B. Shop Drawings: Detail fabrication of pipe anchors, hangers, special pipe support assemblies, alignment guides, expansion joints and loops,

Similar documents
PROJ. NO SECTION HYDRONIC PIPING

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING

Division 23 - HVAC Switzerland Beallsville K-12. Section HYDRONIC PIPING SECTION HYDRONIC PIPING PART 1 - GENERAL

SECTION HYDRONIC PIPING

Essex County College - West Essex Campus Addition And Renovations dib # / SECTION HYDRONIC PIPING SPECIALTIES PART 1- GENERAL

PROJECT NAME: DPW Idaho State University Liberal Arts Building Chiller Replacement

PROJ. NO SECTION REFRIGERANT PIPING

Mercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No.

REFRIGERANT PIPING

University of Delaware

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION HYDRONIC PIPING AND SPECIALTIES

Ratio Architects, Inc. Section Refrigerant Piping

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

A. This Section includes the following domestic water piping specialties:

A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

D-8 OUTLINE SPECIFICATION FOR HTHW HEAT EXCHANGERS

DIVISION 23 HVAC Hydronic Piping Systems

HYDRONIC SPECIALTIES TACO MPT Tank(s) 05/30/2012. A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler

SECTION DRY-PIPE SPRINKLER SYSTEMS

Lee s Summit West High School Boiler #3 Replacement SECTION CONDENSING BOILERS

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

HYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008

SECTION (15530) - REFRIGERANT PIPING

HYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008

SECTION DOMESTIC WATER PUMPS

SECTION DOMESTIC WATER PIPING SPECIALTIES

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

RESEARCH AND TECHNOLOGY BUILDING RENOVATION 05/18/09 SECTION REFRIGERANT PIPING AND SPECIALITIES

NATURAL GAS PIPING

SECTION (15530) - REFRIGERANT PIPING

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SPRINKLERS TABLE OF CONTENTS

SECTION REFRIGERANT PIPING

SECTION METERS AND GAGES FOR PLUMBING PIPING

SECTION METERS AND GAGES FOR HVAC PIPING

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

WET-PIPE SPRINKLER SYSTEMS

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

PROJ. NO SECTION METERS AND GAGES FOR HVAC PIPING

SECTION SECTION DESIGN REQUIREMENTS

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS

DARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES

A. This Section includes pipe and fitting materials, joining methods, special-duty valves, and specialties for the following:

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

REFRIGERANT PIPING SYSTEM

. ECTION METERS AND GAGES

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

DIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES

TECHNICAL. Series 18. Pump Packages

SECTION WET-PIPE SPRINKLER SYSTEMS

North Hanover Township School District North Hanover Township, New Jersey

SECTION ELECTRIC WATER HEATERS

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

UNIVERSITY OF MISSOURI Building Hydronic Piping and Pump Systems 2017 Q3

SECTION PLUMBING EQUIPMENT

FIRE SUPPRESSION SPRINKLER SYSTEM

B. Related Sections: The following Sections contain requirements that relate to this Section.

B. Standard-Pressure Standpipe Piping: Fire-suppression standpipe piping designed to operate at working pressure 175 psig (1200 kpa) maximum.

NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

SECTION BASIC MATERIALS AND METHODS

4. Provide brass valve tags marked for the service. See pertinent service specification for valve type.

OKLAHOMA STATE UNIVERSITY - BUILDING DESIGN STANDARDS

SECTION PLUMBING EQUIPMENT

SECTION ELECTRIC WATER HEATERS

SECTION DRY-PIPE SPRINKLER SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

SECTION HEATING BOILER FEEDWATER EQUIPMENT

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

VALVES SECTION 15100

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following sanitary drainage piping specialties:

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.

SECTION HEATING AND AIR CONDITIONING PIPING SYSTEMS. A. Provisions of Division 01 apply to this section. 1. Chilled Water System.

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

SECTION FUEL-FIRED, DOMESTIC WATER HEATERS

.2 Section Waste Management and Disposal..5 Section Performance Verification of Mechanical Piping Systems.

