University of Illinois Business Instructional Facility LEED Gold Design. University of Illinois Business Instructional Facility

Similar documents
University of West Florida s New School of Science and Engineering Building Adheres to PKAL Principles

Beaufort County Community College. Maintenance and House Keeping Plan

CITY OF VIRGINIA BEACH PLANNING COMMISSION DESIGN AWARDS PROGRAM 2012

LEED 2009 for New Construction and Major Renovation

F.W. Olin Physical Science Laboratory

Federal Way Public Schools Support Services Center 1211 S 332 nd Street Federal Way, WA Federal Way Public Schools Completion Fall 2012

Problems Air and Water Distribution Systems

2012 Exhibition of School Planning and Architecture. North Toronto Collegiate Institute Redevelopment (NTCI)

Technical Report Three

PROJECT INFORMATION UNBUILT PUBLIC LIBRARY LATE 2017 TYPE II-B CONCRETE MASONRY WEATHERING STEEL GLASS GABION WALLS $6.4 MILLION 13,000 SF

Denver s Green Building Ordinance

Technical Assignment 3

Higher Education Energy Efficiency Partnership Program BEST PRACTICES AWARDS

2014 Exhibition of School Planning and Architecture

Diamond Schmitt Architects MEDIA RELEASE November 24, 2011

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

UFAD and Displacement Ventilation. Dan Int-Hout, FASHRAE Chief Engineer Krueger Richardson, Texas

BAINBRIDGE ISLAND MUSEUM OF ART

SUSTAINABILITY IN THE BUILT ENVIRONMENT

3.2.4 OFFICE FACILITIES

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center

Save Money Save The Planet Appeal to mainstream America with functionality and style that fits into the traditional neighborhood

FIRE SAFETY POLICY. Date approved: 28 September 2018 Approved by:

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Pre-seen case study for Strategic level examinations Papers E3, P3 and F3. For examinations in May 2014 and September 2014

Elm Hall Student Housing

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005

2014 Exhibition of School Planning and Architecture. White Hill Middle School Campus Master Plan & Design. Ross Valley School District Fairfax, CA

GREEN BUILDING AT EVERGREEN SEMINAR II BUILDING

Executive Summary. Houston Museum of American Art New York, New York

Annex 2 - Shelter-in-Place

PALOMAR COLLEGE LEARNING RESOURCE CENTER

Lighting Control Strategies. to meet code requirements save energy and improve building performance

ENVIRONMENTAL ETHICS AND PROJECT MANAGEMENT OF ARCHITECTURE

REPORT CARD TO THE COMMUNITY MAY 15, 2018

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

Today s Topics. Is Preservation Sustainable? Environmental Benefits of Preservation. Other Benefits of Preservation. Common Issues and Questions

PROJECT DESCRIPTION & INTRODUCTION

USGBC Illinois Chapter Chicago South Suburban Branch

Marketing to Architects and Designers

Expansion Project. The Team. Metrics. Replace. Express Svcs. Parking Garage. 380 stalls. Architects: GSDC (CKA/GBJ)

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE

ESL-IC Smart Room Control

Phase 1 : Understanding the Campus Context. Phase 2 : APPROACHES - Alternates & Preferred Plan

THEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC

Electronic Safety and Security

Program Summary: A church designed as a simple, contemporary worship space to attract younger members to an aging congregation.

Earn leed points when you build with light

The Ed Roberts Campus

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

The David Wilson Library, University of Leicester, UK

Green Affordable Housing

Carleton University. Nicol Building New Sprott School of Business. Design Brief and Planning Rationale. Carleton University

Standards: Issues and Challenges

Jim Aswegan Chief Engineer

TEAM 6 NWARAMBILLI UGBODE

Office Furniture Standards

BID INFORMATION LIST Crossroads East N. Scottsdale Road, #105 Scottsdale, AZ Rev

Gene Green Beltway 8 Park

Air Conditioning and Refrigeration

A Survey of Green Remodeling

A Sustainable Built Environment for All

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

BASIC INFRASTRUCTURE CONT. & TRAD.

