltd.

PRX-320 Waterproof Proximity Access Operating Instructions and Installation Manual

For a red enclosure add an R suffix to the part # e.g. eflow4na8dr. Altronix Corp th St. Brooklyn, NY. Installing Company: Service Rep.

ACSI MODEL 1410 POWER SUPPLY INSTALLATION INSTRUCTIONS

For a red enclosure add an R suffix to the part # e.g. eflow4na8r. Altronix Corp th St. Brooklyn, NY. Installing Company: Service Rep.

HARDwired Installation/ Owner s Manual

Installation/Owner s Manual Models 1504 / 1506

R A D I O N I C S. READYKEY K2015A Alarm Event Manager. Installation Data Sheet. Description

DUAL OPTIC. Installation manual

MD12-2 Vehicle Loop Detector

DET-TRONICS SPECIFICATION DATA. Eagle Quantum EQ2200UVHT For Use With C7050B Continuous Duty High Temperature UV Flame Detector DESCRIPTION

Description. Optex Incorporated

PSC-ID-x-CM Series Ceiling Mount Occupancy Sensor

Ethernet General Purpose

Revision November 2013 JVA Technologies. Ethernet General Purpose IO Technical Manual

General Purpose IO Technical Manual

Crypto-Lock. Model CC-8521B Updated 7/17. Access Control System. MONITEQ, Inc. INSTRUCTION MANUAL

GS100-ATEX. Hazardous Areas Infra-Red Beam PULSE MODULATED ACTIVE INFRA-RED BEAM FOR HAZARDOUS AREAS ZONE 1 OR ZONE 2 GENERAL

Cautions and Warnings. Introduction 4009 NAC POWER EXTENDER

Installing the Cisco ONS FAP-4 Fuse Alarm Panel

Operating Instructions

Flame Rod Manual. Publication Rev A

RED1. Technical Support And Installation Manual. Models ST, E1, E2, E3, E4, and 420. Approved

INSTRUCTION MANUAL A105NAPPX & AL105NAPPX APPELLO Alarm Tone and Voice Annunciation Sounder

Model Gas Alarm Panel APPLICABILITY & EFFECTIVITY. This manual provides instructions for the following Sierra Monitor products:

Installation Instructions for W2H Series Signals

Wireless ShatterPro Acoustic Sensor Installation Instructions

MBCE-110/230FR Flame Sensor Module

LifeAlarm Fire Alarm Controls

Installation Instructions

/9308 External Battery Chargers Installation Instructions

Movement Detector GJD 300

1040 Gas Monitor INSTALLATION AND OPERATING INSTRUCTIONS AMC-1040 WITH INTEGRAL ELECTROCHEMICAL SENSOR

CarSense 303 O P E R A T I N G I N S T R U C T I O N S M A G N E T O R E S I T I V E V E H I C L E D E T E C T O R

Installation Instructions

FIREPRO INSTALLATION MANUAL FIRE ALARM CONTROL PANEL INSTALLATION MANUAL. Approved Document No. GLT Issue: 1. 8 Author: NRPJ Date: 7/ 3/201 4

STATUS ALARM ALARM HISTORY POWER HISTORY RESET

Operating Instructions

PSC-BL-I-FM-DC0(-BLE) Bi-level Dimming PIR Sensor

ACSI AO ELECTRIC LATCH RETRACTION CONTROLLER INSTALLATION INSTRUCTIONS I.D. 1089, REV. F

CM-RQE70A PIR REQUEST TO EXIT DETECTOR

MBCE-110/230UV Flame Sensor Module

SBS-H2. Hydrogen Gas Detector Kit. For battery charging rooms and other areas where hydrogen gas may be present

Pre-Installation Requirements:

AL802ULADA. NAC Power Extender. Installation Guide. (See Application Guide for additional information)

WIRELESS OUTDOOR DUAL TECHNOLOGY MOTION DETECTOR AOD-200

RCR-REX Request-to-Exit Dual Technology Motion Sensor Installation Guide

Global Water Instrumentation, Inc.