Design and Construction Standards SECTION PLUMBING EQUIPMENT

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION WATER-TUBE BOILERS

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION

SECTION AUTOMATIC SPRINKLER PIPING

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

Construction Standards Page

Revitalize Building Mechanical Systems (4619)

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8

Transcription:

SECTION 23 21 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes piping, special-duty valves, and hydronic specialties for hot-water heating, and interior ground source heat pump water systems; makeup water for these systems; and condensate drain piping. B. Related Sections include the following: 1. Division 23 Section "Common Work Results for HVAC" for general piping materials and installation requirements. 2. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe supports, product descriptions, and installation requirements. Hanger and support spacing is specified in this Section. 3. Division 23 Section "General-Duty Valves for HVAC Piping" for general-duty ball, butterfly, and check valves. 4. Division 23 Section "Meters and Gages for HVAC Piping" for thermometers, flow meters, and pressure gages. 5. Division 23 Section "Identification for HVAC Piping and Equipment" for labeling and identifying hydronic piping. 6. Division 23 Section "Ground Loop Heat Pump Piping" for exterior heat pump system piping. 7. Division 23 Section "Hydronic Pumps" for pumps, motors, and accessories for hydronic piping. 8. Division 23 Section "Instrumentation and Control for HVAC" for temperature-control valves and sensors. 1.3 SUBMITTALS A. Product Data: For each type of special-duty valve indicated. Include flow and pressure drop curves based on manufacturer's testing for balancing cocks and flow-control valves. 1. Grooved joint couplings and fittings shall be shown on drawings and product submittals and shall be specifically identified with the applicable manufacturer's style or series designation. B. Shop Drawings: Detail fabrication of pipe anchors, hangers, special pipe support assemblies, alignment guides, expansion joints and loops, 23 21 13-1 (45307035)

and their attachment to the building structure. Detail location of anchors, alignment guides, and expansion joints and loops. C. Welding Certificates: Copies of certificates for welding procedures and personnel. D. Field Test Reports: Written reports of tests specified in Part 3 of this Section. Include the following: 1. Test procedures used. 2. Test results that comply with requirements. 3. Failed test results and corrective action taken to achieve requirements. E. Maintenance Data: For hydronic specialties and special-duty valves to include in maintenance manuals. F. Water Analysis: Submit a copy of the water analysis to illustrate water quality available at Project site. 1.4 QUALITY ASSURANCE A. Welding: Qualify processes and operators according to the ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications." B. ASME Compliance: Comply with ASME B31.9, "Building Services Piping," for materials, products, and installation. Safety valves and pressure vessels shall bear the appropriate ASME label. Fabricate and stamp air separators and expansion tanks to comply with the ASME Boiler and Pressure Vessel Code, Section VIII, Division 1. C. All grooved joint couplings and fittings shall be the products of a single manufacturer. Grooving tools shall be of the same manufacturer as the grooved components. 1.5 COORDINATION A. Coordinate layout and installation of hydronic piping and suspension system components with other construction, including light fixtures, HVAC equipment, fire-suppression-system components, and partition assemblies. B. Coordinate pipe sleeve installations for foundation wall penetrations. C. Coordinate pipe fitting pressure classes with products specified in related Sections. D. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into base. Concrete, reinforcement, and formwork requirements are specified in Division 03 Sections. E. Coordinate installation of pipe sleeves for penetrations through walls and floor assemblies. 23 21 13-2 (45307035)

1.6 EXTRA MATERIALS A. Water Treatment Chemicals: Furnish sufficient chemicals for initial system startup and for preventive maintenance for one year from date of Substantial Completion. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Grooved Mechanical-Joint Fittings and Couplings: a. Anvil International, Inc. b. Grinnell, Inc c. Victaulic Company of America. 2. Flow Control Valves: a. Amtrol, Inc. b. Armstrong Pumps, Inc. c. Flow Design, Inc. d. Gerand Engineering Co. e. HCI, Inc. f. ITT Fluid Technology Corp.; ITT Bell & Gossett. g. Nibco h. Taco, Inc. 3. Balancing Cocks (For piping 2-1/2 inches and larger at pumps): a. DeZurik, Series 100, Figures 118 and 128. b. Milliken Valve Company, Inc. 4. Globe Type Check Valves at Pumps: a. Metraflex Company. b. Mueller Valve Co. c. Titan Flow Control, Inc. 5. Safety Relief Valves: a. Amtrol, Inc. b. Armstrong Pumps, Inc. c. Conbraco Industries, Inc. d. ITT Fluid Technology Corp.; ITT McDonnell & Miller. 6. Diaphragm-Type Expansion Tanks: a. Amtrol, Inc. b. Armstrong Pumps, Inc. c. ITT Fluid Technology Corp.; ITT Bell & Gossett. d. Taco, Inc. 23 21 13-3 (45307035)

