Prefunctional Checklist

Similar documents
Prefunctional Checklist

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

Security CCTV System Construction Checklist

University of Houston Master Construction Specifications Insert Project Name

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016)

ENGINE GENERATORS AND ACCESSORIES

University of Houston Master Construction Specifications Insert Project Name SECTION FIRE PROTECTION PUMPS PART 1 - GENERAL

SECTION AUTOMATIC TRANSFER SWITCHES

CxA to Answer this Section

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

SECTION EMERGENCY POWER SYSTEMS

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

Baldor Electric ProSPEC MASTERFORMAT SPECIFICATION 10/26/05

CONTENTS AUTOMATIC TRANSFER SWITCHES

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

City of Duluth Festival Center 04/25

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

B. Section Transfer Switches: Automatic transfer switch.

SECTION SECURITY TESTING AND COMMISSIONING

B. Provide factory test, startup by a supplier authorized by the equipment manufacturer(s), and on-site testing of the system.

AIRPORT OFFICE BUILDING. Smoke Control System. Testing Procedures Manual. September 10, 2016

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

SA Series Startup Form

System Test Report CLEAN AGENT

The Participant will select one of the two Approval Categories (below) and submit the appropriate documentation.

SPECIFICATION: ECS SERIES CLEAN AGENT FIRE SUPPRESSION SYSTEM

SECTION WATER-TUBE BOILERS

STEP 1: SELECT A NITROGEN GENERATOR STEP 2: SELECT A VENT STEP 3: SELECT MONITORING EQUIPMENT STEP 4: CONTACT ECS

Commissioning Methodologies (CM) MUBS-09 Duct Mounted Temperature & Humidity Sensor Testing Method Statement

TONY ESPOSITO LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY

DENVER INTERNATIONAL AIRPORT MAIN AND NORTH TERMINALS 2016

A. NFPA 2001 Standard for Clean Agent Fire Extinguishing Systems 2004 edition.

16620 EMERGENCY POWER SYSTEMS

DTW Master Specification Section EMCS: Start Up, Verification and Commissioning

Type of Fire Alarm Control Panel: System is: Existing OR New If new, provide Electrical Permit Number:

NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM

WESTIN HOTEL. Smoke Control System. Testing Procedures Manual. October 10, Copyright Impact Engineering, Inc All Rights Reserved

Diesel Fuel System Report

SECTION ELECTRICAL SYSTEMS COMMISSIONING

Union County Vocational - Technical Schools Scotch Plains, New Jersey

FLORIDA SHERIFFS ASSOCIATION & FLORIDA ASSOCIATION OF COUNTIES

Electronic Flow Switches

Equipment Maintenance Checklist

CITY OF MEXICO BEACH REQUEST FOR QUOTES: LIFT STATION PANELS REPLACEMENT

Construction Standards Page

Soft Start Series MP700 Solid State, Reduced Voltage

M2 Series Startup Form

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

SECTION INTEGRATED AUTOMATION COMMISSIONING

SECTION PACKAGED ENGINE GENERATORS

Florida Department of Transportation

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)

TESTING, ADJUSTING AND BALANCING

AO Annunciator Module

STATEMENT OF WORK I. SCOPE OF WORK:

University of Houston Master Construction Specifications Insert Project Name SECTION DOMESTIC WATER HEATERS PART 1 - GENERAL

SECTION AIR COILS

AS DIGITAL FIRE PUMP CONTROLLER

P.C. Simonton & Associates, Inc. Consulting Engineers. Paul C. Simonton

A. This Section includes packaged engine-generator sets for [emergency] [standby] power supply with the following features:

EMERGENCY POWER SYSTEMS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

Eccotemp L5 and L10 Comprehensive Troubleshooting Guide

Freightliner Refrigerator Troubleshooting Guide For (TJ18F) (TJ22F) (TJ18FP3)

Revitalize Building Mechanical Systems (4619)

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

MASTER PRESSRE MAINTANENCE CONTROLLER. Models PMCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

Narrative Reports As Regulated by 780 CMR, Section 903.0

Site Address: Bldg./Suite #: Departments Phone Date Approval Signature A) Planning COMMENTS:

Evergreen Liquid Propane Conversion

SECTION INSPECTION AND TESTING OF WORK

SECTION GENERATOR PARALLELING CONTROLS

FM-200 In-Cabinet Series

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

TT /97. Features INSTALLATION INSTRUCTIONS. Horn. Lamps

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

Cold Weather Preparedness Plant Winterization Lessons Learned & Best Practices

SITE REQUIREMENTS & INSTALLATION DSD-201 & SSD-102

DGC-500 DIGITAL GENSET CONTROLLER

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

FORM ACCL-PC1 ACCL WITNESS TEST PROCEDURE AND CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

Owners Manual Refrigerated Air Dryer MHT SERIES

Design & Construction Standards, Revised January

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL

PCD/PEM Power Conversion Department - Equipment Lockout Procedure

SECTION COMMERCIAL-KITCHEN HOODS

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

REQUEST FOR PROPOSALS Grand Traverse County Board of Public Works (BPW) Department of Public Works (DPW) Shop Generator Set

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

GIRTON CABINET WASHER MODEL 794A

POWER GENySYS P ROJECT E XPERIENCE I NFORMATION - D ISTRIBUTED G ENERATION

Liebert Small System MCD and PFH Condensers (1-5 Ton) Warranty Inspection Check Sheet

Transcription:

Prefunctional Checklist This Prefunctional Checklist should be completed as part of startup and initial checkout of the equipment in preparation for Functional Performance testing. PC: 16231 ITEM: Generator Assemblies ID: (Use one form for each Equipment) AREA SERVED: (Building and Room Number / Name) Form Filled Out By: Name & Company Date GC MC EC BC CC OR A/E CA GC = General Contractor; MC = Mechanical Contractor; EC = Electrical Contractor; BC = Balancing Contractor; CC = Controls Contractor; OR = Owner Representative; A/E = Architect/Engineer; CA = Commissioning Agent XX = No Initials Required 1. DOCUMENTATION VERIFICATION Check if OK. Enter note number if deficient. Item GC MC EC BC CC OR A/E CA Product information submitted Shop drawings submitted Manufacturer s installation instructions submitted Manufacturer s startup instructions submitted O & M Manuals submitted Factory test report submitted. Sequence of Operations submitted PC 16231-1

2. MODEL VERIFICATION Manufacturer Model Serial No. Generator voltage rating Engine rating- HP Generator rating- KVA Temperature rating Altitude rating ATS voltage rating ATS current rating [Other] Fill in requested information. Installed Submitted Specified 3. INSTALLATION VERIFICATION This checklist does not take the place of the manufacturer s recommended checkout and startup procedures or report. Check if OK. Enter Outstanding Item Note number if deficient. Item GC MC EC BC CC OR A/E CA Correct Gen Set Gen Set installed per drawings and manufacturer s recommendations. Diesel engine suitable for No. 2 low sulphur diesel fuel oil. Over speed shutdown device installed properly. Engine fuel oil system components installed correctly. Fuel gauge installed properly. Fuel tank capacity: gallons. Fuel tank rupture basin installed correctly. Fuel tank rupture basin capacity: gallons. Fuel tank rupture basin capacity adequate (150% of fuel tank capacity. (1.5x = gallons). Fuel tank rupture basin presence of liquid device Fuel system piping properly installed and protected. Lubricating oil system components properly Lubricating oil system filters properly Engine Cooling system components properly Engine exhaust system properly PC 16231-2

Item GC MC EC BC CC OR A/E CA Engine Air Induction system properly Air filters installed Cranking system installed Power circuit to water jacket heater system correctly Water jacket heater system Starting batteries correct voltage and capacity rating. Batteries installed and connected. Power circuit to charging system correctly Safety shutdown controls and alarms correctly Generator voltage and rating correct. Voltage Regulator Exciter installed Controls installed correctly Instrumentation and gauges installed correctly Remote annunciator installed Wiring to remote annunciator marked and terminated correctly. Generator and engine mounted on a fabricated steel skid base per the drawings. Vibration isolators installed properly Weather-protective insulated generator enclosure installed correctly. All required features provided in enclosure. Interior of gen set enclosure clean. All openings free of debris. Fire suppression equipment and alarms Automatic Transfer Switch (ATS) installed in correct location. Record settings for adjustments. Loss of Normal power to call for start up: Restoration of normal power to shutdown: Other settings: Correct voltage and current rating for ATS. Correct environmental rating for enclosure. Enclosure installed securely, level and plumb. Incoming and outgoing circuits of proper size and terminated correctly. PC 16231-3

Item GC MC EC BC CC OR A/E CA Verify surge suppression devices installed correctly. Verify all ATS accessories provided and installed correctly. PC 16231-4

4. OUTSTANDING ITEMS Note Outstanding items in table below. Use numbers referenced above. Note Description Resolved (Initial / Date) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 5. FIELD NOTES Fill in as appropriate. 6. SIGN OFF System / Equipment has been installed in accordance with the contract documents and is ready for Functional Testing. Contractor s Representative A /E Representative Commissioning Agent Owner s Representative Signature Date END OF CHECKLIST PC 16231-5