Map of erosion control sites is attached to this document.

Similar documents
VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Single most pervasive problem: Polluted runoff from watershed development

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

DITCH BANK STABILIZATION TECHNIQUES

STREAM ALTERATION PRACTICES

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

What Are Some Ways Erosion Can Be Managed?

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

SOIL EROSION COMBATING IS ESSENTIAL IN ORDER TO CONSERVE OUR VALUABLE SOIL RESOURCES

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

City of Yelm. Public Works Department. July 29, Re: Stormwater Maintenance Re-Inspection Results

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness.

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

2.1.4 Roof Downspout Rain Gardens

Town of Vershire Road Erosion Inventory Report

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

Riparian Restoration Plan for the Quiet Waters Homeowners Association Reach of the Yachats River. Site Overview

Restoration of Riparian Buffer at the Former Smelt Hill Dam Site, Falmouth, Maine

Tips for Maintaining and Enhancing Stormwater Management Areas

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

4.6. Low Impact and Retentive Grading

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

HYDRAULIC DESIGN involves several basic

5 TH ANNUAL CAPE COASTAL CONFERENCE

Stop Losing Ground to Erosion. Kimberly Laframboise Ecologist Michalski Nielsen Associates limited

Guidelines for Streambank Protection

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Subsurface Infiltration Bed

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

Chapter Six: Tree Removal and Erosion Control

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank.

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

BIORETENTION FACILITY

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Stormwater BMP and Stream Restoration in a City Park. Jeff Herr P.E., D.WRE Jill Stachura

Rain Gardens. A Welcome Addition to Your Landscape

2011 ASLA Design Awards. Coyote Gulch Honor Award and Land Stewardship Designation Valerian LLC. Environmental Restoration and Reclamation

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

EROSION & SEDIMENT CONTROL

Landfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting

SECTION 6. Routine Maintenance Activity Details

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

Bear Pond Watershed Survey Data Collected: May 2013 Map_Site Sector_Site Land_Use Problem UTM_East UTM_ North Location Area Recommend Impact Cost

Effects of Erosion. Grades 6-8

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION

Green Street Maintenance Program & Lessons Learned

Zoning Ordinance Chapter 10

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

ALOW VOLUME ROAD is considered a road

Table 4.7.1: Swales Potential Application and Storm Water Regulation

H841:02 Deep and severe erosion of roadside ditch to form gullies. H837:02 Deep erosion of roadside ditch

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Town of Corinth Road Erosion Inventory Report

6.1 Bioretention Areas

Conservation Landscaping Spot Check Inspection Checklist

C-10. Disconnected Impervious Surface

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

66-90 RIVER ROAD EAST RESIDENTIAL DEVELOPMENT BREMONT HOMES TOWN OF WASAGA BEACH OPERATIONS AND MAINTENANCE MANUAL. Prepared by: Phone:

Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. July 2013 Jill Stachura

2018 Iowa FFA Soil Judging CDE Exam 1. Landscape positions characterizes the location of the soil on the landscape and identifies potential risks.

Stormwater Outfall Inventory and Mapping City and Borough of Juneau

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN

Kickapoo Woods Restoration Plan

Property Owner s Guide to Creek and Shoreline Maintenance

Vegetating Disturbed Road & Stream Banks. By Mike Fournier NRCS Resource Conservationist

STORMWATER CONTROL OPERATION AND MAINTENANCE PLAN

Iowa FFA Soil Career Development Event 2008

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL

Monica Smith, PE President Robinson Engineering Company

Ponds of. Ballantrae

The Toe Wood Structure

MINNEHAHA GLEN FEASIBILITY STUDY

RIVER TRAINING STRUCTURES

Chagrin River Watershed Partners, Inc. Local Regulations. Amy H. Brennan (440)

Managing Erosion. What is erosion? Types of erosion. A guide for managing and preventing erosion on your farm

2008 SWMM, 2010 Revision City of Tacoma

Rangeland Health (Rangeland only)

Green Street Challenges and Design Considerations. Watershed Revegetation Program Bureau of Environmental Services

Section 3 Non-Structural BMPs

Design and Installation of Embedded Culverts

Coquitlam River Riparian Planting

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Lake and Stream Restoration Project

Best Management Practices

Master Plan Objectives and Policies

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

POST-FIRE RESTORATION Dos and Don ts

Soil Reclamation and Site Reinstatement

HOW TO CONTROL STREAMBANK EROSION

Transcription:

Engineers Without Borders Erosion Control Projects Communities of Malingua Pamba, Tunguiche, and Guantugloma Cotopaxi Province, Ecuador Ecuador Group, Denver Professional Chapter June 2017 Monitoring Update with Photolog Background: Prior to intensive land use, the mountainous areas of the indigenous Kwicha Andean communities of Malingua Pamba and QuintaTunguiche, Cotopaxi Province, Ecuador, were vegetated with dense cloud forest which held the soils in place, augmented water supplies and provided firewood, building materials, and food products. Construction of roads and water supply systems as well as increased farming of steep slopes have resulted in many areas of soil erosion as well as occasional slope failures. The Projects: The goal of the Erosion Control Team has been to empower the Community to implement and replicate low-cost and sustainable methods of erosion control based on locallyavailable materials. Erosion control work jointly conducted by the communities and EWB in 2012 and 2013 included: Native tree and shrub plantings to increase biodiversity Seeding of kikuyo, a naturalized African grass Planting of native sigsig grass hedges to promote water infiltration Installation of erosion control mats, both local and USmade Installation of live post and wicker grade control Construction of plunge pools, toe walls, rock vanes Construction of a discharge water spreader at a pressure break tank. The projects were the start of a major community erosion control effort, resulting in planting of 7000 trees and shrubs, according to community leader Paulino Sacatoro. The community over-plants sites to allow for attrition. Sites 16 and 96 need follow-up maintenance, and much revegetation work remains to be done. Conclusion: Overall, the project has resulted in benefit for the communities although much work remains. Soil stability has greatly increased at most sites due to survival of sufficient cover by native tree and shrub plantings and installation of erosion mats which have allowed establishment of volunteer native species as well as due to construction of live stake and boulder structures. No further road closures due to landslides have occurred. Problems remain where roadside drainage is poor, livestock grazing continues, or the site surface is bedrock. Map of erosion control sites is attached to this document.

Photolog of Erosion Control Sites Photographs by Laura Backus unless otherwise credited Site 9, Malingua Yacu, GPS coordinates -0.823090, -78.852570 Erosion Problem Heavy rains of 2011 caused landslide on slopes above stream. Debris and a large boulder washed into culvert inlet. High flows over-toped inlet and road. Culvert inlet Vegetation Project Activities planting survival Native tree and shrub plug Very low due to planting along 10 m of stream grazing. banks above the culvert. Removal of all material clogging inlet. Stability of culvert and road Structure and banks are stable Culvert remains open, flows are not over-topping the road. Functionality: 100% New erosion features Road closures due to erosion July 2012, pre-project. Note debris and large boulder from a landslide are clogging culvert inlet and forcing flows over the road. June 2017, 4 years following removal of boulder and debris. Water continues to flow freely through culvert; flows have not over-topped road.

Site 9, Malingua Yacu Culvert Outlet Erosion Problem Storm flows at the pipe outfall eroding the base of the road fill slope. Project Activities installation of boulder plunge pool at culvert outlet to dissipate energy of storm flows. Vegetation Excellent growth of volunteer chilca is stabilizing slope. Structures Boulder plunge pool effective, allowing chilca growth. Stability of road and culvert Functionality: 75-100% New erosion features Road closures due to erosion October 2012 view to north, pre-project. Note right side of wing wall is missing. Albert Kettner photo June 2017, view to north, 5 years post-project. Note that construction of the boulder plunge pool allowed stabilization of road slope and culvert outlet, thus allowing excellent growth of volunteers chilca which further stabilizes the infrastructure. October 2012, view to north, post-project. Note boulder plunge pool constructed to protect roadside from further erosion. Albert Kettner photo

Site 16 Tingo Water Spreader, GPS coordinates -0.827350, -78.8704 Erosion Problem Project Activities Stability of irrigation tank Gulleying from leaking pipe overflow pipe was threatening stability of irrigation system pressure break tank. Installation of perforated PVC pipe to spread out tank overflows. Improved New erosion features July 2012, pre-implementation. Note pipe outlet from Tanque Tingo overflow pipe leakage is causing gulley erosion. June 2017, view to north of Tanque Tingo and gulley from north gulley, about 60 m distance. Note development of shrubby vegetation in gulley below Tanque Tingo. October 2013, 1 year post-implementation of perforated PVC pipe to spread out overflows from tank. Note village has fenced out animals.