7. Air Separators: a. Amtrol, Inc. b. Armstrong Pumps, Inc. c. ITT Fluid Technology Corp.; ITT Bell & Gossett. d. Taco, Inc. 8. Make-up Water Valves: a. Hersey. b. Conbraco. c. Watts. 9. Chemical Water Treatment Products: a. Barclay Chemical Co., Inc. b. Dexter Corp., (The); Dexter Water Management Systems Div. c. DuBois Chemicals, Inc.; DuBois USA Subsidiary. d. Grace: W.R. Grace & Co.; Dearborn Div. e. Inter-State Chemical Co. f. Merck & Co., Inc.; Calgon Corp. Subsidiary. g. Nalco Chemical Co. 2.2 PIPE AND TUBING MATERIALS A. General: Refer to Part 3 "Pipe Applications" Article for identifying where the following materials are used. B. Steel Pipe: ASTM A 53, Type E or S, Grade A or B, Schedule 40, plain ends. 1. Steel Pipe Nipples: ASTM A 733, made of ASTM A 53, Schedule 40, carbon steel, seamless for 2-inch NPS and smaller and electricresistance welded for 2-1/2-inch NPS and larger. C. Drawn-Temper Copper Tubing: ASTM B 88, Type L. 2.3 FITTINGS A. Wrought-Copper Fittings: ASME B16.22. B. Wrought-Copper Unions: ASME B16.22. C. Cast-Iron Threaded Fittings: ASME B16.4; Class 125. D. Malleable-Iron Threaded Fittings: ASME B16.3, Class 150. E. Malleable-Iron Unions: ASME B16.39; Class 150. F. Wrought-Steel Fittings: ASTM A 234, Standard Weight. G. Wrought-Steel Flanges and Flanged Fittings: ASME B16.5, Class 150 including bolts, nuts, and gaskets of the following material group, end connections, and facings: 23 21 13-4 (45307035)

1. Material Group: 1.1. 2. End Connections: Butt welding. 3. Facings: Raised face. H. Grooved Mechanical-Joint Fittings: ASTM A 536, Grade 65-45-12 ductile iron; ASTM A 53, Type E or S, Grade B fabricated steel; or ASTM A 234, Grade WPB steel fittings with grooves or shoulders designed to accept grooved end couplings. I. Grooved Mechanical-Joint Couplings: Consist of two ductile-iron housings, a synthetic rubber (EPDM) gasket of a central cavity pressure-responsive design; with nuts, bolts, locking pin, locking toggle, or lugs to secure grooved pipe and fittings. 1. 2-1/2 inches to 12 inches: a. Rigid Type: Housings cast with offsetting, angle-pattern bolt pads to provide rigidity and system support and hanging in accordance with ANSI B31.1 and B31.9. b. Flexible Type: Use only in locations where vibration attenuation and stress relief are required. J. Copper Pressure-Seal-Joint Fittings: (ADD#4) 1. See Editing Instruction No. 1 in the Evaluations for cautions about naming manufacturers. See Division 01 Section "Product Requirements." a. Manufacturers: Subject to compliance with requirements, provide products by one of the following manufacturers: 1) NIBCO INC. 2) Viega; Plumbing and Heating Systems. b. NPS 2 and Smaller: Wrought-copper fitting with EPDM-rubber O-ring seal in each end. c. NPS 2-1/2 to NPS 4: Cast-bronze or wrought-copper fitting with EPDM-rubber O-ring seal in each end. 2.4 JOINING MATERIALS A. Welding Materials: Comply with Section II, Part C of ASME Boiler and Pressure Vessel Code for welding materials appropriate for wall thickness and for chemical analysis of pipe being welded. B. Gasket Material: Thickness, material, and type suitable for fluid to be handled; and design temperatures and pressures. C. Solder Filler Metals: ASTM B 32, 95-5 tin antimony. D. Grooved Materials: Use grooving tools and lubricant for gaskets manufactured and supplied by the coupling manufacturer. 23 21 13-5 (45307035)