SANDOR QUAD/ESA. Double beam. POLITEC s.r.l. Installation And commissioning manual

Beacon 410A Gas Monitor Operator s Manual

Premier Hazard STC Instructions

Instructions R8471J Gas Controller for use with Model OPECL Open Path Eclipse IR Gas Detector 1.1 1/

RDM LOCK G Series Electromagnetic Lock. Listings. Standard Features. Ordering Information:

Elite. GJD022 /GJD023 35m External PIR. Multi Beam Lens Data

WM3000 WIRELESS MODULES

Pakton Technologies Pty Ltd ABN Ferrier Road, Narangba Qld 4504

CabLite Luminous Auto Light Control Installation Manual

RF SCOUT PLUS INSTRUCTION MANUAL. Dielectric, LLC 22 Tower Rd. Raymond, ME Phone: January 2015, Rev B 1

Multi-Spectral, Digital, Infrared Electro-Optical. FSC Model No. s. Unitized, Two Stage, Quick Response Flame Detectors.

Access Power Controllers with Power Supplies

SBS-H2 Hydrogen Gas Detector Kit

RAZOR RZR SERIES DIE CAST ALUMINUM LED EXIT SIGNS INSTALLATION AND OPERATING INSTRUCTIONS IMPORTANT SAFEGUARDS READ AND FOLLOW ALL SAFETY INSTRUCTIONS

PRX-320 Waterproof Proximity Access Operating Instructions and Installation Manual

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

This symbol indicates prohibition. The specific prohibited action is provided in and/or around the figure.

Open-area Smoke Imaging Detection (OSID)

POWER SOURCES MODEL NO. DESCRIPTION PRICE

Quick Reference Guide. Application. Gas Furnaces Boilers Water Heaters Commercial Cooking. Features

ELSEMA MD2010. Application Controls automatic doors or gates when a vehicle is present. Description

Installation Guide for AL600ULM. Multi-Output Access Control Power Supply Charger. Rev

Single Point Freeze Protection Heat Trace Control TRACON MODEL FPT 130 Installation and Operation Manual

Conventional Fire Alarm System 2014 V1.2

GS100-ATEX. Hazardous Areas Infra-Red Beam PULSE MODULATED ACTIVE INFRA-RED BEAM FOR HAZARDOUS AREAS ZONE 1 OR ZONE 2 GENERAL

AL1002ULADA. NAC Power Extender. Installation Guide. (See Application Guide for additional information) Rev X

FiberSensor Fiber Optic Intrusion Detection System (IDS)

MODEL AV2-C1D1M Hazardous Duty Class I. Div 1, Multitone Alarm Station

Transcription:

FIRE STROBE 2000 INSTALLATION INSTRUCTIONS I. SITE INSPECTION FOR INSTALLATION A.P.I voice: (858) 292-1561 web: http:// www.firestrobe.com 1. Carefully inspect the area where the Fire Strobe 2000 will be installed. Proper placement of the photoeye assembly is necessary for optimum performance. 2. The photoeye assembly must be mounted on a structural post to accommodate the height requirement of approximately 8' to 10'. The post should be strong enough to prevent accidental movement of the photoeye assembly after installation. 3. Avoid conflicts with buildings and trees that can obstruct the photoeye assembly. Careful consideration should be given in the event the approach is on a hill.the detector should be mounted accordingly. 4. DO NOT aim the photoeye detector in direct sunlight. This will cause the system to temporarily blind itself during the period of direct sunlight. Use the furnished P.V.C. hood to help shield the photoeye from the sunlight. 5. Note the direction from which the emergency vehicles will arrive at the scene. If the arrival is from two directions, you should use two photoeye detector heads to achieve bi-directional coverage. II. PHOTOEYE ASSEMBLY POST 1. Fabricate and install a 2" x 2" x 8' mounting post. Attach the provided PEA assembly to the top of the post to mount the assembly with two screws. DO NOT GLUE the assembly. You must be able to aim the photoeye assembly in the direction of the approaching emergency traffic. Now, remove the assembly and complete the wiring as described below. III. MOUNTING THE CABINET 1