Duke University Medical School. Duke School of Nursing

ZERVAS SCHOOL BUILDING COMMITTEE and DESIGN REVIEW COMMITTEE - UPDATE Zervas Elementary School Newton, MA June 4th, 2014

Loebl Schlossman & Hackl

r.w. kern c e n t e r R. W. Kern Center OPENING WINTER 2015 / 2016 Bruner/Cott architects and planners

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Sustainable Building Solutions. We Protect People, Places and the Planet

CEFPI James D. MacConnell Award

InItIate Workstations SMART, SuSTAinAble WORKPlACeS START HeRe a

Orchard Commons will target social, environmental and economic sustainability, with a minimum LEED Gold certification.

Multi-Family Green Building Programs. Chris Johnson Johnson Environmental Subsidiary of, Integro Services Group, Inc. Engineers and Architects

Fire safety procedure

2007 Foggy Bottom Campus Plan

The REALTOR. Building 500 NEW JERSEY AVENUE, NW WASHINGTON, D.C

Hultquist IP Building

Design Standards. Green Development. Shadow Studies. Standards. July 2010 Updated October 2014

CONSTRUCTION DOCUMENTS CHECKLIST

DESIGN GUIDELINES & STANDARDS. August UNIVERSITY of DELAWARE

State College Area School District Office of Physical Plant Ed Poprik, Director

Agriculture/Park and Landscape Management Defi nition Program Learning Outcomes Environmental Horticulture Staff Landscape Construction

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

FACILITIES MANAGEMENT

Dates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000

PRODUCTS TAO TAO PRODUCT: ADVANCING THE SCIENCE OF AIR DISTRIBUTION. temperature ambient optimizer. Redefine your comfort zone.

THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Designing an outdoor stage with a dike to be a landmark for the Art and Culture Nakhorn Ratchasima Rajabhat University

Tech Report. September 9,

Session Handout. Title

THE COMMITTEE ON BUILDINGS AND GROUNDS SHALL CONSIDER AND MAKE RECOMMENDATIONS ON ALL MATTERS RELATING TO THE BUILDINGS AND GROUNDS OF THE COLLEGE,

November/December 2006 Kevin Shanley, President, The SWA Group

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

Revolutionizing Green Roof and Green Wall Performance: The Living Architecture Performance Tool

Transcription:

LEED Gold Design University of Illinois LEED Gold Design

Keys to success: Sustainable design strategies included early. Clear and early benchmarking choice. Integrated design process. Consensus building.

Keys to success: Sustainable design strategies considered early: Feasibility Study included: Sustainability listed as one of six main Project Goals Sustainability Statement / Executive Summary Preliminary LEED checklist review identified point/leed certification level options Design Strategies considered and described.

Keys to success: Clear and early benchmarking choice: LEED for New Construction v. 2.1. Project Registered. Early strategy: set target at high Silver Regular checklist reviews identified new opportunities for integrated design decisions leading to additional points. All options for sustainable design were considered decisions were NOT based on achievability of LEED points. Regular review of life cycle cost analysis and energy model helped identify additional strategies / points.

Keys to success: Integrated design process followed from the outset. Design Team / Design Strategy integrated from outset. Environmental Consultant was key to successful integration. All sub-consultants present for virtually all design meetings. Regular review of life cycle cost analysis and energy model. Owner / occupant participation. Specialized consultants included: Environmental Design Sustainable Lighting Design Sustainable Landscape Design Acoustical Design

Integrated design -Who / What are you integrating? University of Illinois University Facilities Planning Office Board of Trustees Urbana-Champaign Campus College of Business Dean Director of College Facilities Director of College Finance Department / Unit heads Teaching Faculty Students Support Staff Campus Design Review Committee Committee for a Sustainable Campus Environment

Urbana-Champaign Campus (cont.) CITES Classroom Technology Facilities and Services Executive Director Planning Project Planner Campus Architect Landscape Architect Financial Director Construction Design / Technical Reviewers Architectural HVAC Plumbing Fire Protection Code compliance / Life Safety reviews Environmental Compliance reviews Trades / Specializations Grounds Security Lighting HVAC Controls Furniture shops

Outside Consultants / Contractors Design Team Design Architect Architectural / Structural / Civil Mechanical / Electrical Engineer Environmental Engineers Landscape Architect Acoustical Engineer Lighting Designer Manufacturer s representatives Lighting Controls Green Roof Design Displacement Air Systems