2.5 VALVES A. Check, ball, and butterfly valves are specified in Division 23 Section "General-Duty Valves for HVAC Piping." B. Refer to Part 3 "Valve Applications" Article for specific uses and applications for each valve specified. C. Flow Control Valves: 125-psig working pressure, 250 deg F maximum operating temperature, globe or ball valve with calibrated orifice. Provide with connections for portable differential pressure meter with integral check valves and seals. Valve shall have integral pointer and calibrated scale to register degree of valve opening and memory stop to retain set position. Valves 2-inch NPS and smaller shall have bronze body with threaded ends and 2-1/2-inch NPS and larger valves shall have cast iron body with flanged ends. 1. Portable Meters: Differential-pressure gage. Include two 12- foot hoses in carrying case with handle. Meter shall remain the property of the Owner. a. Scale: Inches of water, unless otherwise indicated. b. Accuracy: Plus or minus 2 percent between 20 and 80 percent of range. D. Balancing Cocks (For piping 2-1/2 inches and larger at Pumps): Shall be the gland-packed type suitable for 175 psi WWP with Class 150 ANSI flanges and complete with resilient facing suitable to 250 degrees F. Cocks shall be provided with cast iron bodies with integral pressuretemperature fittings, nickel seats, flanged ends and resilient plugs. Balancing cocks 4" and smaller shall be furnished with a hand lever operator. Balancing cocks 6" and larger shall be furnished with a quarter turn gear operator with handwheel. Balancing cocks shall be furnished with a disc position/over-travel indicator to provide visual indication of disc position and to simplify actuator adjustment. E. Globe Type Check Valves (2-1/2 inches and larger at Pumps): To control surge pressures and resulting water hammer with spring-loaded bronze or alloy wafer style disc suitable for 150 psi CWP with Class 150 ANSI flanges. Valves shall be iron body, flanged, with bronze trim. F. Safety Relief Valves: Brass or bronze body with brass and rubber, wetted, internal working parts; to suit system pressure and heat capacity; according to ASME Boiler and Pressure Vessel Code, Section IV. G. Make-up Water Valves: Provide on cold water makeup piping to the hot water system, water pressure reducing valves to provide automatic filling of the systems. Pressure reducing valve shall be suitable for 250 psi CWP, with cast bronze body and bronze trim. Reducing valves shall be set to system fill pressure. 23 21 13-6 (45307035)

2.6 HYDRONIC SPECIALTIES A. Manual Air Vent: Bronze body and nonferrous internal parts; 150-psig working pressure, 225 deg F operating temperature; manually operated with screwdriver or thumbscrew; with 1/8-inch NPS discharge connection and 1/2-inch NPS inlet connection. B. Automatic Air Vent: Designed to vent automatically with float principle; bronze body and nonferrous internal parts; 150-psig working pressure, 240 deg F operating temperature; with 1/4-inch NPS discharge connection and 1/2-inch NPS inlet connection. C. Diaphragm-Type Expansion Tanks: Welded carbon steel for 125-psig working pressure, 240 deg F maximum operating temperature. Separate air charge from system water to maintain design expansion capacity, by a flexible diaphragm securely sealed into tank. Provide taps for pressure gage and air-charging fitting, and drain fitting. Support vertical tanks with steel legs or base; support horizontal tanks with steel saddles. Fabricate and test tank with taps and supports, and label according to ASME Boiler and Pressure Vessel Code, Section VIII, Division 1. D. Air Separators: Welded black steel; ASME constructed and labeled for 125-psig minimum working pressure and 240 deg F maximum operating temperature; perforated stainless-steel air collector tube designed to direct released air into expansion tank; tangential inlet and outlet connections; threaded connections for 2-inch NPS and smaller; flanged connections for 1-1/2-inch NPS and larger; threaded blow-down connection. Provide units in sizes for full-system flow capacity. E. Y-Pattern Strainers: 125-psig working pressure; cast-iron body (ASTM A 126, Class B), flanged ends for 2-1/2-inch NPS and larger, threaded connections for 2-inch NPS and smaller, bolted cover, perforated Type 304 stainless-steel basket, and bottom drain connection. F. Chemical Feeder: Bypass-type chemical feeders of 5-gallon capacity, welded steel construction; 125-psig working pressure; complete with fill funnel and inlet, outlet, and drain valves. 1. Chemicals: Specially formulated to prevent accumulation of scale and corrosion in piping system and connected equipment, and based on a water analysis of makeup water. 2. Chemical Piping: Construct of Schedule 40 PVC or stainless steel pipe as recommended by the chemical supplier. PART 3 - EXECUTION 3.1 PIPE APPLICATIONS A. Hot Water and Interior Geothermal Heat Pump System, 2-Inch NPS and Smaller: Use Schedule 40 steel pipe with Class 125/150 threaded joints or Type L drawn-temper copper tubing with soldered joints. 23 21 13-7 (45307035)