1. We suggest that you mount the control cabinet directly below the post, possibly inside of the wall or fence line. This will help prevent vandalism. Do not install control board in a box with another gate related circuit board. 2. Remove the circuit board from the unit by removing the four screws and solder lug that hold the four corners. Try to discharge any static that you may have built up before handling the board. 3. Determine which of the two openings in the box will be used to run the wires into the cabinet. Run the wires through the ½ inch conduit into the bottom opening of the cabinet. 4. Carefully remove the knockout plug from the opening that will be used. 5. Mount the unit securely. Pull the cables described below into the cabinet and remount the circuit board. IV. PULLING THE CABLES 1. Pull four cables to the control box: P1) use 18 awg, 2-conductor cable that runs the power supply. P2) an 18 to 24 awg, 2- conductor shielded cable that runs to the photoeye assembly. DO NOT use multi-conductor shielded cable or CAT 5. P3) use 18 awg, 2-conductor cable that connects to gate operator. 4) 14awg ground wire V. MAKING CONNECTIONS 1. On the photoeye assembly remove the blue terminal block from the two pin connector at the bottom of the circuit board. Connect it to the 2-conductor shielded cable. NOTE: Shield no connection, #1 SIG, #2 GND Reinstall it on the terminal block pins. 2. Remove the terminal block from P2 the Four pin connector at the bottom of the circuit board. Connect it to the 2-conductor shielded cable according to the following scheme if possible: #1 PHOTOEYE DETECTOR (SIG to IN1 and GND to GND) #2 PHOTOEYE DETECTOR (SIG to IN2 and GND to GND) 2

NOTE: You must connect the shield of the photoeye cable to the PC board green ground wire, which is attached at one of the four corners of the board. And this ground must be attached to electric earth ground or Ground rod. Reinstall it on the terminal block pins. If you are going to use AC power to run the system, connect P1) to one end of the cable and the other to the provided 12 VAC transformer. DO NOT plug the transformer into a 110VAC outlet yet. If you are going to use the DC power to run the system, connect the one end of the cable into a 12 VDC power supply. Please note that the Fire Strobe 2000 will not trickle charge a battery. Therefore, your DC power supply must have its own charging circuit. DO NOT plug in the transformer for the power supply yet. 3. Ground the enclosure thoroughly. The detector contains a number of static-sensitive components that can be damaged destroyed by static discharge. The lug connected to the lower right stanchion is the point where connection to the earth ground should be made. 4. Plug in the 12 VAC transformer provided with the Fire Strobe 2000 or the 12 VDC power supply transformer (which you are providing) into a 110 VAC outlet. The red D6 LED near the middle left of the circuit board will light up when power is applied. VI. RELAY CONFIGURATION 1. The system is provided with dual relay outputs, including common, N/O, and N/C terminals to be hooked up to the gate controller at either the relay or logic input. Note: The maximum rating of the Fire Strobe 2000 relay is 150 ma, 24 VAC. 2. Remove the relay terminal block from the six pin connector at the bottom right corner of the circuit board. Connect your common, N/O-N/C gate controller input to these terminals. 3

Vll. SWITCH CONFIGURATION 1. Acquisition delay time before operating the relay. Factory setting SW1=off SW2=off-----500 milliseconds SW1=on SW2=off-----1 second SW1=off SW2=on-----1.5 seconds SW1=on SW2=on-----2 seconds These times are nominal at 14hz or 840 flashes per minute. The times are shorter by about 20% at 1000 fpm and about 20% longer at 750 fpm. 2. #3 on = STROBEWATCH this new feature when turned on allows the FIRESTROBE 2000 to look for both the Opticom emitter and the STROBEWATCH. It is our new optical recognition firmware that searches for Police and other Emergency vehicle Dual and Quad flash strobes and will operate the relay on valid signals. If you feel you are receiving false inputs turn #3 off to deactivate this feature. 3. To set relay approximate Hold-On-Time, set dip switch SW1 as follows: #4 on = 30minutes #5 on = 12 minutes #6 on = 6 minutes #7 on = 1.5 minutes #8 on = 3 seconds 4. An operational test of the system should be performed to ensure proper gate operation. To check the system's performance, aim an operational strobe light or handheld tester at the photoeye detector assembly. Be certain that the strobe frequency is set at 840 flashes per minute or the required frequency in your fire jurisdiction. Note: The D2 LED on the PC-board will start to blink as the strobe light is activated. The D2 LED will then lock on when the strobe light and the detector are synchronized. The D4 LED will light at the same time as the relay locks on. The D4 stays on as the duration of the relay-on-time set is on the dip switch SW1 #4 - #8. Note free Android tester app https://play.google.com/store/apps/details?id=com.grappetite.tachometer&hl=en We recommend that you call your local fire department for a complete system test. System should be tested monthly. rev 07-6-17 4

5