Construction Management Pre-bid team LEED specialist Feasibility / Cost reviewers Bid package development Construction team Project Manager Site Superintendent Temperature Control Assistants Test and Balance Concrete Prime Contractors (15) Drywall General Work Masonry Plumbing Roofing Heating A/C Site Work Ventilation Structural Steel Electrical Windows Sprinkler Subcontractors too many to list

Keys to success: Consensus building: throughout the entire design process: Environmental Consultant key to educating an inexperienced client. Continuous checks and balance review Variance Process Commissioning and Inspection Energy Model / Life cycle cost analysis Technical rigor critical. Leveraging existing beliefs - sustainable building is simply good building practice taken to the next level. Understanding that it is a good idea to different people for different reasons and that is OK!

Site Location Plan University of Illinois LEED Gold Design

Project Site Plan University of Illinois LEED Gold Design

Section: North Wing at Commons University of Illinois LEED Gold Design

Commons: View from 3 rd Floor west side. University of Illinois LEED Gold Design

Section: East Wing University of Illinois LEED Gold Design

Early Daylighting Model: Typical Classroom University of Illinois LEED Gold Design

Energy Model: Daylight Sensor Study University of Illinois LEED Gold Design

Daylighting Study: Tiered Classroom University of Illinois LEED Gold Design

Wall / Window Section Study University of Illinois LEED Gold Design

Operable Casement Windows Triple Glazed with Interstitial Blinds University of Illinois LEED Gold Design

Perimeter Heat - Eliminated at Casement Window Locations Mean Radiant Temperature Model University of Illinois LEED Gold Design

Schematic Design Primary Air Handling Unit (AHU) University of Illinois LEED Gold Design

Energy Model: Outdoor Air Economizer University of Illinois LEED Gold Design

Concept Sketch: Displacement Ventilation in tiered classroom University of Illinois LEED Gold Design

Energy Model: Displacement Ventilation Monthly Energy Consumption Mixed Ventilation Option Displacement Ventilation Option University of Illinois LEED Gold Design

Energy Model: Displacement Ventilation Annual Space Cooling Energy Consumption University of Illinois LEED Gold Design

Green Roofs University of Illinois LEED Gold Design

We now understand that this Is not this.

LEED Checklist

LEED Checklist

LEED Checklist

LEED Checklist

LEED Checklist

LEED Checklist

LEED Checklist

LEED Checklist

LEED Checklist

LEED Checklist

The final energy savings is 51% over ASHRAE 90.1-1999 in terms of energy cost. (In terms of energy use, the savings is 47% over ASHRAE). The PVs provide 4.7% of the building's annual energy use which earns 1 credit. 83% construction waste diversion (this number probably dropped in the last months of the project - this is from April of this year). 15-23% recycled content 50-75% local manufacture 40-70% local harvest 2% rapidly renewable (doesn't earn the LEED credit) 60% FSC wood Met all low-emitting materials credits Innovation credits sought are: Greatly exceed SSc7.1, heat island effect non-roof Greatly exceed EAc6, Green power (100% green power for 2 years) Greatly exceed MRc5, local materials Green building education Other innovations were revisions to the University standards (based on our variances), future raw water use, and green furniture.

Construction Manager s comments: Huge learning curve for contractors (no prior LEED experience) First project for Construction Management site team Learned a lot about forms and how to use them Learning curve to find recycling facilities for construction waste (drywall, brick, CMU) Confusion about VOC s and where they are allowed (outside vapor barrier but this is ill-defined on docs.) LOTS OF PAPER!!!! Communication is key to end use success (space heaters) Lighting control issues (ballasts) Imported items from oversees (diffusers, some stone) Comments on landscaping Comments on heat gain in Commons

Sustainable design items from design that didn t happen Light shelves eliminated Dual flush toilets Intensive green roof area became extensive (wrong roof deck specified) Window set-back Green cleaning?

Design Team comment: Durability of materials a key element in sustainable building design that is not always understood by contractors (example: veneer used where solid wood was called for)

Not ready for prime time yet:

.

University of Illinois LEED Gold Design