B. Hot Water and Interior Geothermal Heat Pump System, 2-1/2-Inch NPS and Larger: Use Schedule 40 steel pipe with welded and flanged joints or grooved mechanical joints rated at Class 125/150. C. Cold Water Make-Up Piping, All Sizes: Use Type L drawn-temper copper tubing with soldered joints. D. Condensate Drain Piping, All Sizes: Use Type L drawn-temper copper tubing with soldered joints and Type DWV fittings. 3.2 VALVE APPLICATIONS A. General-Duty Valve Applications: Unless otherwise indicated, use the following valve types: 1. Shutoff Duty: Use ball and butterfly valves. 2. Throttling Duty: Use flow control valves and balancing cocks. B. Install shutoff-duty valves at each branch connection to supply and return mains, at supply and return connections to each piece of equipment, and elsewhere as indicated. C. Install flow control valves and balancing cocks on the outlet of each coil, circulating pump and elsewhere as required to facilitate system balancing. D. Install drain valves at low points in mains, risers, branch lines, and elsewhere as required for system drainage. E. Install check valves on each pump discharge and elsewhere as required to control flow direction. F. Install safety relief valves as required by ASME Boiler and Pressure Vessel Code. Pipe discharge to floor without valves. Comply with ASME Boiler and Pressure Vessel Code, Section VIII, Division 1, for installation requirements. G. Install make-up water valves on domestic cold water piping to the hydronic system. 3.3 PIPING INSTALLATIONS A. Install piping according to Division 23 Section "Common Work Results for HVAC". B. Locate groups of pipes parallel to each other, spaced to permit applying insulation and servicing of valves. C. Install drains at low points in mains, risers, and branch lines consisting of a tee fitting, 3/4-inch NPS ball valve, and short 3/4- inch NPS threaded nipple and cap. D. Install piping at a uniform grade of 0.2 percent upward in direction of flow. 23 21 13-8 (45307035)