Site 16 North Gulley, GPS coordinates -0.827900, -78.870360 Erosion Problem Gulleying caused by leaking irrigation pipe, then by pipe breakage Project Activities Vegetation planting survival Stability of pipeline New erosion features October 2012 - planting native trees and shrubs, installation of erosion matting All plants washed out by pipe breakage. Pipe repaired in 2013; natural revegetation taking place Irrigation pipeline and reconstructed trail appear stable. Not known. Recommend replanting erosion gulley October 2012 post project. Note woody plantings in gulley below supported irrigation pipe. June 2017, 5 years post-implementation. Note that trail along irrigation pipeline has been reconstructed and woody vegetation is developing above gulley. October 2013 view across top of gully, 1 year post-implementation. Slump occurred when the pipe burst 2 days before photo. All plantings appear to have washed out. Albert Kettner photo

Site 16, South Gully (wicker weir #8), GPS coordinates -0.828000, -78.870450 Erosion Problem Gulleying caused by Irrigation pipe leakage. Project Activities Installation of live post and wicker grade control: lechero poles, sigsig grass hedges plus mats with woody plantings. Vegetation planting survival Low, but sufficient to greatly reduce erosion and promote volunteer species. Wicker weirs are effectively holding sediment. Stability of pipeline and gulley Functionality: 50-75% New erosion features Gulleying evident, pipeline at top of gulley is undercut. October 2013, pre-implementation, view up gully. Note sparse vegetation in gulley and unstable soils. Jen Walsh photo. March 2015, 1.5 years post-implementation. Note that wicker weir has held in place, vegetation cover increased. Same overhanging pine branch as 2013 photos. October 2013, view down gulley of construction of living wicker weirs. June 2017, 3.5 years post-implementation. Note both new gulleying from possible pipe problems / heavy rains and survival of stabilizing vegetation.

Site 18, Cachiyacu, Cut Slope GPS coordinates -0.820540, -78.82770 Erosion Problem Project Activities Vegetation planting survival Unstable volcanic subsoils slumping during heavy rains causing road closures. Native tree and shrub plantings, sigsig grass hedges on contour. Low, but sufficient to greatly reduce erosion and promote volunteer species. Grass hedges effective. Slope stability New erosion Road closures due features to erosion Functionality: 75-100% July 2012, pre-project. Note deep rilling, sparse vegetation following 2011 slumping and road closures. June 2017, 4.5 years post-project. Note greatly decreased rilling and increased vegetation cover by plantings and volunteer native species and invasive eucalyptus. October 2012, post construction.

Site 20 Facha Chimbusig (-0.81904, -78.8709) Cut Slope Erosion Problem Project Activities Structures Slumping during heavy rains causing road closures Installation of erosion mats, woody plantings, grass hedges, tree pole plantings to block animal access. Construction of boulder toe wall. Boulder retaining wall effectively held soils in place while plant roots developed. Vegetation planting survival Low, but sufficient to greatly reduce erosion and promote volunteer species. Grass hedges grew well. Slope stability Functionality: 75-100% New erosion features Road closures due to erosion October 2012 Pre-project. Note almost barren slope. Slump debris at toe along roadway. June 2017, 5 years post-construction. Note very good growth of native acacia trees, sigsig grass hedge, good vegetation cover. Retaining wall remains in place, stabilized by volunteer plantings inbetween boulders. October 2012 Project Construction. Note children helping to sew local erosion mats, installation of donated map.

Site 20 Facha Chimbusig, slope below road Erosion Problem Project Activities Vegetation planting survival Structures Slope Stability Steep, unstable slope below road. Sand bags are shoring up area of water draining from road and cut slope. Installation of erosion mats with native woody plantings, grass hedges along contours. Construction of boulder step pools in sandbag area. Low, but sufficient survivorship to stabilize slope. Grass hedges grew well. Some eucalyptus invasion. Step pools effective in stabilizing slope while plant roots developed. Functionality: 75-100% New erosion features Road closures due to erosion July 2011, assessment trip, view to NE. Note active erosion and placement of sand bags below the road, white road culvert on left. Will Mahoney photo June 2017, 4.5 years post-implementation, view to NE. White road culvert shown in 2011 photo is at left. Note very good growth of trees, much increased vegetation cover contributing to increased soil stability, some volunteer invasive eucalyptus. Enma Sacatoro photo October 2012, Project Construction, view to SW. Erosion mats and sigsig hedges in center; boulder step pools at lower left.

Site 32 Carretera a Pucará (coordinates -0.822800, -78.851680), Big Cut slope Erosion Problem Project Activities Vegetation planting survival Slumping road cut causing road closures Installation of erosion mats with woody plantings, grass hedges along contours. Low for woody plantings, but sufficient to greatly reduce erosion and promote volunteer species. Grass hedges are vigorous, not palatable to sheep. Slope stability Functionality: 75-100% New erosion features Road closures due to erosion October 2013, project implementation. Sewing local erosion mats into one wide mat. June 2017, 3.5 years post-implementation. Note development of shrubby plantings and volunteer plants, good growth of sigsig grass hedges. October 2013, project implementation. Note Installation of erosion mat, sigsig grass for contour hedges staged at bottom of slope, sheep along road.

