TLA-1245 EFFICIENT HEAT CYCLE SHRINK TUNNEL OPERATION MANUAL
Contents 1. Introduction... 3 1.1 Features... 3 1.2 Specifications... 3 2. Installation... 3 3. Machine explosion drawing... 4 4. Equipment operation... 4 4.1 Operating panel introductions... 4 4.2 Operation flow... 5 5. Common faults and eliminations... 5 5.1 The conveyor belt doesn t work... 6 5.2 No hot air or insufficient air flow... 6 5.3 No heat or insufficient heat... 6 6. Maintenance... 6 6.1 Maintenance instructions... 6 6.2 Conveyor belt roller maintenance... 7 6.3 Conveyor belt motor maintenance... 8 6.4 Heating tubes maintenance... 8 6.5 Blower motor replacement... 9 6.6 Air flow adjustment... 9 7. Technical Service... 10 8. Items not belong to warranty scope... 10 9. Electrical Parts list(attachment)... 11 10. Equipment diagrams(attachment)... 11
1. Introduction Thank you very much for using our company's product, TLA-1245 high performance shrink tunnel, please read this manual completely before operating it. TLA-1245 high performance shrink tunnel can be widely used in food industry, chemical industry, electronic industry and so on, used to perform the shrinking package of the products. 1.1 Features 1) Thermal circulation system using heat integrated design, rapid temperature raise up. 2) SSR and PID control, small temperature tolerance and long working life. 3) Conveyor belt speed controller adjustment, stable transport speed can be adjustable and suitable for the shrinking package of the heavier products. 4) On both sides lateral and bottom air flow direction is adjustable, stable temperature in tunnel, especially suitable for difficult shrinking materials such as the environmental protection composite POT membrane. 5) Heater drawer design. 6) Insulation layer between heating zone and outer skin of about 100mm to minimize heat loss. 7) Live roller design make the bottom shrinking more perfect. 8) Adopt designs of openable tunnel cover, Teflon mesh belt, cooling fan at the tunnel exit according to customer needs. 1.2 Specifications TLA-1245 power Total power Max current Chamber size (L W H) 380V/3PH 11KW 13A 1200X450X 220V/3PH 11KW 23A 300MM 2. Installation Machine size (L W H) 18450X1100 X1250MM 2.1 The machine requires the electricity of three-phase 380VAC and above the required current with ground connection(three live wires, one neutral wire, one ground wire). 2.2 The equipment should be installed on the dry and plain ground, adjust the foot cups of the machine to keep it in a basic horizontal position. Caution: The machine must be safety grounding! Note: the machine must be grounded!
3. Machine explosion drawing 4. Equipment operation 4.1 Operating panel introductions Both of inside and outside of the machine must be cleaned up before or after operating. Name Function START HEATER EMERGENCY STOP POWER LAMP RUN LAMP Start the machine Switch on the heater Press it down, machine stops immediately. To restart the machine, it should be released. Power lamp Machine running lamp
TEMPERATURE CONTROLLER CONVEYOR SPEED ADJ. BLOWER SPEED ADJ. Adjust the temperature parameters, control temperature Adjust conveyor speed Adjust blower airflow 4.2 Operation flow Notice: Inspect all screws on machine carefully before you turn it on, especially the screws on moving parts must be tightened(some screws may be loose during the transportation). If any loose screw is found, please tighten them before you turn on the machine, otherwise it may do damage to the machine if you turn on the machine directly. 1) About 10 minutes before using, firstly open the power switch. Turn the switch to the ON position, the conveyor belt and blower begin to work, the temperature controller will display the temperature, and the speed controller will show the conveyor belt and blower speed control frequency. Then turn on the heater switch to preheat the tunnel. 2) According to the product characteristics, set the transportation speed. Different values from various transportation speeds (depend on the product sizes and the sealing speed), at first set it in the middle position. After you have selected optimum transportation speed, in order to find the appropriate shrinkage temperature under the required speed by repeating actions. 3) The heating temperature must match the conveyor speed properly, the faster the conveyor is, the higher the heating temperature is. According to the optimum shrinking results to increase or decrease the temperature during certain product commissioning, record this corresponding temperature value, avoid the repeating commissioning in the next time production. PVC film heating temperature is generally between 120~150, POF film is between 145~160. Delivery speed should cooperate with the production line requirement. 4) Operation: Place the packaged product with film wearing on the top of the shrinking entrance on the conveyor belt, the conveyor will deliver the packaged product to the shrinking tunnel and perform the film shrinking, then send the packaged product out. 5) Stop: Before turning off the running switch, turn off the heater switch firstly, only after temperature has dropped below 70 can stop the whole machine. 5. Common faults and eliminations In abnormal situation, please cut off the power supply before performing the machine maintenance, the following is a common faults and eliminations:
5.1 The conveyor belt doesn t work 1) Check whether the main breaker QF1, QS1 and QF3 on the front panel is damaged. 2) Check whether the speed controller is energized, the output value is in the normal position. 3) Removed the protective covers of both ends to see whether the product is jammed or roller gets stuck, if roller is damaged, take it out to repair or replace according to the following instructions. 4) Check the chain and bearing lubrication situation, if it is rusty, need to loosen the chain and chain wheel, lubricate the bearing inside or replace the bearing. 5) Check no loose chain and chain wheel not contact to the machine shell. 6) Check U2, V2 and W2 three-phase wire have energized, if there is electric but motor does not work, need to replace the motor. 7) If above all are normal, need to replace the motor or contact the manufacturer. 5.2 No hot air or insufficient air flow 1) Check whether the main breaker QF1, QS1 and QF2 on the front panel is damaged. 2) Check whether the air outlet is blocked by the shrinking film, if so, need to take out the tunnel cover plate to clean. 3) Check whether the fan is in normal working. a. Check whether the U1, V1 and W1 wire is loose. b. Check whether there is the voltage on U1, V1 and W1, if so, but the blower doesn t work, need to replace the blower. 2. Check whether the fan blades of the hot-air blower loose from the spindle. 5.3 No heat or insufficient heat 1) Check whether the main breaker QF1, QS1 on the front panel is damaged. 2) Check whether the blower and the conveyor belt is normally running, if normal, check whether the heater switch SA2 and solid state relay SSR1 KM1 is damaged, if abnormal, check whether SA2 is damaged. 3) Check whether the temperature controller is damaged, if damaged, need to replace. 4) Check whether the wires of the SSR1, KM3 to TC1 is loose, if not, check whether the heater wires is loose. 5) Check whether the heating tubes of the heater is burned, if burned, need to removed the protective covers of both ends to replace the heating tubes. 6. Maintenance 6.1 Maintenance instructions 1) Advise every month use high temperature lubricating oil to lubricate conveyor chain. When conveyor belt running speed distinctly slow down, use a soft brush with the lubricating oil to the belt chain. 2) Before applying the silicone grease on roller, please be sure to check whether the shrinkage tunnel is stained with the scrap film. If so, make sure not to use a sharp tool
to do the damage to the roller, but use smooth without burrs special tool to remove the scrap film. 6.2 Conveyor belt roller maintenance 1) Please be sure to disconnect the power supply before the maintenance. 2) Remove the tunnel lateral side cover at the bottom of the machine. 3) Loosen the adjustment screws of the conveyor belt, adjust the slide board up and down until the conveyor belt tension is proper(at this moment, the chain up or down is loose), then you can take apart the roller. 4) Carefully open the roller along with the side sealing opening. 5) Cleaning all rollers removed, stainless steel wool brush, make sure no residue or sharp stuff attaching on the surface of the rollers after cleaning the rollers. 6) Wiping the rollers after cleaning, wear the roller frame through the roller center hole and install the chain and lock. 7) Tighten the chain. 8) Too tight or loose the sprocket and the roller chain will make noise while the roller running. Before the tension adjustment, please be sure to cut off the power supply.
6.3 Conveyor belt motor maintenance 1) Please be sure to disconnect the power supply before the maintenance. 2) Remove the tunnel lateral side cover at the bottom of the machine. 3) Take apart the drive motor cables, carefully remove the fixed screws at four corners of the motor. 4. Replace the old motor with a same new model motor if required, and perform the wiring according to the drawing. 6.4 Heating tubes maintenance 1) Please be sure to disconnect the power supply before the maintenance, when the temperature drops to 20 perform the maintenance, in case of the safety accidents such as electric shock, burns, etc.. 2) Replace the heating tubes a. Disassemble the heating tubes window screws on the back of the machine. b. Pull out the heating tubes and perform the heating tubes replacement. c. Inspect the heating tubes box, check whether the heating wire is serious black or broken, if so, remove them and replace with the new and same specification heating tubes.
6.5 Blower motor replacement 1) Please be sure to disconnect the power supply before the maintenance. 2) Disassemble the motor cables. 3) Take apart the roller(about 10pcs) on the top of the blower along with the side sealing opening carefully. 4) Take apart the blades fixed screws inside the tunnel, and take out the blades (use a wrench fix the motor shaft when taking out the blades). 5) Carefully remove the fixed screws at four corners of the blower motor. 6) Take out the motor in the downward direction, carefully take out the motor put it on the horizontal ground, perform the maintenance or replace with the new and same specification motor. Attention: Please remember the installation before disassemble the blower motor, for the recovery after a new motor installation. 6.6 Air flow adjustment 1) The lateral air flow adjustment a. Rotate the lateral side air flow adjustment valve. b. When rotating to level state, get the strongest side air flow and the weakest top air flow. c. When rotating to vertical state, get the strongest top air flow and the weakest side air flow. d. Air flow adjustment on the right is the same as the left side.
2) Bottom air flow adjustment a. Rotate the bottom air flow adjustment hand wheel. b. When clockwise rotating the bottom air flow increase, ventilation gap increases gradually, when the maximum bottom air flow, the largest gap. c. When counter clockwise rotating the bottom air flow decrease, ventilation gap gradually decrease, when the minimum bottom air flow, gap to zero. 7. Technical Service Our company provide after-sales technical services,under the situation of proper use and maintenance of products. 1) Warranty, one year warranty from the date of delivery, life-long repair. 2) Replacement parts at preferential price, provide extended function service and corresponding technical support. 8. Items not belong to warranty scope 1) Damage due to the user's improper use, maintenance, transportation and storage.
2) The machine has been supplied incorrect power supply. 3) Damage is caused by Force Majeure such as natural disasters. 4) Exceed warranty period. 5)The machine is not been fully paid. 9. Electrical Parts list(attachment) 10. Equipment diagrams(attachment)