E. Reduce pipe sizes using eccentric reducer fitting installed with level side up. Lap joint stub ends are not permitted. F. Install branch connections to mains using tee fittings in main with takeoff out bottom of main, except for up-feed risers with takeoff out top of main line. G. Install unions in pipes 2-inch NPS and smaller, adjacent to each valve, at final connections of each piece of equipment, and elsewhere as indicated. H. Install flanges on valves, apparatus, and equipment having 2-1/2-inch NPS and larger connections. I. Install flexible connectors at inlet and discharge connections to pumps (except in-line pumps) and other vibration-producing equipment. 1. Three flexible type grooved joint couplings may be used in lieu of a flexible connector at equipment connections for vibration attenuation and stress relief. Couplings shall be placed in close proximity to the source of the vibration. J. Install strainers on supply side of each control valve, pump, and elsewhere as indicated. Install same size nipple and ball valve in blow-down connection of strainers. K. Anchor piping to ensure proper direction of expansion and contraction. 3.4 HANGERS AND SUPPORTS A. General: Hanger, support, and anchor devices are specified in Division 23 Section "Hangers and Supports for HVAC Piping and Equipment." Conform to requirements below for maximum spacing of supports. B. Install the following pipe attachments: 1. Adjustable steel clevis hangers for individual horizontal runs less than 20 feet in length. 2. Pipe Roller: MSS SP-58, Type 44 for multiple horizontal runs 20 feet or longer, supported on a trapeze. 3. Riser clamps to support vertical runs. C. Install hangers for steel piping with the following minimum rod sizes and maximum spacing: 1. NPS 3/4: Maximum span, 7 feet; minimum rod size, 1/4 inch. 2. NPS 1: Maximum span, 7 feet; minimum rod size, 1/4 inch. 3. NPS 1-1/2: Maximum span, 9 feet; minimum rod size, 3/8 inch. 4. NPS 2: Maximum span, 10 feet; minimum rod size, 3/8 inch. 5. NPS 2-1/2: Maximum span, 11 feet; minimum rod size, 3/8 inch. 6. NPS 3: Maximum span, 12 feet; minimum rod size, 3/8 inch. 7. NPS 4: Maximum span, 14 feet; minimum rod size, 1/2 inch. 8. NPS 6: Maximum span, 17 feet; minimum rod size, 1/2 inch. 9. NPS 8: Maximum span, 19 feet; minimum rod size, 5/8 inch. 23 21 13-9 (45307035)

10. NPS 10: Maximum span, 20 feet; minimum rod size, 3/4 inch. 11. NPS 12: Maximum span, 23 feet; minimum rod size, 7/8 inch. D. Install hangers for drawn-temper copper piping with the following minimum rod sizes and maximum spacing: 1. NPS 3/4: Maximum span, 5 feet; minimum rod size, 1/4 inch. 2. NPS 1: Maximum span, 6 feet; minimum rod size, 1/4 inch. 3. NPS 1-1/2: Maximum span, 8 feet; minimum rod size, 3/8 inch. 4. NPS 2: Maximum span, 8 feet; minimum rod size, 3/8 inch. E. Support vertical runs at each floor. 3.5 PIPE JOINT CONSTRUCTION A. Refer to Division 23 Section "Common Work Results for HVAC" for joint construction requirements for soldered joints in copper tubing; threaded, welded, and flanged joints in steel piping. B. Mechanical Joints: Assemble joints according to fitting manufacturer's written instructions. This option does not permit the substitution of valves, cocks, strainers, or other piping system specialties marketed by the mechanical joint manufacturer. Mechanical joints used on the project shall be the product of one manufacturer and shall be designed specifically for building hydronic heating and cooling systems. 1. Grooved joint couplings and fittings shall be installed in accordance with the manufacturer s written installation instructions. Grooved ends shall be clean and free from indentations, projections, and roll marks in the area from pipe end to groove. Gaskets shall be verified as suitable for the intended service prior to installation. Gaskets shall be molded and produced by the coupling manufacturer. The Contractor s field personnel shall be adequately trained in the use of grooving tools, application of groove, and installation of grooved joint products. 3.6 HYDRONIC SPECIALTIES INSTALLATION A. Install manual air vents at high points in system, at heat-transfer coils, and elsewhere as indicated or required for system air venting. B. Install automatic air vents at air separator, at inaccessible high points in the system, and elsewhere as indicated. C. Install in-line air separators in pump suction lines. Run piping to expansion tank with a 2 percent upward slope toward tank. Install drain valve on units 2-inch NPS and larger. D. Install diaphragm-type expansion tanks as indicated. Vent and purge air from hydronic system, and charge tank with proper air charge to suit system design requirements. 23 21 13-10 (45307035)