Site 96 Alcantarizado de Malingua, GPS coordinates -0.822480, -78.865660, Channel Below Culvert Outlet Erosion Problem Project Activities Vegetation planting survival New erosion features Culver storm water discharge threatening adjacent house Installed woody plantings and erosion mats along slopes of channel below culvert outlet. Placed log and boulders at toe of side slopes to stabilize soils during plant establishment. Low, but sufficient survivorship to stabilize sides of channel, especially with Invasion of Scotch broom. Upper channel is stable, as well as sides of lower channel. Grading of slope and removal of soil above culvert inlet have changed drainage pattern. Culvert is nearly filled with sediment. Functionality: 75-100% Road closures due to erosion Owner of house is building 2 nd house adjacent to channel. October 2012, pre-project, view across drainage below culvert. Note active erosion of drainage bank adjacent to house. A Kettner photo June 2017, 4.5 years post-implementation. Note vigorous vegetation growth, especially of non-native Scotch broom, has stabilized channel sides, house is intact. October 2012, project implementation.

Site 96 Alcantarizado de Malingua, Lower Drainage Channel Erosion Problem Downcutting from culvert storm water discharge Project Activities Installed woody plantings along banks. Constructed cross-vanes, boulder plunge pools, infiltration trench at channel terminus. Vegetation planting survival Low, but sufficient survivorship to stabilize sides of channel. Structures Plunge pools intact, very effective. Very little remains of cross-vanes except for largest structure at low end of channel. Fate of cross-vanes is unclear. Channel stability Functionality: 75-100% above cross-vane, 50-75% below cross-vane. Changed conditions due to slope cutting above culvert. New erosion features Sides of lower channel are stable. In-channel downcutting below remaining cross-vane. Natural gulley below the channel could be at risk during very high flows. July 2012, pre-project, view up drainage. Note actively eroding channel walls and extensive sand deposition. March 2015, 2.5 years post-implementation. Note increased plant growth, probably due to cessation of grazing and possibly reduction of scouring flows. October 2012, post-implementation. Note 3 of the 4 cross-vanes in lower channel, 2 step pools above in upper channel. Matt Barbian photo June 2017, 4.5 years post-implementation. Note good shrub growth at channel sides, downcutting in potato field occurring below remaining cross-vane.

Selection of Community-Initiated Projects Watershed of Rumi Checka Potable Water Source Springs To protect their potable water source with its organic black soil, the community of Guantugloma has purchased the watershed and installed fencing and native plants grown in their own nursery started in 2013. They plan to complete the fencing to keep out sheep and continue to plant native species to protect the soil and provide a source of edible berries. July 2012, view up watershed prior to potable water project undertaken with EWB. June 2017, Note removal of most yaugal in upper watershed to limit their water use, natural revegetation taken place in uppermost watershed, grazing sheep which were chased out. March 2015, Note yaugal plantings along foreground fence and upper watershed. June 2017. Estalin Toaquiza planting native chilca shrubs to protect watershed soils.

Elvia Ante s Plantings at Malingua Pamba Hostel October 2013, Elvia Ante and husband Paulino Sacatoro participate in planting the eroding cut slope adjacent to their hostel. June 2017, Chilca and acacia negra plantings have grown well, increasing slope stability.

Ignacio Sacatoro s planting project along road to Pucará October 2013. Sr. Sacatoro s students at the Malingua Pamba high school planted native trees and shrubs to stabilize the edge of the road. June 2016, Enma Sacatoro s planting project on new fill slope June 2016, Malingua Pamba high school students plant native woody species to stabilize a new slope constructed of fill material. June 2017, low planting survivorship, but grasses are beginning to stabilize slope.

Erosion Control Sites Engineers Without Borders & Communities of Malingua Pamba Area Cotopaxi Province, Ecuador Chimbusig Site 20, Facha Chimbusig Map Key Community Erosion Control Site Stream North Site 18, Cachiyacu Site 96, Alcantarizado de Malingua Site 9, Malingua Yacu Malingua Pamba Quinta Tunguiche Quebrada Yanarumi Site Tanque Tingo Sites 16 North & South, Tubo de Riego Site 32, Carretera a Pucará Rio Toachi Pucará Guantugloma