3.7 TERMINAL EQUIPMENT CONNECTIONS A. Piping size for supply and return shall be same size as equipment connections. B. Install control valves in accessible locations close to equipment. 3.8 FIELD QUALITY CONTROL A. Testing Preparation: Prepare hydronic piping according to ASME B31.9 and as follows: 1. Leave joints, including welds, uninsulated and exposed for examination during test. 2. Flush system with clean water. Clean strainers. 3. Isolate equipment that is not subjected to test pressure from piping. If a valve is used to isolate equipment, its closure shall be capable of sealing against test pressure without damage to valve. Flanged joints where blinds are inserted to isolate equipment need not be tested. 4. Install relief valve set at a pressure no more than one-third higher than test pressure, to protect against damage by expanding liquid or other source of overpressure during test. B. Testing: Test hydronic piping as follows: 1. Use ambient temperature water as testing medium, except where there is risk of damage due to freezing. Another liquid may be used if it is safe for workers and compatible with piping system components. 2. Use vents installed at the high points of system to release trapped air while filling system. Use drains installed at low points for complete removal of liquid. 3. Examine system to see that equipment and parts that cannot withstand test pressures are properly isolated. Examine test equipment to ensure that it is tight and that low-pressure filling lines are disconnected. 4. Subject piping system to hydrostatic test pressure that is not less than 1.5 times the design pressure. Test pressure shall not exceed maximum pressure for any vessel, pump, valve, or other component in system under test. Check to verify that stress due to pressure at bottom of vertical runs does not exceed either 90 percent of specified minimum yield strength or 1.7 times "SE" value in Appendix A of ASME B31.9, Code for Pressure Piping, "Building Services Piping." 5. After hydrostatic test pressure has been applied for at least 10 minutes, examine piping, joints, and connections for leakage. Eliminate leaks by tightening, repairing, or replacing components as appropriate, and repeat hydrostatic test until there are no leaks. 6. Prepare written report of testing. C. Use of pressurized air for testing of hydronic piping systems is strictly prohibited. 23 21 13-11 (45307035)

3.9 ADJUSTING AND CLEANING A. After completing system installation, including outlet fittings and devices, inspect finish. Remove burrs, dirt, and construction debris, and repair damaged finishes including chips, scratches, and abrasions. B. Mark calibrated nameplates of pump discharge valves after hydronic system balancing has been completed, to permanently indicate final balanced position. C. Flushing: Flush new hydronic piping systems with clean water prior to connection to existing piping system. Remove, clean, and replace strainer screens. D. Cleaning: 1. Hydronic system piping, circulating pumps, equipment and water passages shall be cleaned by circulating mixtures of trisodium phosphate, sodium carbonate or sodium hydroxide and water. Their preference is in the order named and should be used in the following proportions using a solution of only one type in the system: a. Trisodium phosphate, 1 lb. for each 50 gallons in the system. b. Sodium carbonate, 1 lb. for each 30 gallons in the system. c. Sodium hydroxide, 1 lb. for each 50 gallons in the system. 2. Fill, vent and circulate system with the solution. Allow solution to reach design or operating temperatures if possible. After system has been circulated for four hours, system shall be drained completely and refilled with fresh water. The system shall be thoroughly vented of air. 3. After cleaning and flushing hydronic piping system, but before balancing, remove, clean and replace strainer screens. E. Chemical Treatment: Provide a water analysis prepared by chemical treatment supplier to determine type and level of chemicals required to prevent scale and corrosion. Perform initial treatment after completing system testing. Water analysis shall be made after complete system has been cleaned. Two copies of each water analysis along with two copies of the treatment recommended, shall be furnished, one copy delivered to the Owner and one copy delivered to the Architect. The analysis shall be made by the approved feeder supplier. Chemicals for the initial filling of the system shall be purchased by the Contractor. Chemical containers shall be marked with the chemical name and appropriate hazard warnings as required by OSHA 29, CFR 1910.1200. 3.10 COMMISSIONING A. Fill system and perform initial chemical treatment. B. Check expansion tanks to determine that they are not air bound and that system is completely full of water. 23 21 13-12 (45307035)

C. Perform these steps before operating the system: 1. Open valves to fully open position. Close coil bypass valves. 2. Check pump for proper direction of rotation. 3. Set automatic fill valves for required system pressure. 4. Check air vents at high points of systems and determine if all are installed and operating freely (automatic type) or bleed air completely (manual type). 5. Set temperature controls so all coils are calling for full flow. 6. Check and set operating temperatures of heat exchangers to design requirements. 7. Lubricate motors and bearings. END OF SECTION 23 21 13 23 21 13-13 (